26 November 2014 The Manager Company Announcements Office ASX Limited PO Box H224 Australia Square SYDNEY NSW 2000 Dear Sir/Madam, MD’s PRESENTATION TO ANNUAL GENERAL MEETING Please find attached a copy of the presentation to be given by Saracen Mineral Holdings Limited’s Managing Director, Raleigh Finlayson, at today’s Annual General Meeting. Yours sincerely G F Kaczmarek Company Secretary Saracen Mineral Holdings Ltd ACN 009 215 347 Level 4, 89 St Georges Terrace Perth, WA 6000 Australia Telephone (61 8) 6229 9100 Facsimile (61 8) 6229 9199 For personal use only

Transcript of MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING....

Page 1: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

26 November 2014

The Manager Company Announcements Office ASX Limited PO Box H224 Australia Square SYDNEY NSW 2000

Dear Sir/Madam,

MD’s PRESENTATION TO ANNUAL GENERAL MEETING

Please find attached a copy of the presentation to be given by Saracen Mineral Holdings Limited’s Managing Director, Raleigh Finlayson, at today’s Annual General Meeting.

Yours sincerely

G F Kaczmarek Company Secretary

Saracen Mineral Holdings Ltd

ACN 009 215 347 Level 4, 89 St Georges Terrace

Perth, WA 6000 Australia

Telephone (61 8) 6229 9100 Facsimile (61 8) 6229 9199

For

per

sona

l use

onl

y

Page 2: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

RALEIGH FINLAYSON : MANAGING DIRECTOR DANIEL HOWE : GENERAL MANAGER – GEOLOGY & EXPLORATION

ASX GOLD PRODUCER AGM Presentation – 26 November 2014

For

per

sona

l use

onl

y

Page 3: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Qualification

2

This presentation has been prepared by Saracen Mineral Holdings Limited (Saracen or the Company) based on information from its own and third party sources and is not a disclosure document. No party other than the Company has authorised or caused the issue, lodgement, submission, despatch or provision of this presentation, or takes any responsibility for, or makes or purports to make any statements, representations or undertakings in this presentation. You should be aware that as an Australian company with securities listed on the ASX, the Company is required to report reserves and resources in Australia in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code 2012 Edition ) ("JORC Code"). You should note that while the Company's reserve and resource estimates comply with the JORC Code, they may not comply with the relevant guidelines in other countries. This is a presentation about geology, geoscientific interpretation, geoscientific speculation, gold deposits, gold potential, engineering, infrastructure, potential values, costs, risks, and related matters pertinent to Saracen’s present and future activities as a publicly listed mineral exploration and production company. It includes forecasts, predictions, targets and estimates of future expenditures which may vary over time. It is uncertain if further exploration will result in the determination of a Resource or Reserve. Where exploration, evaluation, operational and feasibility study expenditure estimates and budgets amounts are presented herein, ongoing prioritisation and scaling of expenditures will be subject to results and, where applicable, scheduling changes. Targeted production and other outcomes are subject to change, and may not eventuate, depending on the results of ongoing performance and assessment of data. All Reserves and Resources as referred to herein are in accordance with the JORC Code. Refer to last slide of this presentation for the relevant Competent Person statements. Resources are inclusive of Reserves. Certain statements contained in the Presentation Materials, including information as to the future financial or operating performance of the Company and its projects, are forward looking statements. Such forward looking statements: a) are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company, are inherently subject to significant technical, business, economic, competitive, political and

social uncertainties and contingencies; b) involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or results reflected in such forward looking statements; and c) may include, among other things, statements regarding estimates and assumptions in respect of prices, costs, results and capital expenditure, and are or may be based on assumptions and estimates related to future

