McElhanney Consulting Services Ltd. SIEVE ANALYSIS REPORT · Prince George, BC SIEVE ANALYSIS...

27
McElhanney Consulting Services Ltd. Suite 12-556 North Nechako Rd Prince George, BC SIEVE ANALYSIS REPORT MoTi SERIES Material 75 mm and larger not included in the laboratory analysis. Tested as per ASTM C177 and ASTM C136. PROJECT NO. CLIENT C.C. 2321-22400 Ministry of Transportation and Ministry of Transportation and Infrastructure #213-1001 4th Avenue Prince George, BC V2L 3H9 ATTN: Mr. Todd Wikjord, P.Geo Aggregate Prospecting Services 26 Jan 21,2019 Nov 21,2018 TO PROJECT SIEVE TEST NO. DATE TESTED DATE SAMPLED COMMENTS PER. Page 1 of 1 Jan 23,2019 Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request. McElhanney Consulting Services Ltd. CONTRACTOR GRAVEL SIZES GRADATION LIMITS 100.0 95.6 86.8 81.6 72.4 65.0 SAMPLED BY R. Fenske SUPPLIER 24 Mile Pit SOURCE TP19-01, SA01, 0.05-4.5 m SPECIFICATION TEST METHOD WASHED TESTED BY R. Fenske MATERIAL TYPE PERCENT PASSING 63 mm 50 mm 37.5 mm 25 mm 19 mm 12.5 mm 9.5 mm SAND SIZES AND FINES GRADATION LIMITS 47.9 37.5 24.2 11.7 2.3 0.6 0.3 PERCENT PASSING 4.75 mm 2.36 mm 1.18 mm 600 μm 300 μm 150 μm 75 μm MOISTURE CONTENT 5.4 % DATE RECEIVED Nov 25,2018

Transcript of McElhanney Consulting Services Ltd. SIEVE ANALYSIS REPORT · Prince George, BC SIEVE ANALYSIS...

McElhanney Consulting Services Ltd.Suite 12-556 North Nechako Rd

Prince George, BC

SIEVE ANALYSIS REPORTMoTi SERIES

Material 75 mm and larger not included in the laboratory analysis. Tested as per ASTM C177 and ASTM C136.

PROJECT NO.

CLIENT

C.C.

2321-22400Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvenuePrince George, BCV2L 3H9

ATTN: Mr. Todd Wikjord, P.Geo

Aggregate Prospecting Services

26 Jan 21,2019 Nov 21,2018

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 Jan 23,2019Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd.

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

100.0 95.6 86.8 81.6 72.4 65.0

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP19-01, SA01, 0.05-4.5 mSPECIFICATION TEST METHOD WASHED

TESTED BY R. Fenske

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

47.9 37.5 24.2 11.7 2.3 0.6 0.3

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 5.4%

DATE RECEIVEDNov 25,2018

McElhanney Consulting Services LtdUnit 1 - 5008 Pohle Ave

Terrace, B.C. V8G 4S8

SIEVE ANALYSIS REPORT63mm Series SERIES

Materials 75mm and larger are not included in the laboratory analysis. Percentpassing the 75mm sieve = 100%. Tested as per ASTM C117 and C136 standards.

PROJECT NO.

CLIENT

C.C.

2321-22400-01 Task 2003Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvePrince George, BCV2L 3H9

ATTN: Mr Todd Wikjord, P. Geo.

Aggregate Prospecting Services

5 2019.Feb.02 2018.Nov.22

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 2019.Feb.05

Materials testing

Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

93.8 88.7 84.6 76.5 69.7 61.0 54.6

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP 19-06 SA 6, 0.2-4.2mSPECIFICATION TEST METHOD WASHED

TESTED BY V. Whitaker

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

41.9 31.4 20.2 8.3 2.3 1.3 1.0

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 3.7%

DATE RECEIVED2018.Nov.30

McElhanney Consulting Services LtdUnit 1 - 5008 Pohle Ave

Terrace, B.C. V8G 4S8

SIEVE ANALYSIS REPORT63mm Series SERIES

Materials 75mm and larger are not included in the laboratory analysis. Percentpassing the 100mm sieve = 100%. Tested as per ASTM C117 and C136 standards.

