STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
N104066 SIB-ACNHPP 3 HOBACK-JACKSON/SNAKE RIVERSOUTH SECTION w/N104079 *PODI* Federal RECONSTRUCTION $49,800,000
N104079 STP-E3 (w/ N104066) 3 HOBACK-JACKSON/SNAKE RIVER/SOUTH SECTION/ENHANCEMENT
Federal ENHANCEMENTS/PATHWAYS/LNDSCP+ $1,700,000
N104A08 ARSCT3 (W/104066) ARS/HOBACK-JACKSON/SNAKE RIVER SOUTHSECTION
State BRIDGE CONDUIT $100,000
Sum: $51,600,000
Dist. County PlansReceived Resident Squad
Leader
3 Teton Yes Bob Hammond Doering
ProjectID Prefix Project Name Funding Intent Letting Cost
N372047 NHPP 4 BURGESS JUNCTION/DAYTON/WHITE CROSS SLIDE Federal SLIDE REPAIR $3,000,000
Sum: $3,000,000
Dist. County PlansReceived Resident Squad
Leader
4 Sheridan Yes Jerry Buckley Doering
ProjectID Prefix Project Name Funding Intent Letting Cost
4200016 STP-BR 1 (w/B191004) LARAMIE STREETS/CURTIS/BRIDGE REHAB Federal BRIDGE REHAB $100,000
B191004 NHPP-BR 1 VARIOUS LOCATIONS/BRIDGEREHAB w/4200016 Federal BRIDGE REHAB $2,500,000
Sum: $2,600,000
Dist. County PlansReceived Resident Squad
Leader
1Albany Yes Unassigned
Various Yes Kevin Erickson Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
1104015 STP-BR 1 PINE BLUFF- ALBIN/NORTH SEC/WYO 215 Federal BRIDGE REPLACEMENT $2,200,000
Sum: $2,200,000
Dist. County PlansReceived Resident Squad
Leader
1 Laramie Yes Wayne Shenefelt Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
May 9, 2019 Laramie May 16, 2019 March 8, 2019 April 11, 2019 9 $64,100,000
1/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
B199003 HSIP DISTRICTS 2 & 4/SIGNALDETECTION UPGRADE Federal SIGNAL DETECTION UPGRADE $1,600,000
Sum: $1,600,000
Dist. County PlansReceived Resident Squad
Leader
SW Various Yes Jack Stone
ProjectID Prefix Project Name Funding Intent Letting Cost
B195030 STP-BR 5 VARIOUS LOCATIONS/ BRIGEREHAB/SOUTH Federal BRIDGE REHAB $1,200,000
Sum: $1,200,000
Dist. County PlansReceived Resident Squad
Leader
5 Fremont Yes None Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
P352034 STP 4 LOVELL-BURGESS JUNCTION/OBSERVATION SLIDE Federal SLIDE REPAIR $1,100,000
Sum: $1,100,000
Dist. County PlansReceived Resident Squad
Leader
4 Sheridan Yes Jerry Buckley Doering
ProjectID Prefix Project Name Funding Intent Letting Cost
B181006 STP-GM 1 VARIOUS LOCATIONS/CATTLEGUARDS Federal REPLACE CATTLEGUARDS $600,000
Sum: $600,000
Dist. County PlansReceived Resident Squad
Leader
1 Carbon Yes Jake Lonn Doering
ProjectID Prefix Project Name Funding Intent Letting Cost
TRFSN19 SCP VARIOUS LOCATIONS/LOGO SIGNS State UPGRADE LOGO SIGNS $200,000
Sum: $200,000
Dist. County PlansReceived Resident Squad
Leader
SW Various Yes Clint Lockman Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
May 9, 2019 Laramie May 16, 2019 March 8, 2019 April 11, 2019 9 $64,100,000
2/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
N403007 NHPP 2 LUSK-VAN TASSELL/WESTSECTION State RECONSTRUCTION $13,600,000
Sum: $13,600,000
Dist. County PlansReceived Resident Squad
Leader
2 Niobrara James Barnes Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
N341113 NHPP 5 WALTMAN-SHOSHONI (w/N341A03) Federal PASSING LANES $5,600,000
N341A03 ARSCT 5 (w/N341113) SHOSHONI-CASPER/TURN LANES State TURN LANES $400,000
Sum: $6,000,000
Dist. County PlansReceived Resident Squad
Leader
5 Natrona Yes Kaia Tharp DePew
ProjectID Prefix Project Name Funding Intent Letting Cost
