Me-1 to 10 Gf-podium
-
Upload
kristina-ormacido -
Category
Documents
-
view
224 -
download
1
Transcript of Me-1 to 10 Gf-podium
-
At B
1
1000 mmx600 mm1000 mmx600 mm1000 mmx700 mm1000 mmx700 mm1300 mmx700 mm1300 mmx700 mm
EF /GF-07.1
EF /GF-07.2
1100
mm
x300
mm
EF /GF-05
1100mm x 300mm
750mm x 300mm
1300 mmx700 mm
1300 mmx700 mm
1300 mmx700 mm
10 NOS.1200 x 300 EAGC/W VC @ 700 l/s
1400 mmx600 mm
4 NOS.1300 x 600 EAG@ 1700 l/s
EF /GF-09.2
EF /GF-09.1
FULLY INTAKE LOUVEREDWALL & DOOR C/W FIREDAMPER
150
mm
x150
mm
150 x 150 EAG
800 x 400 SAR @820 l/s
1000 mmx700 mm 1000 mmx600 mm 900 mmx500 mm
400
mm
x250
mm
500
mm
x300
mm
500 x 200 EAD RISER(TYP. TO 5),(TO LOW LEVEL OF PUMPRM.)
5 NOS.400 x 200 EAGC/W VD @ 200 l/s(LOW LEVEL OF PUMP RM.)
2000 x 500 EAL
700 x 350 PROPOSED STP EAD(STUB-OUT AT BASEMENTSTP ROOM CEILING LEVEL)
700 x 350 PROPOSED STP FAD(STUB-OUT AT BASEMENTSTP ROOM CEILING LEVEL)
EF /GF-08
700 mmx300 mm
BDD
BDD
STP-EF /GF-01
BDD
PROPOSED STPVENTILATIONFAN LOCATION
PROPOSED700 x 350 EADRISER T/A FOR STP
PROPOSED1500 x 400 INTAKEAIR LOUVER FOR STP
1100 mmx300 mm
2500
2500
AIRWELL
Ap Bp Cp C'p Dp D'p Ep Fp Gp Hp
1p2p
2'p
3p
3'p
1t
4p
4'p
5'p
6p
6'p
7p
8p
8'p
5p
9'p
10p
E'p
445
978
813
1485
360
VD VDVD VD VD VD
820
VD
VD
VD
VD
VD
VD VD
VD
1895 3510 1560 385
1910 4700
EF /GF-04.1
EF /GF-04.2
1000 x 1000INTAKE AIR LOUVER
3500
1460
3465 1685
830
1795
1285
240
470
250
19505160
21305410
1
ATI-ME-7
2
ATI-ME-7
3
ATI-ME-7
1
ATI-ME-9
2
ATI-ME-9
3
ATI-ME-9
1
ATI-ME-10
STP-SF /GF-01
BDD
2
ATI-ME-10
1240
2972
2972
1400 mmx600 mm
1400
mm
x600
mm
300 x 900 EALOR 5500 x 500 EAL
EF /GF-05.2
FULLY LOUVEREDWALL & DOOR
2824
1400 mmx600 mm
1400 mmx600 mm
700 mmx350 mm 700 mmx350 mm
700 mmx350 mm
1400 mmx600 mm
1400
mm
x600
mm16
20
IE = 3703
IE = 3703
IE = 3703
IE = 3280
IE = 3585
IE = 3285
IE = 3700
IE = 3750
IE = 4000
IE = 4000
IE = 4025
IE = 3480
IE = 3585
IE = 3690
IE = 3540
IE = 3540
IE = 3540
IE = 3540
IE = 4228
IE = 4228IE = 3700
IE = 3450
IE = 3450
IE = 3450
IE = 3450
IE = 3700
IE = 3700
IE = 4025
-
---
-
---
IE = 4350
700 mmx350 mm
OWNER / DEVELOPER
CORPORATIONMAKATI DEVELOPMENT
PROJECT MANAGER
TAGUIG, METRO MANILA, PHILIPPINES
1/F BONIFACIO TECHNOLOGY CENTER
TELEPHONE: 02.623.53.14 - 15
SHEET CONTENTS
E-MAIL: [email protected]
AVIDA TOWERSINTIMA
SITE DEVELOPMENT PLAN
MANILA PHILIPPINES
31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY
MAKATI DEVELOPMENT CORPORATIONBIM OFFICER
MAKATI DEVELOPMENT CORPORATIONTEAM LEADER
NORTH
S
W E
MAKATI DEVELOPMENT CORPORATIONBIM MODELER
AVIDA LANDCORPORATION
PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE
DRAIN PIPECONDENSATE DRAIN PIPE
CONDUITPOWER LINE
DUCTS
AIR CONDITIONING DUCTEXHAUST DUCT
BUS DUCT
LEGEND
REFERENCE PLANS:
ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012
- REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012
DATE ISSUED:
SHEET NO.:
ROCHELLE MARIE M. BALUYOT
EMMANUEL FRANCIS L. YUZON
1/29/2014 11:56:45AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt
GROUND FLOOR MECHANICALLAYOUT (PART 1 OF 2)
EMMAN YUZON
ATI-ME-1 1 : 100GROUND FLOOR AIR-CONDITIONING & VENTILATION LAYOUT (PART 1 OF 2)
1
OTHER CONCERNS
LEGEND DESCRIPTIONDATE
ISSUED ISSUED TO
NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.
