MCDR INSPECTION REPORT 1.0 GENERALibm.nic.in/writereaddata/files/06132018123554Bitkuli...2 22 Name...
Transcript of MCDR INSPECTION REPORT 1.0 GENERALibm.nic.in/writereaddata/files/06132018123554Bitkuli...2 22 Name...
1
MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details
1 Name of inspecting office & designation
S. Kartikeya, Jr. Mining Geologist, Indian Bureau of Mines, Raipur
2 Date of inspection 05/06/2018
3 Name of the Mine Bitkuli Limestone Mine
4 Total Lease Area (Ha) with breakup of Non-forest and forest land
Govt. Land: 0.107 Ha. Private land: 7.471 Ha. Forest Land: NIL Total Lease Area: 7.578 Ha.
5 Mine Code 38CHG14013
6 IBM Registration Number under rule 45 of MCDR, 1988
IBM/12932/2012
7 Name of the lessee, Address, phone, email and fax number
M/s Panchmukhi Enterprises Partner: Shri Sanjay Agrawal and Shri Dilip Agrawal Banjara Chowk, P.O. Neora (Tilda), Distt. Raipur, Chhattisgarh Pin Code: 493 114 Phone: 07721-233563 Mobile: (0) 9425514421, (0) 9300009996 Email: [email protected]
8 Village Bitkuli
8 Taluka / Mandal / District Post: Suhela, Tehsil: Simga, Distt.: Balodabazar
10 State Chhattisharh
11 Post office & PIN Suhela - 493195
12 Nearest police station Suhela (Approx 5.0 Km)
13 Nearest Railway station Hathbandh (Approx 10.0 Km)
14 Date of Grant of Mining Lease
15/01/2002 to 14/01/2032 (Thirty Years)
15 Date of Execution 15/01/2002
16 Date of opening of Mine 28/04/2002
17 Date of first Renewal, if applicable and its period & expiry
As per section 8A of MMDR Amendment Act, 2015 Validity of the lease period: 15/01/2032 to 14/01/2052 (20 Years) Supplementary lease deed has not been made for extended period.
18 Date of second Renewal, if applicable and its period & expiry
Not applicable
19 Date of submission of renewal application if Mining Operations are continuing under deemed extension
Not applicable
20 Name of the Nominated Owner with Address, phone, email, fax number and date of appointment
Not appointed
21 Name of the Mine Agent with Address, phone, email, fax number and date of appointment
Not appointed
2
22 Name of the Mines Manager with Address, phone, email, fax number and date of appointment in mines
Shri Jitendra Kumar Shriwas Qualification: B.E. Mining Address: M/s Panchmukhi Enterprises, Bitkuli Limestone Mine, At – Bitkuli, P.O. Nawapara, Tehsil Simga, Distt. Balodabazar Chhattisgarh – 493113 Phone: (0) 9827493822 Email: [email protected] Date of appointment: 19/05/2017
23 Name of the Mining Engineer, Qualification and total experience with Address, phone, email, fax number and date of appointment in mine
Shri Jitendra Kumar Shriwas Qualification: B.E. Mining Address: M/s Panchmukhi Enterprises, Bitkuli Limestone Mine, At – Bitkuli, P.O. Nawapara, Tehsil Simga, Distt. Balodabazar Chhattisgarh – 493113 Phone: (0) 9827493822 Email: [email protected] Date of appointment: 19/05/2017
24 Whether Geologist and Mining Engineer appointed in mines satisfy the rule 55 & carrying out their duties as per rule 56 & 57.
Not appointed (Deviation has been pointed out)
25 Date of Approval of Mining Plan/Modified Mining Plan with five-year period and specific condition in approval letter, if any.
Mining Plan approved vide letter no. RAP/LST/MPLN-763/NGP Nagpur dated 14/03/2002 Proposal Period: 2002-03 to 2006-07
26 Date of Approval of Scheme of Mining/Modified Scheme of Mining with five-year period and specific condition in approval letter, if any.
