Transcript of Material
Select The BlankQuestion
Inspection methods analyze ________.Correct Answer
Degree of inspectionYour Answer
Quality of material
Multiple Choice Single AnswerQuestion
In Fixed-Order quantity system, cycle time of consumption should be :-Correct Answer
More than lead timeYour Answer
Less than lead-time
Select The BlankQuestion
In the ________ , the composition of code is in three groups of digits that are separated by hyphens, the hyphens serves to break the code into easy to
handle group of digits.Correct Answer Kodak systemYour Answer Kodak system
Multiple Choice Single AnswerQuestion
A buyer gives wrong idea to his supplier about his requirements or show a fictitious figure to get some price discount is called as :-
Correct Answer Misrepresentation of facts
Your Answer Misrepresentation of facts
Multiple Choice Single AnswerQuestion JIT is an :-
Correct Answer Inventory reduction technique
Your Answer Just-in-time
Multiple Choice Single AnswerQuestion
Issues to top up supply to pre-fixed levels of items are :-
Correct Answer Imprest issuesYour Answer
Imprest issues
True/FalseQuestion
Two bin system is better as compared to perpetual inventory system.Correct Answer
FalseYour Answer
True
Multiple Choice Multiple AnswerQuestion
Annual total cost changes :-Correct Answer
If stock turnover rate changes , If quantity changesYour Answer
If stock turnover rate changes , If procurement cost changes , If set-up cost changes
True/FalseQuestion
Functionally critical parts require to be covered under cent per cent inspection
Correct Answer True
Your Answer False
Select The BlankQuestion
GRR are sent from ________.Correct Answer
Stores Dept.Your Answer Stores Dept.
Multiple Choice Single AnswerQuestion
Competitive price information must be treated as confidential and should not be disclosed to the bidders with an intention of allowing them to rebid is :-
Correct Answer Improprieties of bids
Your Answer
Price disclosure
Select The BlankQuestion
Good ________ relations are necessary for effective materials planning as every department is involved in materials planning because each
department requires one item or other another.Correct Answer DepartmentalYour Answer Departmental
Multiple Choice Multiple AnswerQuestion
The following are the actions would help to improve effectiveness of materials planning :-
Correct Answer Accurate forecasting , Computerization , Shorter materials plan period
Your Answer Accurate forecasting , Computerization , Shorter materials plan period
Match The FollowingQuestion
Correct AnswerYour Answer
JEJournal EntriesJournal Entries
POPurchase orderPurchase order
GRNGoods receipt noteGoods receipt note
DNDiscrepancy note.Discrepancy note.
True/FalseQuestion
Cancellation of orders on flimsy ground is unethical.Correct Answer
TrueYour Answer
True
Select The BlankQuestion
Standardized containers eliminates ________Correct Answer Transit damage
Your Answer Transit damage
Multiple Choice Single AnswerQuestion
Purchase order offers acceptance and have been clearly laid down in :-Correct Answer
Indian Contract act 1872Your Answer
Indian Contract act 1872
Multiple Choice Single AnswerQuestion
For the inspection of Stationery which department is responsible?Correct Answer
StoresYour Answer
Stores
Match The FollowingQuestion
Correct AnswerYour Answer
FAS (4-2)Sale at the port of destination
Sale at port of exportFOB (1-1)
Sale is made on FOB vesselSale is made on FOB vessel
CIF (2-4)Sale is made at port of destination
Sale at the port of destinationCFR (3-3)
Sale at port of exportSale is made at port of destination
Multiple Choice Single AnswerQuestion
Reprocessing of Scrap is :-Correct Answer
Reclaiming for re-use
Your Answer Reclaiming for re-use
Multiple Choice Single AnswerQuestion
Limit gauges are used to verify :-Correct Answer
Whether the product is within the specificationYour Answer
Whether the product is within the specification
Multiple Choice Single AnswerQuestion
Which of the following is not the internal factor influencing materials planning?
