MBS/RM875/Healthcare “Operating Theatre” Unit 1. Scope This specification relates to the provision, installation and commissioning of a modular operating theatre to be supplied with all the related mechanical & electrical plant. The facility is to be designed with floor and wall areas to accommodate all of the plant and equipment set out below in order to afford such space as is compliant with HASAW regulations and other relevant codes of practice in force. The complete facility will comprise of an operating theatre, and attendant changing rooms manufactured and supplied to the following performance specification and an adjacent plant room to be supplied by the customer. 2. Building Specification All timber and wood-derived products must be from independently verifiable legal and sustainable sources. A list of assessed certification schemes that currently meet the Government’s requirements can be found at www.forest.net/cpet or:- http://www.defra.gov.uk/sustainable/government/advice/public/buying/products/construction/wood -products.htm 2.1Structural Frame 2.1.1 Roof frame: Shall consist of cold rolled steel beams with cold rolled joists at max 1 .200m centres. All members to bolted together utilising proprietary cleats to form a rigid steel frame. 2.1.2 Floor frame: Shall consist of cold rolled steel beams with cold rolled joists set level to top beams. Main structural members to be bolted together utilising proprietary cleats to form a rigid steel frame. End beams to be strengthened to minimise damage when being moved. 2.1.3 The roof and floor frames to be connected together at the extreme four corners of each module using 100mm x 100mm RHS columns, these being internal to the fabric of the structure. Specification Ceiling height 2.85m nominal FFL to underside of ceiling to operating room 2.7m to the scrub, prep, dirty utility and anaesthetic areas Roof beams 400mm deep Floor beams 300mm deep Floor loading 7.5kN//m 2 floor to all areas Roof decking Warmdeck using proprietary panels Wall construction 18mm Tulsa T&G CCPTs plywood Internal cladding Vinyl faced gypsumboard, or Corus CES steel cladding External wall finish Plastisol steel bonded to plywood

description

NNK

Transcript of MBS RM875 Spec. Operating Theatre_0

  • MBS/RM875/Healthcare Operating Theatre Unit

    1. Scope

    This specification relates to the provision, installation and commissioning of a

    modular operating theatre to be supplied with all the related mechanical & electrical

    plant. The facility is to be designed with floor and wall areas to accommodate all of

    the plant and equipment set out below in order to afford such space as is compliant

    with HASAW regulations and other relevant codes of practice in force. The complete

    facility will comprise of an operating theatre, and attendant changing rooms

    manufactured and supplied to the following performance specification and an

    adjacent plant room to be supplied by the customer.

    2. Building Specification

    All timber and wood-derived products must be from independently verifiable legal and sustainable sources. A list of assessed certification schemes that currently meet the Governments requirements can be found at www.forest.net/cpet or:-

    http://www.defra.gov.uk/sustainable/government/advice/public/buying/products/construction/wood -products.htm

    2.1Structural Frame

    2.1.1 Roof frame: Shall consist of cold rolled steel beams with cold rolled joists at

    max 1 .200m centres. All members to bolted together utilising proprietary

    cleats to form a rigid steel frame.

    2.1.2 Floor frame: Shall consist of cold rolled steel beams with cold rolled joists

    set level to top beams. Main structural members to be bolted together

    utilising proprietary cleats to form a rigid steel frame. End beams to be

    strengthened to minimise damage when being moved.

    2.1.3 The roof and floor frames to be connected together at the extreme four

    corners of each module using 100mm x 100mm RHS columns, these being

    internal to the fabric of the structure.

    Element Specification

    Ceiling height 2.85m nominal FFL to underside of ceiling to operating room 2.7m to the scrub, prep, dirty utility and anaesthetic areas

    Roof beams 400mm deep

    Floor beams 300mm deep

    Floor loading 7.5kN//m 2 floor to all areas

    Roof decking Warmdeck using proprietary panels

    Wall construction 18mm Tulsa T&G CCPTs plywood

    Internal cladding Vinyl faced gypsumboard, or Corus CES steel cladding

    External wall finish Plastisol steel bonded to plywood

  • 2.2 External / Internal walls

    Wall panels shall consist of a plastisol steel faced plywood outer skin, an

    insulation core of rockwool, and an inner lining of either vinyl faced gypsum board

    or hygienic Corus CES steel sheet cladding. The inner lining to depend on the room

    schedule and will suit room application.

