STATE UNIVERSITY CONSTRUCTION FUND Measurement Record of Operations and Accomplishments 2016/2017

Transcript of Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations...

Page 1: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

STATE UNIVERSITY CONSTRUCTION FUND

Measurement Record of Operations and Accomplishments

2016/2017

Page 2: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTDComprehensive Colleges

Buffalo State College Selective Renovations - Butler Library Selective Renovations - Butler Library ARCHITECTURAL RESOURCES PC 1,119,000.00 0.00

Upgrade Mechanical Systems for Safety at Upton Hall

Upgrade Mechanical Systems for Safety at Upton Hall

M E ENGINEERING PC 521,000.00 0.002

Total Buffalo State College 2 Total Projects 1,640,000.00 0.00College at Oneonta Rehabilitate Mechanical Systems - Morris Rehabilitate Mechanical Systems - Morris IBC ENGINEERING PC 138,000.00 0.00

Replace Humidification and DHW Systems - Milne Library

Replace Humidification and DHW Systems - Milne Library

IBC ENGINEERING PC 102,000.00 0.00

Upgrade Plumbing/HVAC Systems - Bugbee Hall

Upgrade Plumbing/HVAC Systems - Bugbee Hall

C & S ENGINEERS INC 550,012.00 279,696.445

Construct New Welcome Center Construct New Welcome Center ARCHITECTURAL RESOURCES PC 520,000.00 237,799.86Milne Library Partial Interior Renovation Partial Interior Renovation - Adding

Program to LibraryLOMONACO & PITTS ARCHITECTS PC 829,000.00 311,767.18

Total College at Oneonta 5 Total Projects 2,139,012.00 829,263.48Empire State College Upgrade Water and Sanitary Systems

Aletta StUpgrade Water and Sanitary Systems Aletta St

LABELLA ASSOCIATES DPC 50,831.00 21,002.14

Rehab Envelope 111 West Rehab Envelope 111 West LOMONACO & PITTS ARCHITECTS PC 209,000.00 4,668.42Total Empire State College 2 Total Projects 259,831.00 25,670.56 2

Old Westbury Replace Electrical Substation No. 45 Replace Electrical Substation 45 LABELLA ASSOCIATES DPC 153,000.00 78,636.29Parking and Traffic Study Parking and Traffic Study LABELLA ASSOCIATES DPC 62,928.00 20,613.59Replace Roofs Nat'l Sci. & Clark Ctr. Replace Roofs Nat'l Sci. & Clark Ctr. HOFFMANN ARCHITECTS INC 435,400.00 0.00 3Total Old Westbury 3 Total Projects 651,328.00 99,249.88

Purchase College Rehab Diesel Generator Rehab Diesel Generator OLA CONSULTING ENGINEERS PC 378,938.91 157,296.25Rehab & Enclose PAC Elevator Rehab & Enclose PAC Elevator PETER GISOLFI ASSOCIATES

ARCHITECTURE LANDSCAPE ARCHITECTURE LLP

75,000.00 0.00

4Roof Replacement Campus Center North Roof Replacement Campus Center North HOFFMANN ARCHITECTS INC 150,000.00 0.00HVAC Renovations - Dance Building HVAC Renovations - Dance Building CANNON DESIGN INC 1,576,496.11 970,520.09

Commissioning Services for HVAC Dance Renovation

OLA CONSULTING ENGINEERS PC 194,918.00 17,580.91

Total Purchase College 4 Total Projects 2,375,353.02 1,145,397.25SUNY Brockport Renovate Exterior Facade & Perimeter

Heating System at Allen HallRenovate Exterior Facade & Perimeter Heating System at Allen Hall

FLYNN BATTAGLIA ARCHITECTS PC 852,000.00 23,710.68

Replace Emergency Generators, Campus Wide

Replace Emergency Generators, Campus Wide

IBC ENGINEERING PC 555,000.00 0.00

Total SUNY Brockport 2 Total Projects 1,407,000.00 23,710.68 2SUNY Cortland Renovate Park Center Facade Renovate Park Center Facade FLYNN BATTAGLIA ARCHITECTS PC 1,729,000.00 112,406.89

Total SUNY Cortland 1 Total Projects 1,729,000.00 112,406.89SUNY Fredonia Program & Phasing Study for New

Academic SpaceProgram & Phasing Study for New Academic Space

KIDENEY ARCHITECTS PC 195,246.00 29,589.651

Total SUNY Fredonia 1 Total Projects 195,246.00 29,589.65SUNY Geneseo Reconstruct Site Electric & Steam

Infrastructure at Sturges Quad AreaReconstruct Site Electric & Steam Infrastructure at Sturges Quad Area

RMF ENGINEERING INC PC 1,117,000.00 400,915.011

Program and Phasing Study: Sturges Quad Area Projects

Program and Phasing Study: Sturges Quad Area Projects

STIEGLITZ SNYDER ARCHITECTURE 116,207.00 106,307.83

Total SUNY Geneseo 2 Total Projects 1,233,207.00 507,222.84 2SUNY New Paltz Upgrade HVAC Systems at Dorsky

Museum, Bldg. No. 31BUpgrade HVAC Systems at Dorsky Museum, Bldg. No. 31B

OLA CONSULTING ENGINEERS PC 316,000.00 33,645.67

Replace Roof, Fine Arts Building Replace Roof, Fine Arts Building HOFFMANN ARCHITECTS INC 159,650.00 0.00 5

Report AState University Construction Fund Projects in Planning

As of September 30, 2016

Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them. All projects listed were managed by the State University Construction Fund.

Page 1 of 20

Page 3: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report AState University Construction Fund Projects in Planning

As of September 30, 2016

Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them. All projects listed were managed by the State University Construction Fund.

Upgrade HVAC Systems, Coykendall Science Bldg.

Upgrade HVAC Systems, Coykendall Science Bldg.

OBRIEN & GERE ENGINEERS INC 461,000.00 0.00

Replace Freight Elevator- Fine Arts Building

Replace Freight Elevator- Fine Arts Building

PETER GISOLFI ASSOCIATES ARCHITECTURE LANDSCAPE ARCHITECTURE LLP

70,000.00 0.00

Replace Plaza Deck, Haggerty Administration & Student Union Bldgs 39 and 38

Replace Plaza Deck, Haggerty Administration & Student Union Bldgs 39 and 38

HOFFMANN ARCHITECTS INC 407,000.00 49,621.87

Total SUNY New Paltz 5 Total Projects 1,413,650.00 83,267.54SUNY Oswego Rehab Exterior - Lee Hall Lee Hall - Window and Door Replacement

for Critical MaintenanceLOMONACO & PITTS ARCHITECTS PC 488,000.00 181,577.03

Program Study - Lee Hall Program Study - Lee Hall JMZ ARCHITECTS AND PLANNERS PC 73,100.00 14,131.06 3Program Study - Laker Hall Program Study - Laker Hall JMZ ARCHITECTS AND PLANNERS PC 105,803.00 15,396.65Total SUNY Oswego 3 Total Projects 666,903.00 211,104.74

SUNY Plattsburgh Renovate & Upgrade Clinton Dining Hall Renovate & Upgrade Clinton Dining Hall EDGE ARCHITECTURE PLLC 534,220.00 157,057.70Mechanical Systems Study Memorial Hall Mechanical Systems Study Memorial Hall HYMAN HAYES ASSOCIATES

ARCHITECTS LLC68,650.00 38,192.32

3HTHW Generator Replacement HTHW Generator Replacement RMF ENGINEERING INC PC 1,694,000.00 892,013.62Total SUNY Plattsburgh 3 Total Projects 2,296,870.00 1,087,263.64

SUNY Potsdam Renovate Timerman Hall Renovate Timerman Hall MACH ARCHITECTURE PC 978,000.00 298,226.87Rehab Kellas Hall, Bldg 25 Rehab Kellas Hall, Bldg 25 M E ENGINEERING PC 1,099,577.00 283,896.65 4Construct New Child Care Center Construct New Child Care Center ARCHITECTURAL RESOURCES PC 548,000.00 114,513.51Crane Music Complex - Master Plan Implementaion Study

Crane Music Complex - Master Plan Implementaion Study

CANNON DESIGN ARCHITECTURE AND ENGINEERI NG, P.C.

640,000.00 255,773.01

Total SUNY Potsdam 4 Total Projects 3,265,577.00 952,410.04

37 Total Projects 19,272,977.02 5,106,557.19Other Research/Doctoral

Alfred Ceramics Install Satellite Boilers - Multiple Buildings Install Satellite Boilers - Multiple Buildings M E ENGINEERING PC 632,000.00 295,883.07

Total Alfred Ceramics 1 Total Projects 632,000.00 295,883.07College of Optometry Renovate Lower Lobby Renovate Lower Lobby PETER GISOLFI ASSOCIATES

ARCHITECTURE LANDSCAPE ARCHITECTURE LLP

491,000.00 64,943.22

Renovate 2nd Floor Lecture Hall Renov 2nd Flr Lectur Hall GOSHOW ARCHITECTS LLP 118,496.87 118,496.87Total College of Optometry 2 Total Projects 609,496.87 183,440.09

Cornell - Geneva Ag. Rehab Agricultural Research Pilot Plant Rehab Agricultural Pilot Plan SWBR ARCHITECTURE ENGINEERING & LANDSCAPE ARCHITECTURE PC

1,497,000.00 282,765.85

Total Cornell - Geneva Ag. 1 Total Projects 1,497,000.00 282,765.85SUNY Downstate Upgrade Electrical System UHB Upgrade Electrical System UHB LIZARDOS ENGINEERING ASSOCIATES

PC2,403,000.00 93,615.66

CM Upgrade Electrical System UHB JACOBS PROJECT MANAGEMENT CO 287,997.00 0.00 1Space Programming Study- BSB Space Programming Study- BSB PETER GISOLFI ASSOCIATES

ARCHITECTURE LANDSCAPE ARCHITECTURE LLP

154,573.50 0.00

Renovate Pharmacy UHB Basement Renovate Pharmacy UHB Basement PETER GISOLFI ASSOCIATES ARCHITECTURE LANDSCAPE ARCHITECTURE LLP

445,700.00 7,151.97

6Upgrade CO Detection Systems Various Buildings

Upgrade CO Detection Systems Various Buildings

PETER GISOLFI ASSOCIATES ARCHITECTURE LANDSCAPE ARCHITECTURE LLP

189,500.00 2,391.84

Total Comprehensive Colleges

Page 2 of 20

Page 4: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report AState University Construction Fund Projects in Planning

As of September 30, 2016

Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them. All projects listed were managed by the State University Construction Fund.