Correct Answer International market
Your Answer International market
Multiple Choice Single AnswerQuestion
The system should be designed in such a way that it serves the advantages that are expected to accrue from it, is called as :-
Correct Answer Objective oriented
Your Answer Objective oriented
Multiple Choice Single AnswerQuestion
Real creative ideas results :-Correct Answer
When members ventures into impossible areasYour Answer
When opportunity is given to staff
Multiple Choice Multiple AnswerQuestion
Segregation of scrap means :-Correct Answer
Sorting by type, size, grade etc. , Sorting by grade, weightYour Answer
Sorting by type, size, grade etc. , Sorting by grade, weight
Select The Blank
Question ________clause should be inserted in the purchase order of items critical to
project to induce supplier for early completion of the orders.Correct Answer
BonusYour Answer
Penalty for delay
True/FalseQuestion
Single tender system is used when there is only one supplier of the item.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
Following are benefits of scientific stoke management :-Correct Answer
Reduction in downtime by efficient issues , Inventory control , Very less time required to identify & issue material
Your Answer Reduction in downtime by efficient issues , Inventory control , Very less time
required to identify & issue material
True/FalseQuestion
Stores is the "Safe Custody" for keeping materialsCorrect Answer
TrueYour Answer
True
True/FalseQuestion
Value analysis is the cost reduction technique.Correct Answer
TrueYour Answer
True
True/FalseQuestion
Codification avoids confusion and doubt caused by long description of items.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
Complaints concerning should be made in such a way that negative reactions are avoided such as :-
Correct Answer Delivery failures , Rejection , Shortages
Your Answer Delivery failures , Rejection , Shortages
True/FalseQuestion
A firm engaged in custom-built-product, is usually plagued with obsolete material.
Correct Answer True
Your Answer True
Select The BlankQuestion
________ refers to the procurement of the requirements of all departments of the firm by a central purchase organization.
Correct Answer CentralisationYour Answer Centralisation
Multiple Choice Multiple AnswerQuestion
Conventional machine set-up time includes :-Correct Answer
Tool replenishment , First piece inspectionYour Answer
Tool replenishment , First piece inspection , Set-up
Multiple Choice Multiple AnswerQuestion
Stock-out is due to :-Correct Answer
Unusual high demands , Delay in deliveriesYour Answer
Unusual high demands , Delay in deliveries , Machine break-down
True/FalseQuestion
Negotiation should end up with an unhappy supplier.Correct Answer
FalseYour Answer
False
Select The BlankQuestion
Systematic, formal and continuous analysis of all factors affect ________ management function is known as Materials research.
Correct Answer Materials
Your Answer Materials
True/FalseQuestion
Since stock-taking is a check on storekeeper, it should not be conducted by him.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion
Salient features of the working of the price panel are as under :-Correct Answer
Usage value above which the panel is to approve of the price is specified. , Vendor development department is required to give cost break up to the
secretary of the price panel , Members of the panel meet to scrutinize and discuss the cost aspects.
Your Answer Usage value above which the panel is to approve of the price is specified. , Vendor development department is required to give cost break up to the
secretary of the price panel , Members of the panel meet to scrutinize and discuss the cost aspects.
Multiple Choice Multiple AnswerQuestion
Application for an import license must be signed from :-Correct Answer
Proprietor , Partner of firm , Person duly authorized by board of directors of
companyYour Answer
Proprietor , Partner of firm , Person duly authorized by board of directors of company
True/FalseQuestion
Manual inspection is economical when volume of output is small.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
For large organizations where product is made up of assemblies of manufactured components raw material store is subdivided into :-
Correct Answer Foundry store , Tool crib , Maintenance store
Your Answer Foundry store , Tool crib , Goods inward store
True/FalseQuestion
Post parcel consignments are cleared through customs & clearance is done through foreign post office.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
What is the meaning of discharge of contract by novation?Correct Answer
If the parties agree to substitute a new contract in place of existing one or alter it, original contract is discharged
Your Answer If the parties agree to substitute a new contract in place of existing one or
alter it, original contract is discharged
Select The BlankQuestion
Quantity delivered of goods must be according to the ________.Correct Answer
Terms of contract
Your Answer Terms of contract
Multiple Choice Single AnswerQuestion
Which of the following is not the external factor influencing materials planning?
