MBA Weekly Bulletin Vol.56 Issue#26
-
Upload
marin-builders-association -
Category
Documents
-
view
233 -
download
9
description
Transcript of MBA Weekly Bulletin Vol.56 Issue#26
![Page 1: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/1.jpg)
WEEKLY BULLETINwww.marinba.org ◆ [email protected] June 25, 2012 Vol. 56, Issue #26
WHOAREYOU
For details, spotlight requirements and any questions, please contact
Barbara at [email protected] or at 415-462-1220.
Among the many benefits of membership are
NETWORKING & OUTREACH
and we want to highlight our members and introduce you to each other. We
are continually working to build a strong foundation in our community, and
want to be sure you take take advantage of all of the benefits and services
of membership.
Maximize your outreach efforts through the MBA and submit your story for
our Weekly Bulletin today!
Share your story in the next MBA Member Spotlight!
![Page 2: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/2.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 2
Wednesday, July 25 8:30AM – 10:30AM
Mechanic’s Lien Law basics and recent changes
Thursday, August 2 Golf Tournament
Thursday, August 16 8:00AM – 5:00PM EPA’s new renovation, repair and painting rule (RRP)
www.marinba.org ◆ [email protected]
![Page 3: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/3.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 3
PROJECT OF THE WEEK
Invitation to bid
-Marin Municipal Water District-
SOUTHERN MARIN LINE ROAD
RETAINING WALL PROJECT
Sealed bids will be received until
Tuesday, July 24th @ 10:00AM at the Office of the
Manager of Engineering, Marin Municipal Water District,
220 Nellen Avenue, Corte Madera, CA 94925
Plans and specifications for Project #431 are
available in the MBA Plan Room and may also
be viewed on-line in the On Line Plan Room.
The contract is for furnishing labor and equipment for excava-tion and providing twenty-eight 24 inch diameter cast-in-place concrete piers, 168 feet cast-in-place concrete pier cap and associated appurtenances to stabilize the roadway and water main located near the end of Crown Road in Kentfield. A valid State of California Class A license is required. There is no pre-bid conference or site visit. Specifications and plans may be obtained upon receipt of a non-refundable deposit of $25 by mail or by phone at (415) 945-1530.Bidders who desire a MMWD representative to accompany them on their first visit to the proposed work site or have questions regarding the project should contact Carl A. Gowan at (415) 945-1577.
in this issue
WHO ARE YOU? : Share your story ...1
MBA Calendar ......................................2
Directors .............................................4
New Member Welcome ..................5
Golf Tournament ................................6
Mechanic’s Lien Seminar ...............7
Marin Community Development
Agency Changes ..................................8
Summer Interns Available ...................9
Kalb’s Q&A .........................................10
MBA Carwash Fundraiser ...............12
Phil Vermeulen ....................................13
Safety Topic: Excavation .....................16
Permits .........................................18
Completions & Liens ........................20
Project Bid Schedule ..........................22
Bid Results ..........................................29
Classifieds ..........................................30
Membership Application ...................31
_____________________
contact MBa660 Las Gallinas Avenue
San Rafael, CA 94903 ◆
Office: 415-462-1220Fax: 415-462-1225
www.marinba.org ◆ [email protected]
![Page 4: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/4.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 4
www.marinba.org ◆ [email protected]
2012 MBa Directors & officers
President
Vice President
chief financial officer
secretary
Past PresiDent
executive DirectorKlif Knoles
Herb Moran - MOC Insurance ServicesJosh Townsend - PG&E
Oliver Dibble - Dibble & CompanyTom Barr - Ghilotti Bros., Inc.
Mark Silvia - Marin Mechanical, Inc.Gary Frugoli - Construction Consultant
Rob Scerri - Golden State LumberKeith Dotto - Dotto Glass, Inc.
Dick Ghilotti - Ghilotti Construction CompanyDave Garbarino - Marin Sanitary Service, IncDiane Henderson - DMH Land Use Planning
Jeff Grady - Grady Financial, Inc.
STAFFPaula Krause - Office Manager
Barbara Jones - Membership ManagerDiane Van Renselaar - Plan Room Technician
Kellie Buono - Administrative Assistant/Reception
Casey Mazzoni - Legislative Analyst/ Consultant
The weekly bulletin is owned by MBA and is available at www.marinba.org
660 Las Gallinas Avenue, San Rafael, CA 94903Publisher: Klif Knoles
Publication Editor: And Them Design
Dave trahan - Patriot Mechanical
aimi Dutra - the Dutra Group
Jeff Mertel - Mertel carpets, inc.
jim schalich - schalich Brothers construction
tyler Doherty - cal West rentals, inc.
MBA MEMBER
ConstruCtion &
real estate attorneys
ContraCt issues MeChaniC’s liens stop notiCes Bond ClaiMs
Protecting More. Attaining More.
Glenn M. Smith
707.522.1100
www.smithdollar.com
talk to Glenn
free telephone Consultations for
Marin Builders assoCiation MeMBers
![Page 5: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/5.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 5
RIVAS BUILDING GROUP (G)Robert Rivas125 Larkspur Street #123San Rafael, CA 94901(415) 999-5927 CSLB# [email protected] Contractor Residential/Com-mercialRefs: Lee Wilkinson, Carl Borgland, Mariah Shields
OUTDOOR ENVIRONMENTS (G)Randy Shadrick, Owner20 Miwok CourtCotati, CA 94931(707) 795-0605 CSLB 707006Fax (707) 795-5165Cell (707) [email protected]\www.outdoor-environs.comLandscape ContractorRefs: MHGE and Joe Ennes, Jess Jans-sen, Lee Rider
www.marinba.org ◆ [email protected]
JUNE 2012NEW MEMBER WELCOME
![Page 6: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/6.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 6
www.marinba.org ◆ [email protected]
Marin Builders Association Annual Golf Tournament
Thursday ~August 2, 2012 Indian Valley Golf Course
3035 Novato Blvd., Novato, CA
Registration: 11:00 A.M. Lunch: 12:00 Noon
Shot-Gun Start: 1:00 P.M. (Scramble Format) Dinner & Awards: 6:00 P.M.
Cost: $165.00 per player
(Includes lunch, green fees, cart, refreshments, dinner with wine and MARGARITAS on the course)
Dinner and wine only - $40.00 per person
ALL PROCEEDS BENEFIT
MARIN BUILDERS ASSOCIATION SCHOLARSHIP FUND Make your reservations early. Tournament limited to 144 players. Return registration form with payment to Marin Builders Association, 660 Las Gallinas Avenue, San Rafael, CA 94903 or fax to (415) 462-1225. Refund/Cancellation Policy: NO cancellations or refunds after Friday, July 27th. _________________________________________________________________________
Golf Reservation Form Index or Player Company Average Score ________________________ _____________________________ ______
________________________ _____________________________ ______
________________________ _____________________________ ______
________________________ _____________________________ ______
************************************************************************ *Pay by Visa, MasterCard or pay online www.marinba.org*
Company Name_______________________ Contact Person_____________________
Address ____________________________ Phone_____________________________
Check enclosed made payable to: Marin Builders Association Scholarship Fund
□Visa □Master Card #___________________Expiration Date______ 3-digit code _____
Signature___________________________________
![Page 7: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/7.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 7
www.marinba.org ◆ [email protected]
Presented by
Construction Attorney Dan McLennon
Wednesday ~ July 25, 2012
8:30 A.M. ~ 10:30 A.M.
Marin Builders Association 660 Las Gallinas Avenue, San Rafael
Discussion of lien law basics and changes effective July 1, 2012
that every contractor should know.
Members $50 – Non-members $100
For reservations please complete and return this form with check made payable to: Marin Builders Association, pay with Visa/MasterCard or
online at our website www.marinba.org
Company Name:____________________ Phone:__________ Person(s) attending:_________________________________
(All reservations must be prepaid. No refunds after July 20th)
![Page 8: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/8.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 8
www.marinba.org ◆ [email protected]
Marin Community Development Agency Conserves, Enhances, Ex p a n d s
SAN RAFAEL, CALIFORNIA. Customers to the Marin County Community Development Agency (CDA) will soon notice changes in
their options for filing building permit applications, achieving quick plan review and scheduling building inspections as CDA begins to
implement long awaited improvements to their permit process.
Beginning July 6th, the planning and building permit counter in Suite 308 of the Civic Center will be closed every Friday. While at first
glance this may not seem like an improvement at all, the closure will allow CDA management to conserve and focus dwindling staff re-
sources more effectively toward a core Monday through Thursday work week intended to increase customer application throughput.
Enhanced customer options for filing building permit applications will also be implemented in July, including greater latitude in mail-in
permit applications and a Friday Drop-Off Box for smaller permit applications that require few plans or are normally issued over the coun-
ter. Online permitting for smaller building permit applications is anticipated within a year and will allow customers to submit their permit
applications from the comfort of their home or office.
Expanding customer choices in how building permits are processed, reviewed and inspected is also part of the CDA strategy to improve
customer satisfaction beginning this summer. These include:
Express Permitting is the new CDA term to describe same-day plan review for certain types of small projects like rooftop solar installa-
tions, landscape retaining walls and minor interior remodels that meet strict criteria for this type of review. This service will allow custom-
ers to secure their building permit in a single day.
Expanded choices for obtaining the fastest possible plan review include requesting overtime plan review for customers willing to pay the
overtime rate, and third-party plan review for customers who prefer to pay extra for potentially quicker review by a private firm of the
customer’s choosing.
Building inspection services will also be offering expanded customer options that include Electronic Inspection for licensed contractors
seeking faster inspection response through self-certification for certain types of inspections. Customers will also have the ability to request
an overtime inspection or third-party inspection if they desire greater control over inspection scheduling and are willing to pay the addi-
tional cost.
This summer, CDA will also commence construction of an expanded permit counter that will help staff better serve customers and visitors,
providing a beautiful and functional space that is respectful of the historic Marin County Civic Center.
For more information on these enhanced permit options visit www.marincounty.org/cda , or visit the CDA Permit Counter in Suite 308 of
the Civic Center – but, don’t go on a Friday!
Ex p a n d sEx p a n d s
![Page 9: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/9.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 9
ROP CONSTRUCTION TECHNOLOGY
BU
ILD
ING
TH
E F
UT
UR
E SUMMER
INTERNS AVAILABLE
Sponsored By: Marin County Office of Education Regional Occupational Program Marin Builders Association National Assoc. of Remodeling Industry
For the last seventeen years students all over Marin County have had the opportunity to learn hands-on skills of the construction trade. The class lasts eighteen weeks and is offered every Spring Semester on Wednesday evenings at Redwood High School, Larkspur. Our Assistant Instructors take groups of five students each and build a shed from the ground up. It is a memorable experience and the students and instructors look forward to every Wednesday. Students also have the opportunity to be hired for a six week Summer Internship with local contractors. They will be completely qualified to use power tools during the internship. Please support us by hiring a student for an internship. Students who interview are recommended by all Instructors to insure they are ready to work for you! You will not be disap-pointed.
THANKS FOR YOUR SUPPORT
“Construction Education is
where education Meets the
Real World”
CONTACT: TOM ELLER INSTRUCTOR 415 488-9865 Office 415 606-1955 Cell [email protected]
![Page 10: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/10.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 10
www.marinba.org ◆ [email protected]
Kalb's Q&A for Contractors By David Kalb & Shauna Krause, Capitol Services, Inc.
