May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system...

23
State support for rail infrastructure development projects May 2010

Transcript of May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system...

Page 1: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

State support for rail infrastructure development projects

May 2010

Page 2: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

The rate of change in RZD’s investment budget 2009–2011 (“own projects”)

536,1

624,3

379,9434,2

225222,8 210,5

0

100

200

300

400

500

600

700

2008 2009 2010 2011

bill

ion r

ouble

s, e

xclu

din

g V

AT

RZD’s current draft investment budgetRZD’s pre-crisis draft investment budget

2

The investment budget for 2009–2011 has been reduced by a factor of 2.4

(by 936 billion roubles)

379.9434.2

222.8

536.1

210.5

624.3

Page 3: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

127,6

228,5225,0210,5222,8

379,9

255,5

172,4151,1

109,1116,1113,9122,4

216,5

173,1

135,1132,9

0

50

100

150

200

250

300

350

400

2004 2005 2006 2007 2008 2009 2010 2011 2012

billion

 rou

bles

in prices  of the res pective years in 2004 prices

The rate of change in RZD’s investment budget 2009–2011 (“own projects”)

in 2004 prices

in prices of the respective years

3

127.6151.1

255.5

379.9

222.8 210.5 225.0 228.5

172.4

132.9 135.1

173.1

216.5

122.4 113.9 116.1 109.1

Page 4: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Volume of transportation of foreign trade freight by rail transport via Russia’s ports in the period up to 2015 (million tonnes)

83,4

46,1 52,6

83,8

61,2

102,7

63,881,8

154,3

0

50

100

150

200

2008 2009 2015

mill

ion t

onnes

Southern ports

4

North-Western ports Far East ports

61.2

83.4

46.163.8

81.8

52.6

102.7

154.3

83.8

Page 5: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

262,8270,5

285299

222,8 210,5225 228,5

188,4190,3

211,4222,9

144,7

138,6 137,1

155,4

100

150

200

250

300

350

2009 г. 2010 г. 2011 г. 2012 г.

млр

д. руб

лей

Инвестиционный бюджет, всего "Собственные" проекты

Амортизация Затраты на обновление  ОС хозяйств и подвижн

Sources of finance for RZD’s investment budget

Investmentbudget, total

“Own” projectsDepreciation

Expenditure on businesses and rolling stock renewal

The gap between the annual volume of the company’s fixed assets renewal

and depreciation amounts to about 60 billion roubles per year

5

billi

on r

oubl

es

188.4190.3

211.4222.9

144.7138.6 137.1

155.4

262.8270.5

222.8228.5

210.5

Page 6: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

State support for RZD’s investment programme for the period 2010–2015

In accordance with the decisions taken at a conference with V.V.Putin, Prime Minister of the Russian Federation (protocol No. VP-P9-pr of 27 February 2010), RZD prepared and submitted to the appropriate ministries:

Proposed amendments to the “Rail transport” sub-programme in the federal strategic programme “The development of Russia’s transport system (2010–2015)”

A methodology for calculating the budget efficiency of state support in the form of budget investments in the registered capital of RZD aimed at implementing projects to develop the company

6

Page 7: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Amendments proposed by RZD to the federal strategic programme “The development of Russia’s transport system (2010–2015)”(billion roubles excluding VAT, in the prices of the respective years)

7

7.41%

90.311% 257.8

32%

67.99%374.8

47%

Increasing the throughput capacity of sections of track

Creating routes for heavy-weight trains, modernizing permanent structuresand facilities

Replacing multiple unit train rolling stock

Replacing the locomotive fleet

Building bypasses round railway junctions

Distribution of investment among the tasks at hand

78,1 104,9 117,8 350,645,351,258,6

112,9104,675

447,6

2010 2011 2012 2013 2014 2015 2010-2015, total

Extra-budgetary sources (RZD) Federal budget

80.6 127,.7 134.0 136.7 156.1 163.1

798.2

104.6 112.958.6 51.2 45.3

447.6

350.678.1 104.9 117.8

Page 8: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Effects taken into account in the composition of inflows of funds in the budget system

Internal inflows of funds in the budget system.

