MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING WATER MAINS AND SERVICES MATERIALS ______________________________________________________________________________ MATERIALS 1 – DESCRIPTION 1.1 General: This part of the specifications shall govern for all materials used in the construction of water distribution facilities under the jurisdiction of the Littleton Water Department. Projects that would necessarily involve materials other than those included in this specification shall be subject to the approval of the Water Department Superintendent. Complete specifications covering all materials not included herein shall be submitted for approval. Any material used other than materials herein specified shall be of the kind and type normally used in the construction of water distribution facilities. 1.1.1 All products included in this section shall conform to the requirements of the standard specifications referenced herein. 1.2 Reference Standards: A. ANSI A21.4/AWWA C104 – Cement Mortar Lining For Ductile Iron Pipe and Gray Iron Pipe and Fittings for Water. B. ANSI A21.10/AWWA C110 – Gray Iron and Ductile Iron Fittings, 3” through 48”, for Water and Other Liquids. C. ANSI A21.11/AWWA C111 – Rubber Gasket Joints for Ductile Iron and Gray Iron Pressure Pipe and Fittings.

Transcript of MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND...

Page 1: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

MATERIALANDINSTALLATIONSPECIFICATIONS

FORCONSTRUCTINGWATERMAINS

ANDSERVICESMATERIALS

______________________________________________________________________________

MATERIALS

1–DESCRIPTION

1.1General:

ThispartofthespecificationsshallgovernforallmaterialsusedintheconstructionofwaterdistributionfacilitiesunderthejurisdictionoftheLittletonWaterDepartment.Projectsthatwouldnecessarily

involvematerialsotherthanthoseincludedinthisspecificationshallbesubjecttotheapprovaloftheWaterDepartmentSuperintendent.Completespecificationscoveringallmaterialsnotincludedhereinshallbesubmittedforapproval.Anymaterialusedotherthanmaterialshereinspecifiedshallbeofthe

kindandtypenormallyusedintheconstructionofwaterdistributionfacilities.

1.1.1Allproductsincludedinthissectionshallconformtotherequirementsofthestandardspecificationsreferencedherein.

1.2ReferenceStandards:

A.ANSIA21.4/AWWAC104–CementMortarLiningForDuctileIronPipeandGrayIronPipeandFittings

forWater.

B.ANSIA21.10/AWWAC110–GrayIronandDuctileIronFittings,3”through48”,forWaterandOtherLiquids.

C.ANSIA21.11/AWWAC111–RubberGasketJointsforDuctileIronandGrayIronPressurePipeand

Fittings.

Page 2: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

D.ANSIA21.51/AWWAC151–DuctileIronPipe.

E.ANSIB.16–CastIronPipeFlangesandFlangedFittings,Class25,125,250,and800.

F.ASTMA126–GrayIronCastingsforValves,Flanges,andPipeFittings.

G.ASTMB62–CompositionBronzeorOunceMetalCastings.

H.AWWAC502–DryBarrelFireHydrants.

I.AWWAC600–InstallationofCastIronWaterMains.

J.AWWAC150–ThicknessDesignforDuctileIronPipe.

K.AWWAC509–Resilient-SeatedGateValves.

L.AWWAC550–ProtectiveInteriorCoatingsforValvesandHydrants.

2–DUCTILEIRONWATERMAINS

2.1General-OnlypipematerialslistedinthissectionshallbeusedformainextensionsunlessspecificallyauthorizedinwritingbytheSuperintendent.

2.2DuctileIronPressurePipes:

2.2.1DuctileIronPipeshallbedesignedinaccordancewithAWWAC150andANSI

A21.51/AWWAC151,Class52andshallhavepush-onjointswherespecified.Pipeshallbedoublecement-linedwithsealcoatinsideandoutconformingtoANSIA21.4/AWWAC104.Push-onjointsandrubbergaskets.

2.2.2ThepipemanufacturershallsupplyLWDwithcertificatesofcompliancewiththese

specificationsandcertificationthateachpieceofductileironpipehasbeentestedatthefoundrywithBallImpressionTest,RingBendingorotherapprovedtestforductilityuponrequest.

2.2.3Ductileironpipemayberejectedforfailuretomeetanyoftherequirementsofthis

specification.

3–SERVICELINES(SeeAttachmentA)

3.1Description:

Theservicelineisthelinefromthemaintotheoutletvalveatthecustomer’smeter.Itshallconsistof

thecorporationstopatthemain,thetubingorpipe,thecurbstopandcurbbox,andameterwithvalvesonboththeinletandoutlet.LWDalsorequiresaPressureReducerbeinstalledpastthemeter,aswellasforallSillCockstobeequippedwithaHoseBibVacuumBreakerequaltoWatts#8.

Page 3: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

3.1.1PolyethyleneServiceline:Tubingforservicesshallbepolyethylenedesignedfor200psiservice.PipeshallbeinaccordancewithAWWAC901standardforPolyethylenePressurePipe,

tubingandfittings.

3.1.2Forservicelineslargerthantwoinchesindiameter,anypipeapprovedinsectionforwatermainsshallbeused.

3.3.3Rejection:PBtubingmayberejectedforfailuretomeetanyoftherequirementsofthisspecification.

4–FITTINGS

4.1Description:

Allfittingsusedintheconstructionofwaterlinesshallbe“UnderwritersLaboratory”(UL)forapproved.

AllmaterialslistedinthissectionshallbemanufacturedinNORTHAMERICA.,unlessspecificallyauthorizedinwritingbytheSuperintendent.