Can a legal judgment ‘ricochet’ from its intended target? Our first contractor is hoping to get out of harm’s way before the le-gal battle is joined. We share the steps another contractor must ‘dance’ in a corporate shuffle. We will help another questioner ‘plug in’ to the reason he may, or may not, need to file a CA con-tractor’s license application…
Q: Okay, say a contractor disassociates from a company while there is a lawsuit pending but before a judgment is obtained, and then associates with another company. If a judgment is later obtained against the first company will it follow the license holder to the new company?
A: In my opinion, the judgment should not follow the contractor under your suggested scenario. However, he or she will likely be re-quired to divulge a suit is pending when associating with the second company. Generally, the Board’s policy is that judgments apply to personnel who are still listed on the license. Personnel who have previously disassociated should not be held responsible. The date of disassociation is critical and this is not a ‘get out of jail’ free card.
Q: Our Company recently converted from a “C” Corp to an “S” Corp. Ownership has remained the same. Do we need to do any-thing with our License? One of your recent Q&A articles in our local contractor’s builder exchange newsletter spoke about a Sole Owner who converted to an “S”, therefore needing a new license. Are we in the same boat?
A: When converting from a “C” corporation to an “S” corporation (or vice versa), you do not need to do anything with your license. The CSLB is not concerned with what type of corporation you are. If you kept the same corporate number (which according to our research looks to be the case) then a new license is not required. A Sole Owner is an entirely different type of business entity than a corporation, hence the need for filing new license application.
Q: If my corporate license were to be suspended, would I be able to use my personal contractor’s license as a back up and continue to work?
A: First, it depends on why the license was ‘Suspended’ by the Board. If the Board action is simply related to a Bond or Worker’s Compensation cancellation then that’s one thing. If the Suspension is caused by a judgment or disciplinary action this is something totally different. We’ll assume it’s the former reason.
You can use your personal license as long as it is current and Active. You should consider transferring the contracts that are currently under your corporate license over to your personal license in order to continue work in progress, plus you would need to sign new contracts under your Sole Owner business name. You should not do business under your corporate license number and name while it is suspended.
Q: We provide a patient safety monitoring system that utilizes the existing CATV coax system in hospitals and other medical facili-ties. We place a Server at the CATV demarcation point in the hos-pital communication room; a Room Control unit (similar to a cable TV set top box) in each patient room; and a computer at each nurse station using the existing hospital computer network. All we do is install and plug in our equipment. All new cable/coax installations are the responsibility of the facility using their in-house staff or contractors. Are we required to apply/obtain a contractor’s license to install our own equipment?
A: According to the CSLB, a license would not be required for this type of work. However, if the medical facility you’re doing the installations for requests that you have a contractor’s license, then a “C-7” (Low Voltage Communications) would be the proper clas-sification to apply for.
While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 580, Sacramento, CA 95814. Re-search past columns at www.cutredtape.com.
![Page 11: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/11.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 11
Your partner in: Commercial Real Estate Small Business Loans
We make it simple.Owning a business can be complicated.
1 (877) 545-4100www.redwoodcu.org/business
– Brett Owner, Anytime Fitness Member since 1993
www.marinba.org ◆ [email protected]
![Page 12: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/12.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 12
SPRING IS IN THE AIR!
Marin Builders Association in partnership with
Matt & Jeff’s Car Wash is providing an opportunity to get a top quality car wash
and support the MBA Scholarship Fund Matt & Jeff’s will donate 50% of car wash price to the Scholarship Fund
Purchase:
Packet of 4 for $100 or Individual car wash for $24.95
How: MBA Office, 660 Las Gallinas Avenue. San Rafael
Reserve tickets by calling Barbara at 462-1220 or send an email to [email protected]. We can bill your membership account!
You get: Full service car wash – takes approximately 15 minutes
Free shuttle to Costco while you wait – come back to a clean car! Car wash tickets never expire!
Offer is available 7 days a week
www.marinba.org ◆ [email protected]
![Page 13: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/13.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 13
Also In This Update• BOE Launches eReg (Electronic Registration) Service• Employment Development Department Also Has Electronic
Program
Next Week Will Be Crazy Around the CapitolDespite the fact that the leadership purports to have an agreement about the language to the myriad trailer bills that will ultimately constitute the, roughly, $92 billion budget – no one really knows what’s contained in the “fine print” besides just a few. Hey, despite these “minor details,” I expect the entire package of trailer bills to be approved by the end of Tuesday of next week and the entire “mess” approved by the governor before the close of the month. This will allow the state to stagger into the 2012-2013 calendar year on July 1st acting as if “life is good!” Just one minor detail remains. Much of the “balancing act” is predicated on the fact that the governor’s tax initiative is approved by the voters in November, which is a HUGE IF! Stay tuned!
Next week is the start of the annual “two-week showdown in Sacramento” for many of the surviving bills from the 2011-2012, two-year session. As usual, everything will go down to the wire around the halls as the pace picks up significantly. While I could write a book (literally) on the bills that I will be dealing with, the two most important ones happen to be ours!
They are:
AB 2021 (Wagner) - Back in the late 1980’s the construction industry sponsored legislation to create the prompt pay statutes. These statutes have helped to ensure that all contractors are paid promptly and fairly for both their progress and their retention payments.
Unfortunately, despite the industry’s best efforts, the Prompt Pay statutes have turned into a mess of loopholes over time. Consequently, they provide no relief to contractors against
a sophisticated owner who has found myriad excuses for withholding money that is owed to his contractors. One of the biggest loopholes has been due to the fact that there is no definition in the law for “disputed amount.” This bill will define “disputed amount.”
We have also recently amended this bill to address another important matter dealing with disputed amount - This bill will declare that it is the intent of the Legislatureto overrule Martin Brothers Construction Inc. v. Thompson Pacific Construction Inc. (2009) 179 Cal.App.4th 1401 to the extent that it is inconsistent with these provisions.
SB 1516 (Leno) - Current law encourages contractors and manufacturers to submit an “or-equal” bid, which is an ingenious public works bid proposal that includes an alternative material or method with the same or greater functionality and at a lower cost than the original bid specifications developed by the agency. Unfortunately, current law allows public agencies to require these “or-equal” submittals prior to the actual bid day. This is a major disincentive to any bidder, because there is nothing preventing the agency from sharing the information with other competitors. Consequently, the original “or-equal” bidder is undercut and bidders are discouraged from submitting innovations that are cost effective, so the taxpayers lose in the end.
Due to intense opposition, we have amended the bill. Listening to the public agency’s concerns, here’s what we are now doing:
• Allow the agencies to continue to require bids prior to bid day if a process is put into place that provides for a fair review of the proposal. The intent is not to over-burden an agency; rather, it is intended to ensure that all submittals are given a fair and honest assessment – FOR THE GOOD OF THE TAXPAYER! Further to this point, SB 1516 allows for each agency to develop their own custom process for accepting OR EQUALS prior to bid day, based
www.marinba.org ◆ [email protected] ◆ [email protected]
Next WeekWill be Crazy Around the Capitol BY Phil Vermeulen, Governmental Relations
![Page 14: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/14.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 14
www.marinba.org ◆ [email protected]
upon what works best for them.
• If an agency decides to require the submittals prior to bid day their assessment of the OR EQUALs and the accompanying supporting documents of their assessment must be concluded at least 10 days prior to bid day. This way, the agency can continue to prepare for the actual bid day for the other bids that they will be receiving without being rushed or overburdened; and if an OR EQUAL submittal is rejected, the submitter of the OR EQUAL still has sufficient time to prepare a revised bid utilizing the materials or methods that were originally specified by the agency. It is also very important to note on this point, that the amendments specifically place ALL of the burden on the submitter to substantiate the OR EQUAL material or method.
• The amendments ensure that the agency has final say in any acceptance or rejection of an OR EQUAL.
• To give the agency “carte blanche” without any potential oversight of their decision would be fool hardy at best. For this reason another amendment states that if the pre bid submittal (note, only the pre bid submittal) is rejected, the rejected submitter shall have standing to challenge that decision in an action for declaratory relief, but that action shall not affect the award of the contract.
• It is important to note that we DO NOT want to hold up the award of the contract for a fight over whether a pre-bid OR-EQUAL submission was correctly rejected. Instead, if the submitter who proposed the product wins a decision in court, it can use the court determination to establish equality for future contracts.
And, to this point, if the submitter decides that he wants to pursue declaratory relief he’d better be sure that he’s right, because he will be charged with all court costs, including expert’s fees should he lose! Conversely to this point, why are the agencies contending that this is going to be a huge burden? If they are indeed correct in their assessment that the submittal was not truly equal, they face no peril EVEN if the submitter does ultimately take them to court since he will bear ALL their court costs if he loses!
• The final amendment provides that not only prime contractors, but also subcontractors and manufacturers also have the ability to submit OR EQUALs. We should encourage all interested stakeholders who wish to raise the bar to introduce innovations and new processes which are truly OR EQUAL or better which will save the taxpayers’ money.
Even though we’ve attempted to address each and every concern raised by the public agencies, they are still opposed and are planning to testify en mass at next Tuesday’s hearing in the Assembly Business and Professions Committee. Ought to be interesting, stay tuned!
Doing Business in California Just Got Easier with eReg BOE Launches eReg (Electronic Registration) Service
Starting or doing business in California just got easier with eReg, the Board of Equalization’s (BOE) new secure electronic registration system, announced Jerome E. Horton, Chairman of the State Board of Equalization (BOE) today. The user-friendly service offers a convenient, fast, and free way to apply online for a permit, license, or account.
“eReg is just one more way the BOE is using innovative technology to make it easier to start and conduct business in California,” said Chairman Horton. “Helping businesses to succeed and getting them started quickly and efficiently is vital for California’s economic health.”
Beginning June 18, 2012, users can access eReg from the BOE’s secure website – any time day or night – to apply for a seller’s permit, pay use tax, and register for other tax and fee programs. Answer a few simple questions and the system works to guide the user through the process of getting the permits, licenses, or accounts needed. If users don’t have time to finish the application process, it’s no problem – they can save their application and return later to finish it.
In addition, eReg allows you to:• Register for a special tax or fee account such as International Fuel Tax Agreement (IFTA) accounts and Cigarette and Tobacco Products Retailer’s Licenses• Add a new business location • Easily make use tax payments • View the status of your account(s) online• Access helpful reference materials, forms, and publications
For a comprehensive list of features and to learn how eReg can help you, visit: www.boe.ca.gov/elecsrv/ereg/index.html.
Employment Development Department Also Has Electronic ProgramThe Employment Development Department (EDD) also has an electronic program similar to BOE’s. To access their website, please go to: http://www.edd.ca.gov/Payroll_Tax_Seminars/ Once there click on eServices.
![Page 15: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/15.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 15
• DesignedSpecificallyforContractors
• OpentoallLicensedBrokers(someconditionsandrestrictionsapply)
• MultipleCarrierParticipation
• VeryCompetitiveRates(ifyouarestillwiththeStateFundyoucanchangeatanytimeandsavemoney.)
• LowMinimumPremiumformanyofourArtisanClasses
• FlexiblePaymentOptions
• On-LineAccesstoPolicyData,LossRuns,ClaimsStatus,AccountStatus,etc.
• FreeAccesstoExtensiveSafetyLibrary(EnglishandSpanish)
• PreferredProviderNetwork
• NurseCaseManagement
• AccidentInvestigationTechniques
• SafetyPrograms
• UniformInjury&IllnessPreventionProgram
• StrongReturntoWorkProgram
• GeneralLiability,Property,InlandMarine,Automobile,Bonding,etc.
• SafetyTrainingClassesandSeminars
• HumanResourceServices
• Dedicatedwebsite
• AndMuchMore!