N104092 NHPP 3 JACKSON-HOBACK/JACKSONSOUTH Federal MILL/LEVEL/OVERLAY/CLEAN PIPES $2,500,000
Sum: $2,500,000
Dist. County PlansReceived Resident Squad
Leader
3 Teton Yes Bob Hammond Doering
ProjectID Prefix Project Name Funding Intent Letting Cost
I901122 NHPPI-GM 4 I-90 VARIOUS LOCATIONS/CULVERT LINING Federal CULVERT LINING $1,900,000
Sum: $1,900,000
Dist. County PlansReceived Resident Squad
Leader
4 Sheridan John Leahy Pickett
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
July 11, 2019 Casper July 18, 2019 May 10, 2019 June 13, 2019 10 $30,900,000
3/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
CN01064 STP-BROS 2 NATRONA COUNTY/COUNTY RD106/STRUCTURE DRD Federal BRIDGE REPLACEMENT $1,500,000
Sum: $1,500,000
Dist. County PlansReceived Resident Squad
Leader
2 Natrona Chad Aagard Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
N202069 NHPP 5 MUDDY GAP-LANDER/LANDERSOUTH Federal TURN LANE $1,500,000
Sum: $1,500,000
Dist. County PlansReceived Resident Squad
Leader
5 Fremont Erik Smith Pickett
ProjectID Prefix Project Name Funding Intent Letting Cost
N433044 HSIP 4 GILLETTE STREETS/TRAFFICSIGNAL Federal TRAFFIC SIGNAL REPLACEMENTS $1,300,000
Sum: $1,300,000
Dist. County PlansReceived Resident Squad
Leader
4 Campbell Josh Jundt Stogsdill
ProjectID Prefix Project Name Funding Intent Letting Cost
B195009 STP 5 VARIOUS LOCATIONS/DMS SIGNS Federal DMS SIGNS $1,200,000
Sum: $1,200,000
Dist. County PlansReceived Resident Squad
Leader
5 Various Yes Kaia Tharp DePew
ProjectID Prefix Project Name Funding Intent Letting Cost
CN06066 STP-BROS 1 CARBON COUNTY/ COUNTY RD/SAVERY CREEK ROAD Federal BRIDGE REPLACEMENT $1,000,000
Sum: $1,000,000
Dist. County PlansReceived Resident Squad
Leader
1 Carbon Yes Jake Lonn Crosby
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
July 11, 2019 Casper July 18, 2019 May 10, 2019 June 13, 2019 10 $30,900,000
4/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
I254166 NHPPI-GM 2 I-25 VARIOUS LOCATIONSCULVERT CLEANING Federal CULVERT CLEANING $400,000
Sum: $400,000
Dist. County PlansReceived Resident Squad
Leader
2 Various Yes Chad Aagard Doering
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
July 11, 2019 Casper July 18, 2019 May 10, 2019 June 13, 2019 10 $30,900,000
5/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
P433041 STP 4 GILLETTE-MONTANA STATE LINE/WHITETAIL CREEK Federal WIDEN & OVERLAY $11,200,000
Sum: $11,200,000
Dist. County PlansReceived Resident Squad
Leader
4 Campbell Yes Josh Jundt DePew
ProjectID Prefix Project Name Funding Intent Letting Cost
N372046 NHPP 4 DAYTON-RANCHESTER Federal MILL & OVERLAY $2,800,000
Sum: $2,800,000
Dist. County PlansReceived Resident Squad
Leader
4 Sheridan Jerry Buckley Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
P111013 STP 3 LAZEART JUNCTION-KEMMERER/MUDDY CREEK State MILL & OVERLAY $2,600,000
Sum: $2,600,000
Dist. County PlansReceived Resident Squad
Leader
3 Uinta Yes Damon Newsome Kladianos
ProjectID Prefix Project Name Funding Intent Letting Cost
0401037 STP 1 DIXON-ENCAMPMENT/SAVERY/WYO 70/WEST Federal MILL/OVERLAY/SEAL COAT $2,100,000
Sum: $2,100,000
Dist. County PlansReceived Resident Squad
Leader
1 Carbon Aaron Spenny Crosby
ProjectID Prefix Project Name Funding Intent Letting Cost
0807007 STP 2 TORRINGTON/HUNTLEY ROAD/EAST SECTION/WY 92 Federal WIDEN/MILL/OVERLAY $2,000,000
