Page 1 of 10 MEGA ENGINEERING & CONSTRUCTION SERVICESEXPERIENCE LIST                                 Projects in Hand or Completed CIVIL & ELECTRICAL PROJECTS   PROJECT NAME CLIENT NAME PROJECT DESCRIPTION PROJECT COST YEAR Construction of UF & RO Water Filtration Plants in District Lodhran KSB  Excavation in foundation  Cement Concrete plain  Reinforced cement concrete in foundations, columns and walls.  Fabrication of mild steel reinforcement for cement concrete  Supply & filling sand under floor  Providing, laying, cutting, jointing, testing UPVC pipe line in trench  Brickworks  Supply & fixing of Steel grated Doors  Supply & fixing of Steel grill  Plaster of Walls & Columns  Providing, fixing & jointing of Ceramic & Floor tiles  Electrification of complete plant 59 Million  2015‐ To date Construction of Pre Cast Boundary Wall of 180 Kanal, 15 Marla Area of Sahafi Colony at Canal Road, Lahore Punjab Government Servants Housing Foundation  Boundary wall area clearance.  Excavation for foundations as per drawings.  PCC and erection of pre cast columns.  Supply & erection of RCC pre cast columns & planks.  Copping at the top of the columns.  Back filling of excavated area.  Filling of Hsection column grooves with mortar. 8.8 million 2014To 2015 Construction of Water Filtration Plants in Lahore KSB  Excavation in foundation  Cement Concrete plain  Reinforced cement concrete in foundations, columns 4.6 Million 2014To2015 

Transcript of MECS Projects _28-June-2016_

Page 1: MECS Projects _28-June-2016_

Page 1 of 10

MEGA ENGINEERING & CONSTRUCTION SERVICES‐EXPERIENCE LIST                                 Projects in Hand or Completed

CIVIL & ELECTRICAL PROJECTS  PROJECT NAME  CLIENT NAME  PROJECT DESCRIPTION  PROJECT 

COST  YEAR 

Construction of UF & RO Water Filtration Plants in District 

Lodhran KSB 

Excavation in foundation  Cement Concrete plain  Reinforced cement concrete in foundations, columns 

and walls.  Fabrication of mild steel reinforcement for cement 

concrete  Supply & filling sand under floor  Providing, laying, cutting, jointing, testing UPVC pipe 

line in trench  Brickworks  Supply & fixing of Steel grated Doors  Supply & fixing of Steel grill  Plaster of Walls & Columns  Providing, fixing & jointing of Ceramic & Floor tiles  Electrification of complete plant 

59 Million   2015‐ To date 

Construction of Pre Cast Boundary Wall of 180 Kanal, 15 Marla Area of Sahafi Colony at 

Canal Road, Lahore 

Punjab Government 

Servants Housing Foundation 

Boundary wall area clearance.  Excavation for foundations as per drawings.  PCC and erection of pre cast columns.  Supply & erection of RCC pre cast columns & planks.  Copping at the top of the columns.  Back filling of excavated area.  Filling of H‐section column grooves with mortar. 

8.8 million  2014‐To 2015 

Construction of Water Filtration Plants in Lahore  KSB 

Excavation in foundation  Cement Concrete plain  Reinforced cement concrete in foundations, columns 

4.6 Million  2014‐To‐2015 

Page 2: MECS Projects _28-June-2016_

Page 2 of 10

MEGA ENGINEERING & CONSTRUCTION SERVICES‐EXPERIENCE LIST                                 Projects in Hand or Completed

and walls.  Fabrication of mild steel reinforcement for cement 

concrete  Supply & filling sand under floor  Providing, laying, cutting, jointing, testing UPVC pipe 

line in trench  Brickworks  Supply & fixing of Steel grated Doors  Supply & fixing of Steel grill  Plaster of Walls & Columns  Providing, fixing & jointing of Ceramic & Floor tiles  Electrification of complete plant 