Provide Additional Electrical Power-BSB Provide Additional Electrical Power-BSB KALLEN & LEMELSON LLP 883,586.00 200,782.88CM Provide Additional Electrical Power-BSB

JACOBS PROJECT MANAGEMENT CO 653,230.00 0.00

Construction Manager- Various Projects 14A18, 14B03, 14B33, 14B44

Construction Manager - Various Projects 14A18

JACOBS PROJECT MANAGEMENT CO 963,736.79 611,051.40

Total SUNY Downstate 6 Total Projects 5,981,323.29 914,993.75SUNY ESF Wanakena Ranger School - Various

Building and Site ImprovementsWanakena Ranger School & Cranberry Lk BS CM Energy Conserv & ADA

LOMONACO & PITTS ARCHITECTS PC 548,000.00 225,504.50

Total SUNY ESF 1 Total Projects 548,000.00 225,504.50

11 9,267,820.16 1,902,587.26Research/University Centers

Binghamton University Renovate Science II - Phase 1 Physics Wing

Renovate Science II - Phase 1 Physics Wing

M E ENGINEERING PC 1,734,000.00 0.00

Rehabilitate Science IV Ph 1 Rehabilitate Science IV ph 1 ASHLEY MCGRAW ARCHITECTS DPC 1,857,012.37 922,827.97 1Total Binghamton University

2Total Projects 3,591,012.37 922,827.97

Stony Brook University

Waste Water Treatment System Southampton

Waste Water Treatment System Southampton

H2M ARCHITECTS ENGINEERS LAND SURVEYING LANDSCAPE ARCHITECTURE DPC

1,338,000.00 540,417.89

Rehabilitation of Javits Lecture Hall Rehabilitation of Javits Lecture Hall BEYER BLINDER & BELLE LLP 2,547,500.00 1,222,707.82Commissioning - Javits Lect Hall Rehab OLA CONSULTING ENGINEERS PC 143,455.00 18,181.20 1

Student Union Rehab Design services - Student Union Tehab SPECTOR GROUP II 6,491,880.46 3,457,310.81Construction Management - Student Union Rehab

JACOBS PROJECT MANAGEMENT CO 2,689,680.00 87,024.233

Total Stony Brook University 3 Total Projects 13,210,515.46 5,325,641.95University Buffalo - North

Replace Electrical Service and Emergency Power Equipment - Cooke and Hochstetter

Replace Electrical Service and Emergency Power Equipment - Cooke and Hochstetter

M E ENGINEERING PC 455,000.00 0.00

Renovate Cooke/Hochsetter Ph1 Renovate Cooke/Hochsetter ASHLEY MCGRAW ARCHITECTS DPC 1,305,010.00 169,575.62Rehabilitate Exterior Envelope & Structure - Center For the Arts (CFA)

Rehabilitate Exterior Envelope & Structure - Center For the Arts (CFA)

DIDONATO ASSOCIATES ENGINEERING & ARCHITECTURE PC

2,206,000.00 1,225,902.73

Total University Buffalo - North 3 Total Projects 3,966,010.00 1,395,478.35University Buffalo - South

Renovate Townsend Hall Renovate Townsend Hall SWBR ARCHITECTURE ENGINEERING & LANDSCAPE ARCHITECTURE PC

950,000.00 133,897.24

Total University Buffalo - South 1 Total Projects 950,000.00 133,897.24 3University at Albany Renovate Sub-Basement Lect Center South Renovate Sub-Basement lecture Ctr South HYMAN HAYES ASSOCIATES

ARCHITECTS LLC544,000.00 68,020.08

Upgrade Central Plant - SUCF Upgrade Central Plant WM GROUP ENGINEERS PC 1,914,000.00 289,116.32Decommission Former Data Center - Bldg 56

Decommission Former Data Center Bldg 56 IBC ENGINEERING PC 68,000.00 0.001

Rehab Toilet Rooms for ADA - Podium Rehab Toilet Rooms for ADA - Podium DEMBLING & DEMBLING ARCHITECTS PC

1,015,600.00 0.00

Upgrade Controls Study/Pilot Campus Wide

Upgrade Controls Study/Pilot Campus Wide

M E ENGINEERING PC 261,669.00 0.00

ADA Compliance Study - Campus Wide ADA Compliance Study - Campus Wide HYMAN HAYES ASSOCIATES ARCHITECTS LLC

349,440.00 34,682.86

Renovate Building 27- Business Administration

Renovate Building 27- Business Administration

CANNON DESIGN INC 3,981,000.00 427,384.43

Construct ETEC Building - 2020 Design services - Construct ETEC Building -2020

CANNON DESIGN ARCHITECTURE AND ENGINEERI NG, P.C.

10,697,769.00 5,655,222.93

Pre-Project construction services - ETEC Building - 2020

SKANSKA USA BUILDING INC 496,081.07 496,081.07

Total Other Research/Doctoral

Page 3 of 20

Page 5: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report AState University Construction Fund Projects in Planning

As of September 30, 2016

Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them. All projects listed were managed by the State University Construction Fund.

Commissioning Services Construct ETEC Research Building & Parking Structure

M E ENGINEERING PC 382,712.51 10,973.67

Redesign ETEC for Harriman Site - ETEC Building 2020

CANNON DESIGN ARCHITECTURE AND ENGINEERI NG, P.C.

14,641,000.00 558,007.49

CM Construct ETEC Building - 2020 TURNER CONSTRUCTION COMPANY 7,439,295.00 0.00Renovate Lecture Center Renovate Lecture Center LOMONACO & PITTS ARCHITECTS PC 2,461,000.00 269,963.61 10Renovate Former Albany HS - Phase II Renovate Schuyler Building - Phase II COLLINS & SCOVILLE ARCHITECTURE

ENGINEERING CONSTRUCTION MANAGEMENT PC

4,847,000.00 280,160.53

Total University at Albany 10 Total Projects 49,098,566.58 8,089,612.99

19 70,816,104.41 15,867,458.50Technology Colleges Alfred State College Install Satellite Boilers - Phase 3 Install Satellite Boilers - Phase 3 M E ENGINEERING PC 705,000.00 0.00

Total Alfred State College 1 Total Projects 705,000.00 0.00Farmingdale State College

Renovate Knapp Hall, Phase 1 Renovate Knapp Hall, Phase I PETER GISOLFI ASSOCIATES ARCHITECTURE LANDSCAPE ARCHITECTURE LLP

296,000.00 78,428.57

Rehabilitate Roosevelt Hall Ph. 1 Rehabilitate Roosevelt Hall Ph. 1 PLAN A ARCHITECTURE & DESIGN PLLC

2,122,000.00 70,040.53

Construct School of Applied Social Sciences

Construct School of Applied Social Sciences

URBAHN ARCHITECTS PLLC URBAHN ARCHITECTS

3,110,100.00 192,229.631

Total Farmingdale State College 3 Total Projects 5,528,100.00 340,698.73Maritime College Program Study - Rehabilitation & Addition -

Marvin Tode S&E BuildingProgram Study - Rehabilitation & Addition - Marvin Tode S&E Building

PETER GISOLFI ASSOCIATES ARCHITECTURE LANDSCAPE ARCHITECTURE LLP

155,479.39 73,860.76

Emergency Generator Upgrade Marvin Tode

Emergency Generator Upgrades Marvin Tode

LILKER ASSOCIATES CONSULTING ENGINEERS PC

122,290.29 122,290.293

Total Maritime College 2 Total Projects 277,769.68 196,151.05Morrisville State College

Upgrade Ventilation to Iceplex Bldg Upgrade Ventilation to Iceplex Bldg 105 HUNT ENGINEERS ARCHITECTS LAND SURVEYORS & LANDSCAPE ARCHITECT DPC

139,000.00 0.00

Rehabilitate Electric Feeder and Distribution System

Rehabilitate Electric Feeder and Distribution System

C & S ENGINEERS INC 1,785,600.00 0.002

Replace Roofs -Bailey and Bicknell Halls Replace Roofs -Bailey and Bicknell Halls LOMONACO & PITTS ARCHITECTS PC 159,000.00 84,344.08Replace MTHW Lines, Greenhouse to Library

Replace Direct Burial MTHW and Domestic Water Lines, Greenhouse to Library

HUNT ENGINEERS ARCHITECTS LAND SURVEYORS & LANDSCAPE ARCHITECT DPC

149,000.00 0.00

Rehabilitate Electrical Feeder & Distribution System

Rehabilitate Electrical Feeder & Distribution System

MCFARLAND-JOHNSON INC 691,000.00 256,926.46

Building Conversion/Construct Design Facility - Commissioing

Building Conversion/Construct Design Facility - Commissioing

BUILDING CONTROLS & SERVICES INC 83,468.11 83,468.11

Total Morrisville State College 6 Total Projects 3,007,068.11 424,738.65 6SUNY Canton Rehabilitate Exterior Envelope Dana Hall REHAB EXTERIOR ENVELOPE DANA

HALLLOMONACO & PITTS ARCHITECTS PC 429,000.00 180,689.75

Rehab Water Distribution System & Related Site Infrastructure

Rehab Water Distribution System & Related Site Infrastructure

LABELLA ASSOCIATES DPC 381,000.00 176,435.69

Renovate Dana Hall RENOVATE DANA HALL HYMAN HAYES ASSOCIATES ARCHITECTS LLC

600,000.00 69,863.50

Renovate Chaney Hall Phase 2 Renovate Chaney Hall Phase 2 KIDENEY ARCHITECTS PC 525,000.00 44,000.00Total SUNY Canton 4 Total Projects 1,935,000.00 470,988.94

SUNY Cobleskill Upgrade Electrical Distribution System Upgrade Old Quad Electrical Distribution System

LABELLA ASSOCIATES DPC 735,000.00 151,819.524

Total Research/University Centers

Page 4 of 20

Page 6: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report AState University Construction Fund Projects in Planning

As of September 30, 2016

Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them. All projects listed were managed by the State University Construction Fund.

Renovate Bouck Hall Theater, Gym and Lobby

Renovate Bouck Hall Theater, Gym and Lobby

HYMAN HAYES ASSOCIATES ARCHITECTS LLC

552,000.00 80,238.26

Upgrade Mechanical and Plumbing Systems Prentice Hall

Upgrade Mechanicaland Plumbing Systems Prentice Hall

IBC ENGINEERING PC 695,500.00 0.00

Upgrade Mechanical, Electrical and Plumbing Systems Champlin Hall

Upgrade Mechanical, Electrical and Plumbing Systems Champlin Hall

HESNOR ENGINEERING ASSOCIATES PLLC

733,000.00 23,871.98

Renovation and Addition to Home Economic Building

Renovation and Addition to Home Economic Building

MESICK COHEN WILSON BAKER ARCHITECTS LLP

914,216.10 512,435.01

Total SUNY Cobleskill 5 Total Projects 3,629,716.10 768,364.77 5SUNY Delhi Replace Roof and Exhaust Fans Evenden

HallREPLACE ROOF AND EXHAUST FANS EVENDEN HALL

LOMONACO & PITTS ARCHITECTS PC 186,000.00 108,090.38

Upgrade Mechanical Systems Various Buildings

Mechanical Electrical Plumbing Alteration Services - Delhi

IBC ENGINEERING PC 418,000.00 53,007.27

Replace Emergency Generators Replace Emergency Generators - Delhi IBC ENGINEERING PC 361,000.00 0.00Replace Windows & Refinish Exterior Walls - Bush Hall

Replace Windows & Refinish Exterior Walls - Bush Hall

LOMONACO & PITTS ARCHITECTS PC 360,000.00 160,025.05

Upgrade Cooking Labs MacDonald Hall Upgrade Cooking Labs MacDonald Hall HYMAN HAYES ASSOCIATES ARCHITECTS LLC

164,000.00 13,593.17

Total SUNY Delhi 5 Total Projects 1,489,000.00 334,715.87

Total Technology Colleges 26 16,571,653.89 2,535,658.01

University-WideGeneral State Construct Anaerobic Digesters - Multiple

CampusesProgram Study - Construct Anaerobic Digesters – Multiple Campuses

ARCADIS OF NEW YORK INC 258,499.27 258,499.275

Design Services - Construct Anaerobic Digesters - Cobleskill, Delhi, & Morrisville (Parent Contract)

GHD CONSULTING SERVICES INC 733,000.00 163,129.28

Design Services - Construct Anaerobic Digesters - Morrisville

GHD CONSULTING SERVICES INC 932,000.00 186,922.41

Total General State 1 Total Projects 1,923,499.27 608,550.96 1System Administration Update to Development Plan - System

AdministrationUpdate Development Study PERKINS & WILL ARCHITECTS PC 197,837.00 27,456.47

Total System Administration 1 Total Projects 197,837.00 27,456.47 1

2 Total Projects 2,121,336.27 636,007.43

Grand Total 95 Total Projects 118,049,891.75 26,048,268.39

91

Total University Wide

Page 5 of 20

Page 7: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTDComprehensive Colleges

Buffalo State College Renovate B-Wing at Buckham Hall Renovate B-Wing at Buckham Hall RODEMS CONSTRUCTION CO INC 3,526,523.00 0.00