1st Scheme of Mining approved vide letter no. RAP/LST/MPLN-763/NGP Nagpur dated 11/01/2007 Proposal Period: 2007-08 to 2011-12 2nd Scheme of Mining approved vide letter no. RAP/LST/MPLN-763/NGP Nagpur dated 17/07/2015 Proposal Period: 2012-13 to 2016-17 1st Review of Mining Plan approved vide letter no. BBR/LST/MPLN-1077/2017-RPR Raipur dated 13/04/2017 Proposal Period: 2017-18 to 2021-22
27 Mineral(s) granted in lease and proved for mining
Limestone
28 Method of Mining(Opencast, Underground)
Opencast
29 Category (Fully Mechanised, Others or Manual)
Category ‘A Mechanised’
30 Captive/Non Captive Non Captive
31 Existing EC Limit and validity Environmental Clearance obtained from State Level Environment Impact Assessment Authority, Chhattisgarh, vide letter no. 410/SEAC-CG/EC/Mining/RYP/115/05 Raipur dated 08/12/2009 for Mining of Limestone 3,00,000 Tonnes Per Annum. Valid up to 14/01/2032
3
32 Status of Financial Assurance
Rs. 15 Lac valid up to 03/04/2022 (As per rule 27 of MCDR, 2017)
Scientific Mining: Compliance of proposals of approved mining plan/scheme of mining. –
1.0 Exploration SN Item Proposals Actual work Remarks
1a Backlog of previous year Proposal not given in the approved document
Not applicable -
1b Exploration over lease area for Geological axis 1 or 2.
Proposal not given in the approved document
Not applicable As per last approved document, the entire lease area has already been explored under G1 Level of exploration.
1c Exploration Agency & Expenditure in lakh Rupees during the year
Proposal not given in the approved document
Not applicable
1d Balance area to be explored to bring Geological axis in 1 or 2
Proposal not given in the approved document
Not applicable As per last approved document, the entire lease area has already been explored under G1 Level of exploration.
1e Balance reserves as on 01.04.2018 (in Million Tonnes)
Under (111): 3.817 Million Tonnes Under (221): 1.388 Million Tonnes
Under (111): 3.924 Million Tonnes Under (221): 1.388 Million Tonnes
Production for F.Y. 2017-18 has been obtained from online submitted monthly returns
1f General remarks of inspecting officer on geology, exploration etc.
As per approved document lessee has been drilled 03 nos. of core boreholes with a cumulative depth of 90 meters. None of the core samples have been preserved for future reference. Hence deviation has been pointed out as MCDR, 2017.
2.0 Development SN Item Proposals Actual work Remarks
2a Location of development w.r.t. lease area (Range in
Eastern side of the lease area by
Production and development was
Deviation has been
4
UTM/Local Coordinate/Plot No./Location)
construction of three four systematic benches
done all over the quarry in an irregular and un-scientific manner. At some places it was found that the development has crossed the lease boundary e.g. northern part and central part of the lease area
pointed out.
2b Separate benches in topsoil, overburden and mineral (Rule 13)
Top Soil: 01 no. Overburden: 00 no. Mineral/Ore: 03 nos.
Top Soil: 01 no. Overburden: 00 no. Mineral/Ore: 02
Quarry has been developed in an irregular and un-scientific manner.
2c Stripping ratio or ore to OB ratio
1: 0.24
Could not be ascertained as no records has been maintained
Deviation has been pointed out.
2d Quantity of topsoil generation in m3
525 Cubic Meter
Could not be ascertained as no records has been maintained
Deviation has been pointed out.
2e Quantity of overburden generation in m3
2392 Cubic Meter
Could not be ascertained as no records has been maintained
Deviation has been pointed out.
2f General remarks of inspecting officer on development of pit w.r.t. type of deposit etc.
1. Quarry has been developed in an irregular and un-scientific manner
2. No records have been maintained for generation of Top Soil, Overburden, and Reject etc. Deviation has been pointed out.
