1 Exercise and Altitude Chapter 23 Brooks Ch 24 McArdle, Katch and Katch.
McArdle Brochure
-
Upload
jordan-sach -
Category
Documents
-
view
217 -
download
1
description
Transcript of McArdle Brochure
![Page 1: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/1.jpg)
Civil Engineering Excellence
![Page 2: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/2.jpg)
first choice civil engineering
partners
![Page 3: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/3.jpg)
With a successful track record in civil engineering spanning over four decades, the McArdle Group has become one of the UK’s leading specialist construction companies in civil engineering and infrastructure works.
Our clients range from government agencies and local councils to blue-chip multinational companies, developers and contractors, and we have been involved in some of the country’s most prestigious projects in both Private and Public Sectors.
We successfully support projects covering a wide range of construction services in the UK and Overseas, as Principal/Main Contractor, Specialist Sub-contractor and/or material/equipment supplier.
Our in-house services:
Civil Engineering Contractor ºEarthworks ºGround Improvements ºReclamation & Remediation ºSmall Civils & External Works/Landscaping ºHaulage ºPlant Hire ºWaste Recycling after Haulage º
McArdle - Civil Engineering Excellence
first choice civil engineering
partners
![Page 4: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/4.jpg)
culture andresponsibility
![Page 5: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/5.jpg)
We strongly believe that our professional culture and ethics are two of the key differentiators in the way we conduct our business. Our teams are fully committed to process-led quality management in all aspects of our work. This work frequently involves the hazardous environments typically found in civil engineering and construction. As a result, McArdle are constantly reviewing site activity, removing opportunities for accidents and near misses.
Our established and award winning safety processes are applied by adopting internationally recognised standards and industry best practice in all areas of our health and safety management. All employees are committed to our environmental policy. Our clients consider us to be one of the most environmentally passionate civil engineering and ground engineering companies in the industry.
culture andresponsibility
![Page 6: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/6.jpg)
divisions
![Page 7: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/7.jpg)
civil engineering Establishing and reinforcing our reputation
among the construction elite demands that our
processes are excellent, that we work safely
and that we deliver on time and to project
specification.
Our depth of expertise allows us to respond
positively to the most demanding and time critical
civil engineering projects.
Our services range from early contractor
involvement to final construction. We are
respected for our safe working practices and
our practical and efficient construction methods
for major construction projects. This has won
us praise for quality, on time completion and
budgetary control.
![Page 8: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/8.jpg)
![Page 9: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/9.jpg)
Our professional surveyors and project teams
work with clients as partners. We ensure that
all environmental aspects of green and brown
field earth movement and muck shifting are
considered.
Our surveyors will help with earthworks
modelling using bespoke/industry standard
Digital Modelling software to determine the most
practical, environmentally friendly programme
and resource level for the project. We identify and
implement the most cost effective way of treating
the earthworks element of your project.
We can assist with all stages of your project:
pre-planning, earthworks balancing options
(reducing offsite disposal), fill hauls, site clearing,
earth and muck removal (where required), project
completion and site enabling.
The skills and practical experience of our project
teams cover all aspects of earth movement and
earthworks modelling. On site, they are supported
by a modern fleet of specialist well-maintained
vehicles, plant and equipment operated by fully
trained and safety minded direct employees.
earthworks
![Page 10: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/10.jpg)
![Page 11: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/11.jpg)
McArdle are one of the UK’s leading ground
engineering and improvement companies. We
have undertaken projects in some of the most
environmentally sensitive areas in the United
Kingdom.
As a result, we have developed a reputation
as innovative and responsible partners to both
government agencies and many of the industry’s
leading developers and contractors.
The comprehensive range of ground improvement
techniques we employ includes band drains,
stabilisation, reinforced earthworks, gabions etc
suitable for treating a wide range of soil types.
Understanding the drive for sustainability means
that much of the aggregates we use come from
recycled sources.
McArdle can provide pre-contract advice and
extensive input into the design for ground
improvement schemes covering a wide range of
developments.
ground improvements
![Page 12: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/12.jpg)
![Page 13: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/13.jpg)
reclamation and remediation As a market leader in land remediation and
reclamation, McArdle provide clients with a
range of some of the most innovative and
environmentally friendly, low cost solutions for
reclamation and remediation available today.
The depth of experience and knowledge within
our management team demonstrates to clients
that McArdle can undertake the most diverse and
challenging of projects. We undertake contracts
where land, due to its historic legacy, has been
left heavily polluted. Our in-house abilities ensure
we can return these problematic sites to the
market, giving enhanced value to both the client
and the wider community.