Renovate B-Wing at Buckham Hall Exterior Rehab

RODEMS CONSTRUCTION CO INC 1,354,353.00 0.00

JOCS - Interior Steel Rehab. SG CONSTRUCTION SERVICES LLC 245,365.12 185,713.00Renovate Science Building - Bldg. 15, Phase II Renovate Science Building - Bldg. 15, Phase II LP CIMINELLI INC 20,799,498.46 20,268,668.00

Commissioning Agent, Renovate Science 15 Phase II

HORIZON ENGINEERING ASSOCIATES LLP 442,866.00 293,899.93

Construction Management Sci Bldg PhaseII TURNER CONSTRUCTION COMPANY 999,829.40 999,829.40

CM Renovate Science Building - Bldg. 15, Phase II

TURNER CONSTRUCTION COMPANY 1,602,297.00 105,421.35

Rehabilitate Caudell Hall, Bldg. No. 18 Rehabilitate Caudell Hall NORTHLAND ASSOCIATES INC 21,958,532.53 20,358,359.00Construction Manager for Upton and Caudell Restoration

LIRO PROGRAM & CONSTRUCTION MANAGEMENT PE PC

1,328,686.00 1,106,508.49

Commissioning for Caudell Hall Restoration BERGMANN ASSOCIATES ARCHITECTS ENGINEERS LANDSCAPE ARCHITECTS SURVEYORS DPC

98,389.00 65,921.51

Replace Sanitary Sewer at Rockwell Road JOCS - Sanitary Sewer - Twin Rise SG CONSTRUCTION SERVICES LLC 34,570.54 34,536.00JOCS - Replace Sanitary Sewer at Rockwell Road

SG CONSTRUCTION SERVICES LLC 282,277.00 266,186.00

Selective Demo & Asbestos Abatement Buckham B & A Wings

Selective Demo & Asbestos Abatement Buckham B Wing

SICOLI CONSTRUCTION SERVICES INC 984,956.70 816,174.00

Total Buffalo State College 5 Total Projects 53,658,143.75 44,501,216.68College at Oneonta Replace Boiler - MOC Replace Boiler - MOC WILKINS MECHANICAL INC 334,059.73 0.00

Replace HVAC Equipment - Hunt College Union Replace HVAC Equipment - Hunt College Union EVANS MECHANICAL INC 4,305,301.00 0.00

Upgrade HVAC Systems - Lee Hall Upgrade HVAC Systems - Lee Hall - College at Oneonta

ANDREW R MANCINI ASSOC INC 1,292,825.53 1,291,534.00

Upgrade HVAC Systems - Netzer Hall WILKINS MECHANICAL INC 1,928,519.59 1,808,450.00Rehab Health Center Rehab Health Center MURNANE BUILDING CONTRACTORS 4,192,439.15 3,773,125.00

Commissioning - Rehab. Health Center GENESYS ENGINEERING PC 29,466.74 14,034.02Upgrade Telecommunications & Data Infrastructure

Upgrade Telecommunications & Data Infrastructure

MATCO ELECTRIC CORPORATION 3,523,636.15 2,714,665.00

ADA Modifications Various Buildings Ph. III ADA Modifications IRC Milne Library & Morris Hall

ANDREW R MANCINI ASSOC INC 403,102.70 359,656.00

ADA Modifications & Surge - Lee Hall MURNANE BUILDING CONTRACTORS 1,401,508.11 1,400,108.00ADA Modifications Various Buildings Ph. III FAHS CONSTRUCTION GROUP INC 1,276,469.19 1,264,741.00

Rehabilitate HVAC Mills & Wilsbach Dining Halls Rehabilitate HVAC Wilsbach Dining Hall DIGESARE MECHANICAL INC 1,169,568.40 953,825.00

Rehabilitate HVAC Mills Dining Hall WILKINS MECHANICAL INC 1,166,729.56 1,080,639.00Rehab North Quad Rehab North Quad RB ROBINSON CONTRACTING INC 1,442,631.19 825,199.00Upgrade Mechanical Systems Morris Hall Upgrade Mechanical Systems Morris Hall WILKINS MECHANICAL INC 1,137,883.75 698,392.00

Total College at Oneonta 9 Total Projects 23,604,140.79 16,184,368.02Empire State College Construct Regional Centers Statewide Regional Center Rochester ALLIED BUILDERS INC 9,909,201.94 9,519,185.00

Commissioning Regn Centr Rochester CJ BROWN ENERGY & ENGINEERING PC 67,747.00 50,988.24

Total Empire State College 1 Total Projects 9,976,948.94 9,570,173.24Old Westbury Replace Roofs at Campus Center Replace Roofs at Campus Center STATEWIDE ROOFING INC 2,425,423.00 0.00

Replace Road Salt Sand Shed (SUCF) Replace Salt Shed - JOCS 80700-02 VOLMAR CONSTRUCTION INC 667,622.96 0.00Rehab Campus Center-H, I & K Wings Rehab Campus Center-H, I & K Wings SIGMA CONTRACTING CORPORATION 3,267,980.85 3,001,594.00

JOCS Punch List Completion of Interior Rehab H, I K 80700-02

VOLMAR CONSTRUCTION INC 7,447.44 0.00

Report BState University Construction Fund Projects in Construction

As of September 30, 2016

Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were managed by the State University Construction Fund.

Page 6 of 20

Page 8: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report BState University Construction Fund Projects in Construction

As of September 30, 2016

Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were managed by the State University Construction Fund.

Renovation of Library/Academic Space Renovation of Library/Academic Space - Stage 2 FRATELLO CONSTRUCTION CORP 8,777,769.00 0.00

Renovation of Library/Academic Space Phase I MINELLI CONSTRUCTION CO INC 13,490,274.00 12,125,940.00

Commissioning Agent - Renovate Library OLA CONSULTING ENGINEERS PC 155,193.00 115,839.23Construction Manager Library Rehabilitation, Stage 1

JACOBS PROJECT MANAGEMENT CO 473,882.31 454,191.90

Renovation of Library/Academic Space JACOBS PROJECT MANAGEMENT CO 416,359.00 88,588.55Removal of Aboveground Fuel Oil Tank Removal of Aboveground Fuel Oil Tank GEMSTAR CONSTRUCTION CORP 307,567.26 0.00

Total Old Westbury 5 Total Projects 29,989,518.82 15,786,153.68Purchase College Renovate/Construct Center for Integrated

Technology LearningRenovate/Construct Center for Integrated Technology Learning

WORTH CONSTRUCTION CO INC 30,646,053.44 11,000,518.00

Building Systems Commissioning Services- CITL Project 29402

LORING CONSULTING ENGINEERS INC 239,905.00 41,758.54

29847 CM - Center for Integrated Tech learning HILL INTERNATIONAL INC 1,078,571.00 716,973.67

Rehabilitate Exteriors / Dining Hall and Physical Education

Rehabilitate Exteriors / Dining Hall and Physical Education

NIRAM INC 8,953,659.72 3,481,699.00

Rehabilitate Exterior Dining Hall CALADRI DEVELOPMENT CORP 2,685,130.45 2,682,448.00Construction Management Services- Exter Rehabilitation Dining & Phys Ed Bldgs

THE MCKISSACK GROUP INC 549,097.00 447,881.40

JOCS- Dining Hall Signage & Vestibule Mats CORBEX INC 69,095.03 60,043.00

Rehabilitate Plaza Exterior Pathways Rehabilitate Plaza Exterior Pathways FOURMEN CONSTRUCTION INC 2,174,733.36 1,971,003.03Rehabilitate Plaza Exterior Pathways Phase I MPCC CORP 5,897,743.51 5,739,544.00

Rehabilitate Exteriors - Various Buildings Rehabilitate Exteriors - Various Buildings NIRAM INC 3,237,308.00 249,153.00Rehabilitate Exteriors - Priority 1 areas SIBA CONTRACTING CORP 615,117.50 511,905.00

Total Purchase College 4 Total Projects 56,146,414.01 26,902,926.64SUNY Brockport Boiler, Ventilation & HVAC Upgrades to REOC JOCS SG CONSTRUCTION SERVICES LLC 978,941.96 883,795.00

Renovate Lathrop Hall Upgrades, Bldg. 07 Renovate Lathrop Hall Upgrades, Bldg. 07 MANNING SQUIRES HENNIG CO INC 11,560,170.62 11,396,388.00

Commissioning Services- Renovate Lathrop and Neff Hall

BERGMANN ASSOCIATES ARCHITECTS ENGINEERS LANDSCAPE ARCHITECTS SURVEYORS DPC

85,269.00 77,657.12

Total SUNY Brockport 2 Total Projects 12,624,381.58 12,357,840.12SUNY Cortland Reconstruct Campus Wide Electrical Distribution Reconstruct Campus Wide Electrical Distribution RIDLEY ELECTRIC COMPANY INC 5,736,731.00 2,530,761.00

Campus Wide Electric Distribution Ph I MOHAWK VALLEY UTILITY CONSTRUCTION CORP

3,324,538.22 3,321,217.00

Comprehensive reconstruction and upgrade of Campus Wide Electrical Distribution infrastructure

NELCORP ELECTRICAL CONTRACTING CORP

7,770,957.19 7,227,904.00

Total SUNY Cortland 1 Total Projects 16,832,226.41 13,079,882.00SUNY Fredonia Demolish Academic Spine Bridge JOCS - Shoring of Academic Spine Bridge SG CONSTRUCTION SERVICES LLC 21,571.55 21,550.00

Demolish Academic Spine Bridge UNION CONCRETE AND CONSTRUCTION CORP

467,129.66 192,863.00

Renovate Houghton Hall Renovate Surge For Exercise Science PERRY CONSTRUCTION GROUP INC 741,973.23 702,368.00Addition and Renovation Rockefeller Arts Center RAC Addition & Renov NORTHLAND ASSOCIATES INC 32,699,257.15 29,443,865.00

Commissioning - Rockefeller Arts Center Addition and Renovation

BERGMANN ASSOCIATES ARCHITECTS ENGINEERS LANDSCAPE ARCHITECTS SURVEYORS DPC

197,325.00 77,249.19

Page 7 of 20

Page 9: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report BState University Construction Fund Projects in Construction

As of September 30, 2016

Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were managed by the State University Construction Fund.