Sum: $2,000,000
Dist. County PlansReceived Resident Squad
Leader
2 Goshen Buck Klemola Kladianos
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
August 8, 2019 Laramie August 15, 2019 June 7, 2019 July 11, 2019 9 $22,900,000
6/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
B199005 HSIP DISTRICTS 3 & 5/NO PASSINGPENNANT SIGNS Federal NO PASSING PENNANT SIGNING $1,000,000
Sum: $1,000,000
Dist. County PlansReceived Resident Squad
Leader
SW Various Daniel McGillivray Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B199006 HSIP DISTRICTS 1 & 3/NO PASSINGPENNANT SIGNS Federal NO PASSING PENNANT SIGNING $700,000
Sum: $700,000
Dist. County PlansReceived Resident Squad
Leader
SW Various Daniel McGillivray Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B194023 STP-GM 4 VARIOUS LOCATIONS/SPOTSAFETY IMPROVEMENTS Federal SPOT SAFETY IMPROVEMENTS $300,000
Sum: $300,000
Dist. County PlansReceived Resident Squad
Leader
4 Various Jerry Buckley DePew
ProjectID Prefix Project Name Funding Intent Letting Cost
DR16226 DR 1 CHEYENNE/I-80/PARSLEY BLVD/BRIDGE State STRUCTURE REPAIR $200,000
Sum: $200,000
Dist. County PlansReceived Resident Squad
Leader
1 Laramie None Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
August 8, 2019 Laramie August 15, 2019 June 7, 2019 July 11, 2019 9 $22,900,000
7/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
I802205 NHPPI3 GRANGER-GREEN RIVER/LABARGE INTERCHANGE WEST/WBL
Federal MILL, OVERLAY & BRIDGE REPAIR $9,500,000
Sum: $9,500,000
Dist. County PlansReceived Resident Squad
Leader
3 Sweetwater Clint Lockman Doering
ProjectID Prefix Project Name Funding Intent Letting Cost
N121111 HIP 3 KEMMERER-GRANGER JUNCTION/KEMMERER EAST Federal MILL AND OVERLAY $3,900,000
Sum: $3,900,000
Dist. County PlansReceived Resident Squad
Leader
3 Lincoln Yes Jennifer Hoffman Stogsdill
ProjectID Prefix Project Name Funding Intent Letting Cost
I251168 HIP-PM1 CHEYENNE- CHUGWATER/RANDALL AVE-HORSE CREEKINTERCHANGE
Federal SLAB REPAIR/GRIND SEAL $3,800,000
Sum: $3,800,000
Dist. County PlansReceived Resident Squad
Leader
1 Laramie Wayne Shenefelt Doering
ProjectID Prefix Project Name Funding Intent Letting Cost
B185002 NHPP-GM5 RIVERTON STREETS/MAINSTREET/ADA UPGDRADES (w/N303057)
Federal ADA UPGRADES $2,000,000
N302053 HIP 5 RIVERTON STREETS/MAINSTREET Federal MILL & OVERLAY $1,200,000
N303057 NHPP 5 (w/B185002) 5 RIVERTONSTREETS/MAJOR & MAIN Federal INTERSECTION MOD/SIGNAL $500,000
Sum: $3,700,000
Dist. County PlansReceived Resident Squad
Leader
5 Fremont Robert Scheidemantel DePew
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
September 12, 2019 Sheridan September 19, 2019 July 12, 2019 August 15, 2019 7 $27,000,000
8/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
N311097 HIP 5 CODY STREETS/US 14/16/20 Federal CONC GRIND/SEAL/ISO SLAB/ADA $3,300,000
Sum: $3,300,000
Dist. County PlansReceived Resident Squad
Leader
5 Park Todd Frost Pickett
ProjectID Prefix Project Name Funding Intent Letting Cost
B183012 STP-BR 3 VARIOUS LOCATIONS/BRIDGEREHAB Federal BRIDGE REHAB $1,900,000
Sum: $1,900,000
Dist. County PlansReceived Resident Squad
Leader
3 Various Yes Damon Newsome Pickett
ProjectID Prefix Project Name Funding Intent Letting Cost
PEG1951 PEG 5 VARIOUS LOCATIONS/STOCKPILE/19 State STOCKPILE $900,000
Sum: $900,000
Dist. County PlansReceived Resident Squad