Formed by RZD’s tax payments and insurance contributions

Corporate income tax

Personal income tax

Insurance contributions (pensions, social and compulsory medical insurances)*

Value-added tax

Tax on property (adjusted for benefits granted)

*Insurance contributions to finance the cumulative part of the RZD staff’s pensions are not included, since they are paid into a non-state pension fund

External main inflows of funds in the budget system.

Formed by tax payments and insurance contributions by producers of goods carried by railway transport as a result of development

projects being implemented

External enabling inflows of funds in the budget system.

Formed by tax payments and insurance contributions by economic actors which provide the

necessary services and resources to implement development projects

8

Extraction tax

Page 9: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Projects to develop the railway infrastructure and routes included in the calculation of budget efficiency

9

1. Comprehensive reconstruction of the Mga – Gatchina – Veymarn – Ivangorodsection and the railway approaches to ports on the southern shore of the Gulf of Finland: proposed volume of state support 90 billion roubles.

2. Comprehensive reconstruction of the M. Gorky – Kotelnikovo – Tikhoretskaya– Krymskaya route, with a bypass round the Krasnodar railway junction: 67.9 billionroubles.

3. Development of the Tobolsk – Surgut route: 21.9 billion roubles.4. Comprehensive reconstruction of the Trubnaya – Verkhniy Baskunchak –

Aksarayskaya route: 11.3 billion roubles.5. Construction of additional main tracks and sidings, development of stations:

72.1 billion roubles.6. Acquisition of locomotive stock: 16.4 billion roubles.

The choice of the aforementioned “development projects” is driven by the need to implement them jointly with the aim of delivering the forecast levels of traffic to the ports in the North-West and South of Russia.

The amount of state support needed to implement these projects represents more than 60% of the total amount of state support being requested.

Page 10: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Map of the projects to develop the railway infrastructure and routes included in the calculation of budget efficiency

10

Coal 13.0 13.1Coke 0.1 0.1Oil freight 26.3 36.3Ores - 0.5Ferrous metals 5.7 8.3Timber 4.1 4.6Construction materials

4.7 7.3

Fertilizers 6.8 6.9Bread 1.5 3.1Other 10.1 17.8Total 72.3 98.0

Coal 0.1 -Coke 0.1 0.1Oil freight 0.2 0.2Ores 1.3 2.8Ferrous metals 0.7 1.2Timber 0.2 0.2Construction materials

2.8 6.6

Fertilizers 0.1 -Bread 0.2 0.3Other 4.4 8.4Total 10.1 19.8

Coal 1.9 7.3Coke - 0.1Oil freight 15.1 27.2Ores 0.2 0.2Ferrous metals 2.7 4.8Timber 0.6 0.8Construction materials

1.5 1.0

Fertilizers 0.3 1.9Bread 0.4 2.8Other 1.2 9.7Total 23.9 55.8

55,8

23,9 3,

57,

4

Coal - -Coke - -Oil freight 0.1 -Ores 0.5 1.2Ferrous metals - 0.3Timber - -Construction materials

1.2 1.7

Fertilizers - 0.4Bread 0.3 0.5Other 1.4 3.3Total 3.5 7.4

LEGEND- Outlined projects to develop the infrastructure of the jointly used railway network being implemented as part of the federal strategic programme

Measures to develop the infrastructure of the jointly used railway network

- Construction of additional main tracks

- Construction of side tracks

- Construction of new railway tracks

- Electrification of the section

- Installation of an automatic block signalling system at the section

- Installation of a semi-automatic block signalling system at the section

- Extension of passing sidings

- Development of freight distribution centres

- Construction and reconstruction of sidings, number of sidings

- Development of Russian borderline stations

- New borderline stations

- Development of Russian pre-port and port stations

- Rail routes providing for the transportation of projected freight flows as the outlined projects are implemented

-Freight flows

Spare throughput capacity as of 01.01.2006 (couples of trains per 24 hours)

Years mln tkm/km

Page 11: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Inflows of funds in the budget system of the Russian Federation formed as a result of implementation of development projects in the federal strategic programme “The development of Russia’s transport system (2010–2015)”

