MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.
-
Upload
kameron-munsey -
Category
Documents
-
view
218 -
download
0
Transcript of MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.
![Page 1: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/1.jpg)
![Page 2: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/2.jpg)
![Page 3: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/3.jpg)
MEBT Update
FETS Meeting 2/201207/03/2012
Imperial College
![Page 4: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/4.jpg)
MEBT Line
Quadrupoles Re-bunching cavities
RF
Q
Fast Chopper Slow Chopper
Chopper beam dumps
Diagnostics beam line with beam dumps
BPM, Steer
Current Monitor Profile
MonitorProfile
MonitorBPM, Steer BPM, Steer
Current Monitor
Example of a quadrupole configuration
Q1 = 16.8 T/m Q5 = 6.5 T/m Q9 = 16.7 T/m C1 = 115 kV
Q2 = -19.9 T/m Q6 = -7.3 T/m Q10 = -10.6 T/m C2 = 63 kV
Q3 = 20.9 T/m Q7 = 6.2 T/m Q11 = 8.9 T/m C3 = 54 kV
Q4 = -18.1 T/m Q8 = -16.6 T/m C4 = 43 kV
![Page 5: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/5.jpg)
Beam Pipe
• Case 1– 30 mm beam pipe aperture.– Using “design” beam distribution.
Input Distribution
Ex 0.27 Pi.mm.mrad
Ey 0.27 Pi.mm.mrad
Ez 0.34 Pi.mm.mrad
![Page 6: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/6.jpg)
Beam Pipe
• Case 2– 40 mm beam pipe aperture– Using “design” beam distribution
![Page 7: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/7.jpg)
Beam Pipe
• Case 3– 30 mm beam pipe aperture– Using FETS RFQ output distribution
Input Distribution
Ex 0.30 Pi.mm.mrad
Ey 0.31 Pi.mm.mrad
Ez 0.49 Pi.mm.mrad
![Page 8: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/8.jpg)
Beam Pipe
• Case 4– 40 mm beam pipe aperture– Using FETS RFQ output distribution
![Page 9: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/9.jpg)
Aperture (mm) 30 38
Freq (MHz) 324 324
Q 26539 25536
ZTT (MOhm/m) 10.98 6.65
T 0.61 0.50
Power (kW) 13.54 22.36
Kilp 1.332 1.63
Effective Voltage (kV) 160 160
Bunchers
![Page 10: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/10.jpg)
Chopper Clarification
• RFQ Distribution• Beam Current• Voltage• Coverage Factor• Safety margins
![Page 11: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College.](https://reader035.fdocuments.us/reader035/viewer/2022062621/551be05b550346c3588b5d54/html5/thumbnails/11.jpg)
Removing End Matching Section?X
30
mm
Y30
m
m
Pha
se12
0 d
eg
Quadrupoles Re-bunching cavities
Fast Chopper Slow Chopper
Chopper beam dumps