4.2FittingsforDuctileIronPipe:

4.2.1FittingsshallbeCastIron,250psipressurerating,orDuctileIron,350psipressurerating,conformingtoANSIA21.10/AWWAC110withmechanicaljoints.CompactDuctileIronFittings

conformingtoANSIA21.53/AWWAC153willbeacceptable.Jointsshallbefurnishedwith

Page 4: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

ductileironretainingglands.RetainingglandsshallbeROMACINDUSTRIES,INC.GRIPRING™PIPERESTRAINER,oranapprovedequal.Glandsusingsetscrewswillnotbeacceptable.Fittings

shallbedoublecement-linedandseal-coatedinsideandoutinaccordancewithANSIA21.4/AWWAC104.Teesforhydrantbranchesandforstubsforfutureuseshallhavemechanicaljointsontherunwithaplain-endhavinganintegralrotatingglandonthebranch

(Anchor-tees).Theglandwillanchormechanicaljointpipeorvalveendstotheplainendofthepipe.

4.2.2AllDuctileandCastIronPipeandfittingsshallbeclean,sound,andwithoutdefects.Thecastingsshallbesmoothandfreefrompinholes,excessiron,etc.Thecoatingsshallbe

continuous,smoothandneitherbrittlenorsticky.

4.3BrassWaterServiceFittings/ServiceBoxes:

4.3.1General-StopsandFittingsfurnishedunderthesespecificationsshallbeofthesizeandtypespecified,withallpartsofbrass,conformingtoAlloyNumber4A(ASTMDesignationB62)whichhasanominalcompositionof85%copperand5%eachoftin,lead,andzinc,plusor

minus1%.Allstops,cocks,andfittingsshallbefullsizeopenings,throughout,ofthesizespecified.

Allcastingsshallbesmooth,freefromburrs,scales,blisters,sandholes,anddefectsofeverynaturethatwouldmakethemunfitfortheuseforwhichtheyareintended.

Nutsshallbesmoothcast,withsymmetrical,hexagonalwrenchflats.

4.3.2CorporationsshallbeAWWAcorporationvalveinletthreadbycompressionfitting,

meetingtherequirementsofANSI/AWWAC800-89,Mueller25008orequivalent.Theyshallbedesignedtorotateabouttheaxisoftheflowpassagewaywithinacircleofrotationsmall

enoughtoproperlycleartheinsideofanystandardtappingmachineofappropriatesize.

4.3.3CurbStopsshallbecompressionfittingmeetingtherequirementsonANSI/AWWAC800-89.Mueller25209orequivalent.

4.3.4ServiceBoxesshallbeErieBoxPlugStylewith36”StainlessSteelRodwithstandard4.5–5.5feetboxeswithastandardplugcoverwithbrasspentagonplug.Eachboxwillbefittedwith

a36’serviceroadandtheboxshallbemanufacturedinU.S.A.

SECTION5–WATERMAINVALVES

5.1ResilientSeatedGateValves:

5.1.1ValvesshallbeResilientWedgeGateValve,WATEROUSSeries500orequivalentmeetingAWWAC509ofthelatestrevision.Allboltsshallbestainlesssteel.Valvesshallhaveanunobstructedwaterwaywhenfullyopenedequalindiametertoatleast¼”greaterthanthe

Page 5: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

nominalvalvesizes.Valvesshallhavemechanicaljointend.ValvesusedinconjunctionwithRomacTappingSleevesshallhaveaflangeend.

5.1.2Allinternalsurfacesshallbecoatedwithepoxytoaminimumthicknessof4mils.Said

coatingshallbenon-toxic,impartnotastetowaterandshallconformtoAWWAC550oflatestrevision.

5.1.3ValvesshallbeprovidedwithtwoO-ringstemseals.BothO-ringsshallbelocatedabovethethrustcollar.Thesealingmechanismshallprovideadualsealwithzeroleakageatthewater

workingpressurewheninstalledwiththelineflowineitherdirection,andshallconsistofaductileirongatehavingavulcanizedsyntheticrubbercoatingwithnorubbermetalseamsoredgesinthewaterwaywheninthefullyclosedposition.

5.1.4AllvalvesshallbeseattestedattheratedworkingpressureinaccordancewithSection6

ofAWWAC-509.Valveshallberatedat200psiworkingpressureand400psitestpressure.

5.1.5ValvesshallOPENLEFT.

5.2TappingSleeveandValve:

5.2.1TappingsleeveshallbeRomacStainlessSteelorequivalent,meetingAWWAC223.

5.2.2Themechanicaljointsleeveshallhavelongitudinalcompoundrubbergasketswhichshall

fitagainsttherubberendgasketsthusaffectingatotallyenclosedrubberwater-tightseal.

5.2.3Tappingsleeveshallhaveaflangewith“O”ringsealanddrilledtocorrespondtothatofthetappingsleevetoinsureproperalignment.

5.3ValveBoxes:

5.3.1Valveboxesshallbestandardcast-iron,asphaltcoated,adjustable,slidingtype,together

withcast-ironcoverswiththeword“Water”plainlycastinreliefonthetopsurface.AllValveBoxesshallbemanufacturedinNorthAmerica.

5.3.2ThebottomsectionshallhaveaminimumI.D.of5-¼”.Thetopsectionshallhavea

minimumdiameterof6-⅛”.Thereshallbeaminimum6”overlapbetweensections.

5.3.3Thebottomsectionshallbe36”inlengthforallgatevalves.Thetopsectionshallbeatleast26”inlengthandhaveaplainbottom.Nothreepiececombinationsshallbeacceptable.