3.0 Exploitation SN Item Proposals Actual work Remarks
3a Number of pits proposed for production
01 no. 01 no. -
3b Quantity of ROM mineral production proposed
2,25,645.000 Metric Tonnes
118623.480 Metric Tonnes
-
3c Recovery of salable/usable mineral from ROM production
95 % from ROM Could not be ascertained as no records has been maintained
Deviation has been pointed out.
3d Quantity of mineral reject generation
4605.000 Metric Tonnes
Could not be ascertained as no records has been maintained
Deviation has been pointed out.
5
3e Grade of mineral reject generation and threshold value declared
Not mentioned in the approved document.
Could not be ascertained as no records has been maintained
Deviation has been pointed out.
3f Quantity of sub-grade mineral generation
No sub-grade mineral will be produced during mining.
Not applicable -
3g Grade of sub-grade mineral generation
No sub-grade mineral will be produced during mining.
Not applicable -
3h Manual / Mechanised method adopted for segregating from ROM
No processing of ROM or Mineral reject proposed.
Not applicable -
3i Any analysis or beneficiation study proposed & carried out for sub-grade mineral and reject
No beneficiation study has been proposed during plan period.
Not applicable -
3j Provision of drilling & blasting in mineral benches
Spacing: 3.0 m Burden: 3.0 m Depth: 6.0 m Drilling Machineries 1. Elgi 85 mm dia 2. Atlas Copco 34 mm dia
Could not be ascertained as no records has been maintained
Deviation has been pointed out.
3k Provision of mining machineries in mineral benches
01 no. Tata Hitachi Excavator with Rock breaker attachment 2.1 m3 Bucket Capacity
Machinery logbook has not been maintained. Hence the details of the mining machineries could not be ascertained.
Deviation has been pointed out.
3l Whether height of benches in overburden and mineral suitable for method of mining proposed in MP/SOM
Bench Height: Overburden: 0.10m Mineral/Ore: 6.0m Bench Width: 12.0m Slope: 55 degree
Could not be ascertained as no updated plan and sections are prepared and made available during inspection.
Deviation has been pointed out.
3m Total area covered under excavation/pits
4.078 ha. up to end of plan period.
Could not be ascertained as no updated plan and sections are prepared and made available during inspection.
-
3n Ore to OB ratio for the pit/mine during the year
1: 0.24
Could not be ascertained as no records has been maintained
Deviation has been pointed out.
6
3o Total area put in use under different heads at the end of year
Pit- 4.078 Ha Waste/reject- 0.165 Ha Others- 0.147 Ha Upto end of Plan period
Could not be ascertained as no records has been maintained
Deviation has been pointed out.
3p Production of ROM mineral during last five-year period, as applicable (in Metric Tonnes)
Yr- 2013-14: 195000.00 Metric Tonnes Yr- 2014-15: 195000.00 Metric Tonnes Yr- 2015-16: 195000.00 Metric Tonnes Yr- 2016-17: 195000.00 Metric Tonnes Yr- 2017-18: 225645.00 Metric Tonnes
Yr- 2013-14: 76890.339 Metric Tonnes Yr- 2014-15: 102183.680 Metric Tonnes Yr- 2015-16: 154200.00 Metric Tonnes Yr- 2016-17: 95400.00 Metric Tonnes Yr- 2017-18: 118623.480 Metric Tonnes
-
3q General remarks of inspecting officer on method of mining etc.
Production and development was done all over the quarry in an irregular and un-scientific manner. At some places it was found that the development has crossed the lease boundary e.g. northern part and central part of the lease area
4.0 Solid Waste Management-Dumping SN Item Proposals Actual work Remarks
4a Separate dumping of topsoil, OB & mineral reject (Rule 36, 37)
OB: South-western part of the lease area.
OB: South-western part of the lease area.
-
4b Location of topsoil, OB & mineral reject dumps (Range in UTM/Local Coordinate/Plot No./Location)
Top Soil: utilized for restoration or rehabilitation of the land. OB: South-western part of the lease area.
The removed top soil has not been utilized for restoration or rehabilitation of the land. The same has been dump with waste/OB. OB: South-western part of the lease area.
