MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget...

19
MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop

Transcript of MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget...

Page 1: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

MAY 1, 2012

GRAFTON CAMPUS

APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES

Hands On Budget Workshop

Page 2: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Who We Are

Zoya Hamilton, CRA, EdDSenior Associate Director

Office of Research AdministrationBoston Campus

[email protected]

Kara CharmanskiGrants Management Administrator

HNRCABoston Campus

[email protected]

Page 3: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Overview of this Session

Provide hands-on experience for grant budget development. Build different types of budgets using Excel. Prepare various grant application budget pages.

SF 424 R&R Budget Pages PHS 398 Modular Budget Pages SF 424 A Budget Pages

Page 4: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Exercise 1- Personnel Costs

Page 5: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Richard Black, Ph.D. has a 12 month appointment and is proposed as a Principal Investigator (PI) working 6 months on a grant. Dr. Black makes $160,000/year.

Joseph Greene, Ph.D. has a 12 month appointment and is proposed as a Co-Investigator (Co-I) working 9 months on a grant. Dr. Greene makes $90,000/year.

Fringe benefits rate is 27.9% for full time faculty.

Page 6: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Exercise 2 –Direct Costs

Page 7: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Richard Black, Ph.D. has a 12 month appointment and is proposed as a PI working 4.8 months on a grant. Dr. Black makes $160,000/year.

Joseph Greene, Ph.D. has a 12 month appointment and is proposed as a Co-I working 3 months on a grant. Dr. Greene makes $90,000/year.

A graduate student who makes $24,000/year is proposed at 100% and receives $4,673 in tuition and fees.

Fringe benefits rate is 27.9% for full time faculty. No fringe is charged for graduate students if they take classes in the summer.

Page 8: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

The project will require a subcontract with Columbia University in the amount of $100,000 ($75,00 direct costs; $25,000 indirect costs).

Dr. Black will have to travel to New York for a 3-day conference. Airfare is $600 and lodging is $200/ night.

Dr. Black will also need the following items to support this project: Animals (rats and mice): $2,000 Animal Housing: $25,000 Computer: $4,000 Mass Spectrometer: $18,000 Wave Guide Analyzer $4,000 Additional laboratory supplies: $8,000 Office Supplies: $200

Page 9: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Exercise 3 – Indirect Costs

Page 10: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Use the budget for Dr. Black’s project.The indirect cost rate is 65% of MTDC. Exclude full cost of equipment.Exclude amount of subcontract that exceeds

$25,000.

Page 11: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

SF 424 R&R Budget Pages

Page 12: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Most commonly seen in NIH applications using grants.gov format.

Requires completion of a detailed budget for each project year.

Consists of three pages per year, plus a cumulative budget page that is automatically calculated.

Budget Justification is one document that covers all years. User cannot move to Year 2 until they attach a document for Budget Justification.

PI effort must be greater than zero.Subaward budgets are attached using R&R

Subaward Budget Attachment Form and follow the same format.

Page 13: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

PHS 398 Modular Budget Pages

Page 14: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Applicable only to R01, R03, R21, R15, and R34 applications.

Cannot be used by foreign institutions who are primary applicants.

Request $250,000 or less per year for direct costs in modules of $25,000.

Consortium F&A costs are not factored into the direct cost limit and are not requested in modules of $25,000.

Must separate out consortium F&A on the form.

Budget Justification is limited to personnel, equipment, consortium, and variance between the number of modules in budget years.

Page 15: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

SF 424A Budget Pages

Page 16: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Used for applications for federal funding unless otherwise specified

Separates federal and non-federal funds in Section A.

Break downs total budget (federal and non-federal together) by categories in Section B.

Breaks down cost share/match by source in Section C.

Breaks down federal funds needed for Year 1 by quarters in Section D.

Shows federal future year totals in Section E. Note: “First Year” is Year 2 of the application.

Shows total direct and indirect costs in Section F.

Page 17: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Institutional Information

Page 18: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Cognizant Federal Agency (Agency Name, POC Name, and POC Phone Number): DHHS, Robert Aaronson, 212-264-2069

Current F&A Agreement date: 06/21/2011Indirect Cost Type: Modified Total Direct

Costs (MTDC)Indirect Costs Rates for Grafton: 65%

(research); 37% (other) Off-campus: 26%

Indirect Costs Base: Total Costs minus equipment, tuition, and portion of EACH subcontract in excess of $25,000 (some other expenses are excluded, but they are rarely present in budgets)

Page 19: MAY 1, 2012 GRAFTON CAMPUS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES Hands On Budget Workshop.

Questions?