Construction of Lowari Tunnel situated in the Khyber‐Pakhtunkhwa province 

of Pakistan connecting Dir and Chitral Valley 

Length: 8.75 km Diameter: 7.1 meters 

 

SAMBU JV (South Korea) 

Construction of Roads.  Supply of complete Construction Material  Supply of different Construction Machinery 

115.4 Million  2009‐To‐2014 

Construction of Kabul‐Kandahar highway AFGHANISTAN 

Rafique Construction Company 

Construction of Highway  Supply of complete Construction Material  Supply of different Construction Machinery 

259.5 Million   2011‐To 2014 

Construction of Shurab Airport AFGHANISTAN 

Eid Gull Construction Company 

Construction of Runways  Construction of Building  Supply of Construction Material  Supply of different Construction Machinery 

534 Million  2010‐13 

Construction of Mazar‐Khomri Highway AFGHANISTAN 

Haji M. Noor Construction 

Construction of Highway  Supply of complete Construction Material  Supply of different Construction Machinery 

160 Million  2010‐2014 

Construction of Highway Logar‐Kabul AFGHANISTAN 

Engr. Mahmood Construction 

Construction of Highway  Supply of complete Construction Material 

213 Milion  2009‐12 

Page 3: MECS Projects _28-June-2016_

Page 3 of 10

MEGA ENGINEERING & CONSTRUCTION SERVICES‐EXPERIENCE LIST                                 Projects in Hand or Completed

Company  Supply of different Construction Machinery Construction of Road from Pasni to Quetta, Balochistan, 

Pakistan FWO 

Construction of Road  Supply of complete Construction Material  Supply of different Construction Machinery 

267 Million  2005‐07 

Construction of CRBC Canal at Taunsa, Punjab, Pakistan 

Taxcer Turkish Company & 

Ghulam Rasool and Company (Pvt.) Ltd.

Excavation works and supply of crush etc.  202 Million  2001‐07 

Construction of Jalalabad‐Torkham Highway AFGHANISTAN 

FWO  Construction of Highway  Supply of complete Construction Material  Supply of different Construction Machinery 

523 million  2003‐06 

Construction of Moro‐Nosero feroz Road, Sindh, Pakistan 

Hasnain Construction Company 

Construction of Road  Supply of complete Construction Material 

208 Million  2005 

Construction of Renala Khurd Bypass, Punjab, Pakistan 

Hasnain Construction Company 

Construction of Road  Supply of complete Construction Material  Supply of different Construction Machinery 

113 Million  2004 

Construction of National Highway from Okara to Sahiwal, Punjab, Pakistan 

LAC  Construction of Highway  Supply of complete Construction Material 

189 Million  1998 

Construction of Indus Highway from Karachi to Peshawar, 

Pakistan China Petroleum  Supply of complete Construction Material 

Supply of different Construction Machinery 178 Million  1980‐88 

 

ELECTRICAL & SOLAR PROJECTS    

Supply, Installation, Testing & Commissioning of Power Cables 

and Pipe 

CNS Engineering (Emporium Mall 

Project) 

Supply, Installation, Testing & Commissioning of Power Cables of different sizes. 

Supply, Installation & Testing of G.I Pipe of different sizes. 

3 Million  2014‐ To‐2015 

Page 4: MECS Projects _28-June-2016_

Page 4 of 10

MEGA ENGINEERING & CONSTRUCTION SERVICES‐EXPERIENCE LIST                                 Projects in Hand or Completed

Supply & Installation of pipe fittings. 

Supply & Installation of LT Panels and 200 KVA Generator 

Bar B.Q Tonight Lahore 

Supply, Installation, Testing and Commissioning of LT Panels. 

Supply, Installation, Testing and Commissioning of 200 KVA Generator. 