Deviation has been pointed out.
4c Number of dumps within lease area and outside lease area
Within lease area: 01 no.
Within lease area: 01 no.
-
4d Location of dumps w.r.t. ultimate pit limit (Rule 14)
Beyond ultimate pit limit at the south-western part of the lease area.
Beyond ultimate pit limit at the south-western part of the lease area.
-
4e Number of active & alive dumps
Active & alive: 01 no.
Active & alive: 01 no.
-
7
4f Number of dead dumps Not mentioned in the approved document.
Not applicable -
4g Number of dumps stabilised
Not proposed in the approved document.
Not applicable -
4h Whether Retaining wall or garland drain all along dumps are there
The dump will be protected by garland drain Afforestation.
Garland drain has not been constructed and no plantation has been done around dump.
Deviation has been pointed out.
4i Length of Retaining wall or garland drain all along dump
Not proposed in the approved document.
Not applicable -
4j Number of settling ponds Not proposed in the approved document.
Not applicable -
4k Specific comments of inspecting officer
The removed top soil has not been utilized for restoration or rehabilitation of the land. The same has been dump with waste/OB.
5.0 Solid Waste Management-Backfilling SN Item Proposals Actual work Remarks
5a Status on part or full extraction of mineral from mined out area before starting backfilling
Proposal given for backfilling in 0.009 ha. area at the central part of the lease area.
In addition to the central part backfilling was observed in the northern-eastern part of the lease area and southern part of the proposed area.
Deviation has been pointed out.
5b Area under backfilling of mined out area
Proposal given for backfilling in 0.009 ha. area at the central part of the lease area.
In addition to the central part backfilling was observed in the northern-eastern part of the lease area and southern part of the proposed area.
Deviation has been pointed out.
5c Concurrent use of topsoil for restoration or rehabilitation of mined out area (Rule 36)
Topsoil will be utilised for Afforestation purpose
The topsoil has been dump with waste/OB in the south-western part of the lease area.
Deviation has been pointed out.
5d Total area fully reclaimed & rehabilitated
Proposal given for backfilling in 0.009 ha. area at the central part of the lease area.
Backfilling is under process. None of the area has been fully reclaimed and rehabilitated.
-
8
5e General remarks of inspecting officer on backfilling, reclamation etc
In addition to the central part backfilling was observed in the northern-eastern part of the lease area and southern part of the proposed area.
6.0 Progressive Mine Closure Plan SN Item Proposals Actual work Remarks
6a Whether Annual report on PMCP submitted on time and correctly - Rule 23. Details should be given in the format as given in Annexure-20.
Annual report on PMCP for the period of 2016-17 has not been submitted
Actual could not be ascertained as no PMCP report has been submitted for the F.Y. 2016-17
Deviation has been pointed out.
6b Management of worked/mined out benches i) Area available for rehabilitation (ha) ii) Afforestation done (ha) iii) No. of saplings planted during the year iv) Cumulative no. of plants v) Any other specific method of rehabilitation vi) Cost incurred on watch & care during the year
0.009 Ha. NIL 200 nos. 200 nos. NIL NIL
0.009 Ha. NIL Not done NIL NIL NIL
Deviation has been pointed out.
6c Compliance on reclamation and rehabilitation by backfilling i) Voids available for backfilling (L X B X D) ii) Void filled by waste/tailings iii) Afforestation on the backfilled area iv) Rehabilitation by making water reservoir v) Any other specific means
0.009 Ha. Not mentioned in the approved document 200 nos. Not mentioned in the approved document NIL
0.009 Ha. Could not be ascertained as no records available NIL Plantation Not Applicable NIL
Deviation has been pointed out.
6d Compliance of Rehabilitation of waste land within lease i) Afforestation ii) Area rehabilitated (ha) iii) Method of rehabilitation
No waste land present within lease area.
Not applicable -
6e Compliance of Environmental monitoring (core zone & buffer zone)
Not proposed in the approved document.
