PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5
MECHANICAL PRESERVATION PROCEDURE
03 10 Dec 08 JI TY MD As Built
02 4 Feb 08 JI TY MD APPROVED FOR CONSTRUCTION
01 03 Jan 08 JI TY MD CPY comments incorporated, ISSUED FOR APPROVAL
00 27-Nov-07 JI TY MD ISSUED FOR COMMENTS
DATE BY CHECK APPR APPR SPEC REPS REV
SUBCONTRACTOR DESCRIPTION
CONTRACTOR COMPANY APPROVAL
STATUS CODE : A = Issued for comments – B = Issued for approval – C = Approved – D = As Built
PECIKO FIELD DEVELOPMENT PROJECT–PHASE 5
CONTRACT PCK5 / EPSCI
Document Number Rev Status
ID-PK5-PF-NSB-0811020
Document Type Discipline
PRC PJM
03 D
This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from the COMPANY.
CLASS 1
PT NISCONI
![Page 2: Mech Preservation Procedure](https://reader037.fdocuments.us/reader037/viewer/2022103021/563dbb16550346aa9aaa2961/html5/thumbnails/2.jpg)
Doc. Title : MECHANICAL PRESERVATION PROCEDURE
Doc. Type PRC Discipline PJM Page 2 of 9
PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5 Doc. No : ID-PK5-PF-NSB-0811020 CONTRACT PCK5 / EPSCI Rev. : 03 Status: D Date : 10 Dec 08 This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from the COMPANY.
PT NIPPON STEEL BATAM
PT. NISCONI
TABULATION OF REVISED PAGES
REVISIONS REVISIONS SHEET
00 01 02 03 04 05 06 07
SHEET
0 1 2 3 4 5 6 7
1 X X 41
2 X X 42
3 X X 43
4 X X 44
5 X X 45
6 X X 46
7 X X X 47
8 48
9 49
10 50
11 51
12 52
13 53
14 54
15 55
16 56
17 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65 26 66 27 67 28 68 29 69 30 70 31 71 32 72 33 73 34 74 35 75 36 76 37 77 38 78 39 79 40 80
![Page 3: Mech Preservation Procedure](https://reader037.fdocuments.us/reader037/viewer/2022103021/563dbb16550346aa9aaa2961/html5/thumbnails/3.jpg)
Doc. Title : MECHANICAL PRESERVATION PROCEDURE
Doc. Type PRC Discipline PJM Page 3 of 9
PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5 Doc. No : ID-PK5-PF-NSB-0811020 CONTRACT PCK5 / EPSCI Rev. : 03 Status: D Date : 10 Dec 08 This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from the COMPANY.
PT NIPPON STEEL BATAM
PT. NISCONI
MECHANICAL PRESERVATION PROCEDURE
TABLE OF CONTENTS
1.0 PURPOSE
2.0 SCOPE
3.0 DEFINITIONS
4.0 REFERENCE DOCUMENTS
5.0 RESPONSIBILITIES
6.0 PROCEDURE
7.0 GENERAL STATEMENT
8.0 ATTACHMENTS
![Page 4: Mech Preservation Procedure](https://reader037.fdocuments.us/reader037/viewer/2022103021/563dbb16550346aa9aaa2961/html5/thumbnails/4.jpg)
Doc. Title : MECHANICAL PRESERVATION PROCEDURE
Doc. Type PRC Discipline PJM Page 4 of 9
PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5 Doc. No : ID-PK5-PF-NSB-0811020 CONTRACT PCK5 / EPSCI Rev. : 03 Status: D Date : 10 Dec 08 This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from the COMPANY.
PT NIPPON STEEL BATAM
PT. NISCONI
1.0 PURPOSE
This Procedure is to ensure that the project equipment are preserved and maintained its integrity in
accordance to project specifications and vendor requirement.
2.0 SCOPE Mechanical, electrical & instrumentation are included in this scope, once received in the Yard till sail away
of the project.