5.4.5Valveboxesshallbecompletelyandthoroughlycoatedwithbitumasticpaint.

Page 6: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

6–FIREHYDRANTS

6.1General:

6.1.1Hydrants–TheLittletonWaterDepthasstandardizedontheWaterusWB-67orClowMedallion.AllHydrantswillbe“OPENLEFT”.HydrantsshallconformtotherequirementsofAWWAC-502,andbedesignedfor150psiworkingpressuretestedto300psihydrostatic

6.1.2Hydrantsshallbeabletoberotated360degrees.Theyshallhaveapositiveclosing,self-

cleaningdrainvalveanddrainageareashallbecompletelybronzeorbrasslined.

6.1.3HydrantsshallbepaintedyellowtomatchtheTown’sstandardcolor.Inaddition,twocolumnswillbeinstalledtoprotecthydrantsfromvehiculartrafficandsnowplows.Columnsshallbepaintedyellowtomatchhydrants.

6.1.4HydrantExtension–MUSTBEapprovedbyLWD,andshallbeprovidedbythesame

manufacturerashydrants.Extensionshallincludebarrel,rod,coupling,bolts,gaskets,andallotheraccessoryequipmentforacompleteinstallation.

SECTION7–METERS

7.1Description:

Thissectioncoverswatermeters⅝inchto2inches.Aspecialdetailwillbesubmittedforapprovalformeterslargerthantwoinches.

7.2MetersmustconformtoAWWAStandardC-700,latestedition.

7.3AsofSeptember1,2003,LWDwillcharge$300.00fora¾”and$360.00fora1”metersetupfornewinstallations.Theownershallprovideashut-offvalveadjacenttoandonthehousesideofthe

meter.Watermustbeshutofffromthemeterincoldweatherorthemeterotherwiseprotectedfromfrost.Anypersonallowingtheirmetertobedamagedbyfrostorotherwisewillbeheldresponsibleforthecostofmakinggoodthesame.Formetersizesoneandone-halfinch(1½”)orgreater,itisthe

responsibilityoftheowner/customertosupplysaidmeterandshut-off,inaccordancewithLWDSpecifications.Allmeterslargerthan1”shallbeapprovedbyLWD.

7.4.LWDrequiresapressurereduceronthehousesideofthemeterbeinstalledbyalicensedplumberpriortofinalsignoff.

8–THRUSTBLOCKS

8.1Blocks–ThrustblocksshallbeSolidPrecastConcreteBlockplacedbetweenbackoffittingandtrenchwall,inamannertopreventblowoffofthefitting.

8.2Rodding–Inareaswherethrustblocksareunabletobeusedtoproperlyrestrainthefittings,

threadedrodsshallbeusedtoanchortheconnectiontothemain.

Page 7: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

SECTION9–PIPEBEDDINGANDBACKFILL

9.1Bedding:

9.1.1Beddingsandshallbeusedforductileorplasticpipe.Sandshallbefreeofstones.Aminimum8”–12”ofbeddingsandshallbelaidbeneaththepipe,andextend18”overthepipe.Beddingsandshallbeextendtothewidthofthetrench.

9.2Backfill:

9.2.1Backfillingshallbedonewithgoodearth,sandorgravelandshallbefreefromlargerocks

orhardlumpymaterial,unlesstherocksorlumpsarenotmorethanapproximatelyfour(4)inchesingreatestdiameterandarescatteredinthesoil.Nomaterialofaperishable,spongy,orotherwiseunsuitablenatureshallbeusedinbackfilling.

SECTION10–METERBOXES

10.1MeterBoxesfor⅝Inchand1InchMeters:

Meterboxesfor⅝inchthru1”inchmetersshallbeasdepictedbelow.DimensionsofmeterboxandlidareintheStandarddetails.

Meterboxlidsshallbecastironasperstandarddetails.SEEBELOW

Page 8: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

10.2MeterBoxesforMetersLargerthan1Inch:

MeterboxesshallbeQualityWaterProduct1.5”–2”MeterPitorequal.

10.3MeterBoxesforMetersLargerthan2Inch:

Meterboxesshallbemadeofconcreteblocks,bricksorpouredconcretefourinchesthickorgreater.Concreteshallbe3000lb.minimumat28days.

Coversforthesemeterboxesshallbemadeofsteelasperdesignandplans.Thesteelshallbestrongenoughtohandlethetrafficload(ifany).

Thewallsofthemeterboxesshallbecoatedwithabituminoussealantinsideandoutside.The

steellidsshallbebituminouscoatedtopreventrust.Lidsshallbeasperspecialstandarddetails.

SECTION11–TRACEWIRE

11.1Tracewireshallbelaidwithallnon-metallicpipeasperstandarddetails.

Traceshallbefourteen(14)gaugesinglestrandplasticcoatedcoppertracewire.

Page 9: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

CONSTRUCTIONOFWATERMAINS

SECTION1–GENERAL

1.1Thispartofthespecificationshallgoverntheconstructionproceduresusedintheinstallationof

waterlinefacilitiesunderthejurisdictionoftheLittletonWaterDept.ConstructionproceduresotherthanthoseoutlinedinthisspecificationshallmeetwiththeapprovaloftheUtility.Completespecificationscoveringanyunusualorspecialconstructionprocedureshallbesubmittedforapproval

andapprovalmustbereceivedpriortobeginninganyconstructionoperations.

SECTION2–EXCAVATIONANDBACKFILL

2.1Description:

Thissectioncoverstheexcavationandbackfillofwaterlines,andappurtenances.