From the initial remediation strategy through
to final approval, we will ensure all aspects of
regulatory compliance are achieved throughout
the project.
![Page 14: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/14.jpg)
![Page 15: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/15.jpg)
Well known for our major projects work,
McArdle’s reputation for outstanding quality
of service is intrinsic to smaller scale civil
engineering projects, external works and
landscaping finishes as well.
Clients rightly demand high levels of workplace
safety, a deep knowledge of regulatory
compliance, and the assurance of on time quality
delivery at a competitive price. Understanding
these demands and those imposed by today’s
economic climate, we continue to perform at
levels that impress our clients both in the public
and commercial sectors.
Our knowledgeable engineering teams have
expertise in a range of sectors where we
undertake infrastructure, external works and
landscaping projects working through a variety of
procurement routes.
With versatile modern plant to support our work,
we are adept at performing in densely populated
urban districts as well as open public areas and
roadways.
small civilengineering
![Page 16: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/16.jpg)
![Page 17: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/17.jpg)
haulageThe McArdle Group’s Road Haulage Service
provides an effectively and professionally
managed fleet of HGVs capable of fulfilling the
significant logistics demands associated with civil
engineering projects.
We routinely manage a fleet of over 200 HGVs,
including an internal fleet of some 60 HGVs.
Our internal fleet consists of tipper lorries, low
loaders, fuel tankers and road sweepers as well
as ancillary equipment such as wheel washers.
Our HGV fleet supports a wide variety of both
internal and external projects.
McArdle’s Road Haulage Service provides the
link between our project activities and our Waste
Management activities, maximising our ability to
limit offsite disposal. By positioning all our road
licensed HGV activity under the control of our
haulage department, we take full advantage of
our established management structure to fulfil
our obligations under the Road Traffic Act whilst
aligning our haulage operations to the varying
legislative and operational environments of
Construction Sites, Waste Management Sites and
Quarries.
We are members of the FTA (Freight Transport
Association) and our management process
is accredited under FORS (Freight Operators
Recognition Scheme).
Our in-house fleet is 100% Euro4 compliant.
![Page 18: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/18.jpg)
![Page 19: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/19.jpg)
wasteMcArdle have been at the forefront of
Construction & Demolition Waste Management
throughout our history, continuously developing
practical and deliverable processes for waste
minimisation. These include re-use and recycling
as well as sustainably developing the viability and
use of recycled secondary aggregates and soil as
substrates for their primary markets.
Apart from servicing our own projects, McArdle
provide a complete waste management service
for the construction industry from initial ground
investigation through to completion of land
restoration.
Our waste specialists offer testing and
classification services designed to prevent
the incorrect disposal of all waste types.
When collecting waste from site our drivers
and operators rigorously police what they are
collecting, an essential service to our clients
when taking waste from brown field sites.
![Page 20: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/20.jpg)
![Page 21: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/21.jpg)
plant hireAs one of the UK’s leading Civil and Ground
Engineering companies, McArdle rely heavily
on up-to-date, well maintained earthmoving
plant. We understand the importance of reliable
machinery to ensure programme schedules are
maintained throughout a project.
Consequently we have made a significant
investment in the specialist plant we operate,
retrofitting numerous safety systems. This
includes auto braking radar, proximity sensors,
reversing cameras, handrail and seatbelt
indicators.
Our attention to safety and project completion
deadlines is supported by our policy of significant
capex investment and directly employed
operators – we leave nothing to chance.
With our large and diverse fleet, we are able to
support both McArdle and other construction
industry clients across the UK, providing reliable,
high quality, self drive or fully staffed earthmoving
plant service.
Our Environmental Commitment
McArdle always source energy efficient products
and machinery. We reduce our carbon footprint
by investing in a modern fleet of machinery of
which 80% achieves the Tier 3 standards for
environmental sustainability criteria for fuel
efficiency and emissions. This is one of the
cleanest emission levels currently available for
plant, with far lower emissions than normally
found in plant of this kind.
Safety and Increased Productivity
McArdle also support construction clients with a
full earthmoving plant hire package that includes
fully trained and experienced operators and
supervisors. We operate one of the largest GPS
enabled fleets of its kind in the UK complete with
laser control equipment. We minimise the amount
of men on the ground working around heavy
equipment whilst maximising productivity time.