    2.3 Roof

    Roof will be a warmdeck (or similar) construction comprising proprietary steel faced

    composite panels fixed to and supported by the steel roof frame.

    2.4 Ceiling

    The ceiling shall consist of a suspended ceiling grid system with either Armstrong

    Orcal (or similar) metal pan tiles to hygienic areas or Armstrong Bioguard (or

    similar) regular tiles to general areas.

    2.5 Floor finishes

    Floor finishes shall be 2mm Polysafe, (or similar), non-slip flooring. The operating

    room vinyl will also be anti-static. The floor / wall junction shall be formed using a

    continuous coved section to allow ease of cleaning. All vinyl joints will be fully

    welded to prevent water ingress.

    2.6 Doors

    External doors shall consist of powder coated aluminium construction and framing

    system with 24mm double glazed units, complete with weatherseals.

    Internal clinical doors shall be constructed from non-porous reinforced polyester

    resin encapsulating a core of expanded PVC or fire resistant insulation. Stainless steel

    frame sets and ironmongery will be provided. All other internal doors will be Koto

    Veneer (or similar).

    The doors into and out of the anaesthetic room shall be provided with door

    automation. A digital lock shall be provided to the door leading to the staff

    ancillary areas.

    2.7 Thermal Insulation

    The calculated average 'U' value for external walls, floor and roof excluding any door

    and window shall comply with the Building Regulations Part L2A.

    2.8 Fire Performance

    Roof: External FAA Rating

    Walls: Externally and internally class O rating, with 30 or 60 min fire resistance to

    suit layout.

    Ceiling:- Class O rating

    2.9 Finishes - External

    2.9.1 External Walls

    Plastisol coated steel: Goosewing grey.

    2.9.2 External Trim

    Fascias and skirting: plastisol Merlin Grey.

    2.9.3 Maintenance

    External walls, surfaces and trims shall require no maintenance for up to 25 years in

    normal conditions, other than for occasional washing down with mild detergents.

  • 2.10 Finishes Internal

    2.10.1 Internal Wall

    White steel coated to operating theatre, anaesthetic, scrub, dirty utility and

    prep.

    2.10.2 Ceiling

    Armstrong Orcal white steel tiles to the operating theatre, anaesthetic, scrub,

    dirty utility and prep. Armstrong Bioguard (or similar) regular tiles coloured to

    all other areas.

    2.10.3 Floor vinyl

    Polyflor range (or similar):- Polysafe 2mm Heavy-duty safety flooring. All

    Vinyl fully welded and coved.

    2.10.4 Electrical trunking

    PVC conduit recessed into walls. All surface trunking where installed to be

    white.

    2.11 Structural design

    All units to be designed and manufactured in accordance with relevant British

    Standards, Codes of Practice and current Building Regulations.BS 6767 Parts 1 and

    2: 1998/9

    BSEN 1991-1-1:2002 & -1-7:2004

    BSEN 1995-1-1:2004 & A1:2008

    BS 5950-1:2000

    Additional structural support to be provided to locate the UCV laminar flow canopy,

    operating light and medical gas pendants.

    2.12 All standard units are designed to meet following loadings:

    Roof super load: 0.75kN/m2

    Floor super load: To BSEN 1991-1-1:2002 (Deflection designed for 7 .5kN/m2)

    (Natural frequency >4Hz)

    Wind loading: 0.79kN/m2

    3 . B u i l d i n g S e r v i c e s a n d Connections

    T h e costing should allow for Mechanical and Electrical connections to the existing

    services as appropriate.

    Mains cold water supply

    Domestic hot water supply LPHW

    Mains electrical connection

    Drainage

    All services supplied by the client will terminate within 1 m of the required

    connection points on the theatre facility.

    The DX chiller plant shall be integral to the new theatre as will AGSS plant.

