Context
• Chem Eng 4W04: Three projects, different areas, groups of 4-5 students.
• Report writing, group presentation and peer evaluation.
• How to “measure” team work for accreditation purposes. Need rubrics for indicators/attributes
![Page 3: “Measuring” Team Work in Captsone Projects](https://reader036.fdocuments.us/reader036/viewer/2022062310/56815e9b550346895dcd2ecf/html5/thumbnails/3.jpg)
Attributes/Indicators
Use Minha Ha's Teamwork Assessment Strategy as Rubrics
![Page 4: “Measuring” Team Work in Captsone Projects](https://reader036.fdocuments.us/reader036/viewer/2022062310/56815e9b550346895dcd2ecf/html5/thumbnails/4.jpg)
Rubric Developed by Minha (old version)
![Page 5: “Measuring” Team Work in Captsone Projects](https://reader036.fdocuments.us/reader036/viewer/2022062310/56815e9b550346895dcd2ecf/html5/thumbnails/5.jpg)
Rubric Developed by Minha (contd.)
![Page 6: “Measuring” Team Work in Captsone Projects](https://reader036.fdocuments.us/reader036/viewer/2022062310/56815e9b550346895dcd2ecf/html5/thumbnails/6.jpg)
How Measurement Was Done
• The quality of team work is reflected in three fronts:– Quality of the Final Report (but what %)– Observations by the professor– The opinions of the students in the groups.
• Created a googledocs survey where the rubric was given to students. They had to pick which level to be closest to their experience
![Page 7: “Measuring” Team Work in Captsone Projects](https://reader036.fdocuments.us/reader036/viewer/2022062310/56815e9b550346895dcd2ecf/html5/thumbnails/7.jpg)
Example of Survey
• Screen Capture from Google Docs
![Page 8: “Measuring” Team Work in Captsone Projects](https://reader036.fdocuments.us/reader036/viewer/2022062310/56815e9b550346895dcd2ecf/html5/thumbnails/8.jpg)
Results
0
2
4
6
8
10
12
14
16
18
20
Fails to Meet Expectations
Marginally Meets Expectations
Meets Expectations
Exceeds Expectations
![Page 9: “Measuring” Team Work in Captsone Projects](https://reader036.fdocuments.us/reader036/viewer/2022062310/56815e9b550346895dcd2ecf/html5/thumbnails/9.jpg)
Main Results
• Lots of Room for Improvement• Time management is most common problem• Accountability is widely achieved • A high number of people are in the
“marginally achieve” expectation category
![Page 10: “Measuring” Team Work in Captsone Projects](https://reader036.fdocuments.us/reader036/viewer/2022062310/56815e9b550346895dcd2ecf/html5/thumbnails/10.jpg)
Most Recent Rubrics for Team Work (V3)
![Page 11: “Measuring” Team Work in Captsone Projects](https://reader036.fdocuments.us/reader036/viewer/2022062310/56815e9b550346895dcd2ecf/html5/thumbnails/11.jpg)
Most Recent Rubrics for Team Work (V3-contd.)
![Page 12: “Measuring” Team Work in Captsone Projects](https://reader036.fdocuments.us/reader036/viewer/2022062310/56815e9b550346895dcd2ecf/html5/thumbnails/12.jpg)