Correct Answer Corporate objective
Your Answer Corporate objective
at 1:43 AM 0 comments Links to this post
Labels: Materials Management
Materials Management - 3
Select The BlankQuestion
Inspection methods analyze ________.Correct Answer
Degree of inspectionYour Answer
Quality of material
Multiple Choice Single AnswerQuestion
In Fixed-Order quantity system, cycle time of consumption should be :-Correct Answer
More than lead timeYour Answer
Less than lead-time
Select The BlankQuestion
In the ________ , the composition of code is in three groups of digits that are separated by hyphens, the hyphens serves to break the code into easy to
handle group of digits.Correct Answer Kodak systemYour Answer Kodak system
Multiple Choice Single AnswerQuestion
A buyer gives wrong idea to his supplier about his requirements or show a fictitious figure to get some price discount is called as :-
Correct Answer Misrepresentation of facts
Your Answer Misrepresentation of facts
Multiple Choice Single AnswerQuestion JIT is an :-
Correct Answer Inventory reduction technique
Your Answer Just-in-time
Multiple Choice Single AnswerQuestion
Issues to top up supply to pre-fixed levels of items are :-Correct Answer Imprest issuesYour Answer
Imprest issues
True/FalseQuestion
Two bin system is better as compared to perpetual inventory system.Correct Answer
FalseYour Answer
True
Multiple Choice Multiple AnswerQuestion
Annual total cost changes :-Correct Answer
If stock turnover rate changes , If quantity changesYour Answer
If stock turnover rate changes , If procurement cost changes , If set-up cost changes
True/FalseQuestion
Functionally critical parts require to be covered under cent per cent inspection
Correct Answer True
Your Answer False
Select The BlankQuestion
GRR are sent from ________.Correct Answer
Stores Dept.Your Answer Stores Dept.
Multiple Choice Single AnswerQuestion
Competitive price information must be treated as confidential and should not be disclosed to the bidders with an intention of allowing them to rebid is :-
Correct Answer Improprieties of bids
Your Answer Price disclosure
Select The BlankQuestion
Good ________ relations are necessary for effective materials planning as every department is involved in materials planning because each
department requires one item or other another.Correct Answer DepartmentalYour Answer Departmental
Multiple Choice Multiple AnswerQuestion
The following are the actions would help to improve effectiveness of materials planning :-
Correct Answer Accurate forecasting , Computerization , Shorter materials plan period
Your Answer Accurate forecasting , Computerization , Shorter materials plan period
Match The FollowingQuestion
Correct AnswerYour Answer
JEJournal EntriesJournal Entries
POPurchase orderPurchase order
GRNGoods receipt noteGoods receipt note
DNDiscrepancy note.Discrepancy note.
True/FalseQuestion
Cancellation of orders on flimsy ground is unethical.Correct Answer
TrueYour Answer
True
Select The BlankQuestion
Standardized containers eliminates ________Correct Answer Transit damage
Your Answer Transit damage
Multiple Choice Single AnswerQuestion
Purchase order offers acceptance and have been clearly laid down in :-Correct Answer
Indian Contract act 1872Your Answer
Indian Contract act 1872
Multiple Choice Single AnswerQuestion
For the inspection of Stationery which department is responsible?Correct Answer
StoresYour Answer
Stores
Match The FollowingQuestion
Correct AnswerYour Answer
FAS (4-2)Sale at the port of destination
Sale at port of exportFOB (1-1)
Sale is made on FOB vesselSale is made on FOB vessel
CIF (2-4)Sale is made at port of destination
Sale at the port of destinationCFR (3-3)
Sale at port of exportSale is made at port of destination
Multiple Choice Single AnswerQuestion
Reprocessing of Scrap is :-Correct Answer
Reclaiming for re-useYour Answer
Reclaiming for re-use
Multiple Choice Single AnswerQuestion
Limit gauges are used to verify :-Correct Answer
Whether the product is within the specificationYour Answer
Whether the product is within the specification
Multiple Choice Single AnswerQuestion
Which of the following is not the internal factor influencing materials planning?
Correct Answer International market
Your Answer International market
Multiple Choice Single AnswerQuestion
The system should be designed in such a way that it serves the advantages that are expected to accrue from it, is called as :-
Correct Answer Objective oriented
Your Answer Objective oriented
Multiple Choice Single AnswerQuestion
Real creative ideas results :-Correct Answer
When members ventures into impossible areasYour Answer
When opportunity is given to staff
Multiple Choice Multiple AnswerQuestion
Segregation of scrap means :-Correct Answer
Sorting by type, size, grade etc. , Sorting by grade, weightYour Answer
Sorting by type, size, grade etc. , Sorting by grade, weight
Select The BlankQuestion
________clause should be inserted in the purchase order of items critical to project to induce supplier for early completion of the orders.