PROJECT NO.

CLIENT

C.C.

2321-22400-01 Task 2003Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvePrince George, BCV2L 3H9

ATTN: Mr Todd Wikjord, P. Geo.

Aggregate Prospecting Services

10 2019.Feb.04 2018.Nov.22

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 2019.Feb.15

Materials testing

Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

94.9 88.3 81.2 72.0 65.3 54.3 47.7

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP 18-07 SA7, 0.2m-4.2mSPECIFICATION TEST METHOD WASHED

TESTED BY V. Whitaker

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

35.9 27.7 19.7 10.8 4.7 2.9 2.3

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 2.3%

DATE RECEIVED2018.Nov.30

McElhanney Consulting Services LtdUnit 1 - 5008 Pohle Ave

Terrace, B.C. V8G 4S8

SIEVE ANALYSIS REPORT63mm Series SERIES

Materials 75mm and larger are not included in the laboratory analysis. Percentpassing the 75mm sieve = 100%. Tested as per ASTM C117 and C136 standards.

PROJECT NO.

CLIENT

C.C.

2321-22400-01 Task 2003Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvePrince George, BCV2L 3H9

ATTN: Mr Todd Wikjord, P. Geo.

Aggregate Prospecting Services

6 2019.Feb.01 2018.Nov.22

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 2019.Feb.05

Materials testing

Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

94.5 93.2 87.3 77.4 70.8 63.4 56.8

SAMPLED BY R.FenskeSUPPLIER 24 Mile PitSOURCE TP 18-08 SA08, 0.2 - 3.2mSPECIFICATION TEST METHOD WASHED

TESTED BY V.Whitaker

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

43.2 31.2 19.8 10.5 5.4 3.8 2.9

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 4.1%

DATE RECEIVED2018.Nov.30

McElhanney Consulting Services LtdUnit 1 - 5008 Pohle Ave

Terrace, B.C. V8G 4S8

SIEVE ANALYSIS REPORT63mm Series SERIES

Materials 75mm and larger are not included in the laboratory analysis. Percentpassing the 75mm Sieve = 100%. Tested as per ASTM C117 and C136 standards.

PROJECT NO.

CLIENT

C.C.

2321-22400-01 Task 2003Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvePrince George, BCV2L 3H9

ATTN: Mr Todd Wikjord, P. Geo.

Aggregate Prospecting Services

8 2019.Feb.02 2018.Nov.22

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 2019.Feb.05

Materials testing

Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

96.4

92.4 85.4 79.7 74.8 69.8

SAMPLED BY R.FenskeSUPPLIER 24 Mile PitSOURCE TP 18-18 SA18, 0.2 - 2.6mSPECIFICATION TEST METHOD WASHED

TESTED BY V.Whitaker

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

57.3 43.8 27.4 11.3 4.1 2.2 1.5

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 6.1%

DATE RECEIVED2018.Nov.30

McElhanney Consulting Services LtdUnit 1 - 5008 Pohle Ave

Terrace, B.C. V8G 4S8

SIEVE ANALYSIS REPORT63mm Series SERIES

Materials 75mm and larger are not included in the laboratory analysis. Tested as per C117 and C136 standards.

PROJECT NO.

CLIENT

C.C.

2321-22400-01 Task 2003Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvePrince George, BCV2L 3H9

ATTN: Mr Todd Wikjord, P. Geo.

Aggregate Prospecting Services

9 2019.Feb.05 2018.Nov.18

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 2019.Feb.05

Materials testing

Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

100.0 98.3 87.9 79.4 69.0 61.8

SAMPLED BY R.FenskeSUPPLIER 24 Mile PitSOURCE TP 18-20 SA20, 0.2 - 2.5mSPECIFICATION TEST METHOD WASHED

TESTED BY V.Whitaker

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

48.1 37.4 27.5 19.2 12.3 8.7 3.9

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 5.6%

DATE RECEIVED2018.Nov.30

McElhanney Consulting Services Ltd.Suite 12-556 North Nechako Rd

Prince George, BC

SIEVE ANALYSIS REPORTMoTi SERIES

Sample taken: 2500g

PROJECT NO.