![Page 22: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/22.jpg)
projects
M25 DBFO
Client: Skanska/Balfour Beatty Joint VentureProject type: EarthworksProject duration: June 09 – May 12Value: £82 million
Project Scope:Earthworks to widen the M25 to 4 lanes over 36km between junctions 16 to 23 and 27km between junctions 27 to 30.
The work included;Early contractor involvement•Over 2,000,000m• 3 of excavation 100,000m• 3 of reinforced earthworks 150,000m• 3ofbackfilltostructures500,000m• 2 of pavement construction Formation of piling platforms •Formation of foundations for SFRW •Excavation of balancing ponds•Construction of landscape and •environmental featuresRe-soiling and grass seeding of all •soft areas
Ascot Racecourse
Client: Royal Ascot RacecourseProject type: Design & BuildInfrastructure ProjectProject duration: 4 monthsValue: £4 million
Project Scope:Hardstandings, lawns and associated services, pavements, race rails, handrails, stairways etc. The work included;
Silver Ring Enclosure redevelopment•New lawns, viewing platforms •and new parking, services, concrete access-ways and stairs, reconstructed access road and soft landscapingTime critical project linked to the •racing calendar of Royal Ascot
projects
Waste Recycling Group(WRG)
Client: Waste Recycling GroupProjecttype:LandfillConstruction/RestorationProject duration: Nov 11 (ongoing)Value: £18 million
Project Scope:3 year Framework Agreement.
The work so far includes;21landfillcells,16operational,4•closed and 1 hazardousNEC3 Engineering and Construction •Contract (July 2005) Option A81 different schemes from surface •water drainage to new cell constructionOver 1,000,000m• 3 of material to be moved/placed per yearIn excess of 750,000m• 2 of geotextile/geocomposite/geomembrane liner to be installed per year
Castle House Environmental Improvement Works
Client:BrookfieldConstruction(UK)LimitedProject type: Small Civils & ExternalWorksProject duration: 5 monthsValue: £700,000 Project Scope:Hard and soft landscaping and minor roadworks.
The work included;Kerbingandpaving•Structuralwaterproofing•Surfacing and white lining•Drainage•Tree/shrub planting•Turfing•
![Page 23: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/23.jpg)
M1 Junctions 6A-10
Client: Balfour Beatty/Skanska Joint VentureProject type: EarthworksProject duration: March 06 – Nov 08Value: £25 million
Project Scope:Earthworks for a 17km section of the M1 and remodelling of junctions 8, 9 and 10.
The work included; Advice on construction strategy•1,600,000m• 3 of bulk earthworks Formation of landscape and •environmental features Recycling of site won and locally •sourced wasteThe excavation and lining of 13 •balancing pondsFormation of pile platforms and •foundations for VCB and surface water channelStructuralbackfillto46bridge•abutments
projects
Blackamoor Lane
Client: Michael Shanly GroupProject type: RemediationProject duration: August 10 – Oct 11
Project Scope:Reclamation and remediation of a 14 hectare former pit site (Badnells), an historicunlicensedlandfilldatingbackapproximately 50 years situated within a densely populated residential area.
The work included;Site Clearance•Construction of an access road and •bridgeInstallation of a slurry wall and a •sheet piled wall Excavation and disposal of •approximately 140,000m3 of contaminated materialRetro-fillingof72,000m• 3
Design and installation of •de-watering system De-pressurising of chalk aquifer•
London Gateway
Client: Laing O’RourkeProject type: Ground ImprovementProject Duration: July 10 – Feb 12Value: £1 million
Project Scope:Ground improvement and reclamation of land adjacent to the River Thames. The work included;
Supply of anchor plates•Installation of 5 million linear metres •of band drains to depths of between 14m to 22m24/7 working with up to 4 rigs•On-site facilities to maintain and •service the installation rigsClose liaison with the dredging and •earthworks contractor to ensure critical dates are achieved
Ocado Warehouse, Tamworth
Client:Bowmer&KirklandProject type: Earthworks and stabilisationProject duration: 7 weeksValue: £690,000
Project Scope:Earthworks and stabilisation package for a new Ocado warehouse in Tamworth, Staffordshire.