    4 . E n g i n e e r i n g S e r v i c e s

  • 4.1. Air handling

    The air-handling unit is to be located in plant room (supplied by others) and

    supply/extract ductwork will be taken to serve the various areas in the facility.

    Partitions will be fitted as appropriate with pressure relief/stabiliser dampers. Air will be

    admitted to the theatre through the use of ceiling supply diffusers.

    4.1.1 The theatre suite will comply, and be installed in accordance with the

    requirements of HTM 03/1 as a stand-alone facility.

    4.1.2 Assume and cost for a separate extract fan without any heat reclaim

    from the extracted air.

    4.1.3 Motorised pressure relief dampers shall be provided within the air-

    handling unit supply and extract ductwork.

    4.1.4 Include and cost for foil faced fibreglass ductwork insulation.

    4.2 Heating Medium shall be LPHW.

    The following temperatures have shall be used for the purposes of costing.

    Summer: 30C DB/20C WB

    Winter: 8C DB/Fully saturated

    4.3 DX Cooling

    DX cooling is to be provided to serve the air handling unit cooling coil from

    multiple condensers located on the roof adjacent to the plant-room.

    The coil is to be connected to each condensing unit via systems of

    refrigerant pipe-work. Include and cost for foil faced fibreglass pipe

    insulation, supplied to comply with building regulation standards to be

    applied to pipe-work within the false ceiling and pipe-work enclosures,

    insulation to be covered with PIB where installed externally.

    4.4 UCV Canopy Specification

    A UCV Canopy will be provided to the operating theatre. The canopy is to be

    precision manufactured from mild steel, finished powder coated white to

    provide a hard durable finish. Fabricated in four separate sections to house

    the following

    Fans: Direct driven single-phase centrifugal type with curved forward

    impeller. Variable speed motors.

    Silencers: Large supply and return silencers built into each of the four

    modules, incorporating acoustic flame retardant foam panels Class O

    fire rating and finished with a PVC membrane.

    Pre-filters: Disposable type 50mm thick glass fibre media 95% efficient

    to 5 micron.

    Main filters: Minipleat glass fibre HEPA type housed in 60mm deep

    extruded aluminium frame with protection grids on both sides. Gel seals

    system. Efficiency 99.997 to 5 micron.

    Diffusers and air grilles: Removable perforated air diffusers manufactured

    from mild steel and powder coated brilliant white to match the main

    body. Removable type return grilles mounted flush on the underside of

    the Ultra Flow Canopy.

    Servicing and access requirements: Four quick release panels on

    underside of main unit provide simple access to the fans and pre-filters.

    Canopy side walls: Clear acrylic panels housed in rigid extruded aluminium

  • frame, without exposed fastenings. Powder coated white to match unit

    4.5 The Ultra Clean Canopy shall be supplied to provide for the following:-

    4.6 Electrical installation

    Power supplies and control wiring to all plant and equipment shall be installed

    to BS 7671: 2008 17th Edition.

    4.6.1. Distribution

    Three phase type b distribution boards and main panel board. Electrical

    wiring shall be supplied in twin and earth within recessed plastic or metal

    conduit.

    4.6.2. IPS / UPS

    Bender (or similar) IPS and UPS systems shall be provided and located in the

    plant-room.

    4.6.3. Voice / Data Installation Containment shall be provided.

    4.6.4. Lighting

    Recessed IP54 sealed Fluorescent fittings to all areas, generally prismatic

    controlled, cat 2 and dimmable to theatres.

    4.6.5. Emergency lighting

    3 hour Conversions to general lighting with exit signs to escape doors and

    external bulkhead fittings to escape doors. Local test key switches to all

    emergency fittings.