11

- 3,4 6,3 6,8 6,8 11,4 15,5 15,5 15,5 15,5-

12,018,7

25,532,2

38,938,9 38,9 38,9 38,9

5,1

13,6

14,112,4

14,4

13,7

15,5

38,9

1,1 1,11,11,1 1,1

-

10

20

30

40

50

60

70

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020Inflow

s of

funds

in t

he b

udget

syst

em

,billion r

ouble

s (i

n 2

010 p

rice

s)

External main inflowsInternal inflows External enabling inflows

Inflows of funds in the budget system

formed by RZD’s tax payments

and insurance contributions

Inflows of funds in the budget system formed

by tax payments and insurance contributions

by economic actors which provide

the necessary services and resources

to implement development projects

Inflows of funds in the budget system formed

by tax payments and insurance contributions

by producers of goods

carried by railway transport

as a result of development projects

being implemented

6.311.46.8 6.8

15.5 15.5 15.5 15.5 15.5

32.238.9

38.9 38.9 38.9 38.9 38.9

25.518.7

12.0

13.7

14.4

12.414.1

13.6

1.1 1.1 1.1 1.1 1.1

Page 12: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Parameters of implementation and indicators of budget efficiency of state investment in the implementation of the federal strategic programme “The development of Russia’s transport system (2010–2015)”

12

2010 2011 2012 2013 2014 2015 Total

75.0 101.3 104.7 50,.7 41.2 33.7 406.7

2010 2011 2012 2013 2014 2015 Total

75.0 104.6 112.9 58.6 51.2 45.3 447.6

Volume of state investment taken into account when calculating budget efficiency

Net discounted financial inflow in the budget system of the Russian Federation,

formed as “development projects” are being implemented

in forecast prices, billion roubles

in 2010 prices, billion roubles

18.4

-250-200-150-100-50

050

100

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

(billion roubles in 2010 prices at a 5% discount rate)

Inflows of fundsOutflows of funds (state investments)Net discounted revenue of the budget system

Page 13: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Effects not taken into account in the composition of inflows of funds in the budget system

13

Tax payments and insurance contributions paid by economic actorswhich provide services on the territory of sea ports.

Customs payments levied on freight owners for taking goods across the customs border of the Russian Federation.

Budget revenue (tax payments) from producers of “other” freight not taken into account in the calculation.

Budget revenue linked to the secondary circulation of capital (the multiplication effect).

Page 14: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Conclusions

14

The calculations show that budget investment in the development of railway transport infrastructure is highly efficient.

The income for the federal budget from the implementation of these projects is driven primarily by budget revenue from sectors of industry limited in their development by transport constraints. This income is significantly in excess of RZD’s income from implementing the projects.

Taking into account the existing rates on the external loan markets, there is a good case for issuing target state bonds with the aim of acquiring sources of the aforementioned budget investment.

Page 15: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Appendices

APPENDICES

15

Page 16: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

The rate of change in RZD’s investment budget 2009–2012

71.460.060.040.0

228.5225.0210.5222.8

0

50

100

150

200

250

300

350

2009 2010 2011 2012

billi

on ro

uble

s

299.9270.5262.8

285.0

555.5 billion roubles

16

Adler – the mountain resort “Alpika-Servis”, financed from the government stake in RZD

Own projects

Page 17: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Sources of finance for RZD’s investment programme

Net profit

Depreciation & amortization

Borrowings

Increased registered capital

190.3 billion roubles

cost optimizationcaps on tariffs

330.0 billion roubles

opportunity for growth

17

!

Page 18: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

210.5 225.0228.5

316.5360.0

370.075.0

104.6 112.9

58.651.2 45.3

0

50

100

150

200

250

300

350

400

450

2010 2011 2012 2013 2014 2015

329.6285.5

341.4375.1

411.2 415.3

Billio

n r

ou

ble

s

Federal budget

18

Extra-budgetary sources (RZD)

Investment required to renew and develop the infrastructure

Page 19: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Forecast freight and passenger traffic across the railway network of the Russian Federation