2.2TrenchExcavation:

2.2.1Thesidesoftheexcavationshallbecutassuchaslopethatwillpreventcaving.Inareas

wheresoilconditionspermitnormalexcavationofthetrench,thesidesshallbecutasnearlyverticalaspossiblefromthebottomofthetrenchtoapoint12”abovethetopofthepipewhenitislaidtograde.Maximumandminimumwidthsofthetrenchshallbeasshownintheplans.

2.2.2Incavinggroundorinwet,saturated,orflowingmaterials,thesidesoftheexcavationshall

beadequatelysheetedandbracedsoastomaintaintheexcavationfreefromslidesorcave-insandsafeforworkmen.Sheetingandshoringshallnotberemoveduntiltheexcavationhasbeenbackfilledtoasufficientdepthtopreventcaving.

2.3TrenchBottom:

TheentirelengthofthewaterlineshallbefoundedonbeddingspecifiedinPipeBeddingand

BackfillMaterials.

2.4DisposalofExcavatedMaterials:

Excavatedmaterialshallbepiledadjacenttotheworktobeusedforbackfillingasrequired.Excavatedmaterialswhichareunsuitableforbackfillingandexcessmaterialshallbedisposedlegallydisposedofatcontractor’sexpense.

2.5UseofExplosives:

Intheeventtheuseofexplosivesisnecessaryfortheefficientprosecutionofthework,theContractor

shallnotifytheSuperintendentinadvanceoftheiruseandshallexerciseeveryprecautiontopreventdamagetoadjoiningimprovementsorpropertybyreasonoftheiruse.Anydamagetoprivateproperty

Page 10: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

resultingfromtheuseofexplosivesshallbetheliabilityoftheContractor.Inallcaseswheretheexplosivesarenecessary,apermitfromthelocalgovernmentagencyshallbeobtainedpriortotheir

use.

2.6Backfilling:

2.6.1WaterLines:

2.6.1.1Backfillingofwaterlinesshallincludetherefillingandconsolidationofthefillintheexcavationuptothesurroundinggroundsurfaceorroadgradeatcrossings.Itisessentialthatthecompletebackfillbedoneinsuchamannertominimizevoidsinthe

backfill.

2.6.1.2Backfillinguptothepoint12”abovethetopofthepipeshallbedonewithgoodearth,sand,orgravelandshallbefreefromlargerocksorhard,lumpymaterials.Nomaterialsofperishable,spongyorotherwiseunsuitablenatureshallbeusedin

backfilling.

2.6.1.3BackfillofPipe:

Rigidpipe(concrete,castiron,orasbestoscement)shallbebackfilledwithselectmaterialsofthepropermoisturecontenttoobtainasupportunderthelower½ofthepipe,compactedtoadensityof90%AASHTOT-180modifiedorbetter.Theintentisto

cradlethepipesothatthefilllengthofeachjointisuniformlysupportedonfirmbeddingandtheweightofpipeandfillisborneuniformlybythelower½ofthepipebarrel.Tampingoffillbelowthespringlineofthepipemaybebyhandtampsprovided

therequireddensityisobtained.

Wheretrenchesarenotunderexistingorproposedpavedareas,backfillshallproceedwiththesameselectmaterialshandplacedtoapoint12”overthetopofthepipe.

Backfillmaythenproceedbywhatevercommonlyusedconstructionmethodsasareconsistentwiththeintegrityofthepipeline.Backfilloutsidetheexistingorproposedpavedareasshallbeleftslightlyoverfulltoallowforsettlement.

Wheretrenchesareunderexistingorproposedpaveareas,theentiretrenchuptoa

point2’belowexistingorproposedsubgradeshallbebackfilledwithselectmaterialsandcompactedtoadensityof90%AASHTOT-180modifiedorbetter.Theremaining2’shallbesimilarlybackfilled,buttheminimumcompactionshallbe95%AASHTOT-180

modified.

Thebackfillofmaterialsintrenchesunderexistingorproposedpavedareasshallbecompactedwithmechanicaldevicesmanufacturedforthatpurposeformtwofeetabovethetopofthepipetothetopoftheexistingorproposedsubgrade

Page 11: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

SECTION3–DEWATERINGOFTRENCHES

3.1Description:

Thissectioncoversthedewateringoftrenchestotheextentthatbeddingmaterialandwaterpipecanbeplacedondry,firmtrenchbottom.

3.2Wellpointing:

Wellpointingwhererequiredtokeeptheexcavationdryandthesubgradestable,shallbeinstalledwhentheexcavationiswithinaminimumoftwo(2)feetofthewatertable,exceptashereinafterprovided,

andshallbeincontinuousoperationuntilbackfilliscompletedtothislevel.Whenconstructionequipmentistobeoperatedinanareathathasbeenexcavatedandwellpointingisrequiredtokeeptrenchexcavationdryandthesubgradestable,thewellpointshallbeinstalledwhentheexcavationis

withinaminimumoffive(5)feetofthewatertable.Thereshallbesufficientpumpingequipment,ingoodworkingorder,availableatalltimes,toremoveanywaterthataccumulateswhenthepipelinecrossesnaturaldrainagechannels,theworkshallbeconductedinsuchamannerthatunnecessary

damageordelaysintheprosecutionoftheworkshallbeprevented.Provisionshallbemadeforthesatisfactorydisposalofsurfacewaterpumpedsoastopreventdamagetopublicorprivateproperty.