The work included;35,000m• 3ofcuttofill130,000m• 2 of cement stabilisation to formation a 30% CBR using a Writgen2500SKrotovatorLay and compact 100mm layer of •recycled crushed concrete over the entire area
![Page 24: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/24.jpg)
projects
Bow East
Client: EWS (England, Wales and Scotland Railways)Project Type: Infrastructure worksProject duration: April – August 08Value: £2 million
Project Scope:Complete infrastructure for a new Logistics Centre and buildings for the 2012 games. Undertakeninclosepartnershipwiththe Olympic Delivery Authority (ODA), work included:
Earthworks•Sheet Piling•Decontamination•Installation of Alpha Block retaining •wallMesh reinforced concrete slabs•Drainage•Road and footpath construction•White Lining•Street Furniture•CCTV•Level crossings•RefurbishmentofWeighbridgeOffice•
M25 Junctions 12-15
Client: Balfour BeattyProject type: EarthworksProject duration: Jan 04 - March 06Value: £11 million
Project Scope:Widening existing 3 and 4 lane motorway to 4, 5 or 6 lanes in each direction, stage 2 construction of the spur road into Terminal 5.
The work included;Bulk earthworks•Road construction•Crushing and screening for recycling •into the works Topsoiling•Landscaping•
Port Glasgow Remediation
Client: Port GlasgowProject type: RemediationProject duration: April – August 08Value: £485,000
Project Scope:Remediation of 2.2 hectares of old gas worksatKingstonYard,PortGlasgowadjacent to the Clyde Estuary. The work included;
Development of risk based •remediation strategy Identificationofhotspotsof•contaminated materialExcavation and removal of heavily •contaminated soil Filtering of 14000m• 3 of perched groundwater
projects
A3 Hindhead
Client: Balfour BeattyProject Type: Earthworks & stabilisationProject duration: April 07 – Jan 12Value: £9.6 million
Project Scope:Earthworks and stabilisation for the 7km dual carriageway A3 Hindhead Tunnel. The work included;
835,000m• 3 of site clearance1,200,000m• 3 of bulk earthworks 100,000m³ of reinforced earthworks•700,000m³ofstructuralbackfill•Placement of over 93,000m• 2 of stabilised cement bound materialExcavation and GCL Lining to 4 •balancing pondsRecycling of site won material •Construction of landscape and •environmental features Placement and pinning of over •10,000m2 of topsoil Re-soiling and grass seeding of all •soft areas
![Page 25: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/25.jpg)
projects
IFF Long Melford
Client: IFF (International Flavours and Fragrances)Project type: Earthworks and RemediationProject duration: Nov 05 - April 07 Value: £1.5 million
Project Scope:Demolition of a disused chemical plant, remediation and earthworks. The work included;
Demolition of existing factory•Crushing•Earthworks•Bio-remediation of hydrocarbons •contaminated soilsSite restoration for future •development
Newhaven
Client: Hochtief Construction AGProject type: Infrastructure and RemediationProject duration: March - Oct 08Value: £750,000
Project Scope:Site investigation, development and implementation of a remediation strategy.
The work included;1000m of clay cut-off trenches •around outside of worksConstruction of HDPE lined storage •lagoon500m drainage•Design, installation and maintenance •of a water treatment plantRemoved offsite and contained •on-site of contaminents Mass dig, stabilisation and disposal •of materials for re-use
Weymouth Relief Road
Client: SkanskaProject type: StabilisationProject duration: June – August 10Value: £299,000
Project Scope:Insitu stabilisation of chalk to form the carriageway foundation for the Weymouth Relief Road in readinessfor the 2012 Olympics.
The work included:Site trials to optimise pavement •design and material usageStabilisation of 7km of 13m wide •carriageway using a Wirtgen 2500SK2 layer construction using Ground •Granulated Blastfurnace Slag (GGBS) in the lower layer and OPC in the upper layerLevel control using a GPS grader •controlled system
A2 Batter Slip
Client: Balfour Beatty/Mott McDonaldProject Type: Embankment rehabilitationProject duration: March - April 11Value: £150,000
Project Scope:Embankment slip reinstatement on the A2carriedoutundercontrolledtrafficmanagement and night time lane closures.
The work included;Removal of unstable and unsuitable •materialConstruction of gabion walling•Reinstatement of embankment using •importedstructuralfillInstallation of toe drains •Rehabilitation of the existing failed •footpathReplacement of the failed crib wall •with a new gabion wall
AWAITING
APPROVAL
![Page 26: McArdle Brochure](https://reader034.fdocuments.us/reader034/viewer/2022042719/568c0ecd1a28ab955a91d22f/html5/thumbnails/26.jpg)
McArdle GroupMcArdle HouseMcArdle Way
ColnbrookSlough
BerkshireSL3 0RG
T: +44(0) 1753 686820F: +44(0) 1753 686821