Construction Manager Rockerfeller Art Center CAMPUS CONSTRUCTION MANAGEMENT GROUP INC

1,724,332.25 1,464,760.79

Rockefeller Arts Center (RAC) Third Floor HVAC and Sprinkler

NORTHLAND ASSOCIATES INC 2,626,868.24 1,726,932.00

Rehab McEwen Hall Exterior Rehab McEwen Hall Exterior CONCEPT CONSTRUCTION CORP 1,874,873.00 264,079.00

Total SUNY Fredonia 4 Total Projects 40,353,330.08 33,893,666.98SUNY New Paltz Upgrade Site Electric Distribution System Upgrade Site Electric Distribution System M SCHER & SON INC 4,792,788.00 1,873,830.00

Upgrade Electric Distribution - Phase I M SCHER & SON INC 4,656,598.38 4,651,590.00New Science Building New Science Building NIRAM INC 36,935,148.15 27,619,490.00

Construction Manager - New Science Building THE WHITING-TURNER CONTRACTING COMPANY INC

2,311,440.00 1,753,756.82

Commissioning - New Science Building OLA CONSULTING ENGINEERS PC 199,832.65 32,059.74Wooster Building Renovations Wooster Building Renovations APS CONTRACTING INC 28,589,602.04 26,553,615.00

Commissioning - Wooster Renovation OLA CONSULTING ENGINEERS PC 188,400.00 129,079.12

Construction Manager - Wooster Renovation JACOBS PROJECT MANAGEMENT CO 2,108,491.95 1,956,867.60

JOCS - Wooster Campus Lounge Fit Out CUTTING EDGE GRP LLC 129,611.48 86,691.00JOCS- Sidewalks At Wooster UPSTATE COMPANIES LLC 76,387.31 0.00

Renovate Locker Rooms, Elting Athletic Complex, Building No. 5

Renovate Locker Rooms, Elting Athletic Complex, Building No. 5

BCI CONSTRUCTION INC 3,792,678.89 319,365.00

Total SUNY New Paltz 4 Total Projects 83,780,978.85 64,976,344.28SUNY Oswego Rehab Tyler Hall Phase II JOC Electrical Work, Contract # T006067 CUTTING EDGE GRP LLC 54,535.48 0.00

Renovation/Additions to Science Engineering and Technologies Phase I

Renovation/Additions to Science Engineering and Technologies Phase I

FAHS CONSTRUCTION GROUP INC 26,740,481.22 26,592,935.00

Renovations/Addition to Rice Creek Field Station RJ TAYLOR GENERAL CONTRACTORS INC 5,241,972.00 5,196,842.02

Site Utility Relocation - Science Engineering & Technology

WD MALONE TRUCKING & EXCAVATING INC 1,877,834.76 1,875,759.00

Piez Hall Addition- Science Engineering and Technology

PIKE CO THE 45,442,574.61 45,395,505.00

CM - Major Improvements to the Education & Science Buildings

THE WHITING-TURNER CONTRACTING COMPANY INC

3,802,969.54 3,802,935.57

Commissioning Agent - Science Building GENESYS ENGINEERING PC 182,620.58 182,620.58Commissioning Services - Rice Creek Field Station

GENESYS ENGINEERING PC 37,540.50 37,540.50

107A5 JOCS -Completion of Rice Creek Field Station

CUTTING EDGE GRP LLC 65,800.74 65,735.00

Tyler Rehab-Lower Level & Partial Main Tyler Hall Rehab 1 BETTE & CRING LLC 24,207,553.37 21,952,267.00Commissioning Services for Tyler Hall Rehab Phase I (Project 10351)

GENESYS ENGINEERING PC 166,828.84 81,523.41

Total SUNY Oswego 3 Total Projects 107,820,711.64 105,183,663.08SUNY Plattsburgh Renovate Sibley Hall Phase 1 Renovate Sibley Hall Phase 1 BETTE & CRING LLC 8,418,330.00 4,765,990.00

Total SUNY Plattsburgh 1 Total Projects 8,418,330.00 4,765,990.00SUNY Potsdam Replace Roofs PH 2 - Brainerd & Flagg Hall Replace Roofs PH 2 - Brainerd & Flagg Hall PTL CONTRACTING CORP 1,173,172.00 0.00

Construct New ADA Restrooms, Kellas Hall Construct New ADA Restrooms, Kellas Hall NORTHERN TIER CONTRACTING INC 372,772.40 228,859.00

Performing Arts Building Performing Arts Building NORTHLAND ASSOCIATES INC 43,377,005.27 43,255,663.00Construction Manager - Performing Arts Building GILBANE BUILDING COMPANY 1,619,973.38 1,619,944.28

Commissioning - Performing Arts Building GENESYS ENGINEERING PC 132,546.00 94,044.82Replace Windows, Various Buildings Repalce Windows, Various Buildings NORTHLAND ASSOCIATES INC 1,161,503.23 915,922.00

Page 8 of 20

Page 10: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report BState University Construction Fund Projects in Construction

As of September 30, 2016

Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were managed by the State University Construction Fund.

Restore Exterior Envelope - Kellas and Thatcher Halls

Restore Exterior Envelope - Kellas and Thatcher Halls

CONTINENTAL CONSTRUCTION LLC 729,395.19 632,073.00

Total SUNY Potsdam 5 Total Projects 48,566,367.47 46,746,506.1044 Total Projects 491,771,492.34 393,948,730.82

Other Research/Doctoral

Alfred Ceramics Rehab/Reconstruct Outdoor Kiln Facility Rehab/Reconstruct Outdoor Kiln Facility FRANK J MARIANACCI INC 855,612.76 209,518.00

Total Alfred Ceramics 1 Total Projects 855,612.76 209,518.00College of Optometry Rehab Building Systems Rehab Electrical Ssystems CRC ASSOCIATES INC 9,104,910.82 8,551,904.00

Rehab Building Systems Mech Ph 1 C D E AIR CONDITIONING CO 10,015,967.96 659,502.00Construction Manager for 41059 & 41060 THE MCKISSACK GROUP INC 741,930.00 716,544.17Commissioning for 41056 SYSKA HENNESSY GROUP INC 182,518.00 7,163.30Rehab Building Systems ANDREW VELEZ CONSTRUCTION INC 575,430.00 95,565.66

Total College of Optometry 1 Total Projects 20,620,756.78 10,030,679.13SUNY Downstate Upgrade HVAC Systems BSB Construction - Stacks and Fans Upgrade, BSB HM HUGHES CO INC 25,455,830.40 0.00

Construction - Sprinkler System Upgrades - BSB LO SARDO GEN CONTRS INC 7,346,339.00 304,522.00

CM Services - Upgrade HVAC Systems BSB JACOBS PROJECT MANAGEMENT CO 684,935.00 0.00

CM services - 01 and 02 lab Exhaust/ Sprinkler system upgrades

JACOBS PROJECT MANAGEMENT CO 1,110,490.00 0.00

JOCS-Partial Surveillance Work Package VOLMAR CONSTRUCTION INC 189,196.01 0.00

JOCS New Academic Building School of Public Health - Busway End Cable Tap Box

VOLMAR CONSTRUCTION INC 22,022.00 0.00

HVAC Upgrade, University Hospital HVAC Upgrade, University Hospital DYNAMIC MECHANICAL CONTRACTORS INC 10,276,838.57 2,736,412.00

HVAC Upgrade, University Hospital - Basement and Sub-Basement

ACS SYSTEM ASSOCIATES INC 4,139,582.00 4,125,314.00

New Academic Building School of Public Health New Academic Building School of Public Health TUTOR PERINI CORPORATION 75,477,600.20 62,311,978.00

Construction Manager for School of Public Health

GILBANE BUILDING COMPANY 5,947,209.00 0.00

Commissioning - School of Public Health GENESYS ENGINEERING PC 131,975.00 83,113.70Replace Boilers BSB CM Services- Replace Boilers BSB JACOBS PROJECT MANAGEMENT CO 2,422,461.00 73,992.42

CM Logistical Planning Services - Replace Boilers BSB

GILBANE BUILDING COMPANY 1,093,936.80 63,285.60

Total SUNY Downstate 4 Total Projects 134,298,414.98 69,698,617.72SUNY ESF Marshall Hall - Repair Gutter, Roofing and

MasonryMarshall Hall - Repair Gutter, Roofing and Masonry

JOSALL SYRACUSE INC 1,035,634.60 465,271.00

New Academic Research Building New Academic Research Building - Block D Site Work

FAHS CONSTRUCTION GROUP INC 1,032,077.78 1,030,631.00

Commissioning Services- Academic Research Building

GENESYS ENGINEERING PC 102,790.00 749.02

Block D Site Improvement Project MCGINNIS NELSON CONSTRUCTION INC 540,540.00 0.00CM New Academic Research Building THE WHITING-TURNER CONTRACTING

COMPANY INC1,510,520.00 0.00

Rehab Skylights, Roof - Bray Hall and Moon Library

Rehab Skylights, Roof - Bray Hall and Moon Library

TITAN ROOFING INC 1,323,322.00 380,855.00

Total SUNY ESF 3 Total Projects 5,544,884.38 1,877,506.02Upstate Medical University

DLAR Renovations Phase III Weiskotten Hall Commissioning – DLAR Phase III Renovation Weiskotten Hall

GENESYS ENGINEERING PC 70,111.00 9,846.24

Complete Chilled Water Loop Weiskotten Addition 15A80

EDWARD JOY COMPANY 942,119.18 941,178.00

New Academic Building New Academic Building BETTE & CRING LLC 33,641,039.43 30,679,311.00

Total Comprehensive Colleges

Page 9 of 20

Page 11: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report BState University Construction Fund Projects in Construction

As of September 30, 2016

Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were managed by the State University Construction Fund.

Construction Manager - New Academic Building THE WHITING-TURNER CONTRACTING COMPANY INC

1,695,996.00 1,281,892.60

Commissioning Services– New Academic Building

GENESYS ENGINEERING PC 103,594.00 77,767.40

Total Upstate Medical University 2 Total Projects 36,452,859.61 32,989,995.2411 Total Projects 197,772,528.51 114,806,316.11

Research/University Centers

Binghamton University Central Heating Plant Upgrades Central Heating Plant Upgrades J & K PLUMBING AND HEATING CO INC 11,884,928.06 8,296,619.00

Central Plant Upgrade Ph 1 NICHOLSON & HALL CORPORATION 5,384,999.62 5,369,620.00Construct School of Pharmacy Construct School of Pharmacy FAHS CONSTRUCTION GROUP INC 33,022,990.00 5,733,377.00

CM Services - Construct School of Pharmacy LECHASE CONSTRUCTION SERVICES LLC 1,166,816.00 255,172.46

Construct School of Pharmacy Site Demolition REGIONAL ENVIRONMENTAL DEMOLITION INC

136,974.20 134,407.00

JOCS-Fencing CUTTING EDGE GRP LLC 101,351.83 101,239.00

Total Binghamton University 2 Total Projects 51,698,059.71 19,890,434.46Stony Brook - HSC New Medical & Res Trans & Bed Tower Commissioning Services-MART/New Beds and

Support TowerRMF ENGINEERING INC PC 925,847.00 378,457.25

MRI STALCO CONSTRUCTION INC 2,583,444.66 2,580,664.00Early Site Package G & M EARTH MOVING INC 4,197,080.14 4,192,600.00Core and Shell EW HOWELL CO INC 163,798,473.84 146,601,198.00Fit-Out EW HOWELL CO INC 137,932,256.46 68,462,998.00New Medical & Res Trans & Bed Tower L&H SIGNS INC 472,634.16 0.00New Medical & Res Trans & Bed Tower 328A1 LIRO PROGRAM & CONSTRUCTION

MANAGEMENT PE PC5,695,661.62 4,416,709.95

Claims Analysis & Resolution Services Claims Analysis & Litigation Services NAVIGANT CONSULTING INC 797,340.00 0.00Rehab Walkway Campus Underpass Rehab Walkway Campus Underpass VANGUARD CONSTRUCTION &

DEVELOPMENT CORP2,595,687.09 235,268.00

Total Stony Brook - HSC 3 Total Projects 318,998,424.97 226,867,895.20Stony Brook University

Construct Stairway Safety Mods-ESS Construct Stairway Safety Mods-ESS CORBEX INC 71,944.87 0.00

Mechanical Systems Upgrade Life Sciences Mechanical Systems Upgrade Life Sciences FRAMAN MECHANICAL INC 14,046,096.31 13,958,404.00

Commissioning - Mech Sys Upgrd Life Sci OLA CONSULTING ENGINEERS PC 130,175.00 114,350.11CM Services - Mech Sys Upgrd Life Sci JACOBS PROJECT MANAGEMENT CO 1,279,042.85 1,222,602.79

Replacement of Electric Trans Feeders Replacement of Electric Trans Feeders ELECNOR HAWKEYE LLC 17,761,628.89 15,135,990.00Feeder Replacement BO - 7 Duct Banks ELDOR CONTRACTING CORP 17,233,878.66 17,216,662.00Replacement Elec Feeders ELDOR CONTRACTING CORP 17,851,285.00 17,050,302.00

Roof Replacement Grad Chemistry Bldg Roof Replacement Grad Chemistry Bldg A & J CONSTRUCTION OF NY INC 2,552,200.65 1,593,627.00

Total Stony Brook University 4 Total Projects 70,926,252.23 66,291,937.90Univ. Buffalo - North ADA Improvements - Phase II ADA Improvements - Phase II TRANSIT CONSTRUCTION SERVICES 1,410,649.24 1,064,523.00

ADA Improvements - Phase IIA TRASON DEVELOPMENT CORPORATION 1,354,516.16 1,353,163.00ADA Imrpovements- Ph IIB North S & W CONTRACTING OF WNY INC 1,768,393.63 1,766,627.00

Replace Fire Alarm Systems North Campus Replace Fire Alarm Systems North Campus - Phase I

FREY ELECTRIC CONSTRUCTION CO INC 3,295,313.02 3,292,021.00

North Campus PH II Replace Fire Alarm Replacement

GOODWIN ELECTRIC CORPORATION 3,525,455.93 2,742,526.00

Replace Fire Alarm Systems North Campus PH III

WEYDMAN ELECTRIC INC 2,123,558.44 1,436,882.00

School of Medicine & Biomedical Sciences New Building Downtown - Phase 1

SMBS Construction Manager- School of Medicine & Biomedical Sciences

GILBANE LIRO A JOINT VENTURE 11,500,672.00 0.00

SMBS Commissioning BO FACILITY DYNAMICS ENGINEERING 904,878.55 193,107.71New Schl. Med/Biomed Ph 1 LP CIMINELLI INC 58,884,065.17 54,627,659.00

Total Other Research/Doctoral

Page 10 of 20

Page 12: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report BState University Construction Fund Projects in Construction

As of September 30, 2016

Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were managed by the State University Construction Fund.