Correct Answer Bonus
Your Answer Penalty for delay
True/FalseQuestion
Single tender system is used when there is only one supplier of the item.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
Following are benefits of scientific stoke management :-Correct Answer
Reduction in downtime by efficient issues , Inventory control , Very less time required to identify & issue material
Your Answer Reduction in downtime by efficient issues , Inventory control , Very less time
required to identify & issue material
True/FalseQuestion
Stores is the "Safe Custody" for keeping materialsCorrect Answer
TrueYour Answer
True
True/FalseQuestion
Value analysis is the cost reduction technique.Correct Answer
TrueYour Answer
True
True/FalseQuestion
Codification avoids confusion and doubt caused by long description of items.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
Complaints concerning should be made in such a way that negative reactions are avoided such as :-
Correct Answer Delivery failures , Rejection , Shortages
Your Answer Delivery failures , Rejection , Shortages
True/FalseQuestion
A firm engaged in custom-built-product, is usually plagued with obsolete material.
Correct Answer True
Your Answer True
Select The BlankQuestion
________ refers to the procurement of the requirements of all departments of the firm by a central purchase organization.
Correct Answer Centralisation
Your Answer Centralisation
Multiple Choice Multiple AnswerQuestion
Conventional machine set-up time includes :-Correct Answer
Tool replenishment , First piece inspectionYour Answer
Tool replenishment , First piece inspection , Set-up
Multiple Choice Multiple AnswerQuestion
Stock-out is due to :-Correct Answer
Unusual high demands , Delay in deliveriesYour Answer
Unusual high demands , Delay in deliveries , Machine break-down
True/FalseQuestion
Negotiation should end up with an unhappy supplier.Correct Answer
FalseYour Answer
False
Select The BlankQuestion
Systematic, formal and continuous analysis of all factors affect ________ management function is known as Materials research.
Correct Answer Materials
Your Answer Materials
True/FalseQuestion
Since stock-taking is a check on storekeeper, it should not be conducted by him.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Salient features of the working of the price panel are as under :-
Correct Answer Usage value above which the panel is to approve of the price is specified. , Vendor development department is required to give cost break up to the
secretary of the price panel , Members of the panel meet to scrutinize and discuss the cost aspects.
Your Answer Usage value above which the panel is to approve of the price is specified. , Vendor development department is required to give cost break up to the
secretary of the price panel , Members of the panel meet to scrutinize and discuss the cost aspects.
Multiple Choice Multiple AnswerQuestion
Application for an import license must be signed from :-Correct Answer
Proprietor , Partner of firm , Person duly authorized by board of directors of company
Your Answer Proprietor , Partner of firm , Person duly authorized by board of directors of
company
True/FalseQuestion
Manual inspection is economical when volume of output is small.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
For large organizations where product is made up of assemblies of manufactured components raw material store is subdivided into :-
Correct Answer Foundry store , Tool crib , Maintenance store
Your Answer Foundry store , Tool crib , Goods inward store
True/FalseQuestion
Post parcel consignments are cleared through customs & clearance is done through foreign post office.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
What is the meaning of discharge of contract by novation?Correct Answer
If the parties agree to substitute a new contract in place of existing one or alter it, original contract is discharged
Your Answer If the parties agree to substitute a new contract in place of existing one or
alter it, original contract is discharged
Select The BlankQuestion
Quantity delivered of goods must be according to the ________.Correct Answer
Terms of contractYour Answer
Terms of contract
Multiple Choice Single AnswerQuestion
Which of the following is not the external factor influencing materials planning?