technical, economic, market, political, social and other conditions. The Company disclaims any intent or obligation to publicly update any forward looking statements, whether as a result of new information, future events or results or otherwise. The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will”, “schedule” and similar expressions identify forward looking statements. All forward looking statements contained in the Presentation Materials are qualified by the foregoing cautionary statements. Recipients are cautioned that forward looking statements are not guarantees of future performance and accordingly recipients are cautioned not to put undue reliance on forward looking statements due to the inherent uncertainty therein. The Presentation Materials do not purport to be all inclusive or to contain all information about the Company. This presentation is not a prospectus, disclosure document or other offering document under Australian law or under any other law. It is provided for information purposes and is not an invitation nor offer of shares for subscription, purchase or sale in any jurisdiction. Take care to question and carefully evaluate any judgments you might make, on the basis of the Presentation Materials, as to the value of Saracen and its securities. This presentation is not intended to provide the sole or principal basis of any investment or credit decision or any other risk evaluation and may not be considered as a recommendation by Saracen or its officers. Any investor reading the Presentation Materials should determine its interest in acquiring securities in Saracen on the basis of independent investigations that it considers necessary, prudent or desirable. Saracen and its officers do not accept any liability for any loss or damage suffered or incurred by any investor or any other person or entity however caused (including negligence) relating in any way to this presentation including, without limitation, the information contained in it, any errors or omissions however caused by any other person or entity placing any reliance on the Presentation Materials, its accuracy or reliability.

For

per

sona

l use

onl

y

Page 4: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Corporate Overview

Corporate Structure ASX Code SAR

Shares 792.8m

Share Price1 A$0.27

Market Cap1 A$214m

Enterprise Value1 A$190m

Cash & Bullion2 A$36.3m

Debt2 A$12.0m

Net Cash2 A$24.3m

Forward Hedging3 89koz @ A$1,709/oz

Spot Deferred Hedging3 72koz @ A$1,404/oz

Total Hedging3 160koz @ A$1,572/oz

Total Hedge Value4 A$33.7m

Last Hedge Delivery June 2016 @ A$1,750/oz

Board Non-Executive Chairman Guido Staltari (retiring at AGM)

Managing Director Raleigh Finlayson

Non-Executive Director Barrie Parker

Non-Executive Director Martin Reed

Non-Executive Director Samantha Tough

Non-Executive Director Geoff Clifford (Chairman elect)

Management Chief Financial Officer Gerry Kaczmarek

Chief Operating Officer Craig Bradshaw

Substantial Shareholders Van Eck Associates 12.8%

Wroxby / Seven Group 8.0%

Paradice Investments 6.9%

Eley Griffiths Group 5.1% 1. As at 25 November 2014 2. As at 30 September 2014 3. As at 31 October 2014 4. As at 6 November 2014 (Spot Price A$1,338/oz)

3

For

per

sona

l use

onl

y

Page 5: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

FY2014 LTIFR

4

5.2 5.4 5.5 5.6

6.7 6.8 7.0 7.2

8.3

7.4

5.3

3.2

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

0

1

2

3

4

5

6

7

8

9

10

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June

Frequency Rate

# of

LTI

s

12 month rolling Lost Time Injury Frequency Rate

LTIs LTIFR

For

per

sona

l use

onl

y

Page 6: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

FY2014 Total Incident Frequency Rate

5

356

435

276

705

484 444 425

383

581 548

443

310 TIFR Target 440

0

100

200

300

400

500

600

700

800

Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14

Tota

l Inc

iden

t Co

unt

Month TIFR Weighted Weighted TIFR Target

For

per

sona

l use

onl

y

Page 7: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

6

Key Assets Thunderbox Operations: • 2.5Mtpa CIL plant • Operational 2002 – 2007 • Produced 805koz @ US$290/oz • 2.8Moz Resource • 783koz Reserve • 5 year mine life already in reserve • Capex A$45-55m • AISC Forecast of ~A$1,100/oz

Carosue Dam Operations: • 2.4Mtpa CIL Plant • Whirling Dervish OP provides declining strip ratio,

increasing grade and margins • Karari Exploration Decline future upside catalyst Red October: • High grade underground mine (6.9g/t reserve) • Set to deliver 60koz again in FY2015

Combined Assets: • 6.9Moz Mineral Resources • 1.6Moz Ore Reserves • Milling capacity 5.0Mtpa • Potential production ~290kozpa • +3,000 km2 tenement package • Progressive and measured approach

For

per

sona

l use

onl

y

Page 8: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations (CDO)

7

Red October: • Red October UG: 333kt @ 6.9g/t for 74koz • 60koz delivered in FY2014 @ 6.4g/t • 60koz guidance in FY2015 @ 6.9g/t • “All In” sustaining costs A$1,150/oz • Recent High grade drilling results (26 Nov 2014):