The School of Medicine & BioMedical Sciences – Shell & Fitout

LP CIMINELLI INC 233,215,305.32 137,061,787.00

-Restore Crofts Hall Plaza & Site Restore Crofts Hall Plaza & Site MANNING SQUIRES HENNIG CO INC 753,367.62 488,199.00

Total University Buffalo - North 4 Total Projects 318,736,175.08 204,026,494.71Univ. Buffalo - South Kapoor Hall Renovation Kapoor Hall Renovation PIKE CO THE 49,289,615.54 49,239,857.00

Demolition & Abatement at Acheson Hall TITAN WRECKING & ENVIRONMENTAL LLC 5,714,048.34 5,708,340.00

Construction Manager - Acheson Hall TURNER CONSTRUCTION COMPANY 2,769,985.94 2,769,959.12Commissioning Services - Acheson Hall AFFILIATED ENGINEERS PC 251,701.86 251,701.86JOCS Assignment SG CONSTRUCTION SERVICES LLC 1,178,909.00 1,167,469.00

Crosby Hall Building Wide Restoration Crosby Hall Replace Bathrooms and Elevator JAVEN CONSTRUCTION CO INC 3,931,993.07 1,850,182.00

Total University Buffalo - South 2 Total Projects 63,136,253.75 60,987,508.98University at Albany Renovate Health Center Renovate Health Center AOW ASSOCIATES INC 12,291,703.46 4,096,059.00

CM Services - Renovate Health Center TURNER CONSTRUCTION COMPANY 269,640.00 100,874.25Renovate Health Center Parking Management Trailer

AOW ASSOCIATES INC 917,917.00 0.00

Rehab Exterior Envelope, Downtown - Various Buildings

Rehab Exterior Envelope, Downtown - Various Buildings

MURNANE BUILDING CONTRACTORS 4,489,853.37 2,142,356.00

Replace Exterior Doors Uptown - Phase 1 Replace Exterior Doors Uptown - Phase 1 FLOWER CITY GLASS CO OF NY LLC 2,377,203.83 0.00

Total University at Albany 3 Total Projects 20,346,317.66 6,339,289.2518 843,841,483.40 584,403,560.50

Technology CollegesAlfred State College Construct Student Activities Facility Construct Student Activities Center LECHASE CONSTRUCTION SERVICES LLC 1,431,373.94 0.00

Install Satellite Boilers Ph2 Install Satellite Boilers Ph2 MONROE PIPING & SHEET METAL LLC 1,473,612.14 840,328.00JOCS - Alfred State Interim Boiler Modifications SG CONSTRUCTION SERVICES LLC 340,699.36 189,881.00

Complete Outstanding Items-SLC Complete Outstanding Items-SLC SG CONSTRUCTION SERVICES LLC 109,520.41 109,411.00

Total Alfred State College 3 Total Projects 3,355,205.85 1,139,620.00Farmingdale State College

Rehabilitate Conklin Hall Rehabilitate Conklin Hall STALCO CONSTRUCTION INC 9,965,832.88 7,778,416.00

Rehab Conklin Hall, Phase 1 CNA ENTERPRISES INC 1,674,202.53 1,672,530.00Commissioning Agent- Rehab Conklin Hall OLA CONSULTING ENGINEERS PC 93,925.00 53,681.56

Rehabilitate Gymnasium, Nold Hall 26312 - Nold Hall - Gymnasium Rehabilitation ALL-CON CONTRACTING CORP 2,396,894.50 0.00

Total Farmingdale State College 2 Total Projects 14,130,854.91 9,504,627.56Maritime College Water System Improvements, Phase 2 Water System Improvements, Phase 2 G & M EARTH MOVING INC 1,286,285.00 392,464.00

Replace Roofs, Various Buildings Replace Roofs, Various Buildings RISING SUN CONSTRUCTION LLC 2,147,578.43 1,852,115.00

Replace Roof - Marvin Tode Building Contract #2

DIMITRI ENTERPRISES INC 1,297,296.00 993,873.00

Replace Roof - Marvin Tode Building Contract #1

AHURA CONSTRUCTION MANAGEMENT INC 121,667.55 121,546.00

Water System Improvements, Phase 1 21244 Water System Improvements, Phase 1 G & M EARTH MOVING INC 2,514,316.81 2,351,069.00

Water System Improvements, Phase 1B K&G ELECTRIC MOTOR & PUMP CORP 649,649.00 0.00

Total Maritime College 3 Total Projects 8,016,792.79 5,711,067.00SUNY Canton Replace Roofs - Cooper & Payson Hall Replace Roofs - Cooper & Payson Hall NORTHERN TIER CONTRACTING INC 1,471,369.90 0.00

Replace Windows & Rehab Entrances for Energy Conservation, Various Bldgs.

Replace Windows & Rehab Entrances for Energy Conservation, Various Bldgs.

BETTE & CRING LLC 2,274,448.18 2,261,976.00

Replace Windows PH I, Cook and Payson Halls N E P GLASS CO LTD 444,557.11 444,113.00

Total Research/University Centers

Page 11 of 20

Page 13: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report BState University Construction Fund Projects in Construction

As of September 30, 2016

Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were managed by the State University Construction Fund.

Replace Underground Natural Gas and Site Lighting Systems, Campus Wide

Replace Underground Natural Gas and Site Lighting Systems, Campus Wide

PERRAS EXCAVATING INC 1,822,978.00 1,369,571.00

Total SUNY Canton3

Total Projects 6,013,353.19 4,075,660.00

SUNY Cobleskill Provide Water and Storm Sewer Improvement Provide Water and Storm Sewer Improvement CASALE CONSTRUCTION SERVICES INC 2,842,399.86 2,777,328.00

Construct New Water Tank Phase I JAT CONSTRUCTION CO INC 308,617.31 308,309.00

Total SUNY Cobleskill 1 Total Projects 3,151,017.17 3,085,637.00SUNY Delhi Replace Fire Alarms - Various Buildings Replace Fire Alarms - Various Buildings TOTAL FACILITY SOLUTIONS INC 230,230.00 0.00

Site Utilities Study and Infrastructure Improvement Project

Site Utilities Study and Infrastructure Improvement Project

NELCORP ELECTRICAL CONTRACTING CORP

3,709,605.90 1,904,281.00

Replace Site Infrastructure - Phase 1 RIFENBURG CONSTRUCTION INC 3,051,081.87 3,047,718.00Replace Site Infrastructure PH II VACRI CONSTRUCTION CORP 1,554,429.81 1,552,661.00Replace Site Infrastructure Phase III VACRI CONSTRUCTION CORP 4,020,883.90 3,155,456.00

Total SUNY Delhi 2 Total Projects 12,566,231.48 9,660,116.00SUNY Polytech Renovate Campus Center Phase 2 - Health &

WellnessRenovate Campus Center Phase 2 - Health & Wellness

NATIONAL BUILDING & RESTORATION CORPORATION

1,030,827.80 12,670.00

Total SUNY Polytech 1 Total Projects 1,030,827.80 12,670.00

Total Technology Colleges 15 Total Projects 48,264,283.19 33,189,397.56

University-WideGeneral State Retooling the Southern Tier Construct Advanced Manufacturing Ctr

Alfred/WellsvilleLECHASE CONSTRUCTION SERVICES LLC 5,067,722.69 4,395,565.00

JOCS for Alfred-Provide Nanosystem Production Lab

SG CONSTRUCTION SERVICES LLC 891,235.35 482,092.00

Total General State 1 Total Projects 5,958,958.04 4,877,657.00System Administration Mechanical Systems Upgrade Ph 2 Mechanical Systems Upgrade Ph 2 DIGESARE MECHANICAL INC 795,795.00 655,953.00

Abate Basement Crawlspace SUNSHINE ENVIRONMENTAL SERVICES INC 183,118.94 181,290.00

Interior Rehab - SUNY Plaza Building Towers Interior Rehab - SUNY Plaza Building Towers SANO-RUBIN CONSTRUCTION SERVICES LLC

1,096,095.00 186,106.00

Replace Fire Pumps - SUNY Plaza Replace Fire Pumps - SUNY Plaza CONDOR FIRE SPRINKLER LLC 197,497.30 168,756.00Replace Federal Building Windows Replace Federal Building Windows FLOWER CITY GLASS CO OF NY LLC 1,436,185.75 0.00

Total System Administration 4 Total Projects 3,708,691.99 1,192,105.00

Total University Wide 5 Total Projects 9,667,650.03 6,069,762.00

Grand Total 93 Total Projects 1,591,317,437.47 1,132,417,766.99

Page 12 of 20

Page 14: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTDComprehensive Colleges

Buffalo State College Renovate Science Building, Bldg. No. 15 Renovate Science Building, Bldg. No. 15 CHRISTA CONSTRUCTION LLC 34,571,334.62 32,843,507.01

Science Bldg. #15 - Steam Tunnel Imp INGALLS SITE DEVELPMENT INC 1,582,884.30 1,581,303.00Commissioning Services-Renovate Science Bldg., 15, Phase 1, Bldg. 15

HORIZON ENGINEERING ASSOCIATES LLP 873,655.63 873,655.63

Construction Manager - Science Phase II LEND LEASE US CONSTRUCTION INC 1,743,227.45 1,743,145.09037A7 JOCs Complete Punch List SG CONSTRUCTION SERVICES LLC 1,836,669.68 1,834,807.00

Total Buffalo State College 1 Total Projects 40,607,771.68 38,876,417.73College at Oneonta Rehabilitation of Fitzelle Hall, Bldg. No. 26 Rehabilitation of Fitzelle Hall, Bldg. No. 26 CHRISTA CONSTRUCTION LLC 26,483,222.00 26,445,464.01

ConstructionMangement Services Rehabilitation of Fitzelle Hall (09308)

GILBANE BUILDING COMPANY 1,170,498.80 1,170,455.32

Commissioning Services - Rehab Fitzelle Hall GENESYS ENGINEERING PC 117,958.00 117,019.73

JOCS- Misc. Steel Work - Fitzelle CUTTING EDGE GRP LLC 74,596.00 22,154.00Rehabilitate Physical Science Building, Bldg no. 0025

Rehabilitate Physical Science Building, Bldg no. 0025

FAHS CONSTRUCTION GROUP INC 28,022,742.15 26,192,986.00

Construction Manager - Rehab Physical Science II

LECHASE CONSTRUCTION SERVICES LLC 668,984.00 495,214.21

Rehab Athletic Fields Rehab Athletic Fields BALLARD CONSTRUCTION INC 1,154,134.02 1,142,428.00Replace Athletic Track COPELAND COATING COMPANY INC 170,207.04 170,037.00Rehab Synthetic Turf Athletic Field BALLARD CONSTRUCTION INC 745,861.00 730,797.00