IMPORTANT ANNOUNCEMENT TO ALL MARIN BUILDERS
ASSOCIATION MEMBERS
ALSO AVAILABLE
For more information, please contact:[email protected] or call (866) 216-5255
or visit our website:www.cabuildersinsuranceprogram.com
CA License #0545478
Your Board of Directors has approved our participation in the California Builders Insurance Program. Program partners include several other builders exchanges and associations. We have all joined forces to deliver competitive insurance programs as well as services designed to meet your specific needs.
We have endorsed Jenkins Insurance Group (a Leavitt Group Affiliate) as the managing broker for the California Builders Insurance Program. As your insurance programs approach expiration, please consider participating in this program. If you are with the State Fund, you can change at any time and save 15% to 35% (depending on underwriting guidelines of participating carriers)
Please support your local Builders Exchange Insurance Program!
California Builders Insurance Program
![Page 16: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/16.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 16
Safety Practices While Working on Excavation Sites Each year, trench collapses are one of the leading causes of injury and death on construction sites. Of these incidents, most of the victims were new employees who lacked training and guidance prior to entering the job site. Sadly, most accidents were preventable. Whether you are new or a seasoned employee, it is essential that you adhere to Occupational Safety and Health Administration (OSHA) regulations to ensure the safety of the entire work crew. Trench Requirements
• Trenches five feet or more in depth require a protective system.
• Trenches that are four feet or more require a safe means of entrance and exit.
• Trenches that are 20 feet or more require an exit system designed by a registered professional engineer.
Protective Systems The designated competent person should inspect the area and determine which protective system will suit the job site and soil most effectively. This is essential, as equipment movement, underground utilities and vibrations can cause a surcharge load on the sides of the trench, forcing it to cave in on the workers inside. The following are the most commonly used protective systems:
• Sloping: Protects workers by cutting back the trench wall at an angle inclined away from the excavation
• Shoring: Protects workers by installing aluminum hydraulic supports to prevent soil movement
• Shielding: Protects workers by using trench boxes to prevent cave-ins
In addition to one of these three safety measures, a low-traffic zone must be designated around the trench allowing only essential equipment to enter. This will minimize the amount of vibration to which the trench is exposed. Avoiding Accidents Excavation accidents can occur if the underground utilities are not located and removed prior to digging a trench. Contact your local one-call system to locate all of the utility lines. Then, label or remove them to prevent injury. Trench accidents can also happen if safe entrance and exit routes are not present or adequate for the situation. Workers may slip back into the trench as they are trying to climb up a ladder if it is unsupported, placed on a steep slope or is poorly built. To prevent injury while entering and exiting a trench, only the designated competent person should approve the structural device used. Workers should also place the ladder in a trench shield while trying to enter and exit to avoid a cave-in. By complying with OSHA regulations and following these safety precautions, the risk of injury at your job site will be greatly reduced. wants everyone on our team to keep safety in mind!
Do not enter a trench without inspecting it at the start of a shift or after a rain shower to ensure that all safety precautions are still in place.
California Builders Insurance Program: Your construction workplace safety partner
Safety Matters
THIS FLYER IS FOR GENERAL INFORMATIONAL PURPOSES ONLY, AND IS NOT INTENDED AS MEDICAL OR LEGAL ADVICE. CONTENT © 2007-2010 ZYWAVE, INC. ALL RIGHTS RESERVED.
California Builders Insurance Program
For more information, call: (866) 216-5255 or visit our website: http://www.cbeins.com
![Page 17: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/17.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 17
Prácticas de seguridad al trabajar. Sitios de excavación Cada año, las caídas de zanjas son una de las principales causas de lesiones y muerte en las obras de construcción. De estos incidentes, la mayoría de las víctimas fueron empleados nuevos que no contaban con capacitación ni orientación antes de ingresar al lugar de trabajo. Tristemente, la mayoría de los accidentes pudieron prevenirse. Ya sea que sea un empleado nuevo o novato, es esencial que respete las reglamentaciones de la Administración de Salud y Seguridad Ocupacional (OSHA) para garantizar la seguridad de todo el personal. Requisitos relacionados con las zanjas
• Las zanjas de cinco pies o más de profundidad requieren de un sistema de protección.
• Las zanjas que tienen cuatro pies de profundidad o más requieren de un medio de entrada y salida seguro.
• Las zanjas que tienen 20 pies o más de profundidad requieres de un sistema de salida diseñado por un ingeniero profesional certificado.
Sistemas de protección La persona competente designada debe inspeccionar el área y determinar qué sistema de protección será el más adecuado para el lugar de trabajo y el suelo. Esto es muy importante, ya que el movimiento de los equipos, los servicios subterráneos y las vibraciones pueden producir una sobrecarga en los lados de la zanja, lo cual puede hacer que los trabajadores queden atrapados adentro. Los siguientes sistemas de protección son los que se usan más comúnmente.
• Sistema de pendiente: Protege a los trabajadores al cortar la pared de la zanja en un ángulo inclinado alejado de la excavación.
• Sistema de escalonamiento: Protege a los trabajadores al instalar soportes
hidráulicos de aluminio para evitar el movimiento del suelo.
• Sistema de protección: Protege a los trabajadores al usar cajas para evitar que queden enterrados.
Además de una de estas tres medidas de seguridad, debe diseñarse una zona de escaso tránsito en torno a la zanja que permita el ingreso de equipos esenciales solamente. Esto reducirá la cantidad de vibración a la que está expuesta la zanja. Como evitar accidentes Los accidentes por excavación pueden ocurrir si los servicios subterráneos no están ubicados y retirados antes de la excavación de una zanja. Comuníquese con el sistema de llamada única para localizar todas las líneas de servicios. Luego, rotúlelos o retírelos para evitar lesiones. Los accidentes relacionados con las zanjas también pueden ocurrir si la entrada y salida de seguridad no están presentes o no son adecuadas para la situación. Los trabajadores pueden resbalarse y caer a la zanja al intentar subir una escalera si no tiene soportes, si está situada en una pendiente o mal construida. Para evitar lesiones al entrar y salir de una zanja, sólo la persona designada competente debe aprobar el dispositivo estructural utilizado. Los trabajadores también deben colocar la escalera en una zanja que cuente con protección al intentar ingresar y salir para evitar quedar enterrados. Al cumplir con las reglamentaciones de la OSHA y seguir estas precauciones de seguridad, el riesgo de sufrir lesiones en el trabajo se reducirá ampliamente. desea que todos en nuestro equipo tengan en cuenta la seguridad.
No ingrese a una zanja sin inspeccionarla al comienzo del turno o después de la lluvia para garantizar que se tomen todas las precauciones de seguridad.
California Builders Insurance Program: Su socio en la seguridad de las obras de construcción
ESTE FOLLETO TIENE FINES INFORMATIVOS GENERALES EXCLUSIVAMENTE Y NO DEBE CONSIDERARSE COMO UNA RECOMENDACIÓN MÉDICA O LEGAL. CONTENIDOS © 2007-2010 ZYWAVE, INC. TODOS LOS DERECHOS RESERVADOS.
Asuntos de Seguridad
California Builders Insurance Program
For more information, call: (866) 216-5255 or visit our website: http://www.cbeins.com
![Page 18: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/18.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 18
PeRMItS Permit lists subject to change,please check with Association.