3.3TrenchDewatering:

DewateringoftrenchesotherthanbywellpointingshallbeaccomplishedbywhatevermeanselectedbytheContractor,however,beddingmaterialorpipemaynotbeplacedinwetorunstabletrenches.Soil

thatcannotbeproperlydewateredshallbeexcavatedanddrymaterialtampedinplacetosuchadepthasmayberequiredtoprovideafirmtrenchbottom.

3.4SurfaceRunoff:

Surfacerunoffwatershallbedivertedawayfromthetrenches.Suchdiversionshallbeintoexistingdrainagestructuressuchasstormsewers,ditchesorstreams.Diversionofsurfacerunoffshallbeinsuch

amannertopreventfloodingofstreetsorprivateproperty.

3.5DispositionofWaterfromDewatering:

Allwaterremovedfromthetrenchesbywellpointingoranyothermeansshallbepumped,pipedordrainedintoexistingdrainagestructures,suchasstormsewers,ditchesorstreams.Thedispositionofwaterfromdewateringoperationsshallbeaccomplishedinamannerthatwillpreventthefloodingof

publicorprivateproperty.

SECTION4–SHEETINGANDSHORING

4.1Description:

Thissectioncoversthesheetingandshoringtoprotectthesafetyofworkers,providesuitablemeansfor

constructingthewaterline,andtoprotectpublicorprivateproperty,includingexistingutilities.

Page 12: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

4.2Cave-ins:

Wheretrenchcave-insareapossibility,adequatesheetingand/orshoringshallbeprovidedsoastomaintainthetrenchfreefromslidesorcave-insandsafeforworkmen.

4.3ExistingStructures:

Whereexistingbuildings,otherutilities,streets,orotherstructuresareincloseproximitytothetrench,

adequateprotectionshallbeprovidedbytheuseofsheetingandshoringtoprotectthestructurefrompossibledamage.

Inthecaseofstreetsorutilities,theContractormayelecttoremovethestreetorutilityprovidedthattheremovalandsubsequentreplacementmeetswiththeapprovaloftheTownofLittleton,theutility

owner,orwhoeverhasjurisdictionofthestructure.Inallcases,itshallbetheresponsibilityoftheContractortoprotectpublicandprivatepropertyandanypersonorpersonwhomight,asaresultoftheContractor’swork,beinjured.

SECTION5–PIPELAYING

5.1Description:Thissectioncoversthelayingofpipeforwaterlines.

Eachjointofpipeshallbeinspectedcarefullybeforebeingplacedinthetrench.Anyjointfoundtobecrackedorotherwisesodamagedastoimpairitsusefulnessshallbeplainlymarkedinsuchamanner

thatthemarkingswillnotruborwashoff.Damagedjointsshallberemovedfromthesiteassoonasfeasible.

5.2PipeLaying:

5.2.1Allpipeandfittingsshallbeinstalledtothelineandgradeasdetailedontheplans.SubjecttotheapprovaloftheEngineer,otherfittingsmaybeaddedtoorsubstitutedforthoseshown

ontheplans,shouldtheneedariseduringconstruction.ThispermissivestipulationinnowayshallrelievetheContractoroftheresponsibilityforfurnishingandinstallingallfittingsrequiredforacompleteandproperinstallationofmainasdetailedontheplans.

• Properfacilitiesshallbeprovidedforloweringsectionsofpipeintotrenches.Underno

circumstancesshallpipebelaidinwaterandnopipeshallbelaidwhentrenchconditionsorweatherareunsuitableforsuchwork.Fullresponsibilityforthediversionofdrainageandfordewateringoftrenchesduringconstructionshallbebornebythe

Contractor.• Alldirtandotherforeignmattershallberemovedfromtheinsideofpipeandfittings

beforetheyareloweredintothetrench.Theyshallbekeptcleanduringandafter

laying,careshallbetakentokeepdirtoutofthejointingspace.• Spigotandbellsshallbecleanedthoroughlybeforetheapplicationoflubricantand

attachmentofthegasketshallbeinstrictaccordwiththejoint.

Page 13: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

• Allfittingsshallbetightenedusingtorquewrenchestothemanufacturer’sspecifications.

• Attheendofeachday’swork,andwhenpipelayingisdiscontinuedforanappreciableperiod,openendsofpipeshallbeclosedwithacastplugorcapfirmlysecuredinplace.

• Allpipeandfittingsshallbeloweredcarefullyintothetrenchinsuchmannerasto

preventdamagetopipe,fittings,orlinings.Neitherpipenorfittingsshallbedroppedordumpedintothetrench.

• Cuttingofpipe,whereneeded,shallbedoneinaneatandworkmanlikemanner

withoutdamagetopipeorpipelining.• Deflectionsshallnotexceedthemaximumrecommendedbythepipemanufacturer.• Allnon-metallicpipesshallhavetracewiremeetingrequirementsofSectionMW12,

“TraceWire”ofthesespecificationsasperstandarddetails.• Backfillingshallnotbeundertakenuntilwatermaininstallationhasbeeninspectedand

approvedbyLWD.

5.3EarlyWarningTape:

Earlywarningtapeorwireshallbeinstalledintrenchontopofpipebeddingsand.