• 0.7m @ 314.6g/t • 6.9m @ 62.3g/t • 4.9m @ 104.7g/t

Carosue Dam: • 2.4mtpa modern processing facility • Whirling Dervish OP: provides base load feed • Remaining Strip Ratio 1.2:1 (26/11/14) • Remaining Average Grade 1.80g/t (26/11/14) • Whirling Dervish UG: 1.5mt @ 3.0g/t for 150koz • “All in” sustaining costs decreasing to A$1,075/oz • Karari: Exploration decline STARTED! • Karari drilling to follow up:

• 25m @ 7.9g/t & 19m @ 5.1g/t

For

per

sona

l use

onl

y

Page 9: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Red October Cross Section

8

For

per

sona

l use

onl

y

Page 10: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

9

Red

Oct

ober

Lon

gsec

tion Started OCT 2011

OCT 2014

10km Dev Milestone: • 20/11/2014 • 266 metres/month • 4.3 meters/day

Updated Mine Plan

Current Drilling

3 Years

For

per

sona

l use

onl

y

Page 11: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Red October Long Section (FW)

10

Recent drilling

Exploration drilling

For

per

sona

l use

onl

y

Page 12: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Red October (Footwall Lode)

11

Results 26th Nov 2014:

RORD045: 0.7m @ 314.6g/t

ROGC397: 6.9m @ 62.3g/t

ROGC390: 4.9m @ 104.7g/t

Results 10th Sep 2014:

ROGC305: 10.4m @ 11.2g/t

ROGC355: 0.4m @ 93.9g/t

ROGC357: 1.8m @ 216.3g/t

Limit of Ore Reserves (as at 9 October 2014)

Current Drilling

Program

Outside Reserve

For

per

sona

l use

onl

y

Page 13: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

12

Red

Oct

ober

Foo

twal

l F

or p

erso

nal u

se o

nly

Page 14: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Red October Village

13

Saracen purchased the Red October village from the hirer

in October 2014 for $1.5m

For

per

sona

l use

onl

y

Page 15: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Whirling Dervish & Karari

14

KARARI WHIRLING DERVISH

PROCESSING PLANT

Slides 15 & 16 Sections

Slides 18 & 19 Sections

For

per

sona

l use

onl

y

Page 16: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

15

2013 AGM Whirling Dervish

Whi

rling

Der

vish

Cro

ss S

ectio

n F

or p

erso

nal u

se o

nly

Page 17: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

16

Whi

rling

Der

vish

Cro

ss S

ectio

n

2014 AGM Whirling Dervish

For

per

sona

l use

onl

y

Page 18: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

17

Whi

rling

Der

vish

Gra

de &

Stri

p R

atio

s

INC

REA

SIN

G M

ARG

INS

For

per

sona

l use

onl

y

Page 19: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

18

Whi

rling

Der

vish

GC

Dril

ling

Final Pit Design

Hangingwall Lodes

48m @ 3.25g/t

23m @ 2.49g/t

For

per

sona

l use

onl

y

Page 20: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

19

Whi

rling

Der

vish

GC

Dril

ling

Final Pit Design

Footwall Lode

18m @ 3.06g/t

10m @ 9.03g/t

For

per

sona

l use

onl

y

Page 21: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

20

Whi

rling

Der

vish

Ope

n P

it

November 2014

For

per

sona

l use

onl

y

Page 22: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

FY2015 Carosue Dam Mill Feed

21

Mine to ROM (FY2015) Whirling Dervish OP 3.9mt @ 1.7g/t = 207,000con oz (using latest reserves)

ROM to Mill (FY2015) Whirling Dervish OP 2.1mt @ 1.60g/t = 110,000con oz

ROM to Mill (FY2016) Whirling Dervish OP 1.8mt @ 1.70g/t = 97,000con oz

RO ROM to Mill (FY2015) Red October UG 0.3mt @ 6.4g/t = 60,000con oz

Key Points: • All mining costs expensed against rec oz milled in

FY2015 (no non-cash deferrals) • Only requires processing, administration and corporate