-
Hp
1p
2p
2'p
3p
3'p
1t
4p
4'p
5'p
6p
6'p
7p
8p
8'p
5p
9'p
10p
1000 mmx600 mm1000 mmx600 mm1000 mmx700 mm
1400 mmx600 mm
FULLY INTAKE LOUVEREDWALL & DOOR C/W FIREDAMPER
900 mmx500 mm
400
mm
x250
mm
500
mm
x300
mm
500 x 200 EAD RISER(TYP. TO 5),(TO LOW LEVEL OF PUMPRM.)
5 NOS.400 x 200 EAGC/W VD @ 200 l/s(LOW LEVEL OF PUMP RM.)
700 mmx300 mm
Jp Kp Lp Mp Np
900 mmx500 mm 900 mmx500 mm
800
mm
x350
mm
700 x 300 EAD RISER
600 x 800 EAG(TOP LEVEL OF GF)
EF /GF-06
800 mmx350 mm
800 x 400 SAR @ 820 l/s
900
mm
x500
mm
1000 x 600 KEADRISER, T/A
350 mmx300 mmVDVDVD
VD
VD
VD
MD
MD
MD
MD
800
mm
x400
mm
500 mmx350 mm
400 mmx350 mm
KSF /GF-01
600 x 350 KSADSTUB-OUT(TYP. TO 4)