SECTION6–TAPS

6.1ServiceTaps:

6.1.1General:

Taps:Tapsfortransmissionofwaterorairfromthemainintosystemserviceaccessoriesaredefinedasfollows:

a.Standardinternalpipethreadedholesinthewallofwatermains;thesetapsmaybeeither

manufacturedintothepipeorinstalledinthefield.

b.Tapinstallationsthataremadebyclampingabronzeserviceclampequippedwithasealedthreadedportontheperipheryofthemainthendrillingthroughthepipewalltocompleteeachserviceport.

c.Whenadirecttapismade,pipedopeorTeflontapeshallbeappliedtothethreadedpartof

thecorporationstop.

d.Serviceswillonlybeprovidedfromdedicatedeasements,alleyadright-of-ways.

e.Tapswillbelocatedinsuchamannertoprovidetheshortestdistanceandmostdirectlinetothemeter.

f.Effortshouldbemadetoallowforthecorporationtobesetateither10o’clockor2o’clock.

6.1.2TappingAsbestos-CementPipe:

Page 14: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

Asbestos-cementpipeshallbetappedbytheuseofatappingsaddlewithdoublestainlesssteelstraps.

6.1.3TappingCastIronPipe:

Castironpipefour(4)inchesindiameterandsmallershallbetappedbytheuseofatapping

saddlemadeofbronzeorstainless

6.1.4TappingDuctileIronPipe:

DuctileIronPipeshallbetappedthesameascastironpipe,SectionCW8.1.3above.

6.1.5TappingPVCPipe:

PVCpipeshallbetappedthesameascastironpipe,SectionCW8.1.3above.

6.1.6TappingConcretePressurePipe:

ConcretepressurepipeshallbetappedbytheuseofabronzeorstainlesssteeltappingsaddleasinCW8.1.1.babove.TapshallbemadeaccordingtoPipeManufacturer’sspecifications.Aftertapismade,tapshallbecoveredwithmortarconformingtoMW13.1“Mortar”ofthese

specifications.

6.2MainTaps:

6.2.1WetTaps:

WetconnectionsshallbeusedforallconnectionsexceptwheredirectedbytheEngineer.WetconnectionsshallbemadewithatappingsleeveandvalveconformingtoMW5.3“TappingValvesandSleeves”ofthesespecifications.Eitherairdrivenormanualtappingmachinesmayb

used.Thepipetobetappedshallbecleanedthoroughlyandwirebrushedtoremoverustandotherforeignmatter.Thetappingsleeveshallbeputonandtighteneddownsecurely.Thevalveshallbeputonthesleeveandbracedagainstmovement.Thenthetapshallbemade.

6.2.2DryTaps:

DryconnectionsshallonlybemadewhendirectedbytheEngineerand/orwhenafittingmustbeaddedtoanexistingline.Fordryconnections,theexistinglinemustbeshutoffanddrained.Thisshouldbedonesothatdowntimeofthelineshallbeasshortaspossible.Afterlinehas

beendrained,thelineshallbecutandthefittingputinandblocked.Thesectionolinecutintoshallbetestedandsterilizedaswouldanewline.

Page 15: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

SECTION7–HYDRANTS

7.1Description:

Thissectioncoversconstructionmethodsusedinsettingfirehydrants.AllfirehydrantsshallconformtoSectionMW6–“FireHydrants”.

7.2Excavation:

Excavationforfirehydrantsshallbeneatandshallleavebackoftrenchandbottomoftrenchundisturbedearthforconcreteblocking.

7.3Installation:

Firehydrantsshallbeinstalledasperstandarddetails.Astandardsix-inchgatevalveshallbebetween

themainandhydrant,asperstandarddetails.Six(6)inchDuctileironwaterline,meetingrequirementsMW2.2–“DuctileIronPressurePipe”ofthesespecifications,orSwivaladaptersshallbeusedtoinstallfirehydrants.

7.4Backfill:

Backfillshallbeasperstandarddetails.Concretelockingshallbeputunderneathandbehindhydrant.At

leastseven(7)cubicfeetofcrushedstone,average¾inchdiameter,shallbeplacedaroundhydrantasperstandarddetailsfordrainageofhydrantbarrel.Fabricshallbeplacedabovestonetoprovideaseparationbarrierbetweenbackfillandstone.

SECTION8–PAVEMENTREPAIRS

8.1Description:

Thissectioncoverstheconstructionmethodstobeusedintherepairofroads,streets,orotherpublicrights-of-way.

8.2PermanentRepairs:

8.2.1Asphaltconcretehotmixsurfacecourseconstructionshallmeetwiththecurrent

requirementsoftheLittletonHighwayDepartmentSpecificationsortheMassDOTSpecificationsfortheconstructionofasphaltconcretehotmixsurfacecourseorasotherwiseapproved.

8.2.2ConcretepavementrepairsshallmeetwiththecurrentrequirementsoftheMassDOT

SpecificationsortheLittletonHighwayDepartmentSpecificationsfortheconstructionofconcreterigidpavements.

8.2.3GravelsurfacingshallmeetwiththecurrentrequirementsoftheLittletonHighwayDepartment

Page 16: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

8.2.4Allpermanentrepairsofstreets,roads,orotherpublicrights-of-wayshallmeetwiththeconstructionrequirementsofthegoverningagencyorprivateownerandshallmeetwiththe

requirementsofalllocalOrdinances,Regulations,Permits,orCodesgoverningtherepairstoroads,streets,orotherrights-of-way.

8.3TemporarySurfacing:

MethodsoftemporarysurfacingshallmeetwiththerequirementsofParagraph14.2orasotherwiseapprovedtoadequatelymaintaintrafficandproperdrainage.