CLIENT

C.C.

2321-22400Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvenuePrince George, BCV2L 3H9

ATTN: Mr. Todd Wikjord, P.Geo

Aggregate Prospecting Services

27 Jan 22,2019 Nov 22,2018

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 Jan 24,2019Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd.

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

100.0 78.6 69.4 57.7 50.4

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP19-02, SA21, 0.2-1.6 mSPECIFICATION TEST METHOD WASHED

TESTED BY R. Fenske

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

34.2 23.2 14.6 7.6 3.4 2.4 1.4

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 5.1%

DATE RECEIVEDNov 25,2018

McElhanney Consulting Services Ltd.Suite 12-556 North Nechako Rd

Prince George, BC

SIEVE ANALYSIS REPORTMoTi SERIES

Material 75 mm and larger not included in the laboratory analysis. Tested as per ASTM C177 and ASTM C136.

PROJECT NO.

CLIENT

C.C.

2321-22400Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvenuePrince George, BCV2L 3H9

ATTN: Mr. Todd Wikjord, P.Geo

Aggregate Prospecting Services

28 Jan 22,2019 Nov 22,2018

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 Jan 24,2019Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd.

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

97.7

95.4 90.2 84.9 76.9 72.0

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP19-22, SA22, 1.0-2.9 mSPECIFICATION TEST METHOD WASHED

TESTED BY R. Fenske

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

57.6 50.3 36.7 21.0 8.4 5.3 4.1

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 5.6%

DATE RECEIVEDNov 25,2018

McElhanney Consulting Services Ltd.Suite 12-556 North Nechako Rd

Prince George, BC

SIEVE ANALYSIS REPORTMoTi SERIES

Material 75 mm and larger not included in the laboratory analysis. Tested as per ASTM C177 and ASTM C136.

PROJECT NO.

CLIENT

C.C.

2321-22400Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvenuePrince George, BCV2L 3H9

ATTN: Mr. Todd Wikjord, P.Geo

Aggregate Prospecting Services

29 Jan 22,2019 Nov 22,2018

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 Jan 24,2019Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd.

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

97.0 90.7 85.8 78.7 73.0 62.7 56.8

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP19-23, SA23, 0.2-4.6 mSPECIFICATION TEST METHOD WASHED

TESTED BY R. Fenske

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

43.2 34.2 23.9 14.8 3.9 1.9 1.3

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 5.0%

DATE RECEIVEDNov 25,2018

McElhanney Consulting Services LtdUnit 1 - 5008 Pohle Ave

Terrace, B.C. V8G 4S8

SIEVE ANALYSIS REPORT63mm Series SERIES

Materials 75mm and larger are not included in the laboratory analysis. Percentpassing the 75mm sieve = 100%. Tested as per ASTM C117 and C136 standards.

PROJECT NO.

CLIENT

C.C.

2321-22400-01 Task 2000 Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvePrince George, BCV2L 3H9

ATTN: Mr Todd Wikjord, P. Geo.

Aggregate Prospecting Services

11 2019.Feb.04 2018.Nov.22

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 2019.Feb.15

Materials testing

Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

100.0 98.0 94.2 85.6 78.8 69.7 62.6

SAMPLED BY R.FenskeSUPPLIER 24 Mile PitSOURCE TP 18-25 SA25, 0.8m - 4.6mSPECIFICATION TEST METHOD WASHED

TESTED BY V.Whitaker

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

50.8 39.1 27.0 14.2 5.2 3.2 2.5

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 5.3%

DATE RECEIVED2018.Nov.30

McElhanney Consulting Services Ltd.Suite 12-556 North Nechako Rd

Prince George, BC

SIEVE ANALYSIS REPORTMoTi SERIES

Material 75 mm and larger not included in the laboratory analysis. Tested as per ASTM C177 and ASTM C136.

PROJECT NO.

CLIENT

C.C.

