PRESENTATION OVERVIEW
• Open Space Elements
• Central Park Public Planning Process
• Eads Street Streetscape Design Recommendations
May 26, 20162
PARK PLANNING PROCESS FOR FUTURE PARK PHASES
The developer of Metropolitan Park Phase 6 agrees to
participate in a public planning process, including utilizing
its resources and expertise to develop, as the process
deems, alternative park designs and uses, for that portion
of the central park associated with Metropolitan Park
Phase 6. The goal of the process is for the developer to
work with PRCR staff, the Park and Recreation
Commission, SPRC members, and interested Metropolitan
Park residents to identify and assess the community’s
recreational needs and interests at that time and make
revisions to the park’s design, or reaffirm the existing
design through the data and feedback from the above
interested parties…
PDSP CONDITION FROM MET PARK 3 (FEBRUARY 2009)
May 26, 20164Department of Parks and Recreation
…The process shall allow for changes to be made to the
original design and uses prescribed for the park space in
the Metropolitan Park Design Guidelines (dated January
23, 2004 and approved by the County Board on February
10, 2004), including, if deemed appropriate by the public
process, the inclusion of more active recreational uses
and amenities in that portion of the park associated with
Phase 6. The public planning process may be initiated
upon filing of the Metropolitan Park Phase 6 final site plan
and shall be completed prior to approval by the County
Board of the Phase 6 final site plan. If, as a result of the
public planning process, revisions are recommended to
the park’s design, the revisions shall be incorporated into
a revised conceptual design for that portion of the central
park associated with Metropolitan Park Phase 6, which
shall be approved as part of the final site plan for Phase 6.
PDSP CONDITION FROM MET PARK 3 (FEBRUARY 2009)
May 26, 20165Department of Parks and Recreation
PUBLIC OPEN SPACE PLANNING PROCESS
May 26, 20166Department of Parks and Recreation
April 6 April 7-22
PUBLIC OPEN SPACE PLANNING PROCESSONLINE SURVEY RESULTS
May 26, 20167Department of Parks and Recreation
Preference: Passive, Semi-Active, and Active Space Amenities
May 26, 20168
PUBLIC OPEN SPACE PLANNING PROCESSONLINE SURVEY RESULTS
Department of Parks and Recreation
Preference: Passive Space Amenity Options
May 26, 20169
PUBLIC OPEN SPACE PLANNING PROCESSONLINE SURVEY RESULTS
Department of Parks and Recreation
Preference: Semi-Active Space Amenity Options
May 26, 201610
PUBLIC OPEN SPACE PLANNING PROCESSONLINE SURVEY RESULTS
Department of Parks and Recreation
Preference: Active Space Amenity Options
PUBLIC OPEN SPACE PLANNING PROCESS
Community Input Indicated Desire for:
• Active, semi-active and passive recreational amenities
• Dedicated play space for children
• Separate play space for dogs
• Shade structure, gardens and unique seating
May 26, 201611Department of Parks and Recreation
PUBLIC OPEN SPACE PLANNING PROCESS
Community input was weighed along with other planning
considerations and information such as:
• Configuration of open spaces
• Public input on current use of existing Central Park
• Distance and convenience of similar amenities
• Integration of design with existing Central Park
May 26, 201612Department of Parks and Recreation
PUBLIC OPEN SPACE PLANNING PROCESS
Public Outreach
• April 6 – public open house to present open space
concept
• April 7 – April 22 – online survey open
• April 19 – Park and Recreation Commission
• May 24 – Park and Recreation Commission
• May 26 – SPRC Meeting #4 open space discussion
• June/July – Applicant to incorporate final open space
concept into their site plan
May 26, 201613Department of Parks and Recreation
Condition #57 approved with Phase 4/5 site plan:
Request the County Manager to provide recommendations regarding the design of the South
Eads Street linear park and building orientation issues of the Metropolitan Park Design
Guidelines for Phases 6-8 of the Metropolitan Park Development.
EADS STREET DESIGN RECOMMENDATIONS
May 26, 201615
Phase 4/5 Eads Street Concept
EADS STREET DESIGN RECOMMENDATIONS
May 26, 201616
Initial Concept Working Draft Concept Current Draft Concept
EADS STREET DESIGN RECOMMENDATIONS
Draft Recommendation Elements:
Streetscape
• Streetscape design quality should be greater than or equal to that
provided for in Phase 4/5
• Maintain minimum clear zones, but allow flexibility in passive
use/landscape zones
• Maintain pedestrian circulation from the curb and coordinate street
furniture, as provided in DES standards and specifications
• Consistency in streetscape furnishings, material palette, and lighting
between phases
• Variety in seating types and flexible spaces
May 26, 201617
EADS STREET DESIGN RECOMMENDATIONS
Draft Recommendation Elements:
Landscape
• Maximize tree canopy and encourage species diversity
• Maximize soil volume
• Use landscaping to frame views, enforce circulation, and define spaces
for public use
• Encourage three dimensional landscape areas
May 26, 201618
EADS STREET DESIGN RECOMMENDATIONS
Draft Recommendation Elements:
Building Orientation
• Consistent building line on South Eads Street
• Building height and massing should take building orientation of previous
phases into consideration
• Building heights should vary along Eads Street and compliment previous
phases through building taper from taller building mass across
secondary streets
• Orientation should include massing strategies that reinforce the division
of the building into base, shaft, and crown sections
May 26, 201619