Matrix injection experience in a disposal well (NAM-1)
-
Upload
montague-santos -
Category
Documents
-
view
35 -
download
0
description
Transcript of Matrix injection experience in a disposal well (NAM-1)
Matrix injection experience in a disposal well (NAM-1)
Well NAM-1
• Produced water injection into far flank of reservoir
• Sandstone 1-2 Darcy
• TVD ca. 1800 m, injection interval 110 m
• Cased - perforated (6spf 60 DP)
• OIW 50-250 ppm
• TSS ‘high’ (from settling tank). FeS, wax, sand.
• II ca. 40 m3/d/bar. 1500 m3/d injection @ 60 bar THP.
• No indication of stress anomaly. 0.7 psi/ft 100 bar THP!
• PW negligible cooling
NAM-1
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Oct
-94
Dec
-94
Jan-
95
Apr
-95
Jun-
95
Aug
-95
Oct
-95
Dec
-95
Feb
-96
Apr
-96
Jun-
96
Aug
-96
Oct
-96
Dec
-96
Feb
-97
Apr
-97
Jun-
97
Aug
-97
Oct
-97
Dec
-97
Feb
-98
Apr
-98
Jun-
98
Aug
-98
Oct
-98
Dec
-98
Feb
-99
Apr
-99
Jun-
99
Aug
-99
Oct
-99
Dec
-99
Feb
-00
Apr
-00
Date
Su
rfac
e In
ject
ion
Rat
e (B
PD
)
3,000
4,000
Inje
ctio
n P
ress
ure
(p
si)
Injection Rate
Pressure "THP"
Pressure "BHP"
Injection Rate & Pressure vs. Time
NAM-1: Injection data
Acid jobNRV removal
NAM-1
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
Oct
-94
Dec
-94
Jan-
95
Apr
-95
Jun-
95
Aug
-95
Oct
-95
Dec
-95
Feb-
96
Apr
-96
Jun-
96
Aug
-96
Oct
-96
Dec
-96
Feb-
97
Apr
-97
Jun-
97
Aug
-97
Oct
-97
Dec
-97
Feb-
98
Apr
-98
Jun-
98
Aug
-98
Oct
-98
Dec
-98
Feb-
99
Apr
-99
Jun-
99
Aug
-99
Oct
-99
Dec
-99
Feb-
00
Apr
-00
Date
Inje
ctiv
ity
Ind
ex (
BP
D/p
si)
3,000
4,000
Bot
tom
hol
e In
ject
ion
Pre
ssu
re (
psi
)
Inj. Index "II"Inj. Pressure "BHP"Acidification Jun/95
Injectivity Index and Pressure vs. Time
Acid treatment
s
NAM-1: Injectivity index
Acid jobNRV removal
Well NAM-1: fractured or not?
• II deterioration very slow: 25% in 2 yrs (600,000 m3 of water)
• Step-rate tests: Constant slope (II) of 40-50 m3/d/bar.
No inflection point.
• ‘Ideal’ (undamaged) matrix II estimated at 90 m3/d/bar.
• SR tests: Intercept p-axis dependent on shut-in time.
‘Leaking box’ reservoir? (nearby faults known).
• Injection pressure far below frac pressure.
• II appears to increase with injection rate.
Well NAM-1: fractured or not?
NAM-1
2,500
3,500
4,500
0 2,000 4,000 6,000 8,000 10,000 12,000 14,000
Surface Injection Rate (BPD)
Bot
tom
hol
e In
ject
ion
Pre
ssu
re (
psi
)
Flow Rate vs. Pressure