4 NOS. 1800 x 300INTAKE AIR GRILLE
KSF /GF-01
KSF /GF-01
KSF /GF-01
RP RISERTO ROOF DECK
RP RISERTO ROOF DECK
400 x 350 KEADSTUB-OUT
FULLY LOUVEREDDOOR
VD
VD
VD
VD
VD
VD
250 x 200 DL
200 x 200 EAG
200 mmx150 mm
EF /GF-02
EF /GF-03
500
mm
x250
mm
300
mm
x250
mm
4 NOS.1200 x 100 SUPPLYLINEAR GRILLE C/W VDDEFLECTOR
VD
VD
VD
VDVD
VD
VD
VD
FCU /GF-01.1
FCU /GF-01.2
700 x 300700 x 300
300
x 25
0
700 x250
300 x
250
300 x
250
200 mmx200 mm
250 x 200 EAG
EF /GF-01
150 x 150 EAG
150 x 150 TEAD
5000x100RETURN LINEAR GRILLE
RP RISERTO ROOF DECK
500 x 350 KEADSTUB-OUT
RP RISERTO ROOF DECK
RP RISERTO ROOF DECK
2000 x 1000RETURN LINEAR DIFFUSER
25 CDP TAP TOTHE NEAREST CDP (TYP.)
4 NOS.1200 x 100SUPPLY LINEAR GRILLEC/W VD DEFLECTOR
600 x 350 KEADSTUB-OUT
4000x100RETURN LINEAR GRILLE
WAC /GF-03.02
WAC /GF-03.01
WAC /GF-02.01
WAC /GF-02.02
WAC /GF-02.03
WAC /GF-02.04
(ONE ON TOP OF THEOTHER)
WAC /GF-04.01
WAC /GF-04.02
150 x 150 DL
BDD
BDD
PROPOSED PLATFORM
1400 mmx600 mm
1130
1077
2785
445
1185 410
1020
3775
135
50
170
800
1845
900
430
3336 1685 600
1215
410
685
1795
1
ATI-ME-8
2
ATI-ME-8
445
1
ATI-ME-9
2
ATI-ME-9
3
ATI-ME-9
1
ATI-ME-10
2
ATI-ME-10
700 x 450 INTAKE AIRDOOR LOUVER
IE = 3700
IE = 3750
IE = 3750
IE = 3800
IE = 3800
IE = 3875
IE = 3875
IE = 4000
IE = 4000
IE = 4000
IE = 4025
IE = 4025
IE = 3380
IE = 3480
IE = 3630
IE = 4025
IE = 4000
IE = 3700
IE = 3700
IE = 3675
IE = 3700
IE = 3682
IE = 3707
IE = 3707
IE = 3480
IE = 3480
IE = 3455
IE = 3480
IE = 3455
IE = 3430
IE = 3480
IE = 3430
IE = 3405
IE = 3505
IE = 3600
-
---
IE = 4343
IE = 3624
LPG VENTTERMINAL C/WLOUVER
D25 LPG STUB-OUT
50 LPG VENT PIPESTUB-OUT
25 LPGVENT PIPE
25 LPG PIPE C/WSECONDARY
CONTAINMENT H/L
25 LPGSTUB-OUT
50 LPGVENT PIPESTUB-OUT
25 LPGSTUB-OUT
50 LPG VENT PIPESTUB-OUT
50 LPG VENTPIPE STUB-OUT
50 LPG VENT PIPESTUB-OUT
50 LPG VENTPIPE STUB-OUT
IE = 3306
IE = 3306
IE = 4035 IE = 3306
IE = 3866
IE = 3866
IE = 4035
IE = 3879
IE = 4035
OWNER / DEVELOPER
CORPORATIONMAKATI DEVELOPMENT
PROJECT MANAGER
TAGUIG, METRO MANILA, PHILIPPINES
1/F BONIFACIO TECHNOLOGY CENTER
TELEPHONE: 02.623.53.14 - 15
SHEET CONTENTS
E-MAIL: [email protected]
AVIDA TOWERSINTIMA
SITE DEVELOPMENT PLAN
MANILA PHILIPPINES
31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY
MAKATI DEVELOPMENT CORPORATIONBIM OFFICER
MAKATI DEVELOPMENT CORPORATIONTEAM LEADER
NORTH
S
W E
MAKATI DEVELOPMENT CORPORATIONBIM MODELER
AVIDA LANDCORPORATION
PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE
DRAIN PIPECONDENSATE DRAIN PIPE
CONDUITPOWER LINE
DUCTS
AIR CONDITIONING DUCTEXHAUST DUCT
BUS DUCT
LEGEND
REFERENCE PLANS:
ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012
- REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012
DATE ISSUED:
SHEET NO.:
ROCHELLE MARIE M. BALUYOT
EMMANUEL FRANCIS L. YUZON
1/29/2014 11:57:09AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt
GROUND FLOOR MECHANICALLAYOUT (PART 2 OF 2)
EMMAN YUZON
ATI-ME-2 1 : 100
GROUND FLOOR AIR-CONDITIONING & VENTILATION LAYOUT (PART 2 OF 2)1
OTHER CONCERNS
LEGEND DESCRIPTIONDATE
ISSUED ISSUED TO
NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.