Baseline information on environmental aspects has not been maintained.
Deviation has been pointed out.
9
6f General remarks of inspecting officer on PMCP compliance & progressive
There was a proposal given for plantation of 200 nos of plants during 2017-18, whereas none of plants have been planted.
7.0 Mineral Conservation SN Item Proposals Actual work Remarks
7a ROM Mineral dispatch or grade-wise sorting within lease area
Directly despatched from the mine without sorting.
ROM Mineral despatched from mine without sorting.
-
7b Method of grade-wise mineral sorting i.e. manual or mechanical
No processing of ROM or Mineral reject proposed.
Not applicable -
7c Different grade of mineral sorted out at mines
Not proposed in the approved document.
Not applicable -
7d Any beneficiation process at mines
No processing of ROM or Mineral reject proposed.
Not applicable -
7e General remarks of inspecting officer on Mineral conservation & beneficiation issues
NIL
8.0 Environment SN Item Proposals Actual work Remarks
8a Separate removal and utilization of topsoil (Rule 36)
Topsoil and Overburden send to Afforestation at 7.5 m mining limit.
Topsoil mixed with overburden has been dumped in the south-western part of the lease area.
Deviation has been pointed out.
8b Concurrent use or storage of topsoil
Topsoil and Overburden send to Afforestation at 7.5 m mining limit.
Topsoil mixed with overburden has been dumped in the south-western part of the lease area.
Deviation has been pointed out.
8c Separate dumps for overburden, waste rock, rejects and fines (Rule 37)
01 no. of waste/overburden dump proposed in the south-western part of the lease area
Dumping of waste/overburden was observed in the south-western part of the lease area.
-
8d Use of overburden, waste rock, rejects and fines dumps for restoring the land to its original use
Proposal has been given for backfilling in 0.009 ha area at the central part of the lease area.
In addition to the central part backfilling was observed in the northern-eastern part of the lease area and southern part of the proposed area.
Deviation has been pointed out.
10
8e Phased restoration, reclamation and rehabilitation of lands affected by mining operations (Pits, dumps etc)
Proposal has been given for backfilling in 0.009 ha area at the central part of the lease area.
In addition to the central part backfilling was observed in the northern-eastern part of the lease area and southern part of the proposed area.
Deviation has been pointed out.
8f Baseline information on existence of plantation & additional plantation done (Rule 44)
200 nos. of plantation during 2017-18.
None of plants have been planted
Deviation has been pointed out.
8g
Survival rate Not mentioned in the approved document.
None of plants have been planted
-
8h Water sprinkling on roads to control airborne dust
Not proposed in the approved document
Not found during inspection
-
8i General remarks of inspecting officer on aesthetic beauty in and around mines are
NIL
9.0 Compliance of Rule 45 S.N.
Item COMMENTS Remarks
Status of submission of Monthly and Annual returns
M.R. Submitted upto – April 2018 A.R. submitted upto- F.Y. 2017-18
NIL
S.N.
Item Details GIVEN in A.R.
Observation of I/Officer
Remarks
9b Scrutiny of Annual return for information on Mining Engineer, Geologist and Manager
Mining Engineer: Shri Jitendra Kumar Shriwas, Geologist: Not Appointed Manager: Shri Jitendra Kumar Shriwas
Full time geologist is not appointed.
Deviation has been pointed out.
9c Scrutiny of Annual return on land use pattern for area under pits, reclaimed area, dumps etc.
Not given in the annual return of F.Y. 2016-17
Pit- 4.078 Ha Waste/reject- 0.165 Ha Others- 0.147 Ha Upto end of Plan period
Information has been obtained from the last approved document
9d Scrutiny of Annual return on afforestation
NIL plantation during 2016-17
NIL Plantation Deviation has been pointed out.
11
9e Scrutiny of Annual return on mineral reject generation (Grade & quantity)
Reject: Nil generation.
Could not be ascertained as no record has been maintained.