2321-22400Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvenuePrince George, BCV2L 3H9

ATTN: Mr. Todd Wikjord, P.Geo

Aggregate Prospecting Services

30 Jan 22,2019 Nov 22,2018

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 Feb 08,2019Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd.

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

97.5 89.6 76.7 65.0 56.7 44.0 36.1

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP19-26, SA26, 0.4-4.3 mSPECIFICATION TEST METHOD WASHED

TESTED BY R. Fenske

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

17.7 13.9 8.6 5.8 3.4 2.5 2.2

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 9.2%

DATE RECEIVEDNov 25,2018

McElhanney Consulting Services LtdUnit 1 - 5008 Pohle Ave

Terrace, B.C. V8G 4S8

SIEVE ANALYSIS REPORT63mm Series SERIES

Materials 75mm and larger were not included in the laboratory analysis.Percent passing the 75mm sieve = 100%. Tested as per C117 and C136 standards.

PROJECT NO.

CLIENT

C.C.

2321-22400-01 Task 2003Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvePrince George, BCV2L 3H9

ATTN: Mr Todd Wikjord, P. Geo.

Aggregate Prospecting Services

7 2019.Feb.01 2018.Nov.22

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 2019.Feb.05

Materials testing

Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

92.5 83.8 72.7 56.6 48.7 38.1 33.1

SAMPLED BY R.FenskeSUPPLIER 24 Mile PitSOURCE TP 18-27 SA27, 0.1-4.6mSPECIFICATION TEST METHOD WASHED

TESTED BY V.Whitaker

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

25.2 21.7 16.4 11.4 7.2 4.9 3.7

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 2.3%

DATE RECEIVED2018.Nov.30

McElhanney Consulting Services Ltd.Suite 12-556 North Nechako Rd

Prince George, BC

SIEVE ANALYSIS REPORTMoTi SERIES

Material 75 mm and larger not included in the laboratory analysis. Tested as per ASTM C177 and ASTM C136.

PROJECT NO.

CLIENT

C.C.

2321-22400Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvenuePrince George, BCV2L 3H9

ATTN: Mr. Todd Wikjord, P.Geo

Aggregate Prospecting Services

31 Jan 22,2019 Nov 22,2018

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 Jan 25,2019Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd.

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

97.7 95.4 89.1 79.6 73.5 63.0 57.3

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP18-31, SA31, 0.0-3.8 mSPECIFICATION TEST METHOD WASHED

TESTED BY R. Fenske

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

43.4 32.3 20.6 7.8 1.5 0.7 0.5

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 8.0%

DATE RECEIVEDNov 25,2018

McElhanney Consulting Services Ltd.Suite 12-556 North Nechako Rd

Prince George, BC

SIEVE ANALYSIS REPORTMoTi SERIES

Material 75 mm and larger not included in the laboratory analysis. Tested as per ASTM C177 and ASTM C136.

PROJECT NO.

CLIENT

C.C.

2321-22400Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvenuePrince George, BCV2L 3H9

ATTN: Mr. Todd Wikjord, P.Geo

Aggregate Prospecting Services

32 Jan 22,2019 Nov 23,2018

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 Jan 25,2019Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd.

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

94.7 87.3 79.6 70.2 62.1 50.4 43.8

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP18-32, SA32, 0.0-4.8 mSPECIFICATION TEST METHOD WASHED

TESTED BY R. Fenske

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

26.5 18.1 7.8 3.6 2.1 1.6 1.4

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 5.3%

DATE RECEIVEDNov 25,2018

McElhanney Consulting Services Ltd.Suite 12-556 North Nechako Rd

Prince George, BC

SIEVE ANALYSIS REPORTMoTi SERIES

Material 75 mm and larger not included in the laboratory analysis. Tested as per ASTM C177 and ASTM C136.

PROJECT NO.

CLIENT

C.C.

2321-22400Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvenuePrince George, BCV2L 3H9

ATTN: Mr. Todd Wikjord, P.Geo

Aggregate Prospecting Services

33 Jan 22,2019 Nov 23,2018

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 Jan 25,2019Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd.