Owner Contractor Address Parcel # Construction ValueRoeck Spencer & BRANDON RIEDEL ROOFING 148 Roundtree Blvd (Units 148- 164-511-15 (53) Reroof $31,620 Marin Roundtree Hoa/Co BRANDON RIEDEL ROOFING 132 Roundtree Blvd 132-138 San 164-511-23 (53) Reroof $26,600 Rotary Valley Assoc L/L LAWSON ROOFING CO INC, TH 10 Jeannette Prandi Way#9 San 164-640-02 (53) Reroof $12,147 Rotary Valley Assoc L/L LAWSON ROOFING CO INC, TH 10 Jeannette Prandi Way#10 San 164-640-02 (53) Reroof $18,214 Rotary Valley Assoc L/L LAWSON ROOFING CO INC, TH 10 Jeannette Prandi Way#11 San 164-640-02 (53) Reroof $18,214 Kaliski Dorothy Tr Estate DE MELLO ROOFING 117 Seminary Dr Mill Valley 043-261-23 (53) Reroof $11,915 Eleanor Harrison MODERN METHOD ROOFING CO, 960 Bel Marin Keys Blvd Novato 157-231-26 (53) Reroof $25,000 Vonwaldburg Arthur R /Tr/CROWN RIDGE ROOFING,INC. 440 San Geronimo Valley Dr San 170-161-01 (53) Reroof $19,375 Kellogg Ralph P Tr & PETERSEN DEAN 135 Peralta Ave Mill Valley 050-051-01 (60) Roof-Mounted $11,700 Fruchtenicht Herman G Tr AMERICAN WINDOW SYS. 22 Manor View Fairfax 174-082-12 (58) 22 Windows 1 $12,823 Wilson, Eric OWNER/BUILDER 150 Pine Ave Woodacre 172-380-01 (58) About 20 Win $20,000 Orrick Andrew D Jr /Tr/ & SUNGATE ENERGY SOLUTIONS 25 H Ln Novato 143-481-02 (60) Roof Mounted $19,000 Camilleri Gioacchino T Tr SUNGATE ENERGY SOLUTIONS 406 Tennessee Glen Way Mill Va 052-560-04 (60) Roof Mount $26,000 Miller Thomas M /Tr/ & BURNS BUILDERS 202 Scott Mill Valley 047-221-26 (22) Remodel(59) $120,000 Marin Roundtree Hoa/CharBRANDON RIEDEL ROOFING 209 Roundtree Way (Also 221) S 164-511-29 (53) Reroof $33,100 Marin Roundtree Hoa/CharBRANDON RIEDEL ROOFING 223 Roundtree Way (Also 225) S 164-511-36 (53) Reroof $16,550 Schoenfeld Dan OLENKA BUILDERS 51 Laurel Grove Ave Kentfield 071-152-36 (21--0/2)(22)(12) $510,000 Schoenfeld Daniel OLENKA BUILDERS 51 Laurel Grove Ave Kentfield 071-152-36 (11) Ret. Wall ( $12,600 Schoenfeld, Dan OLENKA BUILDERS 51 Laurel Grove Ave Kentfield 071-152-36 (11) Ret. WallT. $28,000 Schneider Philip J /Tr/ & OWNER/BUILDER 799 Bolinas Rd Fairfax 197-032-06 (20.2-1/1) Guest $98,100 Matsui Brandon K & AMERICAN SOLAR CORPORATIO 390 Pinewood Dr San Rafael 164-111-27 (60) Install Flus $21,000 Hadlock Black Trust Etal BADER, DENNIS 456 Marin Ave Mill Valley 049-142-11 (21--0/0) Addito $37,000
COUNTY OF MARIN PERMITS ISSUED
www.marinba.org ◆ [email protected]
COUNTY OF MARIN PERMITS RECEIVEDAddress Owner Work Value29 Pt San Pedro Rd San Rafael Waldman Dan (56,13,58) Siding, Deck, Windo $16,2508950 Redwood Hwy Novato Redwood Landfill Inc (12,50)Repl Antennas & Cabinet $25,00010300 Redwood Hwy Novato Lester Corda & Stella Corda Family (12,50) Repl Antennas & Batter $25,0007 S Ridgewood Rd Kentfield Smith Margie /Tr/ (21--0/0) (23--0/0)(13)Remodel $156,50099 St Thomas Way Tiburon Atherton Andrew M & (22,57) Vault Lr Ceiling, Add $60,00028 Stetson Ave Kentfield Bonte Peter A Y (23) Interior RemodelTd 7/2/1 $27,500 275 Van Winkle Dr San Anselmo White Brian A & (22)(13) Structural Remodel Sf $418,00061 Windstone Dr San Rafael Teichmann Mary E /Tr/ (13) Remove And Replace Deck J $12,000113 Wolfe Grade Kentfield Guenther Caroline A Restated Decio (11)(14)(50)(51) Retaining Wal $28,000139 Wood Ln Fairfax Marin Municipal Water District (22,23) Repr Fire Damage 2nd F $200,000150 Pine Ave Woodacre Wilson Eric & (60) Install 12.4 Kw Pv Solar $55,000275 Olive Ave Novato Pge (51) (92) Modification To Exis $40,00050 Oak Knoll Dr San Anselmo Deardorff Charles A & (21)(23)(12) Entry Addn, Remod $40,00050 Mesa Rd Bolinas Dworsky Alan J Tr (21--0/0)(12)(13) Additional L $150,00082 Berens Dr Kentfield Bryan Dale G & (23) Bathroom Remodel $25,00021 Drakes Summit Rd Inverness Conrad Tony J /Tr/ Etal (13)(59) Deck And Structural W $43,000148 Roundtree Blvd (Units 148-158) San R Roeck Spencer & (53) Reroof $31,62010 Jeannette Prandi Way#12 San Rafael Rotary Valley Assoc L/L (53) Reroof $18,214960 Bel Marin Keys Blvd Novato Eleanor Harrison (53) Reroof $25,000308 Joyce Way Mill Valley Gale Judith B /Tr/ (58) Replace 4 Windows Like Fo $10,761306 Joyce Way Mill Valley Mc Cormick John Warren (59)(50) Replace 2 Windows, Ch $15,934
![Page 19: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/19.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 19
PeRMItS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
CITY & TOWN PERMITS ISSUED
City/Town Issue Date Owner Contractor Site Address Type Valuation
San Rafael 6/13 KO DANIEL ETAL 1519 LINCOLN AVE ALTER-SFD $239,625
San Rafael 6/14 SALVEMINI GIA-COMO &
F C Horne & Co 770 KNOCKNABOUL WAY
ALTER-SFD $90,000
San Rafael 6/13 ARCHDIOCESE OF SAN FR
West Bay Builders 1104 5TH AVE ALTER-COM-MERCIAL
$55,000
San Rafael 6/14 DELL OSSO GEOF-FREY G T
Garren’s Auto Body 107 JORDAN ST ALTER-COM-MERCIAL
$30,000
San Rafael 6/12 Luke Sanders Pace Builders Inc 202 MIRADA AVE ALTER-SFD $30,000
San Rafael 6/15 HOWARD DED-RICK C ETA
Joshua Josephson 19 HEARTWOOD CT ALTER-SFD $30,000
San Rafael 6/18 BROWN JUSTIN 251 SANTA MARGARITA DR
ALTER-SFD $25,000
San Rafael 6/12 HUNGERMANN ELVIRA H
Fred Divine Associ-ates
427 FAIRHILLS DR ALTER-SFD $25,000
San Rafael 6/14 WHITE DANIEL R JR
RFW Builders 318 PALOMA AVE ALTER-SFD $20,000
San Rafael 6/18 RYDER-SMITH MATTHEW
Charles Window & door
307 H ST ALTER-SFD $16,000
San Rafael 6/14 TRINITY COMMU-NITY CH
Will Nelken 1675 GRAND AVE ALTER-SFD $15,000
San Rafael 6/12 HOUSTON ANTHO-NY D /T
Finish Line Contract-ing Inc.
52 SUNSET WAY ALTER-SFD $14,500
San Rafael 6/12 BEARDSLEY LYDA Abril Roofing 1069 LAS GALLINAS AVE
ALTER-SFD $14,000
San Rafael 6/19 IGNOFFO FAMILY TRUST
San Anselmo Con-struction
845 5TH AVE 23 ALTER-APART-MENTS
$14,000
San Rafael 6/13 KOLBE MIRANDA B &
DeMello Roofing 14 SENTINEL CT ALTER-SFD $12,835
San Rafael 6/12 OLIPHANT STEVEN B &
Abril Roofing 25 CALAFIA CT ALTER-SFD $12,500
San Rafael 6/12 BOYER NOLEN D & IKEA 82 DURAN DR ALTER-SFD $10,000
San Rafael 6/12 KIVES ANDREW G A Hughes Builder 131 GLORIA DR ALTER-SFD $10,000
San Rafael 6/13 ZOELLNER DAVID M &
Modern Method Roofing
430 CEDAR HILL DR ALTER-SFD $10,000
Tiburon 6/19 Royo Apsaneh Family Trust
KBO Construction 92 Mount Tiburon Ct Addition $860,000
Tiburon 6/19 Town of Tiburon Metro Construction 1505 Tiburon Blvd Upgrade $38,900
Tiburon 6/20 Judith Thompson & Nancy Brooks
Northbay Sunspaces Inc.
139 Hacienda Drive Enclose Deck $24,680
Tiburon 6/21 Nancy Benjamin DeMello Roofing 7 Greenwood Ct Reroof $22,165
Tiburon 6/19 Nicholas Honchi-raw
Simpson Sheet Metal 3 Via Paraiso West Furnaces $10,060
Tiburon 6/19 Megan Ryan Stasz Calidad Construc-tion
261 Karen Way Kitchen Re-model
$10,000
![Page 20: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/20.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 20
tAX lIenS & COMPletIOnS
www.marinba.org ◆ [email protected]
LIENS
Recording Date Grantors/Grantees Grantees/Grantors Title Document Number
06/12/2012 BAUJOUR MANILIA (O) SEASCAPE VILLAGE HOMEOWNERS ASSOCIATION (E)
LIEN 2012-0035572
06/15/2012 DEL MONTE HIGHLANDS HOME-OWNERS ASSOCIATION (E)
RADTKE PAULA (O) LIEN 2012-0036273
06/15/2012 LABOR COMMISSIONER (E) KOLOAMATANGI SIONE (O) LIEN 2012-0036265
06/15/2012 LABOR COMMISSIONER (E) SIONE KOLOAMATANGI (O) LIEN 2012-0036265
06/12/2012 SEASCAPE VILLAGE HOMEOWN-ERS ASSOCIATION (E)
BAUJOUR MANILIA (O) LIEN 2012-0035572
06/14/2012 SEASCAPE VILLAGE HOMEOWN-ERS ASSOCIATION (E)
NGUON SOMUTA (O) LIEN 2012-0036082
06/14/2012 SEASCAPE VILLAGE HOMEOWN-ERS ASSOCIATION (E)
NOU CHANTY (O) LIEN 2012-0036082
06/15/2012 STATE OF CALIFORNIA (E) KOLOAMATANGI SIONE (O) LIEN 2012-0036265
06/15/2012 STATE OF CALIFORNIA (E) SIONE KOLOAMATANGI (O) LIEN 2012-0036265
RELEASE OF LIENS
Recording Date Grantors/Grantees Grantees/Grantors Title Document Number
06/12/2012 JACOBS GARY (E) PLUMBING CONNECTION (O) RELEASE OF LIEN
2012-0035469
06/15/2012 KELLY KATIE (E) CALIFORNIA HOUSING FINANCE AGENCY (O)
RELEASE OF LIEN
2012-0036277
06/11/2012 LARVA CHARLES (E) SANTA CLARA COUNTY DEPART-MENT OF CHILD SUPPORT SERVICES (O)
RELEASE OF LIEN
2012-0035327
06/11/2012 STANS (E) STATE BOARD OF EQUALIZATION (O)
RELEASE OF LIEN
2012-0035328
06/11/2012 STANS (E) STATE BOARD OF EQUALIZATION (O)
RELEASE OF LIEN
2012-0035329
06/11/2012 ZAMOYTA JOANN (E) STATE BOARD OF EQUALIZATION (O)
RELEASE OF LIEN
2012-0035328
06/11/2012 ZAMOYTA JOANN (E) STATE BOARD OF EQUALIZATION (O)
RELEASE OF LIEN
2012-0035329
06/11/2012 ZAMOYTA STANLEY (E) STATE BOARD OF EQUALIZATION (O)