Deviation has been pointed out
9f Scrutiny of Annual return on ROM stock and/or graded ore
ROM Closing stock 1658.435 as on 31/03/2017
NIL NIL
9g Scrutiny of Annual return on sale value, Ex. Mine price & production cost
Sale Value: Rs. 19695959.00 Ex. Mine Price: Rs. 191.00 Production Cost: Rs. 150.32
Sale Value: Rs. 19695959.00 Ex. Mine Price: Rs. 191.00 Production Cost: Rs. 150.32
NIL
9i Scrutiny of Annual return on fixed assets
Not given in the annual return for F.Y. 2016-17
NIL
9k Scrutiny of Annual return on mining machineries
02 nos. of Back Hole 210 cubic meter 01 no. of Air Compressor 450 cum/mn
Could not be ascertained as no record has been maintained.
In complete information has been given.
10- Details of violations observed during current inspection and compliance position of
earlier violation pointed out:-
No outstanding violations.
11- Date of Last Inspection, Name and Designation of the Inspecting Officer:
Shri. J. S. Hada, Asstt. Mining Geologist, Date of Inspection: 03/03/2017
12- Details of the Violations Pointed-out during Inspections:
fu;e mYya?ku ds izdkj dk foLr`r C;kSjk Rule 11
(1)
The following deviations have been found in the mine from the approved Review of Mining vide
letter no. BBR/LST/MPLN-1077/RPR Raipur dated 13/04/2017 for the period of 2017-18 to 2021-
22:
Development: (i) In the approved Review of Mining Plan, there was a proposal given for the
production of mineral during the year 2017-18 from the eastern side of the lease area by
construction of three four systematic benches. Whereas, production and development was done all
over the quarry in an irregular and un-scientific manner. At some places it was found that the
development has crossed the lease boundary e.g. northern part and central part of the lease area.
(ii) It was found that at some places development was been done outside lease area, and the same
area has been backfilled with the waste and top soil.
(iii) No such proposal has been given in the earlier approved MP/MMP/SOM/RMP for mining at
7.5 m barrier zone. Development and excavation was observed along the lease boundary at places,
and the insitu limestone has been completely mined out.
Reclamation/Backfilling: In the approved RMP there was a proposal given for backfilling in
0.009 ha. area at the central part of the lease area. Whereas backfilling was observed in the
northern-eastern part of the lease area and southern part of the proposed area.
Afforestation: There was a proposal given for plantation of 200 nos of plants during 2017-18,
whereas none of plants have been planted.
12
fu;e mYya?ku ds izdkj dk foLr`r C;kSjk Rule 14
(3)
The overburden and waste material obtained during mining operations has been mixed with
Limestone and found dump with waste material.
Rule 19
(1), (2) &
(3)
Log book of heavy earth moving machinery used in the mines is not been maintained and made
available during inspection.
Rule 26
(2)
A yearly report as per the format specified by the Indian Bureau of Mines, before 1st day of July
every year setting forth the extent of protective and rehabilative works carried out has not been
submitted for the year 2015-16 and 2016-17.
Rule 33 Updated print copy of the surface geological plan and sections has not been submitted before 30th
day of June for the year 2016-17.
Rule 36
(2)
The removed top soil has not been utilized for restoration or rehabilitation of the land. The same
has been dumped over the waste dump.
Rule 37
(2)
There is no protective measures have been taken around waste dump.
Rule 40,
41 & 42
Periodical monitoring data of environmental parameters have not been maintained.
Rule 45
(7)
Closing stock of 440.185 Metric Tonnes of Limestone has been mentioned in the return; during
inspection it was not found within the lease area.
Rule 54 Production register, Labour attendance register, contribution of DMF & NEMT have not been
maintained.
Rule 55 Whole-time Geologist is not been appointed.
Rule 63
(3)
All the core samples have been destroyed without the prior permission of the Chief Controller of
Mines of Indian Bureau of Mines.
(Shaival Kartikeya)
Jr. Mining Geologist
Indian Bureau of Mines, Raipur
Date of Inspection: 05/06/2018
(Name of the Inspecting Officer and Designation and Date)