Material Consumption 2
Transcript of Material Consumption 2
-
8/9/2019 Material Consumption 2
1/3
Sub Division - SawantwadiLocation - Ajgaonkarwadi
Activity No - 906
Material Reconciliation Report
Sr.No. Descriptaion of Materials Issue Qty.
1 RSJ Pole 11 Mtr. 17
2 AAAC Raccon Conductor 4.2
3 11 Kv Pin Insulator 54
4 Disc Insulator 44
5 HT Earthing Pipe 25
6 11 Kv GI pin 54
7 Danger Board 18
8 Barbed Wire 96
9 Stay wire 7/8 swg 200
10 V- Cross arm 9
11 HT Stay set 20
15 V-117 stay clamp 40
16 V-127 stay clamp 40
17 Danger Board clamp 18
18 V-123 barbed wire clamp 70
19 V-120 top cleat 1620 Fish Plate 40
21 Tapping Cross arm 22
22 B-08 Bracing cross arm 22
23 Washer 204
24 M 16 x 180 Nut & Bolts 100
25 M 16 x 75 Nut & Bolts 100
26 M 16 x 65 Nut & Bolts 90
27 V-122 Back clamp for V-cross arm 9
28 Strain hardware 80 sq.mm 50
29 GI wire 8 swg 234
30 V-112 Bracing Angle 231 V-101 guarding channel 1
32 V-102 Back clamp for guarding channel 2
33 V-125 Horizontal bracing angle 2
34 V-126 back clamp for DP 5
35 V-132 fish plate 6
36 V-127 stay clamp 4
NOTE- All the pending Materials are transferred to other Site for furth
-
8/9/2019 Material Consumption 2
2/3
Consumption Qty. Balance Qty
15 2
2.42 1.79
42 12
39 5
14 11
42 12
14 4
72 24
160 40
7 2
15 5
20 20
20 0
14 4
70 0
13 316 24
18 4
18 4
204 0
66 34
100 0
90 0
7 2
39 11
195 39
2 01 0
2 0
2 0
4 1
6 0
4 0
er work
-
8/9/2019 Material Consumption 2
3/3
Sub Division - Sawantwadi
Location - Ajgaonkarwadi
Activity No - 906
Bill No : 01
Sr. No. Description of Material Unit Unit Rate
Qty. Total Amount
1 RSJ Pole 100 X 116 mm 11 m No. 850.00 15.00 12750
2 RSJ 100 x 116 mm-9 mtr long for strut No. 850.00 0.00 0
3 11 KV V-Cross Arm Nos 50.00 7.00 350
4 11 kV Top pin Support Nos 20.00 13.00 260
5 DP Top Channel Set 125.00 2.00 250
6 Cross Bressing structure in D.P. Set 100.00 4.00 400
7 11 KV Pin Insulator with Pin No. 15.00 42.00 630
8 Set 25.00 39.00 975
9 AAA Conductor 80 Sq.mm. (ckt Km) with tree cutting Km. 12000.00 0.81 9660
10 Jointing Sleeves for Conductor No. 20.00 0.00 0
11 Stay sets H.T. Set 125.00 15.00 1875
12 H.T.Earthing set Set 200.00 14.00 2800
13
No
6000.00
0.00 0
14 Anticlimbing Device/Barbded Wire with Clamps Nos 25.00 15.00 375
15 Danger Board with Clamps No. 20.00 14.00 280
16 Concreting ratio 1:4:8 Cmt. 2200.00 21.56 47432
17 Wedge Connectors Raccon to Raccon No 10.00 30.00 300
18 Pit Digging for pole (except boring of drills) Nos. 200.00 15.00 3000
19 Pit Digging for earthing of poles ( except boring of drills) Nos. 150.00 14.00 2100
20 Pit Digging for stay except boring of drills Nos. 200.00 15.00 3000
21 Pit Digging 14 inches dia 6 feet Hole Nos. 1000.00 0.00 0
22 Pit Digging 41/2 inches dia 7 feet hole Nos. 450.00 0.00 0
23 Guarding Nos 300.00 0.00 0Sub total:- 86437.00
(Total Amount in Word : Eightysix Thousand Fourhundred & Thirtyseven Rupees only)
PreviousQty
PresentQty.
PreviousAmount
PresentAmount
11 KV Disc.Insulator (70 KN) with Strain Hardware for AAAC 80sq.mm
Earth bore of 150mm dai., 20 mtr deep with installation of GIearthing strip 2 run of 50 x 10 mm. ( GI strip will be free issue tocontractor)