RELEASE OF LIEN
2012-0035328
06/11/2012 ZAMOYTA STANLEY (E) STATE BOARD OF EQUALIZATION (O)
RELEASE OF LIEN
2012-0035329
TAX LIENS
Recording Date Grantors/Grantees Grantees/Grantors Title Document Number
06/11/2012 FRANCHISE TAX BOARD (E) AZARVAND BEHNAZ (O) TAX LIEN 2012-0035316
06/11/2012 FRANCHISE TAX BOARD (E) LOPEZ RONALD (O) TAX LIEN 2012-0035318
06/11/2012 FRANCHISE TAX BOARD (E) DOYLE JACK D (O) TAX LIEN 2012-0035319
06/11/2012 FRANCHISE TAX BOARD (E) WADE CAROLYN J (O) TAX LIEN 2012-0035320
06/11/2012 FRANCHISE TAX BOARD (E) POLINSKI CARMEN (O) TAX LIEN 2012-0035321
06/11/2012 FRANCHISE TAX BOARD (E) JOSEPH MITCH A (O) TAX LIEN 2012-0035322
06/11/2012 FRANCHISE TAX BOARD (E) MIKLOS JUDITH C (O) TAX LIEN 2012-0035323
06/11/2012 FRANCHISE TAX BOARD (E) MC CONNELL MARGARET A (O) TAX LIEN 2012-0035324
![Page 21: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/21.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 21
tAX lIenS & COMPletIOnS
www.marinba.org ◆ [email protected]
TAX LIENS (continued)
Recording Date Grantors/Grantees Grantees/Grantors Title Document Number
06/12/2012 FRANCHISE TAX BOARD (E) NAVE SELF STORAGE INC (O) TAX LIEN 2012-0035429
06/13/2012 FRANCHISE TAX BOARD (E) SELBY JULIE A (O) TAX LIEN 2012-0035879
06/13/2012 FRANCHISE TAX BOARD (E) SELBY MANTON L II (O) TAX LIEN 2012-0035879
06/13/2012 FRANCHISE TAX BOARD (E) RIEKENA JOE (O) TAX LIEN 2012-0035898
06/13/2012 FRANCHISE TAX BOARD (E) ZWEIFACH SANFORD S (O) TAX LIEN 2012-0035899
06/13/2012 FRANCHISE TAX BOARD (E) MC INTIRE NANCY F (O) TAX LIEN 2012-0035903
06/13/2012 FRANCHISE TAX BOARD (E) MC INTIRE STEVEN L (O) TAX LIEN 2012-0035903
06/15/2012 FRANCHISE TAX BOARD (E) 3330 GEARY BOULEVARD LLC (O) TAX LIEN 2012-0036513
06/15/2012 FRANCHISE TAX BOARD (E) PETERSEN DESIGN ASSOCIATES LLC (O)
TAX LIEN 2012-0036514
06/15/2012 FRANCHISE TAX BOARD (E) ORGANIZED GRIND ENTERTAIN-MENT L L C (O)
TAX LIEN 2012-0036515
06/15/2012 FRANCHISE TAX BOARD (E) M2 SPORTS LLC (O) TAX LIEN 2012-0036516
06/15/2012 FRANCHISE TAX BOARD (E) AABBQ LLC (O) TAX LIEN 2012-0036517
06/11/2012 INTERNAL REVENUE SERVICE (E) GORDON KARYN K (O) TAX LIEN 2012-0035358
06/11/2012 INTERNAL REVENUE SERVICE (E) GORDON LANCE (O) TAX LIEN 2012-0035358
06/11/2012 INTERNAL REVENUE SERVICE (E) KONKLIN RIVA D (O) TAX LIEN 2012-0035359
06/11/2012 INTERNAL REVENUE SERVICE (E) NELSON DAVID L (O) TAX LIEN 2012-0035360
06/11/2012 INTERNAL REVENUE SERVICE (E) NELSON MARYANN (O) TAX LIEN 2012-0035360
06/15/2012 INTERNAL REVENUE SERVICE (E) ORTECA DAVID (O) TAX LIEN 2012-0036469
06/15/2012 INTERNAL REVENUE SERVICE (E) ORTEGA A BORRERO (O) TAX LIEN 2012-0036469
06/15/2012 INTERNAL REVENUE SERVICE (E) GREEN APOLLO E (O) TAX LIEN 2012-0036470
06/15/2012 INTERNAL REVENUE SERVICE (E) SEPENZIS THOMAS A (O) TAX LIEN 2012-0036471
06/15/2012 INTERNAL REVENUE SERVICE (E) JONES ELAINE C (O) TAX LIEN 2012-0036472
06/15/2012 INTERNAL REVENUE SERVICE (E) SNIDER DAVID E (O) TAX LIEN 2012-0036473
06/15/2012 INTERNAL REVENUE SERVICE (E) MITCHELL OLIVER J (O) TAX LIEN 2012-0036474
06/15/2012 INTERNAL REVENUE SERVICE (E) BLECHMAN BERTRAM (O) TAX LIEN 2012-0036475
06/15/2012 INTERNAL REVENUE SERVICE (E) GIBSON NATE (O) TAX LIEN 2012-0036476
06/15/2012 INTERNAL REVENUE SERVICE (E) HOPKINS WILLIAM III (O) TAX LIEN 2012-0036476
06/15/2012 INTERNAL REVENUE SERVICE (E) KING ROGER M (O) TAX LIEN 2012-0036477
06/15/2012 INTERNAL REVENUE SERVICE (E) LORD KATHY (O) TAX LIEN 2012-0036477
06/15/2012 INTERNAL REVENUE SERVICE (E) LEWIS SHERYL S (O) TAX LIEN 2012-0036478
06/15/2012 INTERNAL REVENUE SERVICE (E) TUCKER JAMES E (O) TAX LIEN 2012-0036478
![Page 22: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/22.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 22
PROJECT BID SCHEDULE
Bid List Subject to Change Prior To Bid Date, Please Check With Association
Friday, June 22, 2012
MILL VALLEY
11:00 AM 6/22/2012Ref #: 2010-01
Bid Date:
INSTALL APPROXIMATELY 550 LF OF NEW CONCRETE SIDEWALK INCLUDING FIVE ADA CURB RAMPS, ROAD RESURFACING, DRAINAGE IMPROVEMENTS, HIGH VISIBILITY CROSSWALKS, NEW TRAFFIC STRIPING RETAINING WALLS AND OTHER RELATED WORK
Plan#: 373
STRAWBERRY POINT SCHOOL PEDESTRIAN IMPROVEMENTS
12-00373
Est. Cost: $423000Addenda: 0Project Type: IMPROVEMENTS
Contact: MARIN COUNTY DEPT. OF PUB WORKS 415-499-7877
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437Ghilotti Brothers Inc 415-454-7011 415-454-8376Ghilotti Construction Co Inc 707-585-1221 707-585-1601LANDMARK CONSTRUCTION 916-663-1953 916-663-1867STORMWATER SPECIALISTS 707-280-2510 916-405-4180
Tuesday, June 26, 2012
SAN ANSELMO
2:00 PM 6/26/2012Bid Date:
Prebid Conf: 5//3/12 10:00 AM AND/OR 5/10/12 10:00 AM
REHABILITATION AND REMODEL FOR LIFE SAFETY AND ADDITIONS FOR HANDICAPPED ACCESSIBILITY TO AN EXISTING RESIDENCE
Plan#: 277
REHABILITATION. REMODEL AND ADDITION AT ANTHONY HOUSE
12-00277
Addenda: 0Project Type: REMODEL/ADDITION
Contact: CENTER FOR DOMESTIC PEACE
CONFIRMED BIDDERS:Name Phone FaxA.E. Nelson Construction 707-636-1750 707-636-1755CF CONTRACTING 415-721-7160 415-296-6437E.F. BRETT GENERAL CONTRACTOR
415-524-8351 415-524-8349
SWG Systems Inc. 925-705-2839 000-000-0000WEST BAY BUILDERS, INC 415-456-8972 415-459-0665
SANTA ROSA
10:00 AM 6/26/2012Ref #: 70-701-7#01
Bid Date:
Prebid Conf: MAND 5/22/12 10:00 AM OR 5/24/12 2:00 PM
CLASS "A" LICENSE REQUIRED: REPLACE VARIOUS SEWER MAIN PIPES AND APPURTENANT SEWER LATERALS, MANHOLES AND MAINLINE CLEANOUTS; REPLACE EXISTING WATER MAIN AND APPURTENANT WATER SERVICES AND OTHER RELATED WORK
Plan#: 322
SOUTH PARK COUNTY SANITATION DISTRICT GLORIA DRIVE-MEEKLAND COURT COLLECTION SYSTEM REPLACEMENT AND GLORIA DRIVE & VALERIE WAY WATER MAIN REPLACEMENT
12-00322
Est. Cost: $2551000to $2976000
Addenda: 2 5/30/2012Project Type: SEWER/SANITATION
Contact: SOUTH PARK COUNTY SANITATION DISTRICT 707-547-1900
CONFIRMED BIDDERS:Name Phone FaxGHILOTTI CONSTRUCTION CO
707-585-1221 707-585-1601
DALY CITY
2:00 PM 6/26/2012Bid Date:
FURNISH ALL LABOR, MATERIALS AND SERVICES TO PAINT THE TRAFFIC SIGNAL EQUIPMENT AT VARIOUS LOCATIONS
Plan#: 391 2012 TRAFFIC SIGNAL PAINTING
12-00391
Est. Cost: $104000Addenda: 0Project Type: PAINTING
Contact: DALY CITY-CITY ENGINEER 650-991-8163
LIVERMORE
2:30 PM 6/26/2012Ref #: 2010-40
Bid Date:
INSTALLATION OF THREE PEDESTRIAN BRIDGES AND OTHER RELATED WORK
Plan#: 405 DOWNTOWN IRON HORSE TRAIL
12-00405
Addenda: 0Project Type: INSTALLATION
Contact: LIVERMORE, CITY OF 925-960-4558
CONFIRMED BIDDERS:Name Phone FaxInfiniti Engineering 510-393-2792 510-291-3063Mission City Rebar, Inc 925-449-6999 925-447-8797
SONOMA COUNTY
2:00 PM 6/26/2012Bid Date:
Install Rumble Strips. In Sonoma County From 1.8 Miles North of Tolay Creek Bridge to yellow creek bridge the contractor must have either a Class A license or one of the following Class C licenses: C-12. 40 Working Days* 13% UDBE Requirement * Cost per s
Plan#: 407-ONLINE
DOT-04-0G3104 INSTALL RUMBLE STRIPS12-00407
to $3000000Addenda: 0Project Type: ROAD WORK
Contact: CALTRANS 916-654-4490
PROJeCt BId SChedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
![Page 23: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/23.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 23
www.marinba.org ◆ [email protected]
PROJeCt BId SChedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
ALAMEDA COUNTY
2:00 PM 6/26/2012Ref #: 2226
Bid Date:
Prebid Conf: MAND 6/12/12 10:00 AM
CLASS "A" OR C-12 LICENSE REQUIREDPlan#: 411
THE RESURFACING OF CROW CANYON ROAD AT VARIOUS LOCATIONS IN EDEN TOWNSHIP, ALAMEDA COUNTY CALIFORNIA
12-00411
Addenda: 0Project Type: ROAD WORK
Contact: ALAMEDA COUNTY PUBLIC WORKS AGENCY 510-670-5450
CONFIRMED BIDDERS:Name Phone FaxACCURATE LAND SOLUTIONS 510-533-9700 866-231-6537Ghilotti Construction Co Inc 707-585-1221 707-585-1601MCK Services, Inc. 925-957-9200 925-957-9292
SEBASTOPOL
2:00 PM 6/26/2012Ref #: 850.00
Bid Date:
Prebid Conf: MAND 6/19/12 1:30 PM
SITE EXCAVATIION, IMPROVEMENTS, UTILITIES, UTILITIES AND CONCRETE FOUNDATIONS FOR THE CONSTRUCTION OF 1,600 SF MODULAR BUILDING. CLASS "B" LICENSE REQUIRED
Plan#: 430
HILLCREST MIDDLE SCHOOL MODULAR BUILDING AND IMPROVEMENTS
NEW12-00430
Addenda: 0Project Type: SCHOOL
Contact: AXIA ARCHITECTS 707-542-4652Contact: GRAVENSTEIN UNION SCHOOL DISTRICT 707-555-1111
CONFIRMED BIDDERS:Name Phone FaxA.E. Nelson Construction 707-636-1750 707-636-1755Carr's Construction Services 707-539-8650 707-537-1844CULBERT INSTALLS DOORS, INC.
