    Brazilian Market – INMETRO An Overview and the better solutions for INMETRO certification process

    MEDICAL DEVICES – CERTIFICATION PROCESS

    External Webinar | Andréa Aparecida de Souza | 09/11/2020 (Version 1)

  • 2

    Guest speaker

    Andréa Aparecida de SouzaTeam Leader – Medical Devices

    SGS

    [email protected]

    Andrea is electronical technician, graduated as Physicist and

    have got MBA in Engineer & Management of Quality. Also had

    been working during 13 year doing safety/electrical evaluation

    in an important Brazilian laboratory (IPT).

    Andrea Souza has more than 12 years experience in

    certification process according to Brazilian rules for active

    Medical Devices. Since 2009 she´s working at SGS, and

    currently she is leading the SGS Brazilian team, supporting all

    technical aspects in certification process of Medical devices.

  • 3

    Agenda 01 INMETRO process - Overview02 INMETRO - Current regulation

    03 INMETRO – process in 3 steps

    04 Questions

    © SGS Société Générale de Surveillance SA –

    2020 – All rights reserved - SGS is a registered

    trademark of SGS Société Générale de

    Surveillance SA

  • 4

    INMETRO – Orverview

    ▪ Main stakeholders

    • ANVISA - The National Health

    Surveillance Agency

    • INMETRO - National Institute of

    Metrology, Standardization and Industrial

    Quality

    • OCP - Organization of Certification of

    product (SGS!)

    • Importer (Brazilian Representative)

    It is essential know these stakeholders!

  • 5

    INMETRO – Orverview (cont.)SGS Group can offer all

    support on the activities

    needed to get the

    INMETRO certificate!

  • 6

    INMETRO – Current Regulation

    ▪ ORD Nr. 54 + ORD 544 (+ ORD118) (issued

    by INMETRO)

    • It defines the entire procedure with the main

    requirements of the product certification

    process.

    ▪ Resolution RDC 27 (issued by ANVISA)

    • Complementary for the product certification

    process.

    ▪ Normative Instruction IN: Nr 49 (issued by

    ANVISA)

    • All standards required in the process are listed

    here.

  • 7

    INMETRO – Current Regulation(cont.)

    ▪ ORD Nr. 111 (issued by INMETRO)

    • It defined complementary rules due the

    pandemic situation (expired).

    ▪ ORD Nr. 225 (issued by INMETRO)

    • It defines complementary rules due the

    pandemic situation.

    “ INMETRO: NEW MODEL OF REGULATION”

    No news on this subject, but SGS team is always

    monitoring to provide any important updating, if any.

    Rules issued due the Pandemic situation!

  • 8

    INMETRO Process – 3 steps

    • 1st step: Send the application form filled out, plus the user manual of the product: mainly, this form requires information related to Manufacturer/Applicant, Brazilian Representative etc. In case of any doubt you can account with our support for clarifications.

    Step 1

    • 2nd step – It is mandatory that We get a contract with the Brazilian Representative mentioned on the application form, before starts the process.

    Step 2

    • 3rd step – We are ready to starts! And then the applicant/manufacturer must send all documentation listed in our checklist of documents! This documents must be collected by SGS Affiliates or sent directly by the Manufacturer/Importer to SGS Brazil. The communication with the manufacturer will be done by the affiliates, only when the project was sold by Affiliate. Only SGS Brazil approve and issue the certificate.

    Step 3

  • 9

    INMETRO Process – Turn Around Time - 10 Workdays!

    1st Technical

    Analysis

    TECHNICAL ANALYSIS of

    the package of documents

    must be done in 05 WD

    3rd DRAFT of the

    certificate is sent to the customer´s approval 01

    WD.

    2nd Technical

    review/Approval

    The TECHNICAL REVIEW

    must conclude it in 04WD

    Important

    It´s mandatory send the

    complete package to

    consider this TAT. And if

    the package is rejected

    the time restarts.

  • 10

    Questions?Emailto:

    [email protected]

    © SGS Société Générale de Surveillance SA – 2020 – All rights reserved -

    SGS is a registered trademark of SGS Société Générale de Surveillance SA

  • 11

    The INMETRO process is not

    monster, only a bit complex on

    the rules, and heavy on the

    amount of documentation

    evaluated. But you need only

    high-energy and SGS!

    Andrea Aparecida de Souza

    MD team leader

    SGS

  • 12

    Thank you!Do you have any additional questions?

    [email protected]

    +55 11 95654 2080

    www.sgs.com

    © SGS Société Générale de Surveillance SA – 2020 – All rights reserved -

    SGS is a registered trademark of SGS Société Générale de Surveillance SA

    mailto:[email protected]://www.facebook.com/sgshttps://www.linkedin.com/company/sgshttps://www.instagram.com/sgsglobal/https://twitter.com/SGS_SAhttps://www.youtube.com/user/sgseditorhttps://www.slideshare.net/SGSgroup