Math 201 Project 1. Case 5-3 in Hillier and Hiller. Project 1. Final report due at start of class Thursday, October 23, 2008. Final reports submitted on Thursday after the start of class will accrue a 10% lateness penalty. - PowerPoint PPT Presentation

Transcript of Math 201 Project 1

Page 1: Math 201 Project 1

Math 201 Project 1Case 5-3 in Hillier and Hiller

Page 2: Math 201 Project 1

Project 1• Final report due at start of class Thursday, October 23,

2008. • Final reports submitted on Thursday after the start of class

will accrue a 10% lateness penalty.• No final reports will be accepted after Thursday, Oct. 23,

2008 for any reason, no matter how good the reason is.• Final reports must be submitted in hard copy form; no email

submissions will be accepted.

• Team leaders are responsible for collecting team contributions and compiling the final report.

• Go to www.calvin.edu/~cgm3/math201.html for downloadable materials.

Page 3: Math 201 Project 1

Farm Management Problem

Page 4: Math 201 Project 1

Elements of the Problem

• Data• Decisions• Constraints• Measure of Performance

Page 5: Math 201 Project 1

Project 1 Data

• Family labor: home farm

• Wages from work on neighboring farm

Season Hours AvailableWinter/Spring 4000Summer/Fall 4500

Season WagesWinter/Spring $5/hrSummer/Fall $5.50/hr

Page 6: Math 201 Project 1

Data, cont’d

• Two types of livestock:• Dairy cows• Chickens

• Three crops• Soybeans (cash crop)• Corn (cash crop and cattle feed)• Wheat (cash crop and chicken feed)

Page 7: Math 201 Project 1

Data, cont’d• Livestock value:

• 30 cows, total value $35,000• 2,000 hens, total value $5,000

• $20,000 investment fund available to buy new livestock• Each new cow: $1,500• Each new hen: $3

• Barn can hold maximum of 42 cows• Chicken house can hold maximum of 5,000 hens• Depreciation:

• Value of herd of cows depreciates 10%/year• Value of flock of hens depreciates 25%/year

Page 8: Math 201 Project 1

Data, cont’d

• Available acreage for planting: 640 acres• Total family living expenses: $40,000 / year

Page 9: Math 201 Project 1

Data, cont’dCow Hen

Person-hours required each

month

10 0.05

Grazing land required

2 acres 0

Net annual cash income

$850 $4.25

Page 10: Math 201 Project 1

Data, cont’d

• Data per acre planted (estimates for good weather)

• W&S = Winter and Spring; S&F = Summer and Fall Soybeans Corn Wheat

W&S Person-Hours

1.0 0.9 0.6

S&F Person-Hours

1.4 1.2 0.7

Net Value $70 $60 $40

Page 11: Math 201 Project 1

Where do we want to end up?

• The family wants to decide how many acres to plant for each crop, and how many new livestock (cows and hens) to buy, with the goal of maximizing the family’s total monetary worth at the end of the coming year.

• As their consultants, we need to provide them with optimal solutions with respect to estimated conditions for good weather and bad weather (drought, flood).

Page 12: Math 201 Project 1

Decisions

• How much acreage should be planted for each crop?

• How many new cows and hens should the family purchase?

Page 13: Math 201 Project 1

Constraints• The family needs to plant enough acres of corn to

provide feed for the cows:• Acres of corn > (1 acre/cow) times (# of cows)

• The family needs to plant enough acres of wheat to provide chicken feed:• Acres of wheat > (0.05 acres/chicken) times (# of chickens)

• The total spent on new livestock must be no greater than the amount in the investment fund ($20,000)

• Barn constraint: total # of cows < 42• Chicken house constraint: total # of hens < 5,000

Page 14: Math 201 Project 1

Constraints, cont’d• Total hours worked by family = planting hours +

livestock care hours + hours on neighboring farm• Planting hours and livestock care hours

determined by acreage and number of livestock• Hours on neighboring farm: optional (decision)• Total hours worked by family W&S must not

exceed the total available (4,000 hrs)• Total hours worked by family S&F must not exceed

the total available (4,500 hrs)

Page 15: Math 201 Project 1

Decisions, revised

• How much acreage should be planted for each crop?

• How many new cows and hens should the family purchase?

• How many hours should the family work on the neighboring farm?

Page 16: Math 201 Project 1

Measure of Performance

• The measure of performance is the family’s total monetary worth at the end of one year.

• Their total monetary worth is the following sum:Total Net Income

+ End of Year Value of Assets+ Leftover Investment Fund

- Total Living Expense= Total Monetary Worth

Page 17: Math 201 Project 1

Project Assignment• Do parts a) – e) and g) – i) of Case 5-3, pp.182-183 in the

textbook.• Use the spreadsheet template provided on your instructor’s

website to start your work.• Hint for part d): the Sensitivity Report prints “objective

coefficients” for functions that are not the final objective function. • For example, the total net value of the plantings is a SUMPRODUCT

of the acres planted cells and the net value cells. The Sensitivity Report treats the net value cells as “objective coefficients.”

• Thus, your assignment in part d) is to use the Sensitivity Report “objective coefficient” information to find allowable ranges for the net value per acre planted for each of the three crops.

Page 18: Math 201 Project 1

Project Assignment

• Hint for part d) continued: a portion of the Sensitivity Report for the spreadsheet model:

• This is NOT the whole Sensitivity Report, just the portion relevant to part d).

Page 19: Math 201 Project 1

Project Assignment

• Your report should model each scenario in part e) with its own spreadsheet model. These should be tabs in your Excel spreadsheet file.

• Planning: your study group should have at least parts a) - d) completed by Monday and have a very good start on parts e) – i). We will use lab time on Monday to help you complete the project, but you must come to lab with some work done already, or it will be difficult for me to help you.