-
AtAp Bp Cp C'p Dp D'p Ep Fp Gp Hp
1p
2p
2'p
3p
3'p
1t
4p
4'p
5'p
6p
6'p
7p
8p
8'p
9p
5p
9'p
10p
1
ATI-ME-7
2
ATI-ME-7
3
ATI-ME-7
PROPOSED 700 x 350 EADT/A, F/B W/ GOOSENECK TERMINATION
& INSECT SCREEN FOR STP(CEILING LEVEL OF 1ST PODIUM)
1
ATI-ME-9
2
ATI-ME-9
3
ATI-ME-9
1
ATI-ME-10
2
ATI-ME-10
-
---
OWNER / DEVELOPER
CORPORATIONMAKATI DEVELOPMENT
PROJECT MANAGER
TAGUIG, METRO MANILA, PHILIPPINES
1/F BONIFACIO TECHNOLOGY CENTER
TELEPHONE: 02.623.53.14 - 15
SHEET CONTENTS
E-MAIL: [email protected]
AVIDA TOWERSINTIMA
SITE DEVELOPMENT PLAN
MANILA PHILIPPINES
31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY
MAKATI DEVELOPMENT CORPORATIONBIM OFFICER
MAKATI DEVELOPMENT CORPORATIONTEAM LEADER
NORTH
S
W E
MAKATI DEVELOPMENT CORPORATIONBIM MODELER
AVIDA LANDCORPORATION
PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE
DRAIN PIPECONDENSATE DRAIN PIPE
CONDUITPOWER LINE
DUCTS
AIR CONDITIONING DUCTEXHAUST DUCT
BUS DUCT
LEGEND
REFERENCE PLANS:
ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012
- REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012
DATE ISSUED:
SHEET NO.:
ROCHELLE MARIE M. BALUYOT
EMMANUEL FRANCIS L. YUZON
1/29/2014 11:57:17AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt
1ST PODIUM LEVEL MECHANICALLAYOUT (PART 1 OF 2)
EMMAN YUZON
ATI-ME-3 1 : 1001ST PODIUM LEVEL AIR-CONDITIONING & VENTILATION LAYOUT (PART 1 OF 2)
1
OTHER CONCERNS
LEGEND DESCRIPTIONDATE
ISSUED ISSUED TO
NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.
-
Hp
1p
2p
2'p
3p
3'p
1t
4p
4'p
5'p
6p
6'p
7p
8p
8'p
9p
5p
9'p
10p
Jp Kp Lp Mp Np
1
ATI-ME-8 2
ATI-ME-8
200
mm
x200
mm
EF /1FR-01
KEF /2F-01
LMCP-KEF-2F-01
1000 x 600 KEADTERMNATED @ GOOSENECKC/W INSECT SCREEN
1000 x 600 KEADRISER T/A
900 x 500 KEAD
LMCP-ACCU-GF-R-04
ACCU /GF-R-04
ACCU /GF-R-03.2
ACCU /GF-R-03.1
LMCP-ACCU-GF-R-03.2
LMCP-ACCU-GF-R-03.1
RP DOWN TO TENANT'S FCU
ACCU /GF-R-02.2
ACCU /GF-R-02.1
ACCU /GF-R-01.2
ACCU /GF-R-01.1
ACCU /GF-01.2
ACCU /GF-01.1
RP DOWN TO TENANT'S FCU
LMCP-ACCU-GF-R-02.2
LMCP-ACCU-GF-R-02.1
LMCP-ACCU-GF-R-01.2
LMCP-ACCU-GF-R-01.1
LMCP-ACCU-GF-01.2
LMCP-ACCU-GF-01.1
RP DOWN TO TENANT'S FCU1
ATI-ME-9
2
ATI-ME-9
3
ATI-ME-9
1
ATI-ME-10
2
ATI-ME-10
RP DOWN TO TENANT'S FCU
RP DOWN TO TENANT'S FCU
-
---
OWNER / DEVELOPER
CORPORATIONMAKATI DEVELOPMENT
PROJECT MANAGER
TAGUIG, METRO MANILA, PHILIPPINES
1/F BONIFACIO TECHNOLOGY CENTER
TELEPHONE: 02.623.53.14 - 15
SHEET CONTENTS
E-MAIL: [email protected]
AVIDA TOWERSINTIMA
SITE DEVELOPMENT PLAN
MANILA PHILIPPINES
31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY
MAKATI DEVELOPMENT CORPORATIONBIM OFFICER
MAKATI DEVELOPMENT CORPORATIONTEAM LEADER
NORTH
S
W E
MAKATI DEVELOPMENT CORPORATIONBIM MODELER
AVIDA LANDCORPORATION
PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE
DRAIN PIPECONDENSATE DRAIN PIPE
CONDUITPOWER LINE
DUCTS
AIR CONDITIONING DUCTEXHAUST DUCT
BUS DUCT
LEGEND
REFERENCE PLANS:
ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012
- REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012
DATE ISSUED:
SHEET NO.:
ROCHELLE MARIE M. BALUYOT
EMMANUEL FRANCIS L. YUZON
1/29/2014 11:57:24AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt
1ST PODIUM LEVEL MECHANICALLAYOUT (PART 2 OF 2)
EMMAN YUZON
ATI-ME-4
1 : 100
1ST PODIUM LEVEL AIR-CONDITIONING & VENTILATION LAYOUT (PART 2 OF 2)1
OTHER CONCERNS
LEGEND DESCRIPTIONDATE
ISSUED ISSUED TO
NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.