916-675-4050 916-992-0133
GCCI Inc 707-545-2134 707-545-2156RAESFELD ASSOCIATES INC 707-762-2701 707-762-8957
Wednesday, June 27, 2012
OAKLAND
2:00 PM 6/27/2012Ref #: SROO2
Bid Date:
Prebid Conf: MAND 5/9/12 2:00 PM
SELECTIVELY REMOVE 13 ACRES OF EUCALYPTUS ARRANGED IN DENSE POCKETS SCATTERED THROUGHOUT SIBLEY TRIANGLE ON STEEP SLOPES WITH VERY LIMITED TO NO ACCESS
Plan#: 230
SIBLEY TRIANGLE (SR002) EUCALYPTUS TREE REMOVAL PROJECT
12-00230
Est. Cost: $154Addenda: 3 6/4/2012Project Type: TREE REMOVAL
Contact: EAST BAY REGIONAL PARK DISTRICT 510-544-2360
NOVATO
2:00 PM 6/27/2012Ref #: 72403-04
Bid Date:
Prebid Conf: 6/20/12 10:00 AM
FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES FOR THE CONSTRUCTION OF IMPROVEMENTS
Plan#: 389
PUMP STATION IMPROVEMENT PROJECT-UNIT 4 PROJECT NO. 72403-04 CARIBE ISLE PUMP STATION (BMK NO. 9) DEL ORO LAGOON PUMP STATION (BMK NO. 10) HAMILTON PUMP STATION NO. 1
12-00389
Addenda: 1 6/20/2012Project Type: PUMP STATION
Contact: NUTE ENGINEERING 415-453-4480
CONFIRMED BIDDERS:Name Phone FaxLegg, Inc. 925-605-4500 925-605-4510
CORTE MADERA
2:00 PM 6/27/2012Bid Date:
Prebid Conf: 6/7/12 1:00 PM
COMPLETE INTERIOR AND EXTERIOR REMODEL OF EXISTING WOOD FRAMED STRUCTURES OVER PARKING GARAGES WITH ASSOCIATED SITE IMPROVEMENTS AND LANDSCAPING FOR 7 RESIDENTIAL BUILDINGS EACH WITH 18 UNITS FOR A TOTAL OF 126 NEW UNITS. SCOPE OF WORK ALSO INCLUDES A NE
Plan#: 401-0NLINE
THE PRESERVE AT MARIN APARTMENT RENOVATIONS PROJECT
12-00401
Addenda: 2 6/20/2012Project Type: REMODEL
Contact: TRICORP CONSTRUCTION INC 916-779-8010
CONFIRMED BIDDERS:Name Phone FaxA.E. Nelson Construction 707-636-1750 707-636-1755Midstate Construction 707-762-3200 707-762-0700STORMWATER SPECIALISTS 707-280-2510 916-405-4180
LIVERMORE
2:30 PM 6/27/2012Bid Date:
WORK INCLUDES PERFORMING PREPARATORY TREE TRIMMING AND STREET CLEANING, REMOVAL OF EXISTING TRAFFIC STRIPING AND MARKERS, PLACING SLURRY SEAL TREATMENTS AND MICRO SURFACING TREATMENTS ON EXISTING ASPHALT CONCRETE STREETS
Plan#: 410 2012 SLURRY SEAL CITY PROJECT
12-00410
Addenda: 2 6/21/2012Project Type: STREET IMPVS
Contact: LIVERMORE, CITY OF 925-960-4500
CONTRA COSTA COUNTY
1:30 PM 6/27/2012Ref #: 2025A
Bid Date:
Prebid Conf: 6/12/12 10:00 AM
Plan#: 412 LELAND PRESSURE ZONE IMPROVEMENTS
12-00412
Addenda: 0Project Type: PIPELINE
Contact: EBMUD, ENGINEERING SERVICES 510-287-1040
CONFIRMED BIDDERS:Name Phone FaxGHILOTTI CONSTRUCTION CO
707-585-1221 707-585-1601
![Page 24: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/24.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 24
PROJeCt BId SChedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
NAPA
2:00 PM 6/27/2012Ref #: WD13PW01WE-
57601(53105 54501)
Bid Date:
Prebid Conf: MAND 6/20/12 9:00 AM
INSTALLATION OF TWO NEW WATER MAIN FREEWAY CROSSINGS, INCLUDING CASINGS AND CARRIER PIPE OF FUSIBLE C900-DR14 AND FUSIBLE C905-DR18 PIPE
Plan#: 416
SALVADOR AVENUE AND F STREET WATER MAIN FREEWAY CROSSINGS
12-00416
Est. Cost: $1250000Addenda: 0Project Type: WATER MAINS
Contact: NAPA, CITY OF, PWD 707-257-9336
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210
RICHMOND
2:00 PM 6/27/2012Bid Date:
Prebid Conf: MAND 6/19/12 3:00 PM
CONSTRUCT NEW COVERED WALKWAY; IMPROVED SITE DRAINAGE, SELECTIVE TREE REPLACEMENT, NEW ASPHALT SLURRY AND GAME LINE RESTRIPING, , REPLACEMENT OF FINISHES IN 3 TOILET ROOMS, CASEWORK, FLOORING REPLACEMENT, EXTERIOR AND INTERIOR PAINTING, REPAIR EXTERIOR PL
Plan#: 427 PERES ELEMENTARY SCHOOL MODERNIZATION
12-00427
Est. Cost: $1100000Addenda: 0Project Type: SCHOOL
CONFIRMED BIDDERS:Name Phone FaxCal Pacific Construction - SF 415-824-8871 415-824-8867CF CONTRACTING 415-721-7160 415-296-6437CULBERT INSTALLS DOORS, INC.
916-675-4050 916-992-0133
Thursday, June 28, 2012
FAIRFIELD
2:00 PM 6/28/2012Bid Date:
SUPPLY OF TWO IDENTICAL 700 H.P. VERTICAL TURBINE PUMPS FOR CORDELIA PUMP STATION
Plan#: 369
CORDELIA 1 & 2 VERTICAL TURBINE PUMPS PROCUREMENT
12-00369
Est. Cost: $260000Addenda: 0Project Type: PUMP STATION
Contact: VALLEJO, CITY OF WATER DIVISION OFFICE 707-648-4309
SAN FRANCISCO
2:00 PM 6/28/2012Ref #: WW-525
Bid Date:
Prebid Conf: MAND 6/1912 10:00 AM
PREQUALIFIED BIDDERS ONLY: REPLACE AGING MECHANICAL AND ELECTRICAL SYSTEMS.
Plan#: 376
SOUTHEAST WATER POLLUTION CONTROL PLANT FACILITY RELIABILITY UPGRADES-PHASE II
12-00376
Est. Cost: $14000000Addenda: 1 6/18/2012Project Type: WATER-POWER
Contact: SAN FRANCISCO PUBLIC UTILITIES 415-554-3136
SAN FRANCISCO
2:00 PM 6/28/2012
Ref #: WW-442
Bid Date:
Prebid Conf: MAND Pre-Qualification- SFPUC
"Class A" California Contractors License is required to bid. The objective of the project is to line existing brick sewers, replace existing sewers and construct associated appurtenances, and perform pavement renovation on Mason, Powell and Bay Streets.
Plan#: 380
MASON AND POWELL STREETS SEWER SYSTEM IMPROVEMENT AND PAVEMENT RENOVATION
12-00380
to $6000000Addenda: 1 6/21/2012
Project Type: SEWER RENOVATIONS
Contact: CITY & COUNTY 0F SAN FRANCISCO 415-554-3106
YOUNTVILLE
11:00 AM 6/28/2012Ref #: ST-2011
Bid Date:
DIG OUTS, EDGE, GRIND, OVERLAY, ADJUSTING FACILITIES TO GRADE, STRIPING AND OTHER WORK
Plan#: 386 STREET RESURFACING PROJECT ST-2011
12-00386
Addenda: 0Project Type: STREET IMPVS
Contact: COASTLAND CIVIL ENGINEERING INC 707-571-8005Contact: YOUNTVILLE, TOWN OF, P.W.D. 707-944-8851
CONFIRMED BIDDERS:Name Phone FaxGHILOTTI CONSTRUCTION CO
707-585-1221 707-585-1601
HALF MOON BAY
2:00 PM 6/28/2012Bid Date:
CONSTRUCTION OF CONCRETE VALLEY GUTTER, PAVEMENT REPAIR, MICRO SUFACING, CHIP SEAL, ROADWAY STRIPING AND MARKINGS
Plan#: 387 2012 STREET RESURFACING
12-00387
Addenda: 0Project Type: STREET IMPVS
Contact: HALF MOON BAY, CITY OF 650-726-8266
CONCORD
2:00 PM 6/28/2012
Ref #: 112604
Bid Date:
Prebid Conf: 6/7/12 10:00 AM
INSTALLATION OF APPROXIMATELY 4,250 FEET OF 4-INCH, 6-INCH AND 8-INCH PVC WATER MAINS AND OTHER RELATED WORK
Plan#: 392
ALMOND AVENUE AND VICINITY CAST IRON MAIN REPLACMENT-PHASE 1
12-00392
Addenda: 0
Project Type: WATER MAIN/VALVE WORK
Contact: CONTRA COSTA WATER DISTRICT
CONFIRMED BIDDERS:Name Phone FaxGhilotti Construction Co Inc 707-585-1221 707-585-1601Legg, Inc. 925-605-4500 925-605-4510
![Page 25: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/25.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 25
SAN FRANCISCO
12:00 PM 6/28/2012Ref #: DPW
PROJECT NO: 7316A
Bid Date:
Prebid Conf: June 19, 2012 at 9:00am
Prequalified bidders only. This project provides for the phased removal and modernization of the existing elevator systems in three distinct elevator banks in building 5 of SF General Hospital. The construction of this project is anticipated to take plac
Plan#: 399
SAN FRANCISCO GENERAL HOSPITAL BUILDING 5 ELEVATOR MODERNIZATION
12-00399
to $5000000Addenda: 1 6/11/2012Project Type: PUBLIC WORKS
CORTE MADERA
2:00 PM 6/28/2012Ref #: 132799
Bid Date:
Prebid Conf: MAND 6/12/12 10:00 AM
DEMOLITION OF EXISTING ROOFING AND INSTALLATION OF NEW ROOFING AND RELATED WORK
Plan#: 404 DMV CORTE MADERA ROOF REPLACEMENT
12-00404
Addenda: 0Project Type: REROOFING
Contact: CALIFORNIA D.O.G.S.-R.E.S.D. 916-375-5312
RICHMOND
2:00 PM 6/28/2012Ref #: 3641612-02
Bid Date:
Prebid Conf: MAND 6/13/12 10:00 AM
THE SCOPE OF WORK SHALL INVOLVE THE MAIN BUILDING, GIRLS' GYM, 2-STORY CLASSROOMS, THE MUSIC BUILDING AND PORTIONS OF THE SITE
Plan#: 409
RICHMOND HIGH SCHOOL EMERGENCY LIGHTING REPLACEMENT
12-00409
Est. Cost: $230000Addenda: 1 6/21/2012Project Type: REPLACEMENT
Contact: WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT 510-412-8803
CONFIRMED BIDDERS:Name Phone FaxERA Construction, Inc. 510-830-5955 510-743-4153Watson Electric, Inc. 925-228-9901 925-228-9902
NAPA
3:00 PM 6/28/2012Ref #: ST12PW03
Bid Date:
Prebid Conf: 6/19/12 10:30 AM
DELIVER AND APPLY PASS QB POLYMER ASPHALT SURFACE SEALER PAVEMENT REJUVENATOR ON VARIOUS STREETS
Plan#: 415 STREET REJUVENATION PROJECT -2012
12-00415
Est. Cost: $122697Addenda: 0Project Type: STREET IMPVS
Contact: NAPA, CITY OF P.W.D: C.D. 707-257-9407
SAN LEANDRO
3:00 PM 6/28/2012Ref #: 11-144-38-332
Bid Date:
CLASS "A" or C-12 LICENSE. THE WORK TO BE DONE CONSISTS OF APPLYING SLURRY SEAL AND SCRUB SEAL ON CITY STREETS, AND DOING ALL APPURTENANT WORK IN PLACE AND READY FOR USE.
Plan#: 419 ANNUAL STREET SEALING
12-00419
Est. Cost: $500000to $1000000
Addenda: 0Project Type: PUBLIC WORKS
Contact: SAN LEANDRO, CITY OF, DPW, E. & T.D. 510-577-3428
Friday, June 29, 2012
NAPA
3:30 PM 6/29/2012Ref #: PW 11-14
Bid Date:
Prebid Conf: MAND June 13 and June 19
Class A,B, C-10, or C-46. Photovoltaic systems at 12 sites to provide a possible cummulative 464.7kw of production. The photovoltaic systems will individually range in size from an estimated 3.4 to 189.1 kw.