3.0 DEFINITIONS COMPANY TOTAL E & P INDONESIE
CONTRACTOR PT NIPPON STEEL CONSTRUCTION INDONISIA
AFC Approved for Construction
NSB PT. Nippon Steel Batam Offshore Services
PMT Project Management Team
OENG Outfitting Engineering
QA / QC Quality Assurance / Control
DISCIPLINE A group of field of expertise
PCOM Pre-commissioning
COM Commissioning
SUBCONTRACTOR A company selected and awarded by CONTRACTOR to perform a
certain Project Activity
SUPPLIER / VENDOR A company selected and awarded by CONTRACTOR to supply a certain Project goods
4.0 REFERENCE DOCUMENTS ID-PK5-PF-NSB-0811048 Material Control, Handling, Preservation & Tracking
ID-PK5-PF-NSB-0811019 Mechanical / Pressure Vessel Installation Procedure
ID-PK5-PF-NST-3000001 Equipment list
ID-PK5-PF-NST-3006002 Material Handling Study report
ID-PK5-PF-NST-3003001 Equipment Data Sheet – 20” Pig Launcher-1-R-1701 C
ID-PK5-PF-NST-3003002 Equipment Data Sheet – Fuel gas Filters 1-F-17110 A/B
ID-PK5-PF-NST-3003003 Equipment Data Sheet – Fuel gas Scrubber 1-V-17120
![Page 5: Mech Preservation Procedure](https://reader037.fdocuments.us/reader037/viewer/2022103021/563dbb16550346aa9aaa2961/html5/thumbnails/5.jpg)
Doc. Title : MECHANICAL PRESERVATION PROCEDURE
Doc. Type PRC Discipline PJM Page 5 of 9
PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5 Doc. No : ID-PK5-PF-NSB-0811020 CONTRACT PCK5 / EPSCI Rev. : 03 Status: D Date : 10 Dec 08 This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from the COMPANY.
PT NIPPON STEEL BATAM
PT. NISCONI
ID-PK5-PF-NST-3003004 Equipment Data Sheet – HP VENT TIP -1-VT-17150
ID-PK5-PF-NST-3003005 Equipment Data Sheet – Disposal Tube -1-X-17450
ID-PK5-PF-NST-3003006 Equipment Data Sheet – Crane Pedestal Diesel Tank -1-T-17710
ID-PK5-PF-NST-3003007 Equipment Data Sheet – Diesel Oil Filter -1-F-17710
ID-PK5-PF-NST-3003008 Equipment Data Sheet – Offloading pump -1-P-17050
ID-PK5-PF-NST-3003009 Equipment Data Sheet – A/C mobile Diesel Generator-1-T-17050
D-PK5-PF-NST-3003015 Equipment Data Sheet – Corrosion inhibitor storage Tank -1-T-17310
ID-PK5-PF-NST-3003018 Equipment Data Sheet – MDEA storage Tank-1-T-17350
ID-PK5-PF-NST-3003020 Equipment Data Sheet – Portable Methanol Injection Tank-1-T-17380
ID-PK5-PF-NST-3003018 Equipment Data Sheet – MDEA storage Tank-1-T-17350
5.0 RESPONSIBILITIES Fabrication Yard Manager Responsible for implementation of this procedure.
Material Manager Responsible for material & equipment control, handling,
preservation and tracking of equipment in accordance
with the procedure.
Store Supervisor Responsible for equipment receipt, storage, preservation
(while in warehouse), issuance inventory & packaging.
Mechanical / Precom Engineer Responsible for all the activities involves in Mechanical
equipment installation and preservation. Check if the
preservation of the equipment conforms with the
specification and vendor requirement, while stored in
warehouse and installed the wellhead platform.
Coordinate with Engineering (NISCONI) regarding the
vendor requirement for equipment preservation including
lubrications required.
Mechanical Supervisor Coordinate with Mechanical Engineer regarding the
equipment preservation. Coordinate with other dep’t for
the implementation of this procedure.
Engineering (NISCONI) Coordinate with vendor regarding the requirement for
preservation including lubrication / preservatives to be
used for preservation.
![Page 6: Mech Preservation Procedure](https://reader037.fdocuments.us/reader037/viewer/2022103021/563dbb16550346aa9aaa2961/html5/thumbnails/6.jpg)
Doc. Title : MECHANICAL PRESERVATION PROCEDURE
Doc. Type PRC Discipline PJM Page 6 of 9
PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5 Doc. No : ID-PK5-PF-NSB-0811020 CONTRACT PCK5 / EPSCI Rev. : 03 Status: D Date : 10 Dec 08 This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from the COMPANY.
PT NIPPON STEEL BATAM
PT. NISCONI
6.0 PROCEDURE 1.) This procedure is the minimum requirement for equipment preservation in the Yard. Vendor
preservation requirement shall prevail once received from Engineering.
2.) Before the equipment is delivered in Yard, Engineer (NISCONI) shall advise the Yard on some pre-
caution of storing and preserving the equipment. The same will apply if the equipment is supplied by
Client, the Yard shall be informed on the preservation requirement.