-
UP
AtAp Bp Cp C'p Dp D'p Ep Fp Gp Hp
1p
2p
2'p
3p
3'p
1t
4p
4'p
5'p
6p
6'p
7p
8p
8'p
9p
5p
9'p
10p
E'p
1
ATI-ME-7
2
ATI-ME-7
3
ATI-ME-7
1000 mmx550 mm
SPF /2P-01
LMCP-SPF-2P-01
FIRE RATED DUCT
2000 x 1000 OR 4000 x 500INTAKE AIR LOUVER
1000
mm
x550
mm
1
ATI-ME-9
2
ATI-ME-9
3
ATI-ME-9
1
ATI-ME-10
2
ATI-ME-10
IE = 2865
IE = 2270
-
---
3546 1000
1000
2937 698
302
OWNER / DEVELOPER
CORPORATIONMAKATI DEVELOPMENT
PROJECT MANAGER
TAGUIG, METRO MANILA, PHILIPPINES
1/F BONIFACIO TECHNOLOGY CENTER
TELEPHONE: 02.623.53.14 - 15
SHEET CONTENTS
E-MAIL: [email protected]
AVIDA TOWERSINTIMA
SITE DEVELOPMENT PLAN
MANILA PHILIPPINES
31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY
MAKATI DEVELOPMENT CORPORATIONBIM OFFICER
MAKATI DEVELOPMENT CORPORATIONTEAM LEADER
NORTH
S
W E
MAKATI DEVELOPMENT CORPORATIONBIM MODELER
AVIDA LANDCORPORATION
PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE
DRAIN PIPECONDENSATE DRAIN PIPE
CONDUITPOWER LINE
DUCTS
AIR CONDITIONING DUCTEXHAUST DUCT
BUS DUCT
LEGEND
REFERENCE PLANS:
ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012
- REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012
DATE ISSUED:
SHEET NO.:
ROCHELLE MARIE M. BALUYOT
EMMANUEL FRANCIS L. YUZON
1/29/2014 11:57:27AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt
2ND PODIUM LEVEL MECHANICALLAYOUT (PART 1 OF 2)
EMMAN YUZON
ATI-ME-5
OTHER CONCERNS
LEGEND DESCRIPTIONDATE
ISSUED ISSUED TO
1 : 100
2ND PODIUM LEVEL AIR-CONDITIONING & VENTILATION LAYOUT (PART 1 OF 2)1
NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.
-
UP
Hp
1p
2p
2'p
3p
3'p
1t
4p
4'p
5'p
6p
6'p
7p
8p
8'p
9p
5p
Jp Kp Lp Mp Np
1
ATI-ME-8
2
ATI-ME-8
SPF /2P-01
2000 x 1000 OR 4000 x 500INTAKE AIR LOUVER
2000 x 1000 OR 4000 x 500INTAKE AIR LOUVER
FIRE RATED DUCT
200 mmx200 mm
EF /2FP-01
SPF /2FP-01
1000
mm
x550
mm
LMCP-SPF-2P-02
250 x 200 EAG
1
ATI-ME-9
2
ATI-ME-9
3
ATI-ME-9
1
ATI-ME-10
-
---
1000
mm
x550
mm
1000
mm
x550
mm
2328
1000
2006 1000
OWNER / DEVELOPER
CORPORATIONMAKATI DEVELOPMENT
PROJECT MANAGER
TAGUIG, METRO MANILA, PHILIPPINES
1/F BONIFACIO TECHNOLOGY CENTER
TELEPHONE: 02.623.53.14 - 15
SHEET CONTENTS
E-MAIL: [email protected]
AVIDA TOWERSINTIMA
SITE DEVELOPMENT PLAN
MANILA PHILIPPINES
31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY
MAKATI DEVELOPMENT CORPORATIONBIM OFFICER
MAKATI DEVELOPMENT CORPORATIONTEAM LEADER
NORTH
S
W E
MAKATI DEVELOPMENT CORPORATIONBIM MODELER
AVIDA LANDCORPORATION
PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE
DRAIN PIPECONDENSATE DRAIN PIPE
CONDUITPOWER LINE
DUCTS
AIR CONDITIONING DUCTEXHAUST DUCT
BUS DUCT
LEGEND
REFERENCE PLANS:
ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012
- REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012
DATE ISSUED:
SHEET NO.:
ROCHELLE MARIE M. BALUYOT
EMMANUEL FRANCIS L. YUZON
1/29/2014 11:57:27AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt
2ND PODIUM LEVEL MECHANICALLAYOUT (PART 2 OF 2)
EMMAN YUZON
ATI-ME-6
OTHER CONCERNS
LEGEND DESCRIPTIONDATE
ISSUED ISSUED TO
1 : 100
2ND PODIUM LEVEL AIR-CONDITIONING & VENTILATION LAYOUT (PART 2 OF 2)1
NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.