Leader
5 Various Michael E. Miller Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
September 12, 2019 Sheridan September 19, 2019 July 12, 2019 August 15, 2019 7 $27,000,000
9/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
N432055 NHPP 4 DOUGLAS-GILLETTE/WRIGHTSECTION W/N432056 Federal WIDEN TO 5-LANE/OVERLAY $15,500,000
N432056 NHPP-RF 4 (w/ N432055) WRIGHT-GILLETTE/ROW FENCE Federal REPLACE ROW FENCE $400,000
Sum: $15,900,000
Dist. County PlansReceived Resident Squad
Leader
4 Campbell Yes Josh Jundt Doering
ProjectID Prefix Project Name Funding Intent Letting Cost
I254155 NHPPI 2 CASPER-KAYCEE/HORSE RANCHCREEK NORTH Federal MILL/LEVEL/2" OVERLAY $6,900,000
Sum: $6,900,000
Dist. County PlansReceived Resident Squad
Leader
2 Natrona Yes Chad Aagard DePew
ProjectID Prefix Project Name Funding Intent Letting Cost
P261029 SCP-TC 1 LARAMIE-WOODS LANDING/HARMONY/WYO 230 State MILL/OVERLAY/SEAL COAT $4,800,000
Sum: $4,800,000
Dist. County PlansReceived Resident Squad
Leader
1 Albany Yes Steve Cook Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
I805178 NHPPI 1 LARAMIE- CHEYENNE/TELEPHONECANYON Federal HPWC/BRIDGE REHAB $4,000,000
Sum: $4,000,000
Dist. County PlansReceived Resident Squad
Leader
1 Albany Steve Cook Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
October 10, 2019 Rock Springs October 17, 2019 August 9, 2019 September 12, 2019 10 $35,000,000
10/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
B202009 STP-PM 2 VARIOUS LOCATIONS/CRACKSEAL Federal CRACK SEAL $1,000,000
Sum: $1,000,000
Dist. County PlansReceived Resident Squad
Leader
2 Various Buck Klemola Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B203017 STP-PM 3 VARIOUS LOCATIONS/CRACKSEAL Federal CRACK SEAL $900,000
Sum: $900,000
Dist. County PlansReceived Resident Squad
Leader
3 Various Clint Lockman Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B201002 STP-PM 1 VARIOUS LOCATIONS/CRACKSEAL Federal CRACK SEAL $500,000
Sum: $500,000
Dist. County PlansReceived Resident Squad
Leader
1 Albany Steve Cook Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
N202075 NHPP-GM 5 VARIOUS LOCATIONS SOUTHHALF CULVERT CLEANING Federal CULVERT CLEANING & SIPHON $500,000
Sum: $500,000
Dist. County PlansReceived Resident Squad
Leader
5 Fremont Erik Smith Doering
ProjectID Prefix Project Name Funding Intent Letting Cost
B205013 STP-PM 5 VARIOUS LOCATIONS/CRACKSEAL Federal CRACK SEAL $300,000
Sum: $300,000
Dist. County PlansReceived Resident Squad
Leader
5 Various Erik Smith Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
October 10, 2019 Rock Springs October 17, 2019 August 9, 2019 September 12, 2019 10 $35,000,000
11/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
W413005 CMP-PM 3 WYOMING 13/CRACK SEAL State CRACK SEAL $200,000
Sum: $200,000
Dist. County PlansReceived Resident Squad
Leader
3 Uinta Clint Lockman Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
October 10, 2019 Rock Springs October 17, 2019 August 9, 2019 September 12, 2019 10 $35,000,000
12/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
N103103 NHPP 3 THAYNE-ALPINE/ETNA NORTH *PODI* Federal WIDEN 5 LANES $21,600,000
Sum: $21,600,000
Dist. County PlansReceived Resident Squad
Leader
3 Lincoln Yes Darrin Robinson DePew
ProjectID Prefix Project Name Funding Intent Letting Cost
0510001 SCP 2 (w/N431035) DOUGLAS-GILLETTE/DOUGLA NORTH/SERVICE ROAD State RESURFACING $300,000
