A strict and long term cooperation among specialized companies assisting customers in materials design,
procurement, inspection and problem solving
Materials Engineering Group
Mat Eng
![Page 2: Materials Engineering Group](https://reader031.fdocuments.us/reader031/viewer/2022012300/61e09fc07bdf063eba1f2ea9/html5/thumbnails/2.jpg)
Materials Engineering Group
A group of specialized companies to assist customers in improving materials performance and reducing in-service problems
Mat Eng
![Page 3: Materials Engineering Group](https://reader031.fdocuments.us/reader031/viewer/2022012300/61e09fc07bdf063eba1f2ea9/html5/thumbnails/3.jpg)
Coating&
Lining
Phase 1 – Creating knowledge
CathodicProtection
Materials&
Corrosion
Inspection&
QC
Welding &
NDT
LaboratoryTesting
Phase 2 – Growing competence
Phase 3 – Interference and conflict Phase 4 – Overlap & cooperation
The 4 phases of getting together
Coating&
Lining
Materials &
Corrosion
Cathodic Protection
Inspection&
QC
Welding&
NDT
LaboratoryTesting
Mat Eng
Coating&
Lining
Materials &
Corrosion
Inspection&
QC
Cathodic Protection
LaboratoryTesting
Welding&
NDT
![Page 4: Materials Engineering Group](https://reader031.fdocuments.us/reader031/viewer/2022012300/61e09fc07bdf063eba1f2ea9/html5/thumbnails/4.jpg)
Engineering
• Material selection• Corrosion rate evaluation• Coating & Lining• Passive fire protection• Cathodic Protection• Welding & NDT
Procurement
• Supplier Qualification• Supplier Evaluation (alignment)• Quality Management• Data base and product tracking• Supervision during manufacturing• Inspection and Quality Control• Materials’ testing• Supplier performance review
Site Works and Execution
• Site survey and job supervision• Welding Procedures set up• WPS approval• WPS qualification & testing• Quality supervision during welding• Welding Inspection• Coating Inspection• Commissioning
Failure Analysis
• Review of operating conditions• Review of materials’ performance• Laboratory investigation• Root cause analysis• Lesson learnt• Remedial actions
Legal Assistance
• Assist in litigation cases• Identification of responsibilities• Prepare survey report for lawyers• Court discussions
Materials Engineering Group
Mat Eng
Training
• Tailor-made courses• Classroom courses• Virtual courses
![Page 5: Materials Engineering Group](https://reader031.fdocuments.us/reader031/viewer/2022012300/61e09fc07bdf063eba1f2ea9/html5/thumbnails/5.jpg)
EngineeringCarbon Steel Pipes
Clad PipesWeld Overlays
Coating & LiningPassive Fire Protection
Valves & FittingsCathodic Protection
WeldingNDT
• Material selection, corrosion evaluation
• Site survey and cathodic protection design
• Preparation of technical specification, discussion with client up to agreement / approval
• Discussion of specification with potential vendors, discussion of deviations and with client up to approval
• Supplier / product qualification
• Technical bid evaluation & assistance to procurement up to order placement
• Review of manufacturing schedules
Materials Engineering Group
Mat Eng
![Page 6: Materials Engineering Group](https://reader031.fdocuments.us/reader031/viewer/2022012300/61e09fc07bdf063eba1f2ea9/html5/thumbnails/6.jpg)
Follow upQualificationSupervision
InspectionExpediting
• Discussion up to client approval of Manufacturing Procedure, Quality Control Plan, Inspection and Test Plan, Non-Destructive Testing Procedure, Welding Procedures
• Supervision during qualification process
• Witness of qualification tests at supplier lab or third-party lab or execution of independent testing (mechanical and corrosion tests)
• Execution of inspection activities based on the agreed Quality Control Plan
• Setting up of inspection reports to monitor production quality and compliance with specifications
• Setting up of expediting reports to monitor / ensure delivery time and conditions
• Quality Management, review of NCR, corrective and remedial actions
Materials Engineering Group
Mat Eng
![Page 7: Materials Engineering Group](https://reader031.fdocuments.us/reader031/viewer/2022012300/61e09fc07bdf063eba1f2ea9/html5/thumbnails/7.jpg)
DocumentationData collection
Data baseFeed back
Final Documentation
• Collection of data during manufacturing
• Review of manufacturing data to manage products’ quality
• Address inspection activities based on feed back from data
• Setting up and delivery of final product data base
• Collect all final documentation with links from the data base
Materials Engineering Group
Mat Eng
![Page 8: Materials Engineering Group](https://reader031.fdocuments.us/reader031/viewer/2022012300/61e09fc07bdf063eba1f2ea9/html5/thumbnails/8.jpg)
Engineering Supervision Inspection / ExpeditingData & Docs
PipesMario Celant
Luigi RizziMarco Bissoli,
Cosimo Rosato, Luigi Rizzi
Daniele Celant
Coating & Lining
Nicola VirtùMarco Bissoli
Stefano Sgualivato
Nicola VirtùMarco Bissoli
Stefano Sgualivato
Passive Fire Protection
Stefano SgualivatoManuela Malfanti
Roberto Malfanti
Valves & Fittings
Roberto Cerliani Roberto Cerliani
CP Materials
Ugo MarinelliMarco Cattalini
Ugo Marinelli
NDT Oliviero OldaniOliviero Oldani
Marco Bissoli
WeldingFrancesco Cotzia
Mario CelantFrancesco Cotzia
Laboratory
Mat Eng
![Page 9: Materials Engineering Group](https://reader031.fdocuments.us/reader031/viewer/2022012300/61e09fc07bdf063eba1f2ea9/html5/thumbnails/9.jpg)
Materials Engineering Group
Mat Eng
Thanks for considering Mat-Eng