costs to realise • Approx A$520/oz AISC for 90,000 rec oz in FY2016

For

per

sona

l use

onl

y

Page 23: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

22

Car

osue

Dam

Mill

Pro

duct

ion

For

per

sona

l use

onl

y

Page 24: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

FY2013 Delivery

23

FY2013 Reconciliation

Deposit Reserves Actual Variance

Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces

Karari 1,388,000 1.24 55,000 1,274,000 1.48 61,000 -8% +19% +11%

Deep South 221,000 2.30 16,000 210,000 3.90 26,000 -5% +70% +63%

Wallbrook 87,000 1.13 3,000 66,000 1.31 3,000 -24% +16% 0%

Margarets 222,000 1.45 10,000 199,000 1.56 10,000 -10% +8% 0%

Butchers Well 180,000 1.63 10,000 163,000 1.95 10,000 -9% +20% 0%

Red October 98,000 8.33 26,000 116,000 8.30 31,000 18% 0% +19%

Total 2,196,000 1.70 120,000 2,028,000 2.16 141,000 -8% +27% +18%

Highlights: 8% less dilution across all sources (actual versus planned) 20% grade overcall at Karari – trend continued into FY2014… 70% grade overcall at Deep South – deposit subject to future UG mining (FY2017 onwards, min 3 year reserve) 19% ounce overcall at Red October – trend continued into FY2014…

For

per

sona

l use

onl

y

Page 25: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

FY2014 Delivery

24

FY2014 Reconciliation

Deposit Reserve Actual Variance

Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces

Karari 191,000 1.72 10,000 134,000 3.35 14,000 -30% +95% +40%

Whirling Dervish 1,953,000 1.03 65,000 1,767,000 1.14 65,000 -10% +11% 0%

Red October 300,000 5.00 48,000 293,000 6.38 60,000 -2% +28% +25%

Total 2,444,000 1.57 123,000 2,194,000 1.97 139,000 -10% +26% +13%

Highlights: 10% less dilution across all sources (actual versus planned) 11% grade overcall at Whirling Dervish – 67% contribution to FY2015 production guidance 28% grade overcall at Red October – 33% contribution to FY2015 production guidance 95% grade overcall at Karari – deposit subject to exploration decline and drilling program in FY2015, followed by production in FY2016…

For

per

sona

l use

onl

y

Page 26: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

FY2015 Guidance

25

FY2015 Production (oz)1 Cash Costs (A$/oz)2 AISC (A$/oz)3 Growth Capital (A$m)4

Whirling Dervish OP 101,000 rec oz A$910/oz A$1,075/oz Inclusive in AISC

Red October UG 49,000 rec oz A$800/oz A$1,150/oz Inclusive in AISC

Sustaining Capital Inclusive in AISC Inclusive in AISC

Royalties Inclusive in AISC Inclusive in AISC

Corporate & Interest A$50/oz

Deferred waste adjustment5 Nil Nil

Ore Inventory adjustment5 Nil Nil

Karari Exploration Decline A$9-11m

New TSF (CDO) ~4 year’s life A$4-6m

Exploration (CDO) A$4-6m

Exploration (TBO) A$4-6m

Thunderbox – C&M, Feasibility6 A$5-7m

Total 150,000 rec oz A$875/oz A$1,150/oz A$26-36m

1. Production (oz) is the mid-point of the guidance range provided and represents recovered mill production (oz) 2. Cash Costs (A$/oz) includes cash costs for open pit and underground mining, ore cartage, processing, site administration, exclusive of any accounting adjustments 3. ASIC (A$/oz) represents “All in Sustaining Costs” and includes Cash Costs, royalties, open pit and underground sustaining capital, corporate and interest costs , exclusive of any accounting adjustments 4. Growth Capital (A$m) represents capital incurred to increase production, as opposed to sustain production, and includes regional/greenfields exploration, new acquisitions and development that increases production 5. Non-cash adjustments have been excluded in Cash Costs and AISC’s calculations, therefore represent actual movements in cash 6. Includes Thunderbox Care & Maintenance, feasibility and approvals costs in preparation for a development decision in Q3 FY2015 to re-commence operations in Q2 FY2016

95% complete started 18/11

ongoing started 4/10 ongoing

For

per

sona

l use

onl

y

Page 27: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Tailings Storage Facility

