DPNC, le 18 Decembre 2012 1

Mechanics Group

Activities in 2012… and beyond

Mechanics Group

Activities in 2012… and beyond

� Status of the projects in 2012� Outlooks in 2013

Page 2: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 2

«Workshop & Clean room» activitiesCoralie, Laurent *(substituted FLORIAN who left for a deserved retirement), Maarten, Reynald (left our team to join the Central workshop) Franco and M'Barka working on EMR (temporary)*Substitution of Laurent is ongoing.

Mechanical Design & DevelopmentFlorian,Gérard,Laurent, and Maarten in overlap with Workshop activitiesSébastien MICHAL (Engineer, between CERN and DPNC)William SEEZ (1 year student at DPNC in ATLAS group) Franck (Head of the group)

… without forgetting Catherine, Liliane, Nathalie, Marie-Anne,our “Central” workshops, and Yann !

big THANKS for the good job!

Mechanics Group Situation and Evolutions in 2012

Page 3: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 3

ATLAS (IBL project), EMR (Final assembly)POLAR (Qualification models)CTA (Detector plane)

Towards futures projects...• AFP (ATLAS)• DAMPE (Space Experiment_China)• LOFT (Space Experiment_ ESA)• AIDA and Mu3e (Neutrinos)

Mechanics Group Projects in 2012 and beyond ...

Page 4: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 4

Mechanics Group Highlights in 2012

Status of the work in 2012:- The whole process of loading has been validated on STAVE0-A and 0-B- Loading tools have been « fine tuned » and ready for Stave assembly- 25 Staves to be equipped in 2013 , IBL installation to be completed by end of 2013 (tight!)

Wire bonding cradleWire bonding cradle

IBL project (Atlas)Stave Module LoadingIBL project (Atlas)

Stave Module Loading

Stave

Page 5: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 5

IBL Project (Atlas)Staves Integration and related tools

IBL Project (Atlas)Staves Integration and related tools

Mechanics Group Highlights in 2011

7m long

IBL_MPC

What has been done in 2012?- Fabrication and Assembly of the IBL_MPC- Design of the whole IBL integration stand - IBL_MPC needed for Stave integration in September 2013

Page 6: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 6

EMR project (on MICE @ Rutherford Appelton Lab)EMR project (on MICE @ Rutherford Appelton Lab)

EMR

2012 status :- Complete modification on « Bar to PMT connections » (10% losses in 2011)- Led to new developments on fiber optics connectors(of interest for future Neutrinos projects!)… Such as AIDA projects

- EMR completion by Spring 2013 (and move to other businesses)- Installation @ RAL is driven by the Supra Conductive magnet delivery

Mechanics Group Highlights in 2012

EMR as tested in 2011 @ RAL(only 3 modules equipped)

• 2832 bars, • 48 planes (X+Y)• Detection vol.:

1m x1m x80cm

Page 7: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 7

EMR project (on MICE @ Rutherford Appelton Lab)Final production and Assembly of 48 planes (Clear to WLS fibers coupling)

EMR project (on MICE @ Rutherford Appelton Lab)Final production and Assembly of 48 planes (Clear to WLS fibers coupling)

Mechanics Group Highlights in 2012

PMT64 pixels

The First Module under cosmic testing

+ Polishing stands

(2832 bars and 5664 connectors…)

Clear to WLS fiber connector

Fiber polishing at bar end

New module @ DPNC

Page 8: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 8

POLAR project (on TG#2, Chinese Space Station)2 Qualification Models (QM) have been built in 2012

POLAR project (on TG#2, Chinese Space Station)2 Qualification Models (QM) have been built in 2012

Mechanics Group Highlights in 2012

UNIGE responsibilities in 2012• Overall Design is completed • Thermal studies OK• QM1 sent to China in November 2012• QM2 (=QM1) used for Beam tests at

ESRF (Grenoble, last week)

QM2 @ DPNC

Thermal FEA

Page 9: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 9

Mechanics Group Highlights in 2012

POLAR projectBeam tests @ ESRF Grenoble (25 modules on QM2)

POLAR projectBeam tests @ ESRF Grenoble (25 modules on QM2)

• Slight modifications on QM2 Electronics • QM2 to go for Space Qualification tests

in 2013 : EMC, Acceleration, Vibration, TVT.

Page 10: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 10

Mechanics Group Development on CTA camera

Based on a CAD model from the Polish Group…• DPNC is working on the camera Detector plane• Camera Shutter has been installed by DPNC on FACT (Canary)• First R&D on the Winston Cones + Mechanics

6 m

hig

h

Page 11: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 11

Mechanics Group Development on CTA camera

1 mm thick used for fast prototyping (stereolithography) R&D on CTA Camera

(Winstone Cones / SiPMT / FEE)R&D on CTA Camera

(Winstone Cones / SiPMT / FEE)

Single cone

Module assembly (12 Cones)

1296 cones totally

Fast prototyping (from silicone mold)

What’s coming next …• 40 pieces from fast prototyping (to build one module)• Works on optical reflector applied to “Winstone Cones”• Overall mechanical design including FEA (at Telescope level)

SiPMT

Page 12: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 12

Mechanics Group Outlooks towards 2013 and beyond…

R&D on Mu3e & AIDA(Everything about Fibers of different kind… and SiPMT)

R&D on Mu3e & AIDA(Everything about Fibers of different kind… and SiPMT)SiPMT

0.25mm diameter fibers!

Mu3e(R&D on fiber assembly “per strip”)

1mm thick!

AIDA : Development alla EMR(new connectors for SiPMT)

Page 13: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 13

Mechanics Group Outlooks towards 2013 and beyond…

R&D on Astrophysics projects (DAMPE&LOFT) and AFP (Atlas)(Everything about Silicon detectors and their integration…)

R&D on Astrophysics projects (DAMPE&LOFT) and AFP (Atlas)(Everything about Silicon detectors and their integration…)

AFP(R&D on a Thermo mechanical design for 6 Pixel detectors)

Beam

DAMPE(Stacking of Silicon planes +

Tungsten plateson a Chinese Satellite)

LOFT(Silicon Modules

on a ESA Satellite)

Thermo Mechanical FEA

CAD assembly

80 cm

50 c

m

Page 14: Mechanics Group Activities in 2012…and beyonddpnc.unige.ch/Noel2012/GrMeca_Dec2012_v1.pdf · 2012-12-19 · DPNC, le 18 Decembre 2012 4 Mechanics Group Highlights in 2012 Status

DPNC, le 18 Decembre 2012 14

THANKS again and merry Christmas!