Replace Windows - Hulbert Hall Replace Windows - Hulbert Hall FORNO ENTERPRISES INC 659,643.99 653,175.00Rplace Windows - Schumacher & Central Heating Plant

WINDOW SPECIALIST INC 897,297.40 896,401.00

Upgrade Water Lines & Metering - Various Buildings

Upgrade Water Lines & Metering - Various Buildings

PLANK LLC 407,042.64 394,651.00

Upgrade Water Lines & Metering - Various Buildings 09415

WILKINS MECHANICAL INC 919,712.79 918,794.00

Total College at Oneonta 5 Total Projects 61,491,899.83 59,349,576.27Old Westbury New Academic Building New Academic Building MPCC CORP 55,942,983.04 55,886,393.00

Demolish Academic Village Core Space MPCC CORP 6,473,657.77 6,218,037.00Construction Manager For New Academic Building

URS CORPORATION-NY 2,401,354.04 2,401,227.17

Renovate/Reconstruct Bldg 47 - University Police

Renovate/Reconstruct Bldg 47 - University Police

ALDCO BUILDERS INC 2,840,980.47 2,790,850.00

Replace Campus Center Envelope- Bldgs 51 & 56

Replace Campus Center Envelope- Bldgs 51 & 56

J KOKOLAKIS CONTRACTING INC 18,579,795.92 18,267,256.00

JOCS - East Bridge & West Bridge - Snow Guards

CORBEX INC 47,236.00 0.00

Replace Service Group Fuel Tanks- Site Work Replace Service Group Fuel Tanks- Site Work FENLEY & NICOL ENVIRONMENTAL INC 803,798.91 779,014.00

Cogeneration Improvements Cogeneration Improvements BOILERMATIC WELDING INDUSTRIES INC 514,944.43 514,430.00

Replace Roof, H-Wing Campus Center Roof Replacement - H&I Wings at Center Building

SEA BREEZE GENERAL CONSTRUCTION INC 989,034.84 976,589.00

Total Old Westbury 6 Total Projects 88,593,785.42 87,833,796.17Purchase College Site / Civil Repair ( near Campus Cntr South) Site / Civil Repair ( near Campus Cntr South) MARQUISE CONSTRUCTION CORP 851,164.37 808,465.00

Rehab Central Plaza Deck and Drainage Rehab Central Plaza Deck and Drainage MPCC CORP 18,290,631.12 18,219,383.00Foundation WP/Drainage Repair Various Buildings

MPCC CORP 2,035,972.34 2,033,939.00

Critical Maintenance Repairs Exterior Maintenance Visual Arts #58

Critical Maintenance Repairs Exterior Maintenance Visual Arts #58

MPCC CORP 9,752,225.83 9,493,540.00

Report CState University Construction Fund Projects Completed

As of September 30, 2016Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were managed by the State University Construction Fund.

Page 13 of 20

Page 15: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report CState University Construction Fund Projects Completed

As of September 30, 2016Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were managed by the State University Construction Fund.

University Police Department-Relocation University Police Department-Relocation ASHFORTH PROPERTIES CONSTRUCTION INC

3,429,130.71 3,425,705.00

Renovation of Humanities - Bldg. 41 Renovation of Humanities - Bldg. 41 NIRAM INC 34,591,234.15 33,659,961.00Commissioning - Renovate Humanities Bldg 41 LORING CONSULTING ENGINEERS INC 249,634.00 238,926.46

Construction Management Services Renovation of Humanities Building 41

PAVARINI MCGOVERN LLC 1,653,682.59 1,653,600.80

Performing Arts Center Roof Replacement Performing Arts Center Roof Replacement USA GENERAL CONTRACTORS CORP 2,443,640.20 2,441,199.00Student Services Building Roof JOCS - Roof Repairs JEMCO ELECTRICAL CONTRACTORS 617,463.90 616,627.00Rehabilitate Utilidors - Phase I High Temperature Hot Water System

Rehabilitate Utilidors - Phase I High Temperature Hot Water System

ALL STATE CONSTRUCTION & BOILER INC 2,918,103.15 2,902,612.00

Total Purchase College 8 Total Projects 76,832,882.36 75,493,958.26SUNY Brockport Rochester Educational Opportunity Center Rochester Educational Opportunity Center CHRISTA CONSTRUCTION LLC 14,717,440.02 14,702,007.00

Rochester Educational Opportunity Center - Construction Manager

LIRO ENGINEERS INC 1,041,587.22 1,041,587.22

Commissioning - REOC CJ BROWN ENERGY & ENGINEERING PC 69,621.99 69,621.99Special Events Recreation Center Special Events Recreation Center LECHASE CONSTRUCTION SERVICES LLC 29,180,685.92 29,151,631.00

Special Events Recreation Center, PH II HOLDSWORTH KLIMOWSKI CONSTRUCTION LLC

5,868,674.72 5,862,263.00

Building Commissioing - Special Events Recreation Center (SERC)

BERGMANN ASSOCIATES ARCHITECTS ENGINEERS LANDSCAPE ARCHITECTS SURVEYORS DPC

192,193.50 192,193.50

Special Events Receation Center - Construction Manager

GILBANE BUILDING COMPANY 1,874,082.53 1,874,065.76

Commissioning - SERC PH II BERGMANN ASSOCIATES ARCHITECTS ENGINEERS LANDSCAPE ARCHITECTS SURVEYORS DPC

37,899.75 37,899.75

JOCS- Corridor Leak Remediation SG CONSTRUCTION SERVICES LLC 15,950.94 15,935.00JOCS -SERC Lighting Upgrades SG CONSTRUCTION SERVICES LLC 30,500.00 30,500.00JOCS - Drainage Remediation SG CONSTRUCTION SERVICES LLC 37,970.00 37,970.00

Site Infrastructure Improvements - Electric Distribution, Ph II

Site Infrastructure Improvements - Electric Distribution, Ph II

EAST COAST ELECTRIC LLC 3,561,739.37 3,459,271.00

Rehabilitate Exterior - Tuttle North & South Rehabilitate Exterior - Tuttle North & South CHRISTA CONSTRUCTION LLC 7,553,149.91 7,545,563.00JOCS - Stair Tower SG CONSTRUCTION SERVICES LLC 112,174.00 93,875.00

ADA Access to Ped Bridge ADA Access to Ped Bridge BLACK HORSE GROUP LLC 3,151,351.21 3,135,846.00Renovate Morgan Hall for University Police Renovate Morgan Hall for University Police SG CONSTRUCTION SERVICES LLC 549,975.00 549,975.00

Total SUNY Brockport 6 Total Projects 67,994,996.08 67,800,204.22SUNY Cortland Bowers Hall Upgrade to Sciences - Phase I Bowers Hall Upgrade to Sciences - Phase I HUEBER-BREUER CONSTRUCTION INC 34,278,597.26 34,244,069.00

Commissioning Services for Bowers Hall Upgrade to Sciences Phase I

CJ BROWN ENERGY & ENGINEERING PC 128,731.00 122,517.60

Construction Manager-Bowers Hall Upgrade SciencesPhase I

BARR & BARR INC 1,630,900.87 1,618,637.15

Construct Student Life Center Construct Student Life Center FAHS CONSTRUCTION GROUP INC 47,247,434.17 47,190,024.00SLC Constructiom Manager C & S DESIGN BUILD INC 2,334,579.00 1,876,726.18Commissioning - Construct Student Life Center GENESYS ENGINEERING PC 173,378.00 138,278.53

Campus Wide Satellite Boilers Campus Wide Satellite Boilers J & K PLUMBING AND HEATING CO INC 8,764,278.39 8,755,374.00Commissioning - Campus Wide Satellite Boilers GENESYS ENGINEERING PC 58,207.63 58,207.63

Total SUNY Cortland 3 Total Projects 94,616,106.32 94,003,834.09SUNY Fredonia Science Technology Building. Science Technology Building PIKE CO THE 42,448,837.05 42,383,890.00

Page 14 of 20

Page 16: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report CState University Construction Fund Projects Completed

As of September 30, 2016Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were managed by the State University Construction Fund.

Commissioning Services - Science Technology Building

RMF ENGINEERING INC PC 238,579.81 176,502.07

Construction Manager - Science Tech Building LECHASE CONSTRUCTION SERVICES LLC 1,754,342.72 1,754,295.39

JOCS - Intake Hood SG CONSTRUCTION SERVICES LLC 165,450.00 126,627.00Williams Center Rehabilitation Williams Center Rehabilitation MANNING SQUIRES HENNIG CO INC 10,684,741.50 10,423,766.00

Commissioning - Williams Center Rehabilitation BERGMANN ASSOCIATES ARCHITECTS ENGINEERS LANDSCAPE ARCHITECTS SURVEYORS DPC

75,150.87 75,150.87

Exterior Rehabilitation LoGrasso Hall Exterior Rehabilitation LoGrasso Hall RESETARITS CONSTRUCTION CORPORATION

1,571,345.85 1,554,250.00

Rehabilitate Upgrade Elevators Rehab / Upgr Elevs. CONCEPT CONSTRUCTION CORP 1,063,200.15 1,051,885.00

Total SUNY Fredonia 4 Total Projects 58,001,647.95 57,546,366.33SUNY Geneseo Renovation Letchworth Dining Hall Renovation Letchworth Dining Hall HOLDSWORTH KLIMOWSKI CONSTRUCTION

LLC13,964,488.25 13,889,799.00

Commissioning BERGMANN ASSOCIATES ARCHITECTS ENGINEERS LANDSCAPE ARCHITECTS SURVEYORS DPC

91,686.00 87,754.59

Rehabilitate Bailey Hall Rehabilitate Bailey Hall FAHS CONSTRUCTION GROUP INC 21,956,304.67 21,922,363.00Commissioning OBRIEN & GERE ENGINEERS INC 160,028.20 153,489.17

Doty Building Renovation Doty & Stadium - JOCs (067A4) SG CONSTRUCTION SERVICES LLC 78,245.17 78,167.00Commissioning BUILDING CONTROLS & SERVICES INC 139,902.00 93,410.52Construction Manager TURNER CONSTRUCTION COMPANY 1,578,221.25 1,578,207.08Doty Building Renovation LIBERTY MUTUAL INSURANCE CO 14,937,453.91 14,595,756.01JOC -Condensate /Acoustic/Electrical SG CONSTRUCTION SERVICES LLC 20,784.76 20,764.00

New College Stadium New College Stadium - Phase 1 PIKE CO THE 6,686,461.42 6,679,266.00New College Stadium - Phase 2 FAHS CONSTRUCTION GROUP INC 9,445,808.50 9,324,656.00

Total SUNY Geneseo 4 Total Projects 69,059,384.13 68,423,632.37SUNY New Paltz Construct Athletic Center Construct Athletic Center FIDELITY & GUARANTY INS CO 22,067,268.15 21,787,275.00

Replace High Temperature Hot Water Lines Replace High Temperature Hot Water Lines NORTHERN CONSTRUCTION SVC LLC 5,302,290.91 5,296,407.00

Replace High Temperature Hot Water PHASE I MEGRANT CORPORATION 2,452,139.64 2,449,640.00

Replace HTHW - Phase II MEGRANT CORPORATION 3,605,617.02 3,602,015.00Renovate Building 1 - Old Main Renovate Building 1 - Old Main PIAZZA BROTHERS INC 28,366,183.95 28,336,574.00

Building Commissioning - Old Main GENESYS ENGINEERING PC 114,085.00 96,574.13Construction Manager for Old Main HILL INTERNATIONAL INC 133,260.00 127,978.60JOC for canopy repair CUTTING EDGE GRP LLC 43,863.00 40,351.00

Replace Roofs - Various Buildings Replace Roofs - Various Buildings NIRAM INC 1,690,078.96 1,664,555.00Library Renovation Sojourner Truth Library Library Renovation Sojourner Truth Library PIAZZA INC 1,908,311.41 1,906,405.00

Replace Roof - Sojourner Truth Library MARPAT CONSTRUCTION CORP 845,834.99 844,990.00Construction Manager- Library Renovation Sojourner Truth Library

HILL INTERNATIONAL INC 171,303.72 171,266.54

Library Renovation Sojourner Truth Library MEYER CONTRACTING CORP 9,960,513.00 9,305,035.00Acoustical - Mechanical Renovations, Bldg. No. 1, Theater

Acoustical - Mechanical Renovations, Bldg. No. 1, Theater

CUTTING EDGE GRP LLC 207,394.00 206,894.00

Total SUNY New Paltz 6 Total Projects 76,868,143.75 75,835,960.27SUNY Plattsburgh Hudson Hall Rehab Ph II Hudson Hall Rehab Ph II NORTHLAND ASSOCIATES INC 21,940,985.92 21,918,709.00

Commissioning for Hudson Hall Rehab Ph 2 GENESYS ENGINEERING PC 190,899.00 133,996.79

Page 15 of 20

Page 17: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report CState University Construction Fund Projects Completed

As of September 30, 2016Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were managed by the State University Construction Fund.

