MCG Presentation 2019 - MCG MühendislikCV Murat Cenk Gerdanli Representations MCG MÜHENDİSLİK...
Transcript of MCG Presentation 2019 - MCG MühendislikCV Murat Cenk Gerdanli Representations MCG MÜHENDİSLİK...
COMPANY PRESENTATIONEngineering Services
Recent Project References
Representations
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE
DIŞ TİC. LTD. ŞTİ.
ITEMIZED ENGINEERING, DESIGN AND SUPERVISION ACTIVITIES
IN CIVIL PIPELINE PROJECTS
SERVICES SUMMARY
o Outline design
The outline design is the first stage of work required for the submission to the Client of the documentsnecessary to define the project in its general engineering aspects.
o Executive designThe executive design will supply to the Client the design for construction, either as engineering and
design for an EPC (Engineering Procurement Construction) project or as final design for a PC(Procurement Construction).
o Assistance and supervisionMainly as control of the basic and executive design that the client has in his hands in order to confirm
the technical choices and indicate the eventual optimization which may result necessary. Supervisionduring construction.
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: review of the executive design, site supervision for pipe installationPipe: GRP, ND 3700 + ND 3100Date: 2018
TÜRKMENHIMIÝAGARABOGAZ FERTILIZER PLANT PROJECT, TURKMENISTAN
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: executive engineeringwith the cooperation ofProf. Larsen for theinstallationPipe: 630mm HDPE pipeline in 90m depthDate: 2018 – ongoing
CHR. D. CONSTANTINIDIS S.A. CONSTRUCTION COMPANYSALAMINA-AEGINA SUBMARINE AQUEDUCT
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: Detail design and Method
Statement for the installation
Pipe: 5 x 2500mm HDPE pipelines
Date: 2018 – ongoing
TML CONSTRUCTION CO.
MOSTAGENEM POWER PLANT (ALGERIA)
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: executive design of the intake and discharge sealines,supervision of the pipe production and installationPipe: GRP, 3 x ND 2400 + 2 x ND 3200Length: 3 x 850m and 2 x 600m Date: 2012
OMV GAS & POWER870 MW, SAMSUN COMBINED CYCLE POWER PLANT, TURKEY
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Task: Installation supervisionPipe: ND 4000 GRPLength: 750mDate: 2014
ATLAS POWER GENERATION INC.2 X 600 MW, ISKENDERUN COAL-FIRED THERMAL POWER PLANT, TURKEY
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: Supervision of the production and delivery of
GRP pipes, installation supervision
Pipe: ND 3000 GRPDate: 2012
EAST DELTA ELECTRICITY PRODUCTION Co2X650 MW, EL AIN EL SOKHNA SUPERCRITICAL THERMAL PP, EGYPT
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: Coordination and supervision of the design survey, executive
design and installation supervision Pipe: ND1800 GRP
Length: 2000 mDate: 2006
MERSIN METROPOLITAN MUNICIPALITY (MESKI)KARADUVAR WWTP OUTFALL, TURKEY
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: Design and preparation of Ministry permission documents +
construction design for the discharge line
Pipe: ND 3500 GRPLength: 450m
Date: 2010
İÇDAŞ ELEKTRİK ENERJİSİ ÜRETİM ve YATIRIM A.Ş.2 X 600 MW, BEKİRLİ COAL-FIRED THERMAL POWER PLANT, TURKEY
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: Analysis of the contractor’s design and Peer-Review of the executive design detailsPipe: 2 x ND 2200 GRP and ND 2400 GRPDate: 2010
ENERJISA ENERJI ÜRETIM A.Ş936.5 MW, BANDIRMA NATURAL GAS COMBINED CYCLE POWER PLANT, TURKEY
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: Revision of the base design prepared by Siemens, evaluation, design and specifications for GRP, design of the intake structures and of the flexible connection and part time supervision during constructionPipe: 4 x ND2800 GRP and 4 x ND2400 GRPLength: 415m and 1280mDate: 2000
İSKEN İSKENDERUN ENERJI ÜRETIM VE TICARET A.Ş. 2 X 605 MW, SUGÖZÜ POWER PLANT, TURKEY
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: Independent Third Party GRP Pipe Inspector/Consultant for
the cooling water GRP onshore pipeline system
Pipe: ND2500 GRP Length: 6000m
Date: 2000
GECOL - GENERAL ELECTRICAL COMPANY OF LIBYA4x350 MW, AL-KHALIJ THERMAL POWER PLANT, LIBYA
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: Consultancy and design for the installation, installation supervisionPipe: HDPE structural pipe ND 2000 -2nd intervention HDPE solid wall ND 2000Length: 3700 m and 1413 mDate: 2012 and 2013
SOCHI 2014 OLYMPIC ORGANIZATION COMMITTEE, SOCHI WASTEWATER TREATMENT PLANT OUTFALL, RUSSIA
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: Peer review and site assistance for the new intake and discharge lines Pipe: ND 1200 and ND 900, HDPEDate: 2013
IZDEMIR ENERJI ELEKTRIK URETIM A.S.350 MW, ALIAĞA THERMAL POWER PLANT, TURKEY
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: construction design and assistance/supervision Pipe: 8” steel pipe and 6” steel pipe
Length: 3850m and 4850m Date: 2006
IGDAS - ISTANBUL GAS DISTRIBUTION INDUSTRY AND TRADE INCORPORATED COMPANYPRINCESS ISLANDS NATURAL GAS SUPPLY PROJECT, TURKEY
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Tasks: design of the profile and of the
launching ramp and installation
procedures, installation supervision
Pipe: STEEL, OD 2235 x 31,8 mm
Length: 2308m
Date: 2006
ISKI - ISTANBUL WATER AND SEWERAGE ADMINISTRATION
KADIKOY WASTE WATER TREATMENT PLANT AND OUTFALL, TURKEY
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
REPRESENTATIONS
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Straight Couplings
NOVA SIRIA - tailor-made compression couplings up to DN 4000
Duofit Repairing and Hot-tapping
Couplings
Flange Adaptors
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
MEGAFLEXON Expansion Joints
Rubber Expansion Joints
Metallic Expansion Joints
Fabric Expansion Joints
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE DIŞ TİC. LTD. ŞTİ.www.mcgmuhendislik.com.tr
Proco Products, Inc.
The PROCO ProFlex™ Style 730 check valve
The PROCO ProFlex™ Style 740 check valve
The PROCO Proflex™ Style 710 check valve
AMEXRehabilitation with AMEX©-10 Pipe Seals
AMEX©-10 MONO Seal
The MONO Seal is ideal for rehabilitating pipe joints and leaks.
AMEX©-10 VARIO Seal
The flexibility of VARIO Seals allows for tailor-made rehabilitation of leaks of any size.
AMEX©-10 LEM Seal
The Liner End Seal is ideally suited for sealing applications between liner ends and original pipes.
FLOWTITE DEFLECTION TEST FLOWTITE JOINT ROTATION TEST
Detailed information can be found MCG Services
CV Murat Cenk GerdanliRepresentations
MCG MÜHENDİSLİK DANIŞMANLIK SANAYİ VE
DIŞ TİC. LTD. ŞTİ.
Aheste Sok. Neyir Apt. No: 3 / 434730 Göztepe - KADIKÖY - İstanbul-Türkiye
Phone: +90 546 414 [email protected]