19

IndicatorsValues by years

2008 2009 2015

Freight turnover, billion t/km 2116.2 1865.3 2440

Passenger turnover, billionpassenger/km 175.9 153.6 181.6

Total freight carried, million tonnes1486.2 1235.4 1693.4

(100%) (100%) (100%)including:

- Russian domestic972.3 766.9 1097.2

(65.4 %) (62.1 %) (64.8 %)

- export371.7 368.5 440.5

(25.0 %) (29.8 %) (26.0 %)

- import111.7 77.5 113.4

(7.5 %) (6.3 %) (6.7 %)

- transit30.5 22.5 42.3

(2.1 %) (1.8 %) (2.5 %)

Page 20: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Projects to develop the railway infrastructure proposed as part of the federal strategic programme “The development of Russia’s transport system (2010–2015)”

20

- outlined projects to develop the infrastructure of the jointly used railway network being implemented as part of the federal strategic programme

- construction of additional main lines and sidings, development of stations

- railway routes enabling the forecast freight turnover to be carried if the detailed projects are implemented

Page 21: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Projects to develop the railway infrastructure proposed as part of the federal strategic programme “The development of Russia’s transport system (2010–2015)”

21

- outlined projects to develop the infrastructure of the jointly used railway network being implemented as part of the federal strategic programme

- construction of additional main lines and sidings, development of stations

- railway routes enabling the forecast freight turnover to be carried if the detailed projects are implemented

Page 22: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Data used in calculating the external main inflows in the budgetsystem

22

28 (0.6%)

3 049 (69.1%)

60 (1.4%)

34 (0.8%)

263 (6.0%)

527 (11.9%)13 (0.3%)

46 (1.0%)

393 (8.9%)

coal cokeoil freight oresferrous metals timberconstruction materials fertilizersbread

Breakdown of external main inflows, formed during the production and

marketing of produce carried by rail transport, roubles per tonne (%)

Freightcategory

Prices for produce carried by rail transport, roubles per tonne (according to Rosstatdata, “Average manufacturing prices for various types of industrial goods in the

Russian Federation 1998 – 2009”, to the end of 2009)

Return on sales of produce across industrial sectors carried by rail transport (according to

data from the First Independent Ratings Agency FIRA.RU for January to September 2009), %

Coal Bituminous coal for power generation 712 Extraction of bituminous

coal, brown coal and peat 10.8

Coke Coking coal 1 026 Extraction of bituminous coal, brown coal and peat 10.8

Oil freight Extracted oil (includingcondensate) 6 633 Petroleum products

manufacturing 17.9

Ores Iron ore (commodity) 676 Extraction of iron ore 16.3

Ferrous metals Pig iron 7 764 Metal manufacturing 12.9

Timber Round timber material for board 855

Processing timber and manufacturing products

from wood or cork, except for furniture

-1

Construction materials

Ministry of ConstructionMaterials 191 Production of cement,

lime and gypsum 15.6

Bread Flour 7 235Production of flour and

cereals, starch and starch products

1.16

Page 23: May 2010uicgrfc.org/IMG/pdf/s4_rzd_kolomeyski.pdf · development of Russia’s transport system (2010–2015)” (billion roubles excluding VAT, in the prices of the respective years)

Parameters of implementation and indicators of budget efficiency of state investment in the implementation of the federal strategic programme “The development of Russia’s transport system (2010–2015)”(taking into account external main effects at a level of 50%)

23

Net discounted financial inflow in the budget system of the Russian Federation,

formed as “development projects” are being implemented

(billion roubles in 2010 prices at a 5% discount rate)

Притоки денежных средствОттоки денежных средств (госинвестиции)Чистый дисконтированный доход бюджетной системы

11.0

-250

-200

-150

-100

-50

0

50

100

2010 2012 2014 2016 2018 2020 2022 2024 2026

2010 2011 2012 2013 2014 2015 Total

75.0 101.3 104.7 50.7 41.2 33.7 406.7

2010 2011 2012 2013 2014 2015 Total

75.0 104.6 112.9 58.6 51.2 45.3 447.6

Volume of state investment taken into account when calculating budget efficiency

in forecast prices, billion roubles

in 2010 prices, billion roubles

Inflows of fundsOutflows of funds (state investments)Net discounted revenue of the budget system