SECTION9–CONSTRUCTIONWITHINCITYRIGHT-OF-WAY

9.1CityStreets:

LittletonHighwayDepartmentandMassDOT(whenapplicable)shallbenotifiedpriortoanystreetcuts.Properpermittingshallbeobtainedpriortoopeningofanycitystreets

Ifcitystreetshavetobeclosed,theLittletonFire,PoliceandHighwaydepartmentshallbenotifiedof

closing.Properbarricades,warningsigns,lightsandwatchmenshallbeemployed.Workshallbeprosecutedinsuchamannerthatone-halfofthetraveledportionoftheroadisopentotrafficunlessapprovedbyLittletonPoliceDept.inwriting.

Right-of-wayshallbeleftinaneatandorderlymannerandleftinasgoodorbettershapethanitwas

beforeconstruction.

9.2Easements:

Easementsshallbeleftinaneatandorderlymanner.Easementsshallbeleftinasgoodorbettershapethanthatbeforeconstruction.

SECTION10–EXISTINGSTRUCTURES

10.1General:

NotreesorexistingstructuresshallberemovedunlessapprovedbytheSuperintendent.Allexistingstructures,improvements,andutilitiesshallbeadequatelyprotected,attheexpenseoftheContractor,fromdamagethatmightotherwiseoccurduetoconstructionoperations.TheContractorshallbeliable

fordamagetoanyutilitiesresultingfromhisoperation.Duringconstruction,allfirehydrants,valveboxes,fireorpolicecallboxes,andotherexistingutilitycontrolsshallbeleftintact,unobstructedandaccessible.

Page 17: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

SECTION11–STERILIZATION

11.1Description:

Thissectioncoversmethodsforsterilizationofwaterlinesandfacilities.BeforewaterlinesaresterilizedtheymustfirstbepressuretestedaccordingtotherequirementsofPartTW–“TestingofWaterMains”ofthesespecifications.Waterlinesalsomustbeflushedtoremovedirtandotherforeignmatter.

11.2Flushing:

Aservicetapmustbeputononeendofthewaterlinetoallowentryofflushingwaterandsterilization

water.ThetapshallbedoneaccordingtotherequirementsofCW8–“ServiceTaps”ofthesespecifications.

FlushingshallbedonewithcleanwaterfromtheTown’ssystemuntilwaterleavingtheotherendofthemainisclear.

11.3Sterilization:

Chlorineshallbeusedtosterilizethepipelinebythefollowingmethod:

Theamountofchlorineappliedshallbesuchastoprovideadosageofnotlessthanfifty(50)partsper

million.ThechlorinatingmaterialshallbeintroducedtothewaterlinesanddistributionsysteminamannerapprovedbytheEngineer.Afteracontactperiodofnotlessthaneight(8)hours,thesystemshallbeflushedwithcleanwateruntiltheresidualchlorinecontentisnotgreaterthan0.2partsper

million.Allvalvesinthelinesbeingsterilizedshallbeopenedandclosedseveraltimesduringthecontactperiod.

Thecostoffurnishingthechlorine,labor,tools,equipment,andtestsofchlorinecontentandbacteriologicaltestswillbeattheexpenseoftheContractor.Nowatermainsshallbeplacedinservice

untilasatisfactorytestreporthasbeenreceivedfromanapprovedlaboratory.

Page 18: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

TESTINGOFWATERMAINSECTION

SECTION1–GENERAL

1.1Thispartofthespecificationsstipulatestestrequirementsformaterials,constructionmethods,and

leakage,pressureandbacteriologicaltestsofthewaterlines.TestingformaterialsandconstructionmethodsshallbeattheDeveloper’soptionexceptasstipulatedherein.TheLittletonWaterDepartmentmayrequiretestsasoutlinedinthesespecificationsformaterialsandconstructionproceduresif,inthe

opinionoftheWaterDepartment,thequalityofmaterialsandtheconstructionproceduresdonotmeettherequirementsstipulatedherein.

Inallcases,leakage,pressureandbacteriologicaltestsshallbeperformedonwaterlinesasspecifiedinthesestandardspecifications.

SECTION2–HYDROSTATICTESTING

2.1DuctileIronPipe:

Assoonasacontinuoussectionofnewwatermainhasbeeninstalled,theContractorshallproceedimmediatelytocompletealltestingandsterilizing,makeallconnections,andplacethosesectionsin

service.TheContractorshallfurnishalllabor,materials,tools,andequipmentnecessarytobulkheadandsealoffthelinefortesting,coordinatewiththeLittletonWaterDept.toflush&fillthenewlyconstructedmainwithwater.

Unlessotherwiseindicated,thepipelineshallbetestedwithahydrostaticpressureofnotlessthantwo

hundred(200)poundspersquareinchmaintainedoveracontinuousperiodofnotlessthantwo(2)hoursbyanindependentthirdpartycontractorwhoperformswatermainpressuretestingonaregularbasis.Afterasuccessfulcontinuouspressureperiodoftwo(2)hourshasbeencompleted,the

contractorshallchlorinate(seesection11–Sterlilization)thewatermainusingathirdpartycontractor.

Thecostoftesting,finding,andrepairingtheleaksandretesting,shallbeattheexpenseoftheContractor.ThewaterrequiredtofillthelineswillbefurnishedbytheOwner,withoutchargetotheContractor.