-
SIDEWALK1710
GROUND FLOOR FFL
2910
1ST PODIUM FFL
8410
2ND PODIUM FFL
11610
AMENITY LVL
16110
11p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 9p5p 9'p 10p
3285 3600
3600
4500
3200
5500
1200
1300 mmx700 mm 1300 mmx700 mm 700 mmx350 mm
GROUND FLOOR FFL
2910
1ST PODIUM FFL8410
2ND PODIUM FFL11610
AMENITY LVL
16110
11p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 9p5p 9'p 10p
3450
33503700
3450
363
1100 mmx300 mm
1300 mmx700 mm700 mmx350 mm
300 mmx750 mm
4500
3200
5500
SIDEWALK
1710
GROUND FLOOR FFL
2910
1ST PODIUM FFL8410
2ND PODIUM FFL
11610
AMENITY LVL
16110
11p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 9p5p 9'p 10p
3700
353040
25
4000
3900
635 360 1165 2495
300 mmx500 mm 250 mmx400 mm 600 mmx1400 mm
1000 mmx550 mm
4500
3200
5500
1200
3015
2420
OWNER / DEVELOPER
CORPORATIONMAKATI DEVELOPMENT
PROJECT MANAGER
TAGUIG, METRO MANILA, PHILIPPINES
1/F BONIFACIO TECHNOLOGY CENTER
TELEPHONE: 02.623.53.14 - 15
SHEET CONTENTS
E-MAIL: [email protected]
AVIDA TOWERSINTIMA
SITE DEVELOPMENT PLAN
MANILA PHILIPPINES
31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY
MAKATI DEVELOPMENT CORPORATIONBIM OFFICER
MAKATI DEVELOPMENT CORPORATIONTEAM LEADER
NORTH
S
W E
MAKATI DEVELOPMENT CORPORATIONBIM MODELER
AVIDA LANDCORPORATION
PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE
DRAIN PIPECONDENSATE DRAIN PIPE
CONDUITPOWER LINE
DUCTS
AIR CONDITIONING DUCTEXHAUST DUCT
BUS DUCT
LEGEND
REFERENCE PLANS:
ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012
- REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012
DATE ISSUED:
SHEET NO.:
ROCHELLE MARIE M. BALUYOT
EMMANUEL FRANCIS L. YUZON
1/29/2014 11:57:36AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt
GROUND FLOOR - PODIUM LEVELMECHANICAL SECTION ALONG GRID
EMMAN YUZON
ATI-ME-7
1 : 100
SECTION ALONG GRIDLINE Ap-Cp1
1 : 100
SECTION ALONG GRIDLINE D'p-Ep2
1 : 100
SECTION ALONG GRIDLINE Gp-Hp3
OTHER CONCERNS
LEGEND DESCRIPTIONDATE
ISSUED ISSUED TO
-
SIDEWALK
1710
GROUND FLOOR FFL2910
1ST PODIUM FFL
8410
2ND PODIUM FFL
11610
AMENITY LVL16110
11p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 9p5p 9'p 10p
4000
3875
3800
3866
4035
500 mmx900 mm 350 mmx800 mm 350 mmx800 mm
1000 mmx550 mm
200 mmx200 mm
200 mmx200 mm
2320
4500
3200
5500
1200
2410
3306
3015
2430
550 mmx1000 mm
550 mmx1000 mm
SIDEWALK1710
GROUND FLOOR FFL
2910
1ST PODIUM FFL
8410
2ND PODIUM FFL11610
AMENITY LVL
16110
11p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 9p5p 9'p 10p
300037
00
3480
3455
3430
3405
400
500 mmx900 mm
450 mmx900 mm 400 mmx800 mm 350 mmx500 mm