Correct Answer Corporate objective
Your Answer Corporate objective
at 1:42 AM 0 comments Links to this post
Labels: Materials Management
Materials Management - 2
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion
In fixed-order interval system, order interval is fixed.Correct Answer
TrueYour Answer
True
True/FalseQuestion
Pre-fixed qty. issue system is suitable for A-class items.Correct Answer
FalseYour Answer
True
Select The BlankQuestion
________ find their use in identification of raw materials, lubricants, pipelines etc.
Correct Answer Colour codesYour Answer Colour codes
Select The BlankQuestion
Two-bin system supersedes ________.Correct Answer
Perpetual inventoryYour Answer
Variable inventory
Multiple Choice Multiple AnswerQuestion
In F.O.R. contract seller is responsible for :-Correct Answer
Arranging for movement of goods to the transporter's godown , Safe loading on into the vehicle , Keeping the material in deliverable state
Your Answer Paying for the local transport , Arranging for movement of goods to the
transporter's godown , Safe loading on into the vehicle
Multiple Choice Single AnswerQuestion
Organization decided to import when :-Correct Answer
Item is not available in the countryYour Answer
Item is not available in the country
Multiple Choice Single Answer
Question The purchasing made under contract , usually formal, of needed materials,
the delivery of which is frequently spread over a period of time is known as :-Correct Answer Contract buying
Your Answer Contract buying
Multiple Choice Multiple AnswerQuestion
Internal lead time can be reduced :-Correct Answer
By selectively delegating the powers , By developing local vendorYour Answer
By selectively delegating the powers , By developing local vendor , By better paper-work
True/FalseQuestion
Telephonic quotations are useful when there is limited competition.Correct Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
The point of transfer of ownership rights from seller to buyer is :-Correct Answer Place of delivery
Your Answer Spare part and supply contracts
Multiple Choice Single AnswerQuestion
Prices of certain commodity may be fixed by the government and thereby putting a restriction on both buyer and seller is :-
Correct Answer Government restrictions
Your Answer Government restrictions
Match The FollowingQuestion
Correct AnswerYour Answer
Review periodOrder interval
Two-bin systemFOQ systemB-class itemsB-class items
Reduction in record-keepingTwo-bin systemOrder interval
Fixed-Order Interval systemFixed order intervalFixed order interval
Select The BlankQuestion
Average inventory in any replenishment system is ________ to sum of minimum & maximum stock.
Correct Answer Equal
Your Answer Steady
Multiple Choice Multiple AnswerQuestion
Following are distinguishing features of Air consignment :-Correct Answer
No system of prior entry , 3 free days are allowed from flight dateYour Answer
No system of prior entry , 3 free days are allowed from flight date , All rules are same for Air & Sea consignment
Multiple Choice Multiple AnswerQuestion
Typical examples of direct materials are :-Correct Answer
Cloth in the manufacture of garment , Wood in the manufacture of furniture , Fruits in a canning industry
Your Answer Cloth in the manufacture of garment , Wood in the manufacture of furniture ,
Fruits in a canning industry
True/FalseQuestion
Cost of capacity which may be rendered idle if the item currently being manufactured in purchased needs to be added to the cost to buy.
Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
Following special schemes are announced by Indian Government under which import can be permitted at zero duty or at less duty :-
Correct Answer Export promotion capital goods scheme , Diamond &Jewellary promotion
scheme , Import by 100% export oriented unitsYour Answer
Export promotion capital goods scheme , Diamond &Jewellary promotion scheme
Multiple Choice Single AnswerQuestion
Government departments and public sector undertakings in India follow this method of buying :-
Correct Answer Tender buyingYour Answer
Blanket orders
Match The FollowingQuestion
Correct AnswerYour AnswerRight place
Delivery as per contractDelivery as per contract
Buyers rightExamine the goods
Examine the contractUnpaid sellers right
Of lienAttack on buyers property
DeliveryTransfer of ownership rights from seller to the buyer
Of lien
Select The BlankQuestion
Acceptance sampling plans have been evolved ________.Correct Answer
Based on probability theory
Your Answer Based on probability theory
True/FalseQuestion
Purchase cost is the price paid the supplierCorrect Answer
TrueYour Answer
True
True/FalseQuestion
Esteem value is paid by the supplier.Correct Answer
FalseYour Answer
True
True/FalseQuestion
Vendors are not responsible for statutory approvals from government authorities.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion
Advantages of fixed price agreements are :-Correct Answer
They are easy to administer , They give certainty to the buyer who knows from the start, amount he has to pay for the goods/services. , They protect
buyer from possible financial risks from price escalationsYour Answer
They are easy to administer , They give certainty to the buyer who knows from the start, amount he has to pay for the goods/services. , They protect
buyer from possible financial risks from price escalations
Multiple Choice Single AnswerQuestion
The threat on the part of supplier to hold supplies until favourable price decisions is :-
Correct Answer Ability to hold on price
Your Answer Ability to hold on price
Select The BlankQuestion
Finished parts are called as ________.Correct Answer Bought-out parts
Your Answer Auxillary parts
Select The BlankQuestion
Tendering in the absence of negotiations is also called ________.Correct Answer
Firm biddingYour Answer
Schedule buying
Multiple Choice Multiple AnswerQuestion
Special stores are created where :-Correct Answer
Material need to be held under the control of the bank , Material need to be held for perishable items , Material need to be held for explosive &
inflammable itemsYour Answer
Material need to be held under the control of the bank , Material need to be held for perishable items , Material need to be held for costly items
Multiple Choice Single AnswerQuestion
What is the identification & location of stock in store?Correct Answer
Formulating & updating a system of stores and coding to items which should ensure efficient identification & location of goods.