Plan#: 413 NAPA COUNTY VARIOUS FACILITIES PHOTOVOLTAIC
12-00413
Addenda: 0Project Type: PUBLIC WORKS
Contact: NAPA COUNTY FLOOD CONTROL & WATER CONSV. DISTRICT 707-299-4488
SAN LEANDRO
3:00 PM 6/29/2012Ref #: 11-144-38-332
Bid Date:
A CLASS "A" OR C-12" LICENSE. THE WORK TO BE DONE CONSISTS OF APPLYING ASPHALT RUBBER CHIP SEAL, SLURRY SEAL, OR MICROSURFACING ON CITY STREETS, AND DOING ALL APPURTENANT WORK IN PLACE AND READY FOR USE, ALL AS SHOWN ON THE PLAN AND DESCRIBED IN THE SPEC
Plan#: 420 ASPHALT RUBBER STREET SEALING 2011-2012
12-00420
Est. Cost: $500000to $1000000
Addenda: 0Project Type: PUBLIC WORKS
Contact: SAN LEANDRO, CITY OF, DPW, E. & T.D. 510-577-3428
Monday, July 02, 2012
TIBURON
2:00 PM 7/2/2012Bid Date:
CONSTRUCTION OF A PAVED PARKING LOT AND BUS STOP ON TIBURON BLVD, SR 131 AT THE INTERSECTION OF LYFORD DRIVE
Plan#: 400
LYFORD DRIVE MULTI-MODAL PARKING LOT PROJECT
12-00400
Addenda: 0Project Type: PAVING/PARKING LOT
Contact: TIBURON, TOWN OF 415-435-7354Contact: TIBURON, TOWN OF 415-435-7388
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437Ghilotti Brothers Inc 415-454-7011 415-454-8376MAGGIORA & GHILOTTI INC 415-459-8640 415-459-2065
Tuesday, July 03, 2012
MONTARA
2:00 PM 7/3/2012Bid Date:CLASS "A"LICENSE REQUIREDPlan#: 368 VALLEMAR ENGINE GENERATOR SET INSTALLATION
12-00368
Addenda: 1 6/18/2012Project Type: INSTALLATION
Contact: NUTE ENGINEERING 415-453-4480
CONFIRMED BIDDERS:Name Phone FaxFORT BRAGG ELECTRIC 707-964-9118 707-964-1404
www.marinba.org ◆ [email protected]
PROJeCt BId SChedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
![Page 26: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/26.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 26
PROJeCt BId SChedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
SAN FRANCISCO
2:00 PM 7/3/2012Ref #: WW-499
Bid Date:
Prebid Conf: June 14, 2012 at 10:00am
The objective of the project is to replace the existing sewer and renovate the existing street pavement on various streets in the downtown district.
Plan#: 396
DOWNTOWN DISTRICT SEWER REPLACEMENT AND PAVEMENT RENOVATION
12-00396
to $2000000Addenda: 0Project Type: PUBLIC WORKS
Contact: SAN FRANCISCO PUB UTILITIES 415-551-4603
SAN FRANCISCO
2:00 PM 7/3/2012Ref #: WW-555
Bid Date:
Prebid Conf: JUNE 14, 2012 AT 11:00am
THE OBJECTIVE OF THE PROJECT IS TO PROVIDE CONTINGENCY BASED AS-NEEDED SEWER REPAIR ON SHORT NOTICE AT LOCATION TO BE DETERMINED WITHIN THE CITY AND COUNTY OF SAN FRANCISCO.
Plan#: 418 SPOT SEWER REPAIR CONTRACT
12-00418
to $7000000Addenda: 0Project Type: SEWER REPAIR
Contact: SAN FRANCISCO PUBLIC UTILITIES 415-551-4603
SAN LEANDRO
3:00 PM 7/3/2012Ref #: 11-120-28-192
Bid Date:
Prebid Conf: JUNE 18th at 10am
CLASS "A" or "C-10" IS REQUIRED. THE WORK TO BE DONE CONSISTS OF REPLACING FIBER OPTIC CABLES AND EQUIPMENT; TERMINATING, SPLICING, AND TESTING FIBER STRANDS; PROGRAMMING ETHERNET SWITCHES; AND DOING ALL APPURTENANT WORK IN PLACE AND READY TO USE, ALL AS
Plan#: 421 FIBER LOOP PROJECT
12-00421
Est. Cost: $100000to $250000
Addenda: 0Project Type: PUBLIC WORKS
Contact: SAN LEANDRO, CITY OF, DPW, E. & T.D. 510-577-3428
SAN MATEO
2:00 PM 7/3/2012Ref #: 463334
Bid Date:STREET AND ROADWAY IMPROVEMENTSPlan#: 423
EL CAMINO REAL MASTER PLAN-PHASE 1 IMPROVEMENTS 28TH TO 31ST AVENUE
12-00423
Est. Cost: $904000Addenda: 0Project Type: IMPROVEMENTS
Contact: SAN MATEO, CITY OF 650-522-7305
Monday, July 09, 2012
POINT ARENA
2:00 PM 7/9/2012Ref #: 11382-12-003
Bid Date:
CLASS "A" LICENSE REQUIRED. THE WORK CONSISTS OF THE FURNISHING OF ALL LABOR, MATERIAL, EQUIPMENT, SUPERVISION FOR THE CONSTRUCTION OF AN ASPHALT CONCRETE OVERLAY, SHOULDER BACKING, ADJUSTING UTILITY COVERS, DRIVEWAY CONFORMS, AND TRAFFIC CONTROL.
Plan#: 436 WINDY HOLLOW ROAD REHABILITATION
NEW12-00436
to $460000Addenda: 0Project Type: PUBLIC IMPVS
Contact: GHD 707-523-1010
Tuesday, July 10, 2012
OAKLAND
2:00 PM 7/10/2012Ref #: 20LZ-110
Bid Date:
Prebid Conf: 6/27/12 10:00 AM
C-10 LICENSE REQUIREDPlan#: 317 TRAIN CONTROL ROOM BATTERY REPLACEMENTS
12-00317
Est. Cost: $600000to $750000
Addenda: 0Project Type: REPLACEMENT
Contact: BART 510-287-4717
CONFIRMED BIDDERS:Name Phone FaxFORT BRAGG ELECTRIC 707-964-9118 707-964-1404
SANTA ROSA
10:00 AM 7/10/2012
Ref #: 45-6.1-7 #2
Bid Date:
Prebid Conf: MAND 6/19/12 10:00 AND 6/21/12 2:00 PM
WORK INCLUDES NEW SIDE CHANNELS, PONDS, ALCOVES, ROCK WEIR RIFFLES; ENHANCEMENTS TO EXISTING POOLS THROUGH SELECTIVE GRADING, INSTALLATION OF WOODY DEBRIS, LOG JAMS AND LARGE BOULDERS AS ANCHOR MATERIAL; VEGETATION PLANTING, INSTALLATION OF EROSION CONTRO
Plan#: 417
DRY CREEK HABITAT ENHANCEMENT DEMONSTRATION PROJECT, PHASE I
12-00417
Est. Cost: $190000to $250000
Addenda: 0
Project Type: ENHANCEMENT PROJECT
LIVERMORE
2:30 PM 7/10/2012Ref #: 2007-2033
Bid Date:
Prebid Conf: JUNE 19, 2012 at 10:00am
"CLASS A OR C-27 LICENSE. THE WORK COMPRISES OF TWO PHASES OF WORK AT EACH OF THE TWO CONSERVATION AREAS. THE FIRST PHASE WORK ENTAILS THE CONSTRUCTION OF THE HABITAT MITIGATION AND RESTORATION AREA FOR THE EL CHARRO SPECIFIC PLAN IN THE CITY OF LIVERMO
Plan#: 424
EL CHARRO SPECIFIC PLAN MITIGATION AND MAINTENANCE
12-00424
Addenda: 0Project Type: PUBLIC WORKS
Contact: LIVERMORE D.P.W. 925-960-4533
NOVATO
3:00 PM 7/10/2012Ref #: 56056.20
Bid Date:
Prebid Conf: MAND 6/28/12 2:00 PM
WORK INCLUDES RECYCLED WATER ON-SITE RETROFITS TO CONVERT IRRIGATION SYSTEMS CURRENTLY USING POTABLE WATER TO USE OF RECYCLED WATER. CLASS "A" LICENSE REQUIRED
Plan#: 426
RECYCLED WATER SOUTH SERVICE AREA-ON-SITE RETROFIT CONSTRUCTION PROJECT (GROUP 1S)
12-00426
Addenda: 0Project Type: WASTEWATER
Contact: NORTH MARIN WATER DISTRICT 415-892-4133, EXT. 8490
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437
![Page 27: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/27.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 27
www.marinba.org ◆ [email protected]
PROJeCt BId SChedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
NAPA
3:00 PM 7/10/2012Ref #: ST11PW03
Bid Date:
Prebid Conf: 6/28/12 10:00 AM
PAVEMENT EDGE GRINDING, ASPHALT CONCRETE PLUGS, ASPHALT CONCRETE OVERLAY, INSTALLATION OF ASPHALT CONCRETE DIKES, REMOVAL AND REPLACEMENT OF CURB RAMPS, CURB RAMP UPGRADES, SIDEWALK REPAIRS, REMOVAL AND REPLACEMENT OF SIGNS, REPLACEMENT OF PAVEMENT MARKIN
Plan#: 428
REHABILITATION OF LINDA VISTA AVENUE REDWOOD ROAD TO TROWER AVENUE
12-00428
Est. Cost: $633000Addenda: 0Project Type: STREET IMPVS
Contact: NAPA CITY OF, DPW 707-257-9386
CONFIRMED BIDDERS:Name Phone FaxGhilotti Brothers Inc 415-454-7011 415-454-8376
EL CERRITO
2:00 PM 7/10/2012Ref #: 1271223-01
Bid Date:
Prebid Conf: MAND 6/25/12 1:00 PM
CONSTRUCTION INCLUDES CLEANING THE EXISTING CRAWL SPACE, FURNISHING AND INSTALLING A NEW VAPOR BARRIER AND DEHUMIDIFYING SYSTEM IN THE EXISTING CRAWL SPACES
Plan#: 439
HARDING ELEMENTARY SCHOOL FOUNDATION VENTILATION REPAIRS
NEW12-00439
Est. Cost: $61700Addenda: 0Project Type: SCHOOL
Contact: WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT 510-412-8803
Wednesday, July 11, 2012
SAN FRANCISCO
2:30 PM 7/11/2012Ref #: 1930J
Bid Date:
Prebid Conf: JUNE 20, 2012 at 1:00pm
"CLASS "A" LICENSE REQUIRED. THE WORK IS PAVEMENT RENOVATION ALONG BALBOA STREET INCLUDING ASPHALT GRINDING;CONCRETE BASE;ASPHALT PAVING;CRUB RAMP CONSTRUCTION;SEWER REPLACEMENT AND REPAIR;TRAFFIC SIGNAL CONDUIT WORK;TRAFFIC ROUTING WORK;AND ALL RELATED W
Plan#: 432
PAVEMENT RENOVATION AND SEWER REPLACEMENT-BALBOA STREET, PHASE 2
NEW12-00432
to $4200000Addenda: 0Project Type: PUBLIC WORKS
Contact: CITY AND COUNTY S.F. 415-554-8280
ROCKLIN2:00 PM 7/11/2012Bid Date:
Prebid Conf: JUNE 26, 2012 at 1:30pm
Plan#: 440 ROCKLIN CROSSING ONSITE IMPROVEMENTS
NEW12-00440
Addenda: 0Project Type: PUBLIC IMPVS
Thursday, July 12, 2012
SANTA ROSA
3:00 PM 7/12/2012Ref #: WO7113
Bid Date:
Prebid Conf: 6/14/12 10:00 AM
REMOVAL OF ASPHALT PAVEMENTAND REPLACE WITH REINFORCED CONCRETE PAVEMENT, RESTRIPE PARKING FACILITIES AND REPLACEMENT OF ENTRY GATE AND OTHER RELATED WORK. EMAIL QUESTIONS TO BRYAN ALBEE: [email protected]
Plan#: 402
SONOMA COUNTY TRANSIT BUS PARKING LOT REHABILITATION PROJECT
12-00402
Addenda: 0Project Type: PARKING LOT
Contact: SONOMA COUNTY DEPT OF TRANSPORTATION & PUBLIC WORKS 707-585-7516
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437Ghilotti Brothers Inc 415-454-7011 415-454-8376
DILLON BEACH
2:00 PM 7/12/2012Ref #: 86001.20
Bid Date:
Prebid Conf: MAND 6/28/12 2:00 PM
WORK INCLUDES PRE-CLEANING, PRE-TELEVISING, REPAIR OF DEFECTS, A SECOND CLEANING AMD TELEVISING PRIOR TO LINING, CIPP LINING OF THREE EASEMENT SEWERS SERVING KAMAHA WAY, KONA LANE AND WAIKIKI LANE, RESTORATION OF ALL SERVICES, POST-CLEANING, AIR TESTING A
Plan#: 422 OCEANA MARIN CIPP SEWER LINING PROJECT
12-00422
Addenda: 0Project Type: SEWER/SANITATION
Contact: NORTH MARIN WATER DISTRICT 415-897-4133
MARIN COUNTY
1:00 PM 7/12/2012Ref #: 2009-021
Bid Date:
INSTALLATION OF A CAST-IN-PLACE TIE BACK RETAINING WALL ALONG SIR FRANCIS DRAKE BLVD NEAR SHAFTER BRIDGE IN MARIN COUNTY. CONSTRUCTION INCLUDES DRILLING AND POURING 18 CIDH CONCRETE PILES, A CONCRETE RETAINING WALL WITH 8 STEEL TIEBACKS, LANE CLOSURE, TR
Plan#: 425
REHABILITATION OF SIR FRANCIS DRAKE BLVD. PHASE 1A
12-00425
Est. Cost: $295000Addenda: 0Project Type: CONCRETE WORK
Contact: MARIN COUNTY DEPT. OF PUB WORKS 415-499-7877
CONFIRMED BIDDERS:Name Phone FaxGhilotti Brothers Inc 415-454-7011 415-454-8376Ghilotti Construction Co Inc 707-585-1221 707-585-1601
![Page 28: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/28.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 28
DUBLIN
2:00 PM 7/12/2012Ref #: DLM NO. 2010-
0400
Bid Date:
Prebid Conf: MAND 6/7/12 3:00 PM
PRE-QUALIFIED BIDDERS ONLYPlan#: 429
WELLS MIDDLE SCHOOL BLDGS. B, C & L REPLACEMENT
NEW12-00429
Addenda: 0Project Type: SCHOOL
Contact: DEEMS LEWIS MCKINLEY ARCHITECTURE 916-448-1100
CONFIRMED BIDDERS:Name Phone FaxArntz Builders, Inc. 415-382-1188 415-883-7529CULBERT INSTALLS DOORS, INC.