250 mmx500 mm 250 mmx300 mm
3000
KEF /2F-01
KSF /GF-01
4500
3200
5500
1200
OWNER / DEVELOPER
CORPORATIONMAKATI DEVELOPMENT
PROJECT MANAGER
TAGUIG, METRO MANILA, PHILIPPINES
1/F BONIFACIO TECHNOLOGY CENTER
TELEPHONE: 02.623.53.14 - 15
SHEET CONTENTS
E-MAIL: [email protected]
AVIDA TOWERSINTIMA
SITE DEVELOPMENT PLAN
MANILA PHILIPPINES
31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY
MAKATI DEVELOPMENT CORPORATIONBIM OFFICER
MAKATI DEVELOPMENT CORPORATIONTEAM LEADER
NORTH
S
W E
MAKATI DEVELOPMENT CORPORATIONBIM MODELER
AVIDA LANDCORPORATION
PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE
DRAIN PIPECONDENSATE DRAIN PIPE
CONDUITPOWER LINE
DUCTS
AIR CONDITIONING DUCTEXHAUST DUCT
BUS DUCT
LEGEND
REFERENCE PLANS:
ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012
- REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012
DATE ISSUED:
SHEET NO.:
ROCHELLE MARIE M. BALUYOT
EMMANUEL FRANCIS L. YUZON
1/29/2014 11:57:41AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt
GROUND FLOOR - PODIUM LEVELMECHANICAL SECTION ALONG GRID
EMMAN YUZON
ATI-ME-8
1 : 100
SECTION ALONG GRIDLINE Kp1
1 : 100
SECTION ALONG GRIDLINE Lp2
OTHER CONCERNS
LEGEND DESCRIPTIONDATE
ISSUED ISSUED TO
-
SIDEWALK1710
GROUND FLOOR FFL
2910
1ST PODIUM FFL
8410
2ND PODIUM FFL11610
AMENITY LVL
16110
At BBp Cp C'p Dp D'p Ep Fp Gp HpE'p Jp Kp Lp Mp Np
700 mmx1300 mm 700 mmx1300 mm 700 mmx1000 mm 700 mmx1000 mm 600 mmx1000 mm 600 mmx1000 mm 500 mmx900 mm 500 mmx900 mm
800 mmx300 mm
314035053800
3700
3700
4500
3200
5500
1200
SIDEWALK
1710
GROUND FLOOR FFL
2910
1ST PODIUM FFL8410
2ND PODIUM FFL11610
AMENITY LVL
16110
Ap Bp Cp C'p Dp D'p Gp Hp Jp Kp Lp Mp Np
700 mmx1300 mm700 mmx1300 mm
EF /GF-07.1
328537
03
4000
EF /GF-06
300 mmx700 mm
3875
3480
KSF /GF-01
2980
4500
3200
5500
1200
SIDEWALK1710
GROUND FLOOR FFL
2910
1ST PODIUM FFL
8410
2ND PODIUM FFL11610
AMENITY LVL
16110
At BAp Bp Cp C'p Dp D'p Ep Fp Gp HpE'p Jp Kp Lp Mp
EF /GF-07.2
3703
3280
3380
3480
3630
700 mmx1300 mm 700 mmx1300 mm 600 mmx1000 mm 500 mmx900 mm 350 mmx800 mm
550 mmx1000 mm
2260
3280
700 mmx1000 mm
700 mmx350 mm
3585
4500
3200
5500
1200
OWNER / DEVELOPER
CORPORATIONMAKATI DEVELOPMENT
PROJECT MANAGER
TAGUIG, METRO MANILA, PHILIPPINES
1/F BONIFACIO TECHNOLOGY CENTER
TELEPHONE: 02.623.53.14 - 15
SHEET CONTENTS
E-MAIL: [email protected]
AVIDA TOWERSINTIMA
SITE DEVELOPMENT PLAN
MANILA PHILIPPINES
31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY
MAKATI DEVELOPMENT CORPORATIONBIM OFFICER
MAKATI DEVELOPMENT CORPORATIONTEAM LEADER
NORTH