3.) Material / Equipment Receiving, Control, Handling, Preservation and Tracking shall be handled by
Warehouse Group as per Procedure ID-PK5-PF-NSB-0811048.
4.) Electrical and Instrument Panels original packing shall not be torn-out. Once torn-out these panels
shall be kept in an air-conditioned room. Vendor shall be consulted on the preservation requirement.
5.) Once equipment issued to the Yard, Mechanical / Precom Engineer and Mechanical supervisor shall
continue the preservation whether equipment is on lay-down area, installed on the deck till Pre-
commissioning, Commissioning and until sail away.
6.) Once installed on the deck, the equipment shall be protected by plastic sheet over-layed by fire
retardant blanket or cover by plywood.
7.) Rotating equipment shall be internally protected by vendor with rust preventive oil. Periodic checking
shall be performed in the Yard once a week. Top up with the recommended preservative oil once
noticed it is in low level.
8.) As required by vendor, rotating equipment shaft shall be turned manually with minimum of two and
one-fourth revolutions in week interval. Care should be taken that the final position of the shaft after
turning is at least one quarter revolution from the point at which it was rotated. Oil levels shall be
checked at the time of rotation. A preservation log shall be kept to record those actions.
9.) Space heaters for motors or generators shall be energized upon advise by vendor, irrespective of the
location, i.e. warehouse, lay-down area or platform. These shall be energized using temporary power
supply until it is connected in MCC.
10.) All exposed machined surface shall be protected by grease or other preservative recommended by
vendor.
11.) Valve stems shall be greased to prevent from rusting.
12.) All junction box / panel cable entries that are not used (spares) shall be plugged with suitable material.
13.) Valve flanges must have a suitable cover installed on both openings to keep out foreign materials, dirt
rust etc.
14.) Glass material of instrument or equipment shall be covered with thick carton material or plywood to
avoid breakage.
![Page 7: Mech Preservation Procedure](https://reader037.fdocuments.us/reader037/viewer/2022103021/563dbb16550346aa9aaa2961/html5/thumbnails/7.jpg)
Doc. Title : MECHANICAL PRESERVATION PROCEDURE
Doc. Type PRC Discipline PJM Page 7 of 9
PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5 Doc. No : ID-PK5-PF-NSB-0811020 CONTRACT PCK5 / EPSCI Rev. : 03 Status: D Date : 10 Dec 08 This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from the COMPANY.
PT NIPPON STEEL BATAM
PT. NISCONI
15.) Foods and drinks shall not be allowed on the platform so as not to attract rodents (i.e., mice, rats etc.)
Once these rodents are noticed in the platform, it must be terminated immediately to avoid damaging
cables inside the panels.
16.) In all the preservation activities, Mechanical Engineer shall keep record and readily available if
required by Client for verification.
7.0 GENERAL STATEMENT 1. Equipment shall be protected keep clean throughout the duration of the project by means of
protective covers or regular maintenance routine.
2. Special care shall be taken to prevent damage to any mechanical equipment due to welding and
grinding or sand blasting is taken place nearby or other fabrication or installation works.
3. Equipment shall be preserved in accordance with manufacturer’s recommendation.
4. All equipment in preservation shall be located in a dedicated area far from blasting and painting area
and protected from direct exposure to sunlight.
8.0 Attachment
1.) Ex project preservation sample preservation record.
![Page 8: Mech Preservation Procedure](https://reader037.fdocuments.us/reader037/viewer/2022103021/563dbb16550346aa9aaa2961/html5/thumbnails/8.jpg)
Doc. Title : MECHANICAL PRESERVATION PROCEDURE
Doc. Type PRC Discipline PJM Page 8 of 9
PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5 Doc. No : ID-PK5-PF-NSB-0811020 CONTRACT PCK5 / EPSCI Rev. : 03 Status: D Date : 10 Dec 08 This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from the COMPANY.
PT NIPPON STEEL BATAM
PT. NISCONI
![Page 9: Mech Preservation Procedure](https://reader037.fdocuments.us/reader037/viewer/2022103021/563dbb16550346aa9aaa2961/html5/thumbnails/9.jpg)
Doc. Title : MECHANICAL PRESERVATION PROCEDURE
Doc. Type PRC Discipline PJM Page 9 of 9
PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5 Doc. No : ID-PK5-PF-NSB-0811020 CONTRACT PCK5 / EPSCI Rev. : 03 Status: D Date : 10 Dec 08 This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorization from the COMPANY.
PT NIPPON STEEL BATAM
PT. NISCONI