B202032 STP 2 (w/N431035) DOUGLAS-GILLETTE/DOUGLAS NORTH State RESURFACE $1,000,000
N431035 NHPP2 DOUGLAS-GILLETTE/DOUGLASNORTH/WY59 BYPASS W/B202032,N431036, 0510001
Federal MILL/OVERLAY/AUX&PASSING LANES $12,000,000
N431036 STP-E 2 (w/ N431035) DOUGLAS-GILLETTE/DOUGLAS NORTH Federal GATEWAY SIGN $100,000
Sum: $13,400,000
Dist. County PlansReceived Resident Squad
Leader
2 Converse Yes James Barnes Doering
ProjectID Prefix Project Name Funding Intent Letting Cost
N853092 NHPP 2 LINGLE-LUSK/RAWHIDE SECTION Federal MILL/OVERLAY $5,900,000
Sum: $5,900,000
Dist. County PlansReceived Resident Squad
Leader
2 Goshen Buck Klemola Pickett
ProjectID Prefix Project Name Funding Intent Letting Cost
N343044 NHPP 5 THERMOPOLIS STREETS/US 20/WYO 789 Federal MILL/OVRLY/CHIP SEAL/ADA/DRAIN $3,900,000
Sum: $3,900,000
Dist. County PlansReceived Resident Squad
Leader
5 Hot Springs Yes Kaia Tharp Kladianos
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
November 14, 2019 Laramie November 21, 2019 September 13, 2019 October 17, 2019 8 $53,500,000
13/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
P182032 SCP-TC 1 CRESTON JUNCTION-BAGGS/MUDDY CREEK NORTH State MILL/OVERLAY/SEAL COAT $3,500,000
Sum: $3,500,000
Dist. County PlansReceived Resident Squad
Leader
1 Carbon Yes Jake Lonn Kladianos
ProjectID Prefix Project Name Funding Intent Letting Cost
0302089STP-BR
4 BUFFALO-GILLETTE/WILDCATCREEK w/ 0302090 Federal BRIDGE REPLACEMENT $1,500,000
0302090 4 (w/ 0302089) BUFFALO-GILLETTE/RAWHIDE CREEK Federal BRIDGE REPLACEMENT $1,800,000
Sum: $3,300,000
Dist. County PlansReceived Resident Squad
Leader
4 Campbell Josh Jundt Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B201006 STP-BR 1 VARIOUS LOCATIONS BRIDGEREHAB Federal EPXY OVRLY/EXPANSION/MINOR REH $1,000,000
Sum: $1,000,000
Dist. County PlansReceived Resident Squad
Leader
1 Laramie Wayne Shenefelt Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
CN18058 STP-BROS 4 CROOK COUNTY/BELLE FOURCHEBRDG/DXQ Federal BRIDGE REPLACEMENT $900,000
Sum: $900,000
Dist. County PlansReceived Resident Squad
Leader
4 Crook Preston Beckstead Pickett
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
November 14, 2019 Laramie November 21, 2019 September 13, 2019 October 17, 2019 8 $53,500,000
14/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
I806209 NHPPI 1 CHEYENNE/PINE BLUFFS/HILLSDALE SECTION *PODI* Federal LVL/OVRLY/SEALCOAT/REPL 2 STRC $21,600,000
Sum: $21,600,000
Dist. County PlansReceived Resident Squad
Leader
1 Laramie Kevin Erickson Stogsdill
ProjectID Prefix Project Name Funding Intent Letting Cost
B202010 STP-BR 2 VARIOUS LOCATIONS/BRIDGEREHAB Federal BRIDGE REHAB $5,300,000
Sum: $5,300,000
Dist. County PlansReceived Resident Squad
Leader
2 Various Tim Rasnake Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
N852004SCP-TC
1 CHEYENNE- TORRINGTON/GUNBARREL NORTH W/ N852005 State MILL/OVERLAY/SEAL COAT $2,000,000
N852005 1 (w/ N852004) CHEYENNE-TORRINGTON/GUN BARREL NORTH State MILL/OVERLAY/SEAL COAT $2,200,000
Sum: $4,200,000
Dist. County PlansReceived Resident Squad
Leader
1 Laramie Wayne Shenefelt Pickett
ProjectID Prefix Project Name Funding Intent Letting Cost
B201004 STP-PM 1 VARIOUS LOCATIONS/SLABREPAIR Federal SLAB REPAIR $1,500,000
Sum: $1,500,000
Dist. County PlansReceived Resident Squad
Leader