26

• FY2015 Capex $4-6m • ~4 years capacity • $2mpa less working capital

required over next 4 years

For

per

sona

l use

onl

y

Page 28: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Exploration

27

Exploration Budget FY2015

Red October Exploration

($5m)

Bio-Geochemistry & Gravity Surveys

($<1m)

Blue Manna Auger & RC Drilling

(<$1m)

Karari Exploration Decline & Drilling

($10m)

Thunderbox Ops Drilling ($5m)

1-2 Rigs 1-2 Rigs 3 Rigs 2 Rigs 2 Crews

For

per

sona

l use

onl

y

Page 29: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Whirling Dervish & Karari

28

KARARI WHIRLING DERVISH

PROCESSING PLANT

For

per

sona

l use

onl

y

Page 30: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Karari Exploration *2m intervals

18m @ 5.8g/t

For

per

sona

l use

onl

y

Page 31: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

30

Karari Open Pit August 2013

HG

Kar

ari

For

per

sona

l use

onl

y

Page 32: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Karari Long Section

31

For

per

sona

l use

onl

y

Page 33: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Karari Exploration

32 Looking South

Main Decline

Exploration Drill Drive

Ore Zones

For

per

sona

l use

onl

y

Page 34: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Karari Exploration

33

Interpretation Extensions

Exploration Drill Drive

Exploration Drilling

400m

(~4

year

s m

ine

life)

Looking South

Looking West

600m (~4 years mine life)

South Shoot

Central Shoot

North Shoot

For

per

sona

l use

onl

y

Page 35: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Karari Exploration

34

18th November 2014

For

per

sona

l use

onl

y

Page 36: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Karari Exploration

35

For

per

sona

l use

onl

y

Page 37: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Karari Exploration

36 25th November 2014

For

per

sona

l use

onl

y

Page 38: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Carosue Dam Operations – Karari Exploration

37

N D J F M A M J J A S O N DKarari Main Decline

Karari Exploration Decline

Karari Stope Definition Drilling

Karari Exploration Drilling

Karari Exploration Results

Karari Ore Development

Karari Stoping

Exploration FY2015

Gold Ore

FY2016

Legend:Development

Drilling

Results

For

per

sona

l use

onl

y

Page 39: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

38

Thun

derb

ox O

pera

tions

F

or p

erso

nal u

se o

nly

Page 40: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

39

Consideration: • A$20 million cash on Settlement; • A$3 million cash upon the sooner

of commencement of commercial production, or if, after a period of 24 months following settlement, the prevailing gold price has exceeded A$1,550/oz for a calendar month;

• 1.5% NSR Royalty on the Thunderbox Operations (capped at A$17 million).

Equates to an acquisition cost of A$11 per Resource ounce & A$32 per Reserve ounce

Thun

derb

ox O

pera

tions

F

or p

erso

nal u

se o

nly

Page 41: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Thunderbox 2.5mtpa CIL Plant

40

For

per

sona

l use

onl

y

Page 42: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Thunderbox Open Pit

41

For

per

sona

l use

onl

y

Page 43: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

42

Breaking new ground at Thunderbox…

24 November 2014

VM Drilling

Thun

derb

ox E

xplo

ratio

n

DDH1

For

per

sona

l use

onl

y

Page 44: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

43

Breaking new ground at Bannockburn…

12 November 2014

Orlando Drilling

Ban

nock

burn

Exp

lora

tion

For

per

sona

l use

onl

y

Page 45: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Thunderbox Development Timeline

44

Settlement

Approvals

Feasibility Study

Thunderbox Extension Drilling

Thunderbox Drilling Results

Bannockburn Infill Drilling

Bannockburn Drilling Results

Development Decision*

Plant Refurbishment

Development

Commissioning

Production

* Subject to positive feasib ility results

Jun QThunderbox Operations FY2016Dec Q Mar Q Jun Q Sep Q Dec Q Mar Q

FY2015

For

per

sona

l use

onl

y

Page 46: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Saracen Exploration

45

Exploration Budget FY2015

Red October Exploration

($5m)

Bio-Geochemistry & Gravity Surveys

($<1m)

Blue Manna Auger & RC Drilling

(<$1m)

Karari Exploration Decline & Drilling

($10m)

Thunderbox Ops Drilling ($5m)