5.6 Million  2013‐14 

Supply, Installation, Testing & Commissioning  Of LED Street 

Lights 

Punjab University Employees Housing Scheme (Phase‐II) 

Supply of LED Street Lights and Power cable  Installation, testing & Commissioning of LED Street 

Lights 1.7 Million  2014 

Ibrahim Fiber Faisalabad   

Supply of 11 KV Steel Structure, Hardware & Aluminum Conductor. 

Installation, Testing & Commissioning of 11 KV Transmission Lines (Total Length: 5 KM) 

9.2 Million  2014‐To 2015 

Design, Supply, Installation, Testing & Commissioning of 

Solar System for Tube Wells in Dera Ghazi Khan, Punjab. 

Rasheed Farm House & Yousaf Farm House 

Supply, Installation, Testing and Commissioning of 40 HP Solar Submersible Pumps. 

Supply, Installation, Testing and Commissioning of Solar Inverter. 

Supply, Installation, Testing and Commissioning of Solar Modules. 

7.2 Million  2014‐‐2015 

External Electrification of Canal Garden Housing Society 

Mohlanwal  

Installation & Commissioning of 11 KV Transmission Line. 

Installation & Commissioning of Switchgears, Transformers, Power Generators, Lightning system, Earthing System, Street Lights, etc 

9.5 Million  2010‐15 

Mughal Steel Sheikhupura Road   

Supply, Laying, Installation, Testing & Commissioning of Power Cables 

Supply, Installation, Testing & Commissioning of Switchgears 

Supply, Installation, Testing & Commissioning of material regarding 11 KV Transmission Lines 

10.5 Million  2009‐15 

Page 5: MECS Projects _28-June-2016_

Page 5 of 10

MEGA ENGINEERING & CONSTRUCTION SERVICES‐EXPERIENCE LIST                                 Projects in Hand or Completed

Air Force Officer Housing Society (AFOHS) (Falcon 

Complex) Near Centre Point, Lahore. 

PAF  Supply, Installation and Commissioning of Transmission 

Line including Installation, Testing & Commissioning of Transformers. 

11.4 Million  2011‐14 

220 KV Wapda Town Grid Station    Laying, Installation, Testing & Commissioning of Power 

& Control Cables 3 Million  2013‐14 

132 KV Okara Grid Station    Laying, Installation, Testing & Commissioning of Power 

& Control Cables  Installation & Commissioning of Termination Kits 

5.7 Million  2014 

132 KV Toba Tek Singh   

Laying, Installation, Testing & Commissioning of Power & Control Cables 

Installation & Commissioning of Termination Kits  Installation, Testing & Commissioning of Control & 

Relay Panels 

9.8 Million  2014 

MGM GT Road Faisalabad   

Supply of 11 KV Steel Structure, Hardware & Aluminum Conductor. 

Installation, Testing & Commissioning of 11 KV Transmission Line (Total Length: 7 KM) 

11 Million  2013‐14 

Designing, Supply, Installation, Testing and Commissioning of Switchgears and Electrification 

of Different Halls (Conform to IEC 60364 (Electrical Installation of Buildings) & IEC 61024 

Protection of Structures against Lightning)) 

DeSOM Services Club Lahore 

(Supervised by Military 

Engineering Services (MES)) 

Supply, Installation, Testing and Commissioning of Switchgears. 

Supply, Installation, Testing and Commissioning of    4‐Ton Cabinet (FMAC). 

Supply, Installation, Testing and Commissioning of Power Cables of different sizes. 

Supply, Installation, Testing and Commissioning Copper Strip for Lightning protection. 

Designing of Electrification and Providing & Installation of complete electrical fixtures. 

1.8 Million  2014 

Supply & Installation of Various Electrical and Mechanical Equipment and Fabrication 

works 

Hyperstar Lahore 

Supply and Installation of Switchgears.  Fabrication of Cabinet and Staff Lockers. 

