Material and energy balance using Aspen
-
Upload
rajat-verma -
Category
Engineering
-
view
133 -
download
13
Transcript of Material and energy balance using Aspen
![Page 1: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/1.jpg)
Material and Energy Balance using
ASPEN Plus Simulation
By Rajat Verma : 13112071
Navneet kumar rai : 13112057
![Page 2: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/2.jpg)
Design of an acetic anhydride manufacturing facility, states that one of the key steps is the vapor-phase cracking of acetone to ketene and methane: CH3COCH3 CH2CO + CH4He states further that this reaction is first-order with respect to acetone and that the specific reaction rate can be expressed by ln k = 34.34 – 34.222/T Where k is in reciprocal seconds and T is in Kelvin. In this design, it is desired to feed 8000 kg of acetone per hour to a tubular reactor. If the reactor is adiabatic, the feed pure acetone, the inlet temperature 1035K, and the pressure 1 62 kPa (1.6 atm), a tubular reactor of what volume is required for 20% conversion?
Example Problem
![Page 3: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/3.jpg)
Cracking in vapor-phase Reaction is first-order with respect to acetone feed 8000 kg of acetone per hour Tubular reactor Reactor is adiabatic feed is pure acetone The inlet temperature 1035K, and the
pressure 162 kPa (1.6 atm), 20% conversion
Data from given problem
![Page 4: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/4.jpg)
what volume is required for 20% conversion?
![Page 5: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/5.jpg)
Start a new project in Aspen
![Page 6: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/6.jpg)
![Page 7: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/7.jpg)
![Page 8: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/8.jpg)
![Page 9: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/9.jpg)
![Page 10: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/10.jpg)
![Page 11: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/11.jpg)
![Page 12: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/12.jpg)
![Page 13: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/13.jpg)
![Page 14: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/14.jpg)
![Page 15: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/15.jpg)
![Page 16: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/16.jpg)
![Page 17: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/17.jpg)
![Page 18: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/18.jpg)
![Page 19: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/19.jpg)
![Page 20: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/20.jpg)
![Page 21: Material and energy balance using Aspen](https://reader035.fdocuments.us/reader035/viewer/2022062218/58a8ff1c1a28ab837c8b673f/html5/thumbnails/21.jpg)