Implementing BIM Strategically
buildingSMART Conference 2009
-
8/12/2019 Mcdonald Angus BIMandEngineering
2/51
Changing The Old Order
there is nothing more difficult to take in hand,
more perilous to conduct, or more uncertain in
its success, than to take the lead in the
introduction of a new order of thingsMachiavelli, The Prince, 1513
-
8/12/2019 Mcdonald Angus BIMandEngineering
3/51
2 years ago.
CW Adelaide
CW Sydney
CW Auckland
CW Brisbane
CW Melbourne
-
8/12/2019 Mcdonald Angus BIMandEngineering
4/51
2 years ago.
?
-
8/12/2019 Mcdonald Angus BIMandEngineering
5/51
2 years ago.
2D Drawing Board 2D Electronic Drawing Board
-
8/12/2019 Mcdonald Angus BIMandEngineering
6/51
2 years ago.
Traditional hierarchical management structure
-
8/12/2019 Mcdonald Angus BIMandEngineering
7/51
Then
Old partnerships broke up...
-
8/12/2019 Mcdonald Angus BIMandEngineering
8/51
This Year
...and new alliances were formed
-
8/12/2019 Mcdonald Angus BIMandEngineering
9/51
This Year
Africa-Middle
East Zone (AME) Asia Pacific Zone
(APAC)
-
8/12/2019 Mcdonald Angus BIMandEngineering
10/51
This Year
Flattening of Management Structures
-
8/12/2019 Mcdonald Angus BIMandEngineering
11/51
This Year
The G.F.C
-
8/12/2019 Mcdonald Angus BIMandEngineering
12/51
So Why BIM?
Clients starting to demand it
More than 50% of problems on site attributed
to poor design information
Effective information management is key todelivering quality projects
If you dont adapt you get left behind!
-
8/12/2019 Mcdonald Angus BIMandEngineering
13/51
So Why BIM?
We need to work out
how best to implement BIM on
projects rather than findingreasons not to
-
8/12/2019 Mcdonald Angus BIMandEngineering
14/51
Aurecon Engineering BIM Vision
Bills ofQuantities
StructuralAnalysis
3DVisualisation
ProjectManagement
FabricationDetails
BuildingManagement
2D Drawings
-
8/12/2019 Mcdonald Angus BIMandEngineering
15/51
Process Culture
Technology
Success Relies On
-
8/12/2019 Mcdonald Angus BIMandEngineering
16/51
BIMArchitectural
Model
ArchitectureStructure MEP
Concept
SketchConcept
Framing
Sketch
Concept
Services
Sketch
Conce
pt
DD
+Analysis
FinalD+D
Aurecon BIM Process
-
8/12/2019 Mcdonald Angus BIMandEngineering
17/51
ArchitectureStructure MEP
PHOENICS
IES
STEPS
ETABS
STRAND7
RAM
SGASS
BIM
Structure
Model
BIM
MEP
Model
BIM
Co-ordination
Model
Conce
pt
DD
+Analysis
FinalD+D
Aurecon BIM Process
-
8/12/2019 Mcdonald Angus BIMandEngineering
18/51
ArchitectureStructure MEP
Final
BIM
Structural
Final D+D
MEP Final
D+DArchitecture
Final D+D
Conce
pt
DD
+Anal
ysis
FinalD+D
Aurecon BIM Process
-
8/12/2019 Mcdonald Angus BIMandEngineering
19/51
BIM
Co-ordination
Model
BIM
Architectural
Model
ArchitectureStructure MEP
Concept
SketchConcept
Framing
Sketch
Concept
Services
Sketch
Concep
t
DD
+Analys
is
FinalD+D
Aurecon BIM Process
PHOENICS
IES
STEPS
ETABS
STRAND7
RAM
SGASS
BIM
Structure
Model
BIM
MEP
Model
Final BIM
Structural
Final D+D
MEP Final
D+DArchitecture
Final D+D
FinalD+D
-
8/12/2019 Mcdonald Angus BIMandEngineering
20/51
Aurecon BIM Culture
General business cultural shift programunderway
BIM strategy developed, linking into overall
business plan Training provided for both drafters and
engineers
Encouraged to think One Aurecon
-
8/12/2019 Mcdonald Angus BIMandEngineering
21/51
Aurecon BIM Technology
Electronic Document Management SystemLiveLink(EDMS)
Revitfor now! CrossPlatform agreements
Improved Intranet SystemForumscentral toknowledge management across Group
Adopting additional tools e.g. NavisWorks
-
8/12/2019 Mcdonald Angus BIMandEngineering
22/51
LiveLink EDMS
Provides a secure and flexible file storagefacility
Efficient access to documents
High level of controlview/change/delete Based on standard Aurecon templates
-
8/12/2019 Mcdonald Angus BIMandEngineering
23/51
BIM Successes
Adelaide Motors BMW
3D Visualisation
-
8/12/2019 Mcdonald Angus BIMandEngineering
24/51
BIM Successes
Adelaide Motors BMW
Revit model and site progress photo
-
8/12/2019 Mcdonald Angus BIMandEngineering
25/51
SACA Grandstand, Adelaide
Aurecon Buildings Group
30 March 2009
-
8/12/2019 Mcdonald Angus BIMandEngineering
26/51
SACA Grandstand, Adelaide
-
8/12/2019 Mcdonald Angus BIMandEngineering
27/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
28/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
29/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
30/51
GM Diesel Engine Facility , Thailand
-
8/12/2019 Mcdonald Angus BIMandEngineering
31/51
Macquarie University Link Bridge
Aurecon Buildings Group
30 March 2009
-
8/12/2019 Mcdonald Angus BIMandEngineering
32/51
QNB Tower, Qatar
Aurecon Buildings Group
30 March 2009
BIM Ob t l
-
8/12/2019 Mcdonald Angus BIMandEngineering
33/51
BIM Obstacles
Training
Time / initial impact on productivity
Interoperability
Hardware requirements/scalability
BIM Ob t l
-
8/12/2019 Mcdonald Angus BIMandEngineering
34/51
BIM Obstacles
Level of detail modelled Limitations of software
Standardising Revit / ACAD output
Resistancehavent we been through
this before? Itll never work.
Lessons Learned
-
8/12/2019 Mcdonald Angus BIMandEngineering
35/51
Lessons Learned
Determine BIM scope early Take people with youmindset change
Dont put unnecessary detail in models
Lessons Learned
-
8/12/2019 Mcdonald Angus BIMandEngineering
36/51
Lessons Learned
Understand the technology and itslimitations
Understand what other disciplines
need/dont need in data exchanges
Who retains overall responsibility for
models/accuracy?
Engineering BIM The Future
-
8/12/2019 Mcdonald Angus BIMandEngineering
37/51
Engineering BIMThe Future
Innovative, Collaborative, Design-FocusedEngineers
Blending of roles of drafters and engineers
What does this mean for industry?
-
8/12/2019 Mcdonald Angus BIMandEngineering
38/51
What does this mean for industry?
The technology is largely there for both
creation of BIM models and
interoperability
Cultural change is required
Main power to change lies with clients
-
8/12/2019 Mcdonald Angus BIMandEngineering
39/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
40/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
41/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
42/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
43/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
44/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
45/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
46/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
47/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
48/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
49/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
50/51
-
8/12/2019 Mcdonald Angus BIMandEngineering
51/51