2.3 Million  2014 

Page 6: MECS Projects _28-June-2016_

Page 6 of 10

MEGA ENGINEERING & CONSTRUCTION SERVICES‐EXPERIENCE LIST                                 Projects in Hand or Completed

Supply & Installation of 350 KVA Generator (Conform to 

NFPA 110) 

French Embassy Islamabad 

Supply, Installation, Testing and Commissioning of 350 KVA Generator. 

8.7 Million  2014 

Designing, Supply, Installation, Testing and Commissioning of Switchgears, Power Cables and 

Electrification (Conform to IEC 60364 (Electrical Installation of 

Buildings) & IEC 60439‐1 (Low voltage Switchgear and controlgear assemblies) 

Intelligent Metering Systems 

(Pvt) Ltd. 

Supply, Installation, Testing and Commissioning of Switchgears. 

Supply, Installation, Testing and Commissioning of Power Cables of different sizes. 

Electrification and Installation of complete electrical fixtures. 

1.9 Million  2014 

Interloop GT Road Faisalabad   

Supply, Installation, Testing & Commissioning of material regarding 7 KM 11 KV Transmission Lines 

Supply, Laying, Installation, Testing & Commissioning of Power Cables 

Supply, Installation, Testing & Commissioning of Switchgears 

, Installation, Testing & Commissioning of 2 MVA Power Transformer 

6 Million  2013‐14 

Electrification, Supply and laying of Power Cables (Conform to IEC 60364 (Electrical Installation of 

Buildings) & IEC 60268 (Sound System Equipment)) 

Quality Switchgear Ferozpur Road, 

Lahore. 

Electrification and Electrical Fixtures installation of complete factory. 

Supply, Laying and Testing of Power Cables.  Supply and installation of CCTV.  Supply and installation of Public Address System. 

7 Million  2013‐14 

Pakistan Medical Housing Society (PMHS), Sunder State, 

Raiwind Road, Lahore. 

Pakistan Medical Association (PMA) (Supervised by 

LESCO) 

Installation & commissioning      of   Underground Electrical Distribution System. 

Installation & commissioning of RMUs,    Switchgears, Transformers, Power Generators. 

Installation & commissioning  of Lightning system, Earthing System, Street Lights, etc 

4.6 million  2011‐13 

Page 7: MECS Projects _28-June-2016_

Page 7 of 10

MEGA ENGINEERING & CONSTRUCTION SERVICES‐EXPERIENCE LIST                                 Projects in Hand or Completed

Preparation of Construction Claims and Drafting of letters 

Harbin Electric International (HEI 

China) 

Preparation of EOT & Cost Claims for 560 MW Combined Cycle Power Plant, Bin Qasim, Karachi. 

Preparation of EOT & Cost Claims for 747 MW Combined Cycle Power Plant, Guddu, Sindh.  

9.5 Million  2012‐14 

PEL Transformer Unit‐02  PEL 

Installation, Testing & Commissioning of Substation, Switchgears, Transformers, Power Generators. 

Installation & Commissioning of Internal & External Electrification (Overhead & Underground Electrical Distribution System). 

Installation & Commissioning of Electrical Wiring & Light Fixtures, Lightning system & Earthing System. 

Installation & Commissioning of Public Address System & Fire Alarm System. 

90.6 Million  2009‐13 

500 KV Grid Station Yousaf Wala Sahiwal, 132 KV Diplpur Grid Station, 132 Sadiqqbad Grid Station & 220 KV Daharki 

Grid Station 

  Installation, Testing & Commissioning of PLC Panels  Termination of Control Cables 

23 Million  2013 

Designing, Installation, Testing & Commissioning of 132 KV 

Grid Station. 

Gharibwal Cement Limited 

Designing of complete 132 KV Grid Station.  Installation of 132/66KV dual input, 46MVA Power 

Transformer.  Design and develop the connections diagrams / 

terminations for all Grid equipment along with cable schedules, sizes and routing. 

Design and develop Protection and control scheme design and diagrams. 