1 Laramie Kevin Erickson Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
December 11, 2019 Sheridan December 18, 2019 October 10, 2019 November 13, 2019 5 $33,800,000
15/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
B203019 STP-BR 3 VARIOUS LOCATIONS/BRIDGEREHAB/NORTH Federal BRIDGE REHAB $1,200,000
Sum: $1,200,000
Dist. County PlansReceived Resident Squad
Leader
3 Various Daniel McGillivray Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
December 11, 2019 Sheridan December 18, 2019 October 10, 2019 November 13, 2019 5 $33,800,000
16/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
I254160 NHPPI 2 CASPER MARGINAL/STRUCTURESw/I254165 *PODI* Federal REMOVE AND REPLACE STRUCTURES $23,300,000
I254165 STP-E 2 (w/ I254160) CASPER /I-25/WALSHDRIVE Federal ENHANCEMENTS $500,000
Sum: $23,800,000
Dist. County PlansReceived Resident Squad
Leader
2 Natrona Chad Aagard Pickett
ProjectID Prefix Project Name Funding Intent Letting Cost
N332033 NHPP 5 MEETEETSE-CODY/CODY SOUTH Federal LEVEL/OVERLAY/CHIP SEAL/ISO RE $5,500,000
Sum: $5,500,000
Dist. County PlansReceived Resident Squad
Leader
5 Park Todd Frost Kladianos
ProjectID Prefix Project Name Funding Intent Letting Cost
0104064 SCP-TC 1 LARAMIE HERRICK LANE/WYO 12 State OVERLAY/SEAL COAT $4,400,000
Sum: $4,400,000
Dist. County PlansReceived Resident Squad
Leader
1 Albany Kory Cramer Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B203016 STP-PM 3 VARIOUS LOCATIONS/CONTRACTPATCH Federal CONTRACT PATCH $2,800,000
Sum: $2,800,000
Dist. County PlansReceived Resident Squad
Leader
3 Various Clint Lockman Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B202011 STP-PM 2 VARIOUS LOCATIONS/CONTRACTPATCH Federal CONTRACT PATCHING $2,500,000
Sum: $2,500,000
Dist. County PlansReceived Resident Squad
Leader
2 Various Jack Stone Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
January 9, 2020 January 16, 2020 November 8, 2019 December 12, 2019 11 $48,200,000
17/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
B201003 STP-PM 1 VARIOUS LOCATIONS/CONTRACTPATCHING Federal CONTRACT PATCHING $2,200,000
Sum: $2,200,000
Dist. County PlansReceived Resident Squad
Leader
1 Carbon Wayne Shenefelt Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B203018 STP-PM 3 VARIOUS LOCATIONS/CHIP SEAL Federal CHIP SEAL $2,100,000
Sum: $2,100,000
Dist. County PlansReceived Resident Squad
Leader
3 Various Clint Lockman Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
PEG2031 PEG 3 VARIOUS LOCATIONS/STOCKPILE/20 State STOCKPILE $1,600,000
Sum: $1,600,000
Dist. County PlansReceived Resident Squad
Leader
3 Various Jennifer Hoffman Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B202008 STP-PM 2 VARIOUS LOCATIONS/CHIP SEAL Federal CHIP SEAL $1,500,000
Sum: $1,500,000
Dist. County PlansReceived Resident Squad
Leader
2 Various Tim Rasnake Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B201001 STP-PM 1 VARIOUS LOCATIONS/CHIP SEAL Federal CHIP SEAL $1,000,000
Sum: $1,000,000
Dist. County PlansReceived Resident Squad
Leader
1 Various Kevin Erickson Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
January 9, 2020 January 16, 2020 November 8, 2019 December 12, 2019 11 $48,200,000
18/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
CN19036 STP-BROS 3 UINTA COUNTY/SULPHUR CREEK/STRUCTURE FKL Federal BRIDGE REPLACEMENT $800,000
Sum: $800,000