S
W E
MAKATI DEVELOPMENT CORPORATIONBIM MODELER
AVIDA LANDCORPORATION
PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE
DRAIN PIPECONDENSATE DRAIN PIPE
CONDUITPOWER LINE
DUCTS
AIR CONDITIONING DUCTEXHAUST DUCT
BUS DUCT
LEGEND
REFERENCE PLANS:
ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012
- REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012
DATE ISSUED:
SHEET NO.:
ROCHELLE MARIE M. BALUYOT
EMMANUEL FRANCIS L. YUZON
1/29/2014 11:57:50AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt
GROUND FLOOR - PODIUM LEVELMECHANICAL SECTION ALONG GRID
EMMAN YUZON
ATI-ME-9
1 : 100
SECTION ALONG GRIDLINE 2p1
1 : 100
SECTION ALONG GRIDLINE 3'p-4p2
1 : 100
SECTION ALONG GRIDLINE 5p3
OTHER CONCERNS
LEGEND DESCRIPTIONDATE
ISSUED ISSUED TO
-
SIDEWALK
1710
GROUND FLOOR FFL
2910
1ST PODIUM FFL8410
2ND PODIUM FFL11610
AMENITY LVL
16110
At BAp Bp Cp C'p Dp D'p Ep Fp GpE'p Jp Kp Lp Mp Np
358543
50
SPF /2FP-01
2865
3690
350 mmx700 mm
3000
700 x 350 PROPOSED STP EAD(STUB-OUT AT BASEMENTSTP ROOM CEILING LEVEL)
700 x 350 PROPOSED STP FAD(STUB-OUT AT BASEMENTSTP ROOM CEILING LEVEL)
STP-SF /GF-01
2300
4500
3200
5500
1200
1000 mmx550 mm
3700
4000
2600
SIDEWALK
1710
GROUND FLOOR FFL
2910
1ST PODIUM FFL8410
2ND PODIUM FFL11610
AMENITY LVL
16110
At BAp Bp Cp C'p Dp D'p Ep Fp Gp HpE'p Jp Kp Lp Mp Np
3200
EF /GF-05
EF /GF-04.2
600 mmx1400 mm
3000 x 900 EALOR 5500 x 500 EAL
4500
3200
5500
1200
OWNER / DEVELOPER
CORPORATIONMAKATI DEVELOPMENT
PROJECT MANAGER
TAGUIG, METRO MANILA, PHILIPPINES
1/F BONIFACIO TECHNOLOGY CENTER
TELEPHONE: 02.623.53.14 - 15
SHEET CONTENTS
E-MAIL: [email protected]
AVIDA TOWERSINTIMA
SITE DEVELOPMENT PLAN
MANILA PHILIPPINES
31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY
MAKATI DEVELOPMENT CORPORATIONBIM OFFICER
MAKATI DEVELOPMENT CORPORATIONTEAM LEADER
NORTH
S
W E
MAKATI DEVELOPMENT CORPORATIONBIM MODELER
AVIDA LANDCORPORATION
PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE
DRAIN PIPECONDENSATE DRAIN PIPE
CONDUITPOWER LINE
DUCTS
AIR CONDITIONING DUCTEXHAUST DUCT
BUS DUCT
LEGEND
REFERENCE PLANS:
ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012
- REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012
DATE ISSUED:
SHEET NO.:
ROCHELLE MARIE M. BALUYOT
EMMANUEL FRANCIS L. YUZON
1/29/2014 11:58:03AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt
GROUND FLOOR - PODIUM LEVELMECHANICAL SECTION ALONG GRID
Author
ATI-ME-10
1 : 100
SECTION ALONG GRIDLINE 6p-6'p1
1 : 100
SECTION ALONG GRIDLINE 8'p-9'p2
OTHER CONCERNS
LEGEND DESCRIPTIONDATE
ISSUED ISSUED TO