1-2 Rigs 1-2 Rigs 3 Rigs 2 Rigs 2 Crews

For

per

sona

l use

onl

y

Page 47: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

46

Thun

derb

ox L

ongs

ectio

n F

or p

erso

nal u

se o

nly

Page 48: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

47

Thun

derb

ox C

ross

sec

tion

Zone

“C”

For

per

sona

l use

onl

y

Page 49: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

48

Thun

derb

ox C

ross

sec

tion

Zone

“A”

For

per

sona

l use

onl

y

Page 50: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

49

Car

osue

Dam

Gra

vity

Sur

vey

Deep South

Carosue Dam

For

per

sona

l use

onl

y

Page 51: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Bio-Geochemistry Survey

50

For

per

sona

l use

onl

y

Page 52: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Blue Manna

51

For

per

sona

l use

onl

y

Page 53: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

52

Blu

e M

anna

F

or p

erso

nal u

se o

nly

Page 54: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

53

Blu

e M

anna

F

or p

erso

nal u

se o

nly

Page 55: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Exploration Activity

54

Red October Drilling

Red October Results

Karari Exploration Decline

Karari Drilling

Karari Results

Blue Manna Drilling

Blue Manna Results

Thunderbox Drilling

Thunderbox Results

Bannockburn Drilling

Bannockburn ResultsThun

derb

ox

Legend:

Car

osue

Dam

Development

Drilling

Results

Op Exploration Dec Q Mar QFY2015

Jun Q

For

per

sona

l use

onl

y

Page 56: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

SAR FY2014 Share Price Performance

55

For

per

sona

l use

onl

y

Page 57: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

SAR FY2015 YTD Share Price Performance

56

For

per

sona

l use

onl

y

Page 58: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Gold Price Performance

57

For

per

sona

l use

onl

y

Page 59: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

58

H

edgi

ng 5 YEAR GOLD PRICE IN AUD/oz

For

per

sona

l use

onl

y

Page 60: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Points of Difference

59

Delivery • One of Saracen’s core values • Consistently delivery into guidance quarter by quarter over 2.5 years • Resource confidence and reconciliation performance underpins guidance

1

Declining Cost Profile

• AISC set to decrease over A$350/oz to A$1,150/oz (Carosue Dam Operations) • Thunderbox cash costs of A$1,100/oz (approx 5 year mine life) • Increasing margins via declining costs & increasing hedge prices

2

Progressive & Measured

• Carosue Dam Operation forecast to deliver 150,000 ounces per annum • Thunderbox Operations potential to deliver 140,000 ounces per annum • Potential to double production to 290,000 ounces per annum and increase free cashflow

4

Exploration Pipeline

• A$10m regional exploration budget (Carosue Dam & Thunderbox Operations) • A$10m exploration decline & drilling program at Karari (Carosue Dam Operations) • A$5m exploration budget for Red October program

3

Safe Gold Bet • Protection to the downside… via hedgebook, 100% protection in FY2015, ~32% in FY2016 • Leverage to the upside… via our 1.6Moz ore reserve base, with significant upside • Reliable Board & Management, focused on cashflow and delivery

5 For

per

sona

l use

onl

y

Page 61: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Farewell Guido F

or p

erso

nal u

se o

nly

Page 62: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

For

per

sona

l use

onl

y

Page 63: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

62

Gro

up M

iner

al R

esou

rces

- G

old

For

per

sona

l use

onl

y

Page 64: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

63

Gro

up M

iner

al R

esou

rces

- N

icke

l F

or p

erso

nal u

se o

nly

Page 65: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

64

Gro

up O

re R

eser

ves

F

or p

erso

nal u

se o

nly

Page 66: MD’s PRESENTATION TO ANNUAL GENERAL MEETING … · MD’s PRESENTATION TO ANNUAL GENERAL MEETING. ... Refer to last slide of this presentation for the relevant ... (26/11/14) •

Group Mineral Resources & Ore Reserves

Competent Persons Statement: The information on Exploration Results, Group Mineral Resources and Ore Reserves is extracted from the report entitled “2014 Mineral Resources and Ore Reserves” dated 9 October 2014 This report is available to view on the ASX Website at www.asx.com.au and the Company’s website at www.saracen.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources and Ore Reserves, that all market assumptions and technical assumptions underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.