2.2PVCPressurePipe:

Assoonasacontinuoussectionofnewwatermainhasbeeninstalled,theContractorshallproceed

immediatelytocompletealltestingandsterilizing,makeallconnections,andplacethosesectionsinservice.TheContractorshallfurnishalllabor,materials,tools,andequipmentnecessarytobulkheadandsealoffthelinefortesting,fillitwithwater,raisethefilledlinetotestpressure,andmeasurethe

amountofleakageoverthetestperiod.Unlessotherwiseindicated,thepipelineshallbetestedwithahydrostaticpressureofnotlessthanthatpressurethepipeisratedat(i.e.,class200testpressure200

Page 19: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

psi)maintainedoveracontinuousperiodofnotlessthanfour(4)hours.Afterasuccessfulcontinuouspressureperiodoffour(4)hourshasbeencompleted,atestforthedeterminationofamountofleakage

shallberunatthesamepressureasbeforeforadurationoftwo(2)hours.Ifthetestsindicatealeakageinexcessofarateequaltoten(10)gallonsperinchofinternalpipediameterpermileofpipelinepertwenty-four(24)hours,theContractorwillberequiredtofindandeliminatetheleak.Allknownleaks

shallbestopped,regardlessofthetestrequirement.

Thecostoftesting,findingandrepairingtheleaksandretesting,shallbeattheexpenseoftheContractor.ThewaterrequiredtofillthelineswillbefurnishedbytheOwner,withoutchargetotheContractor.

SECTION3–BACTERIOLOGICALTEST

3.1AfterasectionofwatermainhasbeensterilizedandflushedaccordingtoSectionCW19–“Sterilization”ofthesespecifications,theUtilityshallbenotifiedtopickupasample.Abacteriologicaltestshallberuntodeterminewhethercoliformorganismsarepresent.Ifcoliformorganismsarefound

thelinewillhavetoberesterilizedasperSection11.3ofthesespecifications.

TheContractorwillbenotifiedastotheresultsofthetest.Thetestrequires48hourstocomplete.

ASBUILTDRAWINGS

Page 20: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

SECTION1–GENERAL

1.1ThispartofthespecificationsstipulatestestrequirementsfortheprovisionofASBUILTdrawingsofworktobeprovidedtotheLittletonWaterDept.AllcostsassociatedwithprovidingaccurateASBUILTdrawingstoLWDshallbetheresponsibilityofthecontractor.

SECTION2–SERVICEASBUILT

2.1Atthecompletionoftheinstallation,andpriortoawatermeterbeinginstalled,thecontractorshallprovidetoLittletonWaterDeptanASBUILTdrawingdepictingthefollowing:

• CurbStop• WaterLinewithDesignationastothesize.

• Locationwheretheserviceentersthebuilding

AllASBUILTDrawingsshallhaveaminimumoftwo(2)tiesfrompermanentstructures(i.e.buildingcorner,hydrant,gatecover,manholecover,catchbasin,hydrant,propertybound).

SECTION3–WATERMAINASBUILT

Page 21: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

3.1As-BuiltDrawings–WaterInfrastructure

As-BuiltDrawingsshallbeinaccordancewiththestandardsestablishedbyLWDandshallshowcompletedetailsoftheinstallationoftheMainandappurtenancesasrequired,including,butnot

limitedto,

1)ThelocationoftheMainwithrespecttopropertylines,

2)Thesize,make,andlocationwithrespecttostreetcornersofallvalvesandfirehydrants,manholes,andcleanouts,

3)Thelimitsandlocationofanyandallspecialencasementsorbackfillmaterialsincludingaveragedepthofcoveratsuchlocation,

4)Adetaileddiagramofallspecialinstallationsatutility,drainage,androadwaycrossings,

5)Locationofotherutilitiesencountered.

6)Flowlineandrimelevationforallmanholes.

7)Sizeandmaterialofmain,

8)Locationandsizeofeasements.

TheApplicantshallprovidetheWaterDepartmentwithafullsize,reduced,anddigitalcopyofthe

finalsetofAs-builtplanspriortowaterserviceacceptance.

3.1.1Thedigitalcopyofapprovedas-builtplansmustfollowthefiverequirementslistedbelow:

1.Allplansandspecificationsmustbesubmittedonelectronicmedia(CDorDVD_ROMusinganIBM-PCorcompatiblefileformat).Acceptablefileformatsinclude:AutoCAD*.dwg,AutoCAD*.dxf,ArcView*.shp,orArcGISGeodatabase*.mdb.Thefilesmustbe

identicaltotheprintedplanandcontainallinformationincludedonthewrittenplan.

2.AlldigitalmappingdatamustbedeliveredintheMassachusettsStatePlaneCoordinatesystemwithahorizontaldatumofNAD83andverticaldatumofNGVD88.

3.EachfeaturetypemustbeorganizedintheCADorGISdatastructureasaseparate

layerusinglogicallayernames.Forexample,theremustbeseparateCADlayersforbuildings,roads,parcellines,andwetlands.HavingallthesefeaturesinasingleCADlayerorGISfilewillnotbeaccepted.

4.DocumentationofthedataformatmustbeprovidedwithadescriptionoftheCAD

layersandlistofthetypesoffeaturesplacedineachlayer.Submissionofmultiplefilesmustalsoincludealistofthefilesandtheirpurpose.

Page 22: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining

5.Thedatasubmittedmustincludedocumentationonthemethodusedtogatherthedata,thenameoftheperson(s)responsibleforpreparingthedata,contactinformation,

anestimationofthehorizontalandverticalaccuracy,andthedateofdatacapture.Allmediashallbefreefromanyandalldefectsandviruses,andlabeledastotheircontents.

Page 23: MATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... · PDF fileMATERIAL AND INSTALLATION SPECIFICATIONS FOR CONSTRUCTING ... A. ANSI A21.4/AWWA C104 – Cement Mortar Lining