Your Answer Formulating & updating a system of stores and coding to items which should
ensure efficient identification & location of goods.
Multiple Choice Single AnswerQuestion
The inventories which refer to the maintenance, repair and operation supplies which are consumed during process of manufacturing but do not
become part of the product is :-Correct Answer
MRO inventoriesYour Answer
In process inventories
True/FalseQuestion
Noting clerk examines bill of entry papers & if found in order signs the bill of entry.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
The organization set up by FAO & WHO to evolve food standards :-Correct Answer
Codex Alimentarious commissionYour Answer
Codex Alimentarious commission
Multiple Choice Multiple AnswerQuestion
Salient features of the working of the price panel are as under :-Correct Answer
Usage value above which the panel is to approve of the price is specified. , Vendor development department is required to give cost break up to the
secretary of the price panel , Members of the panel meet to scrutinize and discuss the cost aspects.
Your Answer Usage value above which the panel is to approve of the price is specified. , Vendor development department is required to give cost break up to the
secretary of the price panel , Members of the panel meet to scrutinize and discuss the cost aspects.
Multiple Choice Single AnswerQuestion
The method used for making purchases of proprietary items is :-Correct Answer
Single tenderYour Answer Open tender
Select The BlankQuestion
All incoming materials are insured against ________
Correct Answer Damage / lossYour Answer
Value of material
Multiple Choice Multiple AnswerQuestion
Disadvantages of forward buying are :-Correct Answer
Such a buying may not serve entirely the needs of the production department , Price expectations if not realised may result in major financial
loss to the firm. , Large scale obsolescence may result if design changes occur.
Your Answer Such a buying may not serve entirely the needs of the production
department , Price expectations if not realised may result in major financial loss to the firm. , Inventory holding charges are lower.
True/FalseQuestion
Lead time information is required for determination of safety stock.Correct Answer
FalseYour Answer
True
True/FalseQuestion
Fire extinguishers should be very near to staff members.Correct Answer
FalseYour Answer
True
Multiple Choice Multiple AnswerQuestion
In Ex-works contract buyer is responsible for :-Correct Answer
Arranging for transport including loading on to the vehicle at supplier's works , Paying for freight , Arranging for transit insurance
Your Answer Keeping the material in deliverable state , Arranging for transport including
loading on to the vehicle at supplier's works
Multiple Choice Single AnswerQuestion
Sales returns means :-Correct Answer
Receipt of goods from CustomerYour Answer
Rejection of goods
Select The BlankQuestion
Cost of special tooling is called as ________.Correct Answer
Cost to buyYour Answer Cost to buy
Select The BlankQuestion
________ is followed in public sector organizations to identify the lowest potential bidder.Correct Answer Tender systemYour Answer
Tender system
Select The BlankQuestion
Stock-out is nothing but ________.Correct Answer
Stock get depleted before receiptYour Answer
Nil stock
Multiple Choice Single AnswerQuestion
The orders, to the extent possible should be avoided is called as :-Correct Answer
RushYour Answer
Rush
Multiple Choice Multiple AnswerQuestion
Deterioration of electrodes causes :-Correct Answer
Increase in arc instability , Excessive spatterYour Answer
Increase in arc instability , Excessive spatter , High smoke while using
Multiple Choice Multiple AnswerQuestion
Following agreement have been expressly declared void as per the Indian Contract Act 1872 :-
Correct Answer Agreement in restraint of marriage , Agreement by way of wages ,
Agreements to do impossible actsYour Answer
Agreement in restraint of marriage , Agreements in restraints of business , Agreement by way of wages
Select The BlankQuestion
Systematic ________of stores is the key to its efficient operation.Correct Answer
LayoutYour Answer
Layout
at 1:30 AM 0 comments Links to this post
Labels: Materials Management
Materials Management - 1
Multiple Choice Multiple AnswerQuestion
Primary duties to be performed by purchase department are :-Correct Answer
Receipts, sorting of purchase indents and determination of method of buying , Performance evaluation and feedback , Search for suppliers
Your Answer Search for suppliers , Receipts, sorting of purchase indents and
determination of method of buying , Performance evaluation and feedback
True/FalseQuestion
Indentor's copy is meant to enable indentor to follow up with the purchase department.
