Maximal Heart Rate Determining Maximal Heart Rate Maximal heart is a key element in planning the...
-
Upload
suzanna-bell -
Category
Documents
-
view
213 -
download
1
Transcript of Maximal Heart Rate Determining Maximal Heart Rate Maximal heart is a key element in planning the...
Maximal Heart Rate
Determining Maximal Heart Rate Maximal heart is a key element in planning the
intensity of training. A ramp test that leads to high intensity exercise of
about 3 - 4 minutes will get the athlete's MHR. A 2-minute period is too short because muscular
exhaustion occurs before the maximum heart rate is reached.
Prolonged periods above 10 -12 minutes involve a work load to low to reach MHR, even though exhaustion has occurred in the athlete.
Pre MHR Requirements
Ensure the athlete is in rested condition, 1 day of active recovery for well-trained
athletes, In fatigued or less trained athletes, more
than 1 day of active recovery may be necessary.
Abstain from eating large meals or caffeine at least 3 hours before the test.
Maximal Heart Rate
The MHR Test can be easily and carried out using the following equipment and procedure.Equipment;1. Bicycle Ergometer or Indoor Trainer 2. Heart Rate Monitor 3. Bicycle fitted with cadence metre.4. Warm Up
Maximal Heart Rate
Have the rider warm up for 30 minutes in a small gear say, in 39 x 17 with a steady cadence of 90 - 92 rpm.
Have the rider maintain this steady state heart rate (approximately 130 - 140 BPM) during this time.
Maximal Heart Rate
Then engage 53 x 23, maintain cadence at 90 - 92 rpm.
Each minute increase gear ratio and maintain cadence until rider can no longer maintain the cadence of 90 - 92 rpm.
The assessment ends when the rider is no longer able to maintain this cadence. Record the highest heart rate achieved.
Maximal Heart Rate
Calculate the Heart Rate Target Zones.
Zone % of MHRREC < 70% E-1 70 - 76%E-2 a 77 - 82%E-2 b 82 - 87%E-3 88 - 90%E-4 VO2max 90 - 92%
Maximal Heart Rate
Calculate the Heart Rate Target Zones. REC = < 70% of MHRE-1 (188 x 0.70 - 0.76) = 131 - 143E-2 a (188 x 0.77 - 0.82) = 144 - 153E-2 b (188 x 0.82 - 0.87) = 154 - 164E-3 (188 x 0.88 - 0.90) = 165 - 170E-4 (188 x 0.90 - 0.92) = 170 - 173