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

93.8 88.9 80.2 64.2 56.5 46.8 41.6

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP18-33, SA33, 0.1-4.5 mSPECIFICATION TEST METHOD WASHED

TESTED BY R. Fenske

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

28.2 18.6 10.1 5.3 1.9 1.0 0.6

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 7.8%

DATE RECEIVEDNov 25,2018

McElhanney Consulting Services Ltd.Suite 12-556 North Nechako Rd

Prince George, BC

SIEVE ANALYSIS REPORTMoTi SERIES

Material 75 mm and larger not included in the laboratory analysis. Tested as per ASTM C177 and ASTM C136.

PROJECT NO.

CLIENT

C.C.

2321-22400Ministry of Transportation and

Ministry of Transportation andInfrastructure#213-1001 4th AvenuePrince George, BCV2L 3H9

ATTN: Mr. Todd Wikjord, P.Geo

Aggregate Prospecting Services

34 Jan 22,2019 Nov 23,2018

TO

PROJECT

SIEVE TEST NO. DATE TESTED DATE SAMPLED

COMMENTS

PER.Page 1 of 1 Jan 25,2019Reporting of these test results constitutes a testing service only. Engineering interpretation or evaluation of test results is provided only on written request.

McElhanney Consulting Services Ltd.

CONTRACTOR

GRAVEL SIZES GRADATIONLIMITS

91.3 82.8 78.3 68.7 60.4 51.1 45.8

SAMPLED BY R. FenskeSUPPLIER 24 Mile PitSOURCE TP18-34, SA34, 0.1-4.6 mSPECIFICATION TEST METHOD WASHED

TESTED BY R. Fenske

MATERIAL TYPE

PERCENTPASSING

63 mm50 mm37.5 mm25 mm19 mm12.5 mm9.5 mm

SAND SIZES AND FINES GRADATIONLIMITS

33.2 24.8 15.8 8.3 3.3 2.2 1.7

PERCENTPASSING

4.75 mm2.36 mm1.18 mm600 µm300 µm150 µm75 µm

MOISTURE CONTENT 5.3%

DATE RECEIVEDNov 25,2018

MICRO-DEVAL ASTM D6928

Project No. Client:Pit: Date Sampled: Product: Date Rec'd: T.P. 19-07 Sample #: 7 Date Tested: Technician: VW

Passing Retained mm Inches mm Inches Required Actual Required Actual Required Actual19.0 3/4 16.0 5/8 375 g 376.216.0 5/8 12.5 1.2 375 g 374.612.5 1/2 9.5 3/8 750 g 753.7 750 g -9.5 3/8 6.3 0.265 375 g 0.0 750 g 0.06.3 0.265 4.75 # 4 375 g 0.0 750 g 0.0

Total 1504.5 - 0.0 - 0.0

1504.51363.3

Pan Weight (B) 0.0

2321-22400-01 Task 2003 MOTI24 Mile Pit November 13, 2019Gravel November 22, 2019

Final Sample Weight (C)

Percent Loss 9.39%

February 12, 2019

"A" Grading (3/4"-) "B" Grading (1/2"-) "C" Grading (3/8"-)

Max Size Aggregate Used

Intital Sample Weight (A)

Reviewed By: ___________________

MICRO-DEVAL ASTM D6928

Project No. Client:Pit: Date Sampled: Product: Date Rec'd: T.P. 19-18 Sample #: 18 Date Tested: Technician: VW

Passing Retained mm Inches mm Inches Required Actual Required Actual Required Actual19.0 3/4 16.0 5/8 375 g 375.416.0 5/8 12.5 1.2 375 g 375.112.5 1/2 9.5 3/8 750 g 751.9 750 g -9.5 3/8 6.3 0.265 375 g 0.0 750 g 0.06.3 0.265 4.75 # 4 375 g 0.0 750 g 0.0

Total 1502.4 - 0.0 - 0.0

1502.41362.6

Pan Weight (B) 0.0

2321-22400-01 Task 2003 MOTI24 Mile Pit November 13, 2019Gravel November 22, 2019

Final Sample Weight (C)