Facility Enhancements for the School of Business

Facility Enhancements for the School of Business

PIKE CO THE 15,327,022.86 15,311,531.00

Commissioning - GNU Building Project GENESYS ENGINEERING PC 64,934.45 64,934.45Hawkins Hall Pond Infrastructure Site Infrastructure LUCK BROTHERS INC 3,741,383.43 3,727,489.00

Total SUNY Plattsburgh 3 Total Projects 41,265,225.66 41,156,660.24SUNY Potsdam Upgrade HVAC/Labs Stowell Hall Upgrade HVAC/Labs Stowell Hall NORTHLAND ASSOCIATES INC 9,298,932.10 9,272,950.00

Commissioning - Upgr HVAC/Labs Stowell GENESYS ENGINEERING PC 83,205.00 41,499.31

Rehabilitate Ice Arena Maxcy Hall Rehabilitate Ice Arena Maxcy Hall BETTE & CRING LLC 8,741,246.00 8,732,347.00Commissioning Services - Maxcy Ice Arena GENESYS ENGINEERING PC 41,078.76 41,078.76

Replace Roof, Service Complex Replace Roof, Service Complex PTL CONTRACTING CORP 659,813.00 540,930.00Replace Roof Crumb Library Replace Roof Crumb Library PTL CONTRACTING CORP 378,668.00 310,650.00Replace Surface on Athletic Turf Replace Surface on Athletic Turf JE SHEEHAN CONTRACTING CORP 988,639.00 966,361.00

Total SUNY Potsdam 5 Total Projects 20,191,581.86 19,905,816.0751 Total Projects 695,523,425.04 686,226,222.02

Other Research/Doctoral

Alfred Ceramics Infill Projects - Various Buildings Infill Projects - Various Buildings LECHASE CONSTRUCTION SERVICES LLC 9,426,879.50 9,328,848.00

Commissioning-McMahon Infill Project BERGMANN ASSOCIATES ARCHITECTS ENGINEERS LANDSCAPE ARCHITECTS SURVEYORS DPC

125,419.00 115,498.03

Total Alfred Ceramics 1 Total Projects 9,552,298.50 9,444,346.03College of Optometry Multipurpose Space 3rd Floor Multipurpose Space 3rd Floor KNIGHTSBRIDGE CONSTRUCTION CORP 7,380,935.83 7,363,835.00

Commissioning for 3rd Floor Renov OLA CONSULTING ENGINEERS PC 94,360.00 88,552.53Lobby Renovations Lobby Renovation STALCO CONSTRUCTION INC 4,648,146.00 4,284,698.00Rehabilitate First Floor Lecture Halls Rehabilitate First Floor Lecture Halls STALCO CONSTRUCTION INC 2,036,800.70 1,959,800.00

Total College of Optometry 3 Total Projects 14,160,242.53 13,696,885.53Cornell - Ag&Life Science

Stocking Hall Rehab/System Upgrades Stocking Hall Rehab/System Upgrades PIKE CO THE 70,763,958.97 70,271,698.04

Building Commissioning - Stocking Hall HORIZON ENGINEERING ASSOCIATES LLP 430,444.46 430,444.46

Construction Manager - Stocking Hall GILBANE BUILDING COMPANY 3,997,523.41 3,997,329.28

Total Cornell - Ag & Life Science 1 Total Projects 75,191,926.84 74,699,471.78Cornell - Geneva Ag. Replace Roofs - Geneva/Barton Lab Replace Roofs - Geneva/Barton Lab NORTHEASTERN INSULATION CO INC 784,394.61 783,611.00

Total Cornell - Geneva Ag. 1 Total Projects 784,394.61 783,611.00SUNY Downstate Renovate and Expand Basic Science Building Relocate/Upgrade Gross Anatomy Laboratories

and Selected Spaces BSBWENGER CONSTRUCTION CO INC 8,676,850.18 8,668,182.00

Rehabilitate HVAC & Waterproof Animal Laboratories

Rehabilitate HVAC & Waterproof Animal Laboratories

HM HUGHES CO INC 22,950,451.84 22,866,167.02

Commissioning Services for Rehab HVAC & Waterproofing - Animal Labs

GENESYS ENGINEERING PC 198,000.00 165,019.37

Construction Mananger Services for DLAR URS CORPORATION-NY 1,613,943.65 1,613,911.25Remediate DLAR Mechanical Renovations Remediate DLAR Mechanical Renovations CORBEX INC 751,637.00 721,883.00Replace Roof BSB Replace Roof BSB DIMITRI ENTERPRISES INC 1,463,072.48 1,448,740.00Replace Windows BSB Replace Windows BSB APS CONTRACTING INC 4,908,607.00 4,903,729.00

JOC's Soffits for AC Units CORBEX INC 92,786.00 0.00

Total SUNY Downstate 5 Total Projects 40,655,348.15 40,387,631.64SUNY ESF Exterior Rehab Illick Hall Exterior Rehab - Illick Hall MURNANE BUILDING CONTRACTORS 8,996,212.15 8,987,069.00

Upgrade Emergency Generator - Illick Hall BEKEN CONTRACTING SERVICES LLC 728,223.50 727,496.00

Total Comprehensive Colleges

Page 16 of 20

Page 18: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report CState University Construction Fund Projects Completed

As of September 30, 2016Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were managed by the State University Construction Fund.

Gateway Building Gateway Building MURNANE BUILDING CONTRACTORS 18,273,893.02 17,369,638.00Gateway Building - Foundations, Steel & Sitework

MURNANE BUILDING CONTRACTORS 3,645,275.98 3,335,223.00

Building Commissioning - Gateway Bldg GENESYS ENGINEERING PC 185,789.05 185,789.05Construction Manager - Gateway Building TURNER CONSTRUCTION COMPANY 1,537,926.73 1,537,850.97

Replace Electrical Substation/Restore Site Replace Electrical Substation/Restore Site MATCO ELECTRIC CORPORATION 4,850,432.20 4,429,031.00

Total SUNY ESF 3 Total Projects 38,217,752.63 36,572,097.02Upstate Medical Univ. University Hospital Vertical Expansion - Hospital University Hospital Vertical Expansion

Core/ShellLECHASE CONSTRUCTION SERVICES LLC 40,960,798.88 40,919,879.00

University Hospital Vertical Expansion Mechanical

NORTH CENTRAL MECHANICAL INC 29,977,836.22 29,947,815.00

University Hospital Vertical Expansion Electrical RIDLEY ELECTRIC COMPANY INC 16,477,984.46 16,461,436.00

University Hospital Vertical Expansion Interior Fit-Out

FAHS CONSTRUCTION GROUP INC 24,763,836.76 24,739,016.00

Construction Manager For Vertical Expansion Project

PIKE CO THE 6,071,218.71 6,071,108.04

Commissioning For Vertical Expansion - Hospital

AFFILIATED ENGINEERS PC 211,265.77 211,195.68

Commissioning AHUs at Vertical Expansion GENESYS ENGINEERING PC 51,941.91 51,941.91

IHP Expansion IHP Expansion NORTHLAND ASSOCIATES INC 47,518,662.19 47,471,191.00Construction Manager - IHP Addition TURNER CONSTRUCTION COMPANY 2,510,906.58 2,509,230.51Commissioning - IHP Addition GENESYS ENGINEERING PC 135,104.23 135,104.23Construct Foundation, Steel & Site Work IHP Expansion

LECHASE CONSTRUCTION SERVICES LLC 7,941,527.59 7,933,594.00

Total Upstate Medical University 2 Total Projects 176,621,083.30 176,451,511.3716 Total Projects 355,183,046.56 352,035,554.37

Research/University Centers

Binghamton University Rehab University Union North Ph 2 Rehab University Union North Ph 2 FAHS CONSTRUCTION GROUP INC 10,130,691.93 10,120,054.99

Commissioning UUNorth Phase 2 GENESYS ENGINEERING PC 37,070.91 37,070.91Const Manager Uni Union North - 07A35 TURNER CONSTRUCTION COMPANY 565,880.77 565,731.07

Rehabilitate OConnor Johnson Rehabilitate OConnor Johnson WELLIVER MCGUIRE INC 17,647,321.15 17,470,830.00JOCS Construct Mock Up (077A6) SG CONSTRUCTION SERVICES LLC 149,840.69 149,691.00Const Manager - OConnor Johnson LECHASE CONSTRUCTION SERVICES LLC 34,221.60 34,221.60

Commissioning Services- OConnor, Johnson GENESYS ENGINEERING PC 90,266.53 90,266.53

Rehab Lect Hall Student Wing Rehab Lect Hall Student Wing LECHASE CONSTRUCTION SERVICES LLC 12,092,270.00 11,551,559.00

Total Binghamton University 3 Total Projects 40,747,563.58 40,019,425.10Stony Brook - HSC Renovate HSC - Phase I Renovate HSC - Phase I WEST RAC CONTRACTING CORP 7,304,096.80 7,296,800.00

Replace Roof, Clinical Science Tower MILCON CONSTRUCTION CORP 1,039,732.69 1,038,694.00HSC Deck Rehab HSC Deck Rehab ZHN CONTRACTING CORPORATION 15,777,429.92 15,670,073.00

Total Stony Brook - HSC 2 Total Projects 24,121,259.41 24,005,567.00Stony Brook University Upgrade Site Utilities, Phase I Upgrade Site Utilities, Phase I TR PIPE INC 12,109,796.61 11,079,407.00

Upgrade Site Utilities Phase 1 - Part 2 HSC and West Campus

ALL STATE CONSTRUCTION & BOILER INC 7,727,201.48 7,719,482.00

Rehab Old Chem Classroom Bldg #02 Rehab Old Chem Classroom Bldg #02 J KOKOLAKIS CONTRACTING INC 24,749,027.90 24,723,904.00

Total Other Research/Doctoral

Page 17 of 20

Page 19: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report CState University Construction Fund Projects Completed

As of September 30, 2016Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were managed by the State University Construction Fund.