916-675-4050 916-992-0133
Diede Construction 209-369-8255 209-368-0600Lathrop Construction Inc 707-746-8000 707-746-8080Sonitrol Security 510-537-1122 510-881-8192
WALNUT CREEK
2:00 PM 7/12/2012Ref #: 156M-12-651
Bid Date:
Prebid Conf: MAND June 28, 2012 at 10:00am
CLASS A- GENERAL CONTRACTOR; C-12. ASPHALT PAVEMENT REPAIRS: 125,000SF. CLEAN ASPHALT; INSTALL MINIMUM ONE INCH THICK 1/2" HOT MIX AS LEVELING COURSE; PROVIDE AND INSTALL TRUPAVE ENGINEERED PAVING MAT; AC PAVE MINIMUM TWO INCHES THICK 1/2" HOT MIX AC.
Plan#: 435
ASPHALT PAVEMENT REPAIRS CONTRA COSTA CANAL TRAIL HEATHER FARMS
NEW12-00435
to $300000Addenda: 0Project Type: PAVING
Contact: EAST BAY REGIONAL PARK DISTRICT 510-544-2703
Tuesday, July 17, 2012
CONCORD10:00 AM 7/17/2012
Ref #: 112045Bid Date:
Prebid Conf: 6/27/12 10:00 AM
Plan#: 434
BOLLMAN HIGH LIFT AND NORTHGATE PUMP STATION REHABILITATION
NEW12-00434
Addenda: 0Project Type: PUMP STATION
Contact: CONTRA COSTA WATER DISTRICT
CONFIRMED BIDDERS:Name Phone FaxMAGGIORA & GHILOTTI INC 415-459-8640 415-459-2065
Tuesday, July 24, 2012
KENTFIELD
10:00 AM 7/24/2012Ref #: 1587
Bid Date:
FURNISH LABOR AND EQUIPMENT FOR EXCAVATION AND PROVIDE 28 24-INCH DIAMETER CAST-IN-PLACE CONCRETE PIERS, 168 FT CAST-IN-PLACE CONCRETE PIER CAPS AND ASSOCIATED APPURTENACES
Plan#: 431 SOUTHERN MARIN ROAD RETAINING WALL PROJECT
NEW12-00431
Addenda: 0Project Type: CONCRETE WORK
Contact: MARIN MUNICIPAL WATER DISTRICT 415-945-1577
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437
Wednesday, July 25, 2012
PETALUMA
2:00 PM 7/25/2012Ref #: WO7914
Bid Date:
Prebid Conf: MAND 7/11/12 10:00 AM
REPLACE PORTIONS OF THE CONCRETE SLAB FLOOR AND REPAIR PUSH WALL AND COLUMNS. PROJECT ALSO INCLUDES DEMOLITION, STEEL WOR AND WELDING
Plan#: 433
CENTRAL TRANSFER STATION FLOOR AND WALL REPAIR PROJECT
NEW12-00433
Addenda: 0Project Type: REPAIRS
Contact: SONOMA COUNTY DEPART OF TRANSPORTATION 707-565-2620
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437
Tuesday, August 14, 2012
NOVATO
2:00 PM 8/14/2012Ref #: 04-Mrn-101-
R23.2/27.1
Bid Date:
MODIFY OVERCROSSING IN MARIN COUNTY IN AND NEAR NOVATO FROM 1.0 MILE NORTH OF NORTH NOVATO OVERHEAD TO 0.6 MILE SOUTH OF SONOMA COUNTY LINE. THE CONTRACTOR MUST HAVE EITHER A CLASS A LICENSE OR A COMBINATION OF CLASS C LICENSES WHICH CONSTITUTES A MAJORIT
Plan#: 438 DOT-04-264074 MODIFY OVERCROSSING
NEW12-00438
to $28000000Addenda: 0Project Type: ROAD WORK
Tuesday, August 21, 2012
PETALUMA
2:00 PM 8/21/2012Ref #: 04-SON-101-
0.9/3.6
Bid Date:
Prebid Conf: MAND JULY 25, 2012 1-3 PM
CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR. IN SONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD THE CONTRACTOR MUST HAVE EITHER A CLASS A LICENSE OR A COMBINATION OF CLASS C LICENSES WHI
Plan#: 437
DOT 04-2640U4 CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR
NEW12-00437
to $66000000Addenda: 0Project Type: PUBLIC WORKS
PROJeCt BId SChedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
![Page 29: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/29.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 29
Date Job Name Location6/13/2012 BRYANT NO 1/COLORADOS/
LELAND PUMPING PLANTS ELECTRICAL REHAB
CONTRA COSTA
OVERAA & CO $559,000BLOCKA CONST. $578,450FRANKE ELECTRIC $652,000
6/13/2012 LAFAYETTE RESERVOIR PARKING IMPROVEMENTS
LAFAYETTE
GHILOTTI CONST. $1,333,333MCI ENG $1,480,000JFC CONST. $1,714,255
6/14/2012 2010-2011 MISC WATER/SEWER MAIN REPLACE-MENTS AND TRASH CAP-TURE DEMO
MOUNTAIN VIEW
KJ WOODS $1,588,000PACIFIC UNDERGROUND $1,625,532CALIFORNIA TRENCHLESS $1,682,760
6/18/2012 LAKE HENNESSEY WTP BASIN-CONTAINMENT COATING RENOVATION
NAPA
WEST COAST FLOORING $52,3616/18/2012 NEW SIDEWALKS- FRANK-
LIN AVE, WEST HARDER RD, PHILLIPS WAY
HAYWARD
ROSAS BROTHERS CONST. $315,1076/19/2012 KIRKER PASS ROAD OVER-
LAYPITTSBURG
GHILOTTI BROS INC $1,295,4116/19/2012 ROADWAY REHABILITATION
AT VARIOUS LOCATIONSWALNUT CREEK
GHILOTTI CONST. $1,932,363TOP GRADE CONST. 1,988,485.00MCK SERVICES $2,004,608
PROJeCt BId ReSultS
www.marinba.org ◆ [email protected]
PROJECT BID RESULTS 6.13.12 - 6.19.12
-MBA Quote of the day -
THE ROAD
TO
SUCCESS
IS ALWAYS
UNDER
CONSTRUCTION
- Lily Tomlin
“ “
![Page 30: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/30.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 30
www.marinba.org ◆ [email protected] ◆ [email protected]
ClASSIfIed AdSClassified ads are provided free to MBA members & staff.
Please advise if position is filled or commodity is [email protected]
Project Manager, Senior EstimatorGhilotti Bros., Inc. is seeking an experienced Project Man-ager and Senior Estimator. Caltrans experience is a plus. GBI has been a Marin based contractor since 1914, and looks forward to adding motivated individuals to the team. These are excellent opportunities with an excellent com-pany. GBI offers competitive pay and a great benefits package.
Field Supervisor and Concrete ForemanGhilotti Bros., Inc. is in search of 2 Field Supervisors to join our team. A Field Supervisor with Highway work/Caltrans background is plus. The Concrete Foreman must specifically have an architectural concrete background.These positions will report to VP of Operations and Con-crete Manager respectively.
Position: Part Time Bid RunnerGhilotti Bros., Inc. is seeking an experienced part–time Bid Runner. Flexible hours range from 5-10 hours per week. Responsible for delivering bid documents. Must be dependable, punctual, and have excellent penmanship. The ability to listen and write quickly and accurately under pressure is crucial. Must have the confidence to meet strict time deadlines. Receives bid pricing and subcontractor information over the telephone. Reliable vehicle necessary and a clean driving record. Mileage reimbursed.
Please apply to [email protected] or fax to 415.455.9274.
Position: Experienced Power Tool and Hardware Counter Sales
Jackson’s Hardware in San Rafael is currently seeking a Full and Part time Experienced Power Tool and & Hard-ware Counter Sales.Schedules will vary and can change weekly based upon staffing requirements. Our store hours are Monday thru Friday 6:00am – 6:00pm & Saturday 8:00am – 5:00pm
Please send your resume to [email protected]
Position – Experienced Decorative Plumbing and Door Hardware Counter Sales
Jackson’s Hardware in San Rafael is currently seeking a Full and Part time Experienced Decorative Plumbing and Door Hardware Counter Salesperson.Schedules will vary and can change weekly based upon staffing requirements. Our store hours are Monday thru Friday 6:00am – 6:00pm & Saturday 8:00am – 5:00pm
Please send your resume to [email protected]
.
PLACE YOUR AD
HERE
contact Paula at 415.462.1220 or [email protected]
![Page 32: MBA Weekly Bulletin Vol.56 Issue#26](https://reader034.fdocuments.us/reader034/viewer/2022042604/568c4cb91a28ab4916a14123/html5/thumbnails/32.jpg)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 32Marin Builders Association ◆ Weekly Bulletin ◆ Page 34
Publication rules for submission of articles to the MBA Weekly Bulletin
Members cornerLimited to 600 words and edited for length, grammar, spelling, clarity, style, libel and civility. We do not publish form
letters, petitions or consumer complaints. Please include writers name, address and phone number. All submissions become the property of Marin Builders Association and cannot be returned.
note: We would like a photo (jpeg) head shot and can offer ¼ page ad space to *fill out page for ½ the price.
*Ad space only available to fill out page if necessary.
www.marinba.org ◆ [email protected]
Page 34
Marin Builders Associationcirca 1962