Percent Loss 9.31%

February 12, 2019

"A" Grading (3/4"-) "B" Grading (1/2"-) "C" Grading (3/8"-)

Max Size Aggregate Used

Intital Sample Weight (A)

Reviewed by: __________________

MICRO-DEVAL ASTM D6928

Project No. Client:Pit: Date Sampled: Product: Date Rec'd: T.P. 19-25 Sample #: 25 Date Tested: Technician: VW

Passing Retained mm Inches mm Inches Required Actual Required Actual Required Actual19.0 3/4 16.0 5/8 375 g 375.016.0 5/8 12.5 1.2 375 g 375.012.5 1/2 9.5 3/8 750 g 750.7 750 g -9.5 3/8 6.3 0.265 375 g 0.0 750 g 0.06.3 0.265 4.75 # 4 375 g 0.0 750 g 0.0

Total 1500.7 - 0.0 - 0.0

1500.71386.6

Pan Weight (B) 0.0Final Sample Weight (C)

Percent Loss 7.60%

February 14, 2019

"A" Grading (3/4"-) "B" Grading (1/2"-) "C" Grading (3/8"-)

Max Size Aggregate Used

Intital Sample Weight (A)

2321-22400-01 Task 2003 MOTI24 Mile Pit November 13, 2019Gravel November 22, 2019

Reviewed by: ___________________

MICRO-DEVAL ASTM D6928

Project No. Client:Pit: Date Sampled: Product: Date Rec'd: T.P. 19-27 Sample #: 27 Date Tested: Technician: VW

Passing Retained mm Inches mm Inches Required Actual Required Actual Required Actual19.0 3/4 16.0 5/8 375 g 373.116.0 5/8 12.5 1.2 375 g 375.612.5 1/2 9.5 3/8 750 g 749.4 750 g -9.5 3/8 6.3 0.265 375 g 0.0 750 g 0.06.3 0.265 4.75 # 4 375 g 0.0 750 g 0.0

Total 1498.1 - 0.0 - 0.0

1498.11355.0

Pan Weight (B) 0.0

2321-22400-01 Task 2003 MOTI24 Mile Pit November 13, 2019Gravel November 22, 2019

Final Sample Weight (C)

Percent Loss 9.55%

February 2, 2019

"A" Grading (3/4"-) "B" Grading (1/2"-) "C" Grading (3/8"-)

Max Size Aggregate Used

Intital Sample Weight (A)

Reviewed by: __________________

Project No. Client:Pit: Date Sampled:Product: Date Rec'd: T.P. 18-07 Sample #: 7 Date Tested:

Trial # 1 2 3 4 Average

Clay Height (mm): 129.5 134.6 119.4 124.5

Sediment Period: 20 min. 20 min. 20 min. 20 min.

Sand Height (mm): 111.8 104.1 94.0 101.6

Sand Equivalent (SE): 86.3 77.4 78.7 81.6 81.0

Calculations:Sand Equivalent (SE) = (Sand Height / Clay Height) x 100

INTERPRETATION OF RESULTS

Sand Equivalent (SE)

PlasticMaterial

REMARKS

Possible PlasticMaterial

Absence ofPlastic Fines

SAND EQUIVALENT TEST A.S.T.M. D-2419

40 30 2050

24 Mile PitNovember 30, 2018

MOTINovember 22, 2018

February 13, 2019

2321-22400-01 Task 2003

Reveiwed by: ____________________

Project No. Client:Pit: Date Sampled:Product: Date Rec'd: T.P. 18-18 Sample #: 18 Date Tested:

Trial # 1 2 3 4 Average

Clay Height (mm): 152.4 177.8 147.3 154.9

Sediment Period: 20 min. 20 min. 20 min. 20 min.