Correct Answer True
Your Answer True
Select The Blank
Question ________specification are usually flexible and can be altered during
consultation with different manufacturers of the equipment.Correct Answer
EquipmentYour Answer Equipment
Multiple Choice Single AnswerQuestion
Second bin quantity can be qualified by :-Correct Answer
m + L x CYour Answer
m + L x C
True/FalseQuestion
Continuous stock-taking tends to dislocate the working of store.Correct Answer
FalseYour Answer
False
Multiple Choice Single AnswerQuestion
Redundant Stock is nothing but :-Correct Answer
Worthless for conversion & other useYour Answer
Worthless for conversion & other use
Multiple Choice Single AnswerQuestion
The cost incurred in providing adequate insurance cover to the materials in transit and in storage is
Correct Answer Insurance costYour Answer
Insurance cost
Select The BlankQuestion
Set-up cost for manufactured item in own plant is ________.Correct Answer
Very high
Your Answer Very high
Multiple Choice Single AnswerQuestion
The buying which is received in staggered lots, each lot at times may equal EOQ is :-
Correct Answer Contract buying
Your Answer Schedule buying
Multiple Choice Single AnswerQuestion
Price of the commodity is conditioned by the forces of supply and demand is :-
Correct Answer Demand and supply condition
Your Answer Demand and supply condition
Multiple Choice Single AnswerQuestion
The submission of the final offers by the prospective sources is :-Correct Answer
Firm biddingYour Answer Firm bidding
Select The BlankQuestion
________ of the department refers to the placement of the department in the structure of the company.
Correct Answer Status
Your Answer Size
Select The BlankQuestion
Paper work cost is ________.Correct Answer
Procurement costYour Answer
Procurement cost
True/FalseQuestion
The trade discount is not allowed as a percentage of published price.Correct Answer
FalseYour Answer
False
Multiple Choice Multiple AnswerQuestion
What are the different methods of identifying materials?Correct Answer
Tagging , Labeling , EngravingYour Answer
Tagging , Labeling , Engraving
Multiple Choice Single AnswerQuestion
Prices of certain commodity may be fixed by the government and thereby putting a restriction on both buyer and seller is :-
Correct Answer Government restrictions
Your Answer Government restrictions
True/FalseQuestion
Multiple sampling is an extension of the double sampling plan.Correct Answer
TrueYour Answer
True
Match The FollowingQuestion
Correct AnswerYour Answer
Labour management relationsInvestigating into suppliers capabilitiesInvestigating into suppliers capabilities
Technical discussions between the representatives of a buyer and supplierTechno commercial discussion and trial orderTechno commercial discussion and trial order
Follow up with the supplier until sample submissionSample validationSample validation
Type of supplierPreliminary selection of the suppliersPreliminary selection of the suppliers
Select The BlankQuestion
Review system-optional replenishment is a modification of ________.Correct Answer
Fixed-order interval systemYour Answer
Re-order level system
Multiple Choice Multiple AnswerQuestion
Costs involved in materials management areCorrect Answer
Basic cost of materials , Government tax and levies , Ordering costYour Answer
Basic cost of materials , Government tax and levies , Ordering cost
True/FalseQuestion
Safety stock forms a fixed portion of inventories.Correct Answer
TrueYour Answer
True
True/FalseQuestion
Maintenance and repair costs in used equipments are relatively higher.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
What are the areas of control to improve profitCorrect Answer
Increase units sold , Increase production , Reducing capitalYour Answer
Increase units sold , Increase production , Reducing capital
Multiple Choice Multiple AnswerQuestion
Main transport documents used by trade are :-Correct Answer
RR , LRYour Answer
RR , LR
Multiple Choice Single AnswerQuestion
Quantity based advance license is based on standard of :-Correct Answer
Input-output norms fixed by ALCYour Answer
Input-output norms fixed by ALC
Select The BlankQuestion
Originating department of daily material receipt report is ________.Correct Answer Receiving storeYour Answer
Purchase department
Multiple Choice Multiple AnswerQuestion
What are the limitations of alpha betical system?Correct Answer
Repetition of alphabets often leads to confusion and wrong identification , The selection of proper alphabets for each of the items is difficult. , The
codes cannot be amplified which restricts its use to smaller firmsYour Answer
Repetition of alphabets often leads to confusion and wrong identification , The selection of proper alphabets for each of the items is difficult. , The
codes cannot be amplified which restricts its use to smaller firms
True/FalseQuestion
Small parcels, Samples, gifts which are received from other countries provisions of import policy & customs not applied on them.