Commissioning for Old Chem Classroom Bld HORIZON ENGINEERING ASSOCIATES LLP 79,093.56 71,783.35

CM Services Old Chem, ESS Rehabs LIRO PROGRAM & CONSTRUCTION MANAGEMENT PE PC

2,234,024.00 2,201,386.94

ESS Bldg Exterior Rehab ESS Bldg Exterior Rehab KENSTAR CONSTRUCTION CORP 4,302,456.48 4,051,002.00New Computer Science Building New Computer Science Building MPCC CORP 33,785,664.77 32,895,378.00

CM Services - New Comp Science Bldg URS CORPORATION-NY 3,123,924.00 2,820,791.56Commissioning - New Computer Science HORIZON ENGINEERING ASSOCIATES LLP 83,394.00 83,388.39

Total Stony Brook University 4 Total Projects 88,194,582.80 85,646,523.24University Buffalo - North

EOC (Educational Opportunity Center) Buffalo EOC (Educational Opportunity Center) Buffalo SAVARINO COMPANIES LLC 18,559,546.51 18,540,591.00

Construction Manager - Buffalo Educational Opportuniy Center (EOC)

CANNON DESIGN INC 1,253,391.85 1,253,309.33

Total University Buffalo - North 1 Total Projects 19,812,938.36 19,793,900.33University Buffalo - South

Biomed Education Building - HVAC Improvements

Biomed Education Building - HVAC Improvements

NORTHLAND ASSOCIATES INC 3,401,799.00 3,388,700.00

Biomed Education Bldg- HVAC Improve Ph1 DV BROWN & ASSOCIATES INC 1,998,862.87 1,996,866.00

Commissioning BEB HVAC Improvments BERGMANN ASSOCIATES ARCHITECTS ENGINEERS LANDSCAPE ARCHITECTS SURVEYORS DPC

63,958.31 63,958.31

Hayes Hall Building Wide Restoration Hayes Hall Building Wide Restoration SLR CONTRACTING & SERVICE CO INC 10,414,261.86 10,403,858.00Construction Manager - Hayes Hall Restoration LP CIMINELLI INC 1,639,435.13 1,503,592.48

Hayes Hall Building Wide RestorPhase II LECHASE CONSTRUCTION SERVICES LLC 27,947,917.00 27,912,296.00

Total University Buffalo - South 2 Total Projects 45,466,234.17 45,269,270.79University at Albany Rehab Fuel Delivery Area- Data Center Rehab Fuel Delivery Area- Data Center CUTTING EDGE GRP LLC 37,334.48 33,935.00

Relocate University Data Center Relocate University Data Center JERSEN CONSTRUCTION GROUP LLC 24,817,469.13 24,647,309.00Commissioning - Relocate University Data Center

TETRA TECH ENGINEERS ARCHITECTS & LANDSCAPE ARCHITECTS PC

358,623.00 325,719.70

Construction Management Services - Relocate University Data Center

LECHASE CONSTRUCTION SERVICES LLC 1,413,454.22 1,377,182.50

JOCS-HVAC Modifications & Finishes - Data Center

CUTTING EDGE GRP LLC 545,257.00 526,959.00

Construct New Business School Construct New Business School KIRCHHOFF-CONSIGLI CONSTRUCTION MANAGMENT LLC

37,676,411.14 37,631,297.00

Commissioning Services - Construct New Business School

HORIZON ENGINEERING ASSOCIATES LLP 218,063.00 205,793.67

Construction Management Services - New Business School

SKANSKA USA BUILDING INC 1,698,210.01 1,698,184.63

New Business School/Parking & Site Work DELSIGNORE BLACKTOP PAVING INC 3,557,666.91 3,553,913.00JOCS - Replace Pair of Doors - New Business School

CUTTING EDGE GRP LLC 10,851.84 10,841.00

Rehabilitate Water Tower and Fountains Rehabilitate Water Tower and Fountains JERSEN CONSTRUCTION GROUP LLC 18,312,935.94 18,118,131.02Commissioning - Water Tower and Fountain GENESYS ENGINEERING PC 35,433.00 30,685.23

CM - Construction Services Rehab. Water Tower & Fountain

THE WHITING-TURNER CONTRACTING COMPANY INC

496,618.08 482,961.32

JOCS Fountain Work CUTTING EDGE GRP LLC 728,634.00 44,086.00

Total University at Albany 4 Total Projects 89,906,961.75 88,686,998.0716 Total Projects 308,249,540.07 303,421,684.53Total Research/University Centers

Page 18 of 20

Page 20: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report CState University Construction Fund Projects Completed

As of September 30, 2016Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were managed by the State University Construction Fund.

Technology Colleges Alfred State College Student Leadership Center - Phase 2 Student Leadership Center - Phase 2 MANNING SQUIRES HENNIG CO INC 17,565,648.81 17,547,966.00Student Leadership Center Phase 1 CHRISTA CONSTRUCTION LLC 6,966,093.84 6,958,835.00Construction Manager - Student Union / Activities Center

LECHASE CONSTRUCTION SERVICES LLC 1,751,485.73 1,751,217.71

Commissioning - Student Union / Student Activities Center

HORIZON ENGINEERING ASSOCIATES LLP 151,470.00 148,969.17

Install Satellite Boilers - Phase 1 Install Satellite Boilers - Phase 1 JOHN W DANFORTH COMPANY 2,292,881.60 2,278,692.00

Total Alfred State College 2 Total Projects 28,727,579.98 28,685,679.88Farmingdale State Coll Replace Roof, Nold Hall Replace Roof, Nold Hall METROPOLITAN CONSTRUCTIONSYSTEMS

INC1,007,290.28 1,006,284.00

Construct Student Center Construct Student Center J KOKOLAKIS CONTRACTING INC 21,530,695.25 21,469,406.01Commissioning for Student Center SYSKA HENNESSY GROUP INC 96,794.75 96,794.75Construction Manager - Major Projects Phase 1 GILBANE BUILDING COMPANY 3,320,248.00 2,943,870.36

Rehabilitate Roadways/Walkways/ Landscaping Reconfigure Loop Road / Rehabilitate Parking Lots and Landscaping

LASER INDUSTRIES 6,413,859.25 6,407,252.00

Bunche Plaza Improvements CONDOS BROTHERS CONSTRUCTION CORP 1,724,927.18 1,715,303.00

Construct School of Business Construct School of Business STALCO CONSTRUCTION INC 19,401,850.81 19,354,987.01Commissioning Agent- New Business School OLA CONSULTING ENGINEERS PC 149,619.40 147,052.94

Construction Manager, New Business Bldg and Conklin Hall Rehabilitation

JACOBS PROJECT MANAGEMENT CO 1,964,553.67 1,874,214.46

Locker Room Renovations - Nold Hall Locker Room Renovations - Nold Hall GII CONSTRUCTION COMPANY INCORPORATED

16,406,270.09 16,389,596.00

Commissioning, Locker Rm Rehab at Nold OLA CONSULTING ENGINEERS PC 134,148.32 134,148.32Construction Manager, Nold Hall & New Day Care Center

HILL INTERNATIONAL INC 533,731.33 533,731.33

New Day Care Center New Day Care Center FRATELLO CONSTRUCTION CORP 5,704,923.64 5,688,611.00Commissioning Agent- New Day Care Ctr. OLA CONSULTING ENGINEERS PC 68,731.97 68,731.97

Rehabilitate Elevators, Various Building Rehabilitate Elevators, Various Building LIPSKY ENTERPRISES INC 3,170,492.74 3,081,988.00

Total Farmingdale State College 7 Total Projects 81,628,136.68 80,911,971.15Maritime College Replace Campus Steam Distribution Replace Campus Steam Distribution MARIC MECHANICAL INC 2,229,668.44 2,227,441.00

Replace Steam Distribution, Phase 1 R&L HEATING & AIR CONDITIONING 2,811,708.91 2,774,303.00Rehab/Upgrade HVAC Systems Various Bldgs Rehab/Upgrade HVAC Systems Various Bldgs EX AIR INC 4,092,803.26 4,065,616.00

Commissioning - Upgrade/ Rehab HVAC Various Buildings

SYSKA HENNESSY GROUP INC 89,850.00 82,392.64

New Academic Building New Academic Building J KOKOLAKIS CONTRACTING INC 24,358,456.46 24,184,912.00Commissioning Agent - New Academic Bldg. OLA CONSULTING ENGINEERS PC 141,865.00 131,934.80

JOCS Emergency Glass Repairs VOLMAR CONSTRUCTION INC 36,478.00 0.00New Secondary Electrical System - Fort New Secondary Electrical System - Fort GLOBAL ELECTRICAL CONTRACTING OF

WESTCHESTER INC627,816.19 627,189.00

Renovate Central Heating Plant Renovate Central Heating Plant MARIC MECHANICAL INC 1,834,917.60 1,563,623.00Rehabilitate Athletic Field Rehab Athletic Field APPLIED LANDSCAPE TECHNOLOGIES 863,329.08 847,984.00

Total Maritime College 6 Total Projects 37,086,892.94 36,505,395.44Morrisville State College

Student Activity Center Renovation (STUAC), Ph II

Student Activity Center Renovation (STUAC), Ph II

BETTE & CRING LLC 9,868,450.61 9,857,671.00

Commissioning - Student Activities Center Renovation, (STUAC), PH II

GENESYS ENGINEERING PC 65,819.46 65,819.46

Total Morrisville State College 1 Total Projects 9,934,270.07 9,923,490.46

Page 19 of 20

Page 21: Measurement Record of Operations and Accomplishments 2016/2017 · Measurement Record of Operations and Accomplishments 2016/2017 . ... Rehab & Enclose PAC Elevator Rehab & Enclose

Project Name Contract Title Vendor Name Estimated Value Expended LTD

Report CState University Construction Fund Projects Completed

As of September 30, 2016Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were managed by the State University Construction Fund.

SUNY Canton Cook Hall Building Stabilization & Restoration Cook Hall Building Stabilization & Restoration DC BUILDING SYSTEMS INC 3,067,382.81 3,008,544.00

Total SUNY Canton 1 Total Projects 3,067,382.81 3,008,544.00SUNY Cobleskill Center for Agriculture and Natural Resources Center for Agriculture and Natural Resources J KOKOLAKIS CONTRACTING INC 39,292,576.15 38,615,769.00

Center for Agriculture and Natural Resources - Commissioning Services

GENESYS ENGINEERING PC 195,863.00 171,898.80

Construction Manager Scheduling Services TURNER CONSTRUCTION COMPANY 38,079.60 38,079.60

Total SUNY Cobleskill 1 Total Projects 39,526,518.75 38,825,747.40SUNY Delhi Renovate Sanford Hall Renovate Sanford Hall BAST HATFIELD CONSTRUCTION LLC 11,089,067.55 11,077,828.00

Commissioning - Renovate Sanford Hall GENESYS ENGINEERING PC 65,820.85 65,820.85Construction Manager – Renovate Sanford Hall GILBANE OMEGA A JOINT VENTURE 15,045.84 15,045.84

Replace Building Fire Alarm System - Various Buildings

Replace Building Fire Alarm System - Various Buildings

MATCO ELECTRIC CORPORATION 656,051.50 602,330.00

Total SUNY Delhi 2 Total Projects 11,825,985.74 11,761,024.69SUNY Polytech Replace Roof - Donovan Hall Repl Roof - Donovan TITAN ROOFING INC 1,078,912.51 1,011,757.00

Renovate Bio-Chemistry Lab JOC 397A5 JOCS CUTTING EDGE GRP LLC 593,080.00 582,686.00

Total SUNY Polytech 2 Total Projects 1,671,992.51 1,594,443.00Total Technology Colleges 22 Total Projects 213,468,759.48 211,216,296.02

University-WideSystem Administration

Site Rehab System Admin Site Improvements - Phase 3B BUNKOFF GENERAL CONTRACTORS INC 1,026,538.00 1,016,079.00

Exterior Renovations RIG Exterior Renovations RIG EASTERN BUILDING & RESTORATION INC 1,954,653.90 1,841,546.00

Replace Exterior Doors & Security Sys Replace Exter Doors & Sec BUNKOFF GENERAL CONTRACTORS INC 1,341,437.70 1,329,680.00Rehab Plaza Garage Deck Rehab Plaza Garage Deck - Priority 1 and 2

RepairsDEBRINO CAULKING ASSOC INC 348,462.80 286,035.00

Rehab Plaza Garage Deck Level 5 Connection Replacement

LUPINI CONSTRUCTION INC 335,277.00 0.00

Total System Administration 4 Total Projects 5,006,369.40 4,473,340.00Total University Wide 4 Total Projects 5,006,369.40 4,473,340.00

Grand Total 109 Total Projects 1,577,431,140.55 1,557,373,096.94