Sand Height (mm): 91.4 96.5 101.6 104.1

Sand Equivalent (SE): 60.0 54.3 69.0 67.2 62.6

Calculations:Sand Equivalent (SE) = (Sand Height / Clay Height) x 100

INTERPRETATION OF RESULTS

Sand Equivalent (SE)

PlasticMaterial

REMARKS

Possible PlasticMaterial

Absence ofPlastic Fines

SAND EQUIVALENT TEST A.S.T.M. D-2419

40 30 2050

24 Mile PitNovember 30, 2018

MOTINovember 22, 2018

February 4, 2019

2321-22400-01 Task 2003

Reviewed by: __________________

Project No. Client:Pit: Date Sampled:Product: Date Rec'd: T.P. 18-25 Sample #: 25 Date Tested:

Trial # 1 2 3 4 Average

Clay Height (mm): 185.4 167.6 137.2 134.6

Sediment Period: 20 min. 20 min. 20 min. 20 min.

Sand Height (mm): 94.0 88.9 83.8 88.9

Sand Equivalent (SE): 50.7 53.0 61.1 66.0 57.7

Calculations:Sand Equivalent (SE) = (Sand Height / Clay Height) x 100

INTERPRETATION OF RESULTS

Sand Equivalent (SE)

PlasticMaterial

REMARKS

Possible PlasticMaterial

Absence ofPlastic Fines

SAND EQUIVALENT TEST A.S.T.M. D-2419

40 30 2050

24 Mile PitNovember 30, 2018

MOTINovember 22, 2018

February 8, 2019

2321-22400-01 Task 2003

Reviewed by: __________________

Project No. Client:Pit: Date Sampled:Product: Date Rec'd: T.P. 18-27 Sample #: 27 Date Tested:

Trial # 1 2 3 4 Average

Clay Height (mm): 157.5 193.0 172.7 203.2

Sediment Period: 20 min. 20 min. 20 min. 20 min.

Sand Height (mm): 88.9 96.5 91.4 96.5

Sand Equivalent (SE): 56.5 50.0 52.9 47.5 51.7

Calculations:Sand Equivalent (SE) = (Sand Height / Clay Height) x 100

INTERPRETATION OF RESULTS

Sand Equivalent (SE)

PlasticMaterial

REMARKS

Possible PlasticMaterial

Absence ofPlastic Fines

SAND EQUIVALENT TEST A.S.T.M. D-2419

40 30 2050

24 Mile PitNovember 30, 2018

MOTINovember 22, 2018

February 5, 2019

2321-22400-01 Task 2003

Reveiwed by: ____________________

Client: MoTIDate Sampled: Date Rec'd:

Project No. 2321-22400-01 Task 2003 Pit: 24 Mile PitProduct:T.P. 18-06 Sample #: 6 Date Tested:

BULK RELATIVE DENSITY OF AGGREGATECOARSE AGGREGATE

BULK RELATIVE DENSITY 2.596PERCENT WATER ABSORPTION 1.53

FINE AGGREGATE

BULK RELATIVE DENSITY 2.527PERCENT WATER ABSORPTION 2.53

November 21, 2018November 30, 2018

February 6, 2019

Reviewed by: __________________

Project No. 2321-22400-01 Task 2003 Client: MoTIPit: 24 Mile Pit Date Sampled: Product: Date Rec'd: T.P. 18-08 Sample #: 8 Date Tested:

BULK RELATIVE DENSITY OF AGGREGATECOARSE AGGREGATE

BULK RELATIVE DENSITY 2.600PERCENT WATER ABSORPTION 1.69

FINE AGGREGATE

BULK RELATIVE DENSITY 2.514PERCENT WATER ABSORPTION 2.70

November 21, 2018November 30, 2018

February 6, 2019

Reveiwed by: ____________________

Project No. 2321-22400-01 Task 2003 Client: MoTIPit: 24 Mile Pit Date Sampled: Product: Date Rec'd: T.P. 18-20 Sample #: 20 Date Tested:

BULK RELATIVE DENSITY OF AGGREGATECOARSE AGGREGATE

BULK RELATIVE DENSITY 2.581PERCENT WATER ABSORPTION 1.75

FINE AGGREGATE

BULK RELATIVE DENSITY 2.515PERCENT WATER ABSORPTION 2.79

November 21, 2018November 30, 2018

February 6, 2019

Reviewed by: __________________