Design calculation / setting calculations for relays as per WAPDA / IESCO requirement. 

Setting of the relays at site and its testing.  Review of design and calculations and incorporate / 

address any comments received from Utility for 

102 Million  2013 

Page 8: MECS Projects _28-June-2016_

Page 8 of 10

MEGA ENGINEERING & CONSTRUCTION SERVICES‐EXPERIENCE LIST                                 Projects in Hand or Completed

approval.  

Pearl Continental Hotel Muzaffar Abad A.J.K 

 

P.S.L  Providing & Installation of complete electrical fixtures, Lightning protection system and earthing. 

78 Million  2012 

Sufi City Housing Scheme (SCHS), Mandi bahudin. 

Malik Ali Amir (Supervised by 

GEPCO) 

Installation & Commissioning of 11 KV Transmission Line. 

Installation, Testing & Commissioning of Switchgears, Transformers, Power Generators, Lightning system, Earthing System, Street Lights, etc 

112 Million  2010‐11 

Al Rehman Garden Housing Schem (ARGHS) Near Sharqpur 

Road, Sheikhupura. 

Haji M. Ikhlaq (Supervised by 

LESCO) 

Installation & Commissioning of Transmission Line.  Installation & Commissioning of Switchgears.  Installation & Commissioning of Transformers & Power 

Generators.  Installation & Commissioning of Lightning system, 

Earthing System & Street Lights, etc. 

5.9 Million  2009‐11 

Army Welfare Trust Housing Scheme Raiwind Road, Lahore.  Army welfare Trust 

Installation & Commissioning of Transmission Line.  Installation & Commissioning of Switchgears, 

Transformers, Power Generators.  Installation & Commissioning of Lightning system, 

Earthing System, Street Lights, etc in Sector # 01, 02 & 03. 

3.4 Million  2002‐11  

SUPPLY OF MATERIAL  

Supply of Diesel Generator Sets and Diesel  Hydro China  Supply of 100 KVA Diesel Generator Sets 

Supply of diesel at Wind project in Sindh 4.5 Million 

2014    

Page 9: MECS Projects _28-June-2016_

Page 9 of 10

MEGA ENGINEERING & CONSTRUCTION SERVICES‐EXPERIENCE LIST                                 Projects in Hand or Completed

Supply of Substation Connectors & Transmission 

Line Hardware LESCO  Supply of 132KV Substation Connectors & Transmission 

Line Hardware 5.3 Million  2014 

Supply of Transmission Line Hardware  MEPCO  Supply of 132 KV transmission line hardware & SF6 Gas  89 Million  2014 

Supply of Substation Connectors  IESCO  Supply of 132KV Substation Connectors & Cartridge  2.7 Million  2014 

Supply of Substation Connectors & Transmission 

Line Hardware PESCO  Supply of 132KV Substation Connectors, Transmission 

line hardware, Cartridges & Control Cable. 6.2 Million  2014 

Supply of Termination Kits  SEPCO  Supply of 11 KV indoor & outdoor Termination kits.  3.9 Million  2014 

Supply of Substation Connectors & Transmission 

Line Hardware SEPCO  Supply of 132KV Substation Connectors, Transmission 

line hardware and Cartridges. 7.4 Million  2015‐ To date 

Supply of Diesel Generator Sets  SEPCO  Supply of 50 KVA & 5 KVA Diesel Generator Sets  2.8 Million  2014 

Supply of SF6 Gas  HESCO  Supply of SF6 Gas  1.8 Million  2014 

Supply of CTs  LESCO  Supply of 132KV CTs (Supplier Nanfang, China)  32 Million  2013 

Supply of CTs  FESCO  Supply of 132KV CTs (Supplier Nanfang, China)  53 Million  2013 

Supply of Distribution Transformer  IESCO  Supply of 100 & 200 KVA Distribution Transformer 

(Supplier SEC China) 1.7 Million  2013