    4.6.6. Theatre Light

    A Brandon Galaxy Ultra 53 Operating lamp (or similar) shall be provided as

    Attribute Required Performance

    Size of clean zone 2800 x 2800

    Minimum supply on high speed 3m3/sec

    Noise level 1.5m above floor in centre of clean zone not exceeding

    55 dBA

    Minimum average down-flow velocity

    0.38m / s

    Clean zone air changes 500 times/hour

    Set back down-flow velocity 0.19m /s

    Set back supply air volume 1.5m3/ sec

    Set back noise level 42 dBA

    Set back clean zone air changes 42 dBA

    Filtration standard Pre-filters 80% to Eurovent 4/5 BS 6540 EU3 Main bacteria filters 99.997% Efficiency to BS 3928 Eurovent 4/4

    Cruciform lighting level 500 lux inside clean zone

    Weight of ultra clean module 1250 kg

  • standard.

    4.6.7. Fire Alarm

    Stand alone GENT addressable system comprising of heat /smoke detectors

    to all areas and sounders to 75dB. Wiring in FP200 within the structure and

    within high impact mini-trunking. Connection to the existing system will be

    provided by others.

    4.6.8. Surgeons Control Panel

    The operating theatre facility shall be provided with a Brandon) (or

    similar) SCP to incorporate the following;-

    Air Sampling duct

    Analogue Time of day clock

    Digital elapsed time clock

    Elapsed time clock controls

    Temperature indicator

    Humidity indicator

    Ventilation normal indicator

    Battery in use indicator

    Ventilation high speed indicator

    Ventilation set back indicator

    Ventilation dirty filter indicator

    Mains socket outlet

    General lighting switches

    Ventilation on / set-back switch

    Operating lamp controls

    Twin frame X-ray viewer

    Temperature controller

    Humidity controller

    Medical gas pressure indicators

    4.7 Medical Gases

    The entire medical gas installation shall be supplied in accordance with

    HTM 02/01 and Regulation C11 requirements. The theatre shall be

    supplied with two medical gas pendants:

    4.8 Anaesthetists Pendant incorporating

    1 No Oxygen Outlet

    1 No Nitrous Oxide Outlet

    2 No Vacuum

    1 No 4-Bar Medical Air

    1 No 7-Bar Medical Air

    1No AGSS

    4No Twin socket outlets

  • 4.9 Surgeons Pendant incorporating:

    1 No Oxygen Outlet

    1 No Nitrous Oxide Outlet

    2No Vacuum

    1 No 4-Bar Medical Air

    1 No 7-Bar Medical Air

    1No AGSS

    4No SS

    4.10 Medical alarms and emergency AVSU valves shall be included.

    4.11 The anaesthetic room will incorporate wall trunked mounted services for:

    1No Oxygen

    1No Vacuum

    1No AGSS

    4.12 Hot and Cold Water Services

    All pipe-work shall be copper, joints will be either compression or capillary solder

    joints.

    Each item of equipment shall be fitted with a ball type valve for isolation.

    A return pipe shall be connected all hot tap outlets to ensure hot water is readily

    available to all draw off points.

    All concealed pipe-work and pipe-work in the roof space and in the plant room will be

    insulated with foil faced glass fibre or pre-formed expanded foam thermal insulation

    to building regulation standards as Class O Armaflex, to the thickness to comply with all

    relevant regulations and specifications.

    On completion all hot and cold water systems will be chlorinated to BS 6700.

    4.13 Sanitary ware

    Bidders to include for the supply and installation of all sanitaryware as follows:-

    Male staff changing: 1 No. Male shower unit + 1 No. w/c with wash-hand basin

    Female staff changing: 1 No.1 Female shower unit + 1 No. w/c with wash hand

    basin

    Patient change room 1 No. shower + 1 No. w/c with wash hand basin

    All shower units to be electric units.

    Integrated plumbing systems will be used on all sanitary ware.

    4.14 Soil and Waste Systems

    The sanitary pipework system would be installed utilising a system of plastic

    pipework with solvent welded fittings all in accordance with statutory and public health

    requirements.

    Intumescent fire collars will be installed on 50mm pipe and greater, where crossing

    building fire compartment walls.

  • 5 . C o m m i s s i o n i n g a n d C l e a n i n g

    The whole facility shall be deep cleaned - duct access will be incorporated nominally

    every two metres to allow this.

    The facility shall be fully commissioned and set to work, inclusive of all balancing and

    witnessed testing.