Dist. County PlansReceived Resident Squad
Leader
3 Uinta Damon Newsome Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
January 9, 2020 January 16, 2020 November 8, 2019 December 12, 2019 11 $48,200,000
19/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
B204025 STP-BR 4 VARIOUS LOCATIONS/BRIDGEREHAB Federal BRIDGE REHAB $3,500,000
Sum: $3,500,000
Dist. County PlansReceived Resident Squad
Leader
4 Various Josh Jundt Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B201005 STP-BR 1 VARIOUS LOCATIONS/BRIDGEREHAB Federal BRIDGE REHAB $3,400,000
Sum: $3,400,000
Dist. County PlansReceived Resident Squad
Leader
1 Laramie Wayne Shenefelt Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
I251170 HSIP 1 CHEYENNE MARGINAL/STRIPINGTAPE Federal STRIPING TAPE $1,600,000
Sum: $1,600,000
Dist. County PlansReceived Resident Squad
Leader
1 Laramie Wayne Shenefelt Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B209028 HSIP STATEWIDE/VARIOUS LOCATIONS/EPOXY STRIPING Federal EPOXY STRIPING $1,100,000
Sum: $1,100,000
Dist. County PlansReceived Resident Squad
Leader
SW Various None Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
W258025 HSIP2 CASPER STREETS/WYOMINGBLVD/GANNET DRIVE TOYELLOWSTONE STREET
Federal INTERSECTION MARKINGS $500,000
Sum: $500,000
Dist. County PlansReceived Resident Squad
Leader
2 Natrona None Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
February 13, 2020 February 20, 2020 December 13, 2019 January 16, 2020 7 $10,700,000
20/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
B201007 HSIP 1 THERMOPLASTIC MARKINGS Federal THERMOPLASTIC MARKING $300,000
Sum: $300,000
Dist. County PlansReceived Resident Squad
Leader
1 Various Wayne Shenefelt Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B202012 HSIP 2 THERMOPLASTIC MARKINGS Federal THERMOPLASTIC MARKING $300,000
Sum: $300,000
Dist. County PlansReceived Resident Squad
Leader
2 Various Chad Aagard Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
February 13, 2020 February 20, 2020 December 13, 2019 January 16, 2020 7 $10,700,000
21/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
N302054 NHPP 5 DUBOIS-DIVERSION DAM Federal LEVEL/OVRLY/CHIPSEAL/ROW FENCE $5,300,000
Sum: $5,300,000
Dist. County PlansReceived Resident Squad
Leader
5 Fremont Yes Robert Scheidemantel DePew
ProjectID Prefix Project Name Funding Intent Letting Cost
N202072 NHPP 5 MUDDY GAP-LANDER/BEAVER RIM Federal MILL/2" OVERLAY/CHIP SEAL/MISC $3,600,000
Sum: $3,600,000
Dist. County PlansReceived Resident Squad
Leader
5 Fremont Erik Smith Stogsdill
ProjectID Prefix Project Name Funding Intent Letting Cost
B205014 STP-BR 5 VARIOUS LOCATIONS/BRIDGEREHAB Federal BRIDGE REHABILITATION $3,300,000
Sum: $3,300,000
Dist. County PlansReceived Resident Squad
Leader
5 Various Kaia Tharp Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B152040 STPU 2 CONVERSE COUNTY/BROWNFIELD ROAD/ROBIN ROAD Federal RECONSTRUCTION $2,600,000
Sum: $2,600,000
Dist. County PlansReceived Resident Squad
Leader
2 Converse James Barnes DePew
ProjectID Prefix Project Name Funding Intent Letting Cost
B205031 STP-GM 5 VARIOUS LOCATIONS GUARDRAIL Federal GUARDRAIL $800,000
Sum: $800,000
Dist. County PlansReceived Resident Squad
Leader
5 Fremont Robert Scheidemantel Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
March 12, 2020 March 19, 2020 January 10, 2020 February 13, 2020 7 $16,600,000
22/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
B215001 STP-RF 5 VARIOUS LOCATIONS/SOUTHDISTRICT/FENCING Federal RIGHT OF WAY FENCING $600,000
Sum: $600,000
Dist. County PlansReceived Resident Squad
Leader
5 Fremont Robert Scheidemantel Stogsdill
ProjectID Prefix Project Name Funding Intent Letting Cost
B183033 SSP-TO 3 I-80/US 89/ROAD CLOSURE &LUMINAIRES State ROAD CLOSURE/LUMINAIRES $400,000
Sum: $400,000
Dist. County PlansReceived Resident Squad
Leader
3 Various Yes Jennifer Hoffman
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
March 12, 2020 March 19, 2020 January 10, 2020 February 13, 2020 7 $16,600,000
23/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
B123014 STPU-RO 3 ROCK SPRINGS STS/INTERCHANGE ROAD w/ I802220 Federal RECONSTRUCTION $10,800,000
I802220 INFRA3 (w/ B123014) ROCK SPRINGS/I-80INTERCHANGE & INTERCHANGEROAD
Federal RECONST/INTERCHANGE/BRIDGE $11,500,000
Sum: $22,300,000
Dist. County PlansReceived Resident Squad
Leader
3 Sweetwater Peter Stinchcomb DePew
ProjectID Prefix Project Name Funding Intent Letting Cost
B193020 STP 3 VARIOUS LOCATIONS/ITS Federal VLS/RWIS/WEB CAM/FLASHING SIGN $1,000,000
Sum: $1,000,000
Dist. County PlansReceived Resident Squad
Leader
3 Various Peter Stinchcomb Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
I805181 HSIP 1 I-80/SIGN UPGRADE Federal SIGN UPGRADES $900,000
Sum: $900,000
Dist. County PlansReceived Resident Squad
Leader
1 Albany None Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B209029 HSIP STATEWIDE/CORRIDOR PENNANTSIGNING Federal PENNANT SIGNING $900,000
Sum: $900,000
Dist. County PlansReceived Resident Squad
Leader
SW Various None Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B209030 HSIP STATEWIDE/SIGN UPGRADE Federal NEW/UPGRD WARNING/GUIDE SIGNS $500,000
Sum: $500,000
Dist. County PlansReceived Resident Squad
Leader
SW Various None Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
April 9, 2020 April 16, 2020 February 7, 2020 March 12, 2020 8 $26,500,000
24/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
B203021 HSIP 3 THERMOPLASTIC MARKINGS Federal THERMOPLASTIC MARKINGS $300,000
Sum: $300,000
Dist. County PlansReceived Resident Squad
Leader
3 Various None Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B204027 HSIP 4 THERMOPLASTIC MARKINGS Federal THERMOPLASTIC MARKING $300,000
Sum: $300,000
Dist. County PlansReceived Resident Squad
Leader
4 Various Jerry Buckley Potter
ProjectID Prefix Project Name Funding Intent Letting Cost
B205015 HSIP 5 THERMOPLASTIC MARKINGS Federal THERMOPLASTIC MARKINGS $300,000
Sum: $300,000
Dist. County PlansReceived Resident Squad
Leader
5 Various Michael E. Miller Potter
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
April 9, 2020 April 16, 2020 February 7, 2020 March 12, 2020 8 $26,500,000
25/26 4/22/19
STATE TRANSPORTATION IMPROVEMENT PROJECTSWyoming Department of TransportationLetting Events Between May 9, 2019 and May 14, 2020
ProjectID Prefix Project Name Funding Intent Letting Cost
N361068 NHPP 5 WORLAND-BUFFALO/TENSLEEPEAST Federal MILL/OVERLAY/CHIP SEAL $3,100,000
Sum: $3,100,000
Dist. County PlansReceived Resident Squad
Leader
5 Washakie Michael E. Miller Crosby
Scheduled Letting To Be Held At Award Date Due Date PS&E Advertising Date Total Projects Total for Month
May 14, 2020 May 21, 2020 March 13, 2020 April 16, 2020 1 $3,100,000