Correct Answer False
Your Answer False
Select The BlankQuestion
Malpractices are ________.
Correct Answer Manipulations by stores staff
Your Answer Common in all stores
True/FalseQuestion
The registered firms are required to submit security deposit which is required from unregistered firms.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion
In instantaneous replenishment system :-Correct Answer
Item consumption demand rate is constantYour Answer
Item consumption demand rate is constant
Multiple Choice Multiple AnswerQuestion
Store manager has to ensure security :-Correct Answer
Of store buildings , Of stock yardsYour Answer
Of store buildings , Of stock yards , Of stores staff
Multiple Choice Single AnswerQuestion
The process of procurement of raw material, wip, finished goods, jigs, fixtures and other tools and equipments which are required for the operation
and maintenance of a manufacturing plant is known asCorrect Answer
PurchasingYour Answer Purchasing
Multiple Choice Multiple AnswerQuestion
Receiving inspector should have to :-Correct Answer
Segregate defectives , Maintain vendor wise quality recordsYour Answer
Segregate defectives , Maintain vendor wise quality records
Multiple Choice Single AnswerQuestion
Identifying the need for source selection and source development is :-Correct Answer
Source requirement stageYour Answer
Source requirement stage
True/FalseQuestion
Supplier's delivery ratings should be communicated on periodical basis.Correct Answer
TrueYour Answer
True
Match The FollowingQuestion
Correct AnswerYour AnswerVendor ratingRight sourceRight source
Replenishment methodRight timeRight time
Competitive biddingRight priceRight price
EOQRight quantityRight quantity
Multiple Choice Single AnswerQuestion
EOQ means :-Correct Answer
When total cost & right quantity are balancedYour Answer
When total cost & right quantity are balanced
Multiple Choice Single AnswerQuestion
The cost incurred in movement of materials from suppliers works to buyer's
works isCorrect Answer
Freight costYour Answer Freight cost
Multiple Choice Multiple AnswerQuestion
Value analysis speaks about :-Correct Answer
Cost improvement , Improvement in qualityYour Answer
Cost improvement , Improvement in quality
Multiple Choice Multiple AnswerQuestion
Advantages of fixed price agreements are :-Correct Answer
They are easy to administer , They give certainty to the buyer who knows from the start, amount he has to pay for the goods/services. , They protect
buyer from possible financial risks from price escalationsYour Answer
They are easy to administer , They give certainty to the buyer who knows from the start, amount he has to pay for the goods/services. , They protect
buyer from possible financial risks from price escalations
Multiple Choice Multiple AnswerQuestion
Main information in the bill of material is :-Correct Answer
Part no. , Material specification , Quantity per assemblyYour Answer
Part no. , Material specification
Select The BlankQuestion
________ is responsible for purchase of goods of right quality, quantity, time, price and source.Correct Answer
Purchase divisionYour Answer
Purchase division
Multiple Choice Single AnswerQuestion
The system not only should identify and classify all the existing items and it
should have enough extra unassigned codes to absorb future items is called as :-
Correct Answer Flexibility
Your Answer Flexibility
Multiple Choice Single AnswerQuestion
Purchasing today is no longer just a commercial activity but it is a techno commercial activity. This is known as :-
Correct Answer Changing nature of purchases
Your Answer Changing nature of purchases
True/FalseQuestion
Black listing may be for a limited period or for an indefinite period.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
Actions involved in sample validation are :-Correct Answer
Follow up with the supplier until sample submission , Sample inspection , Feedback on defects and defect prevention
Your Answer Sample inspection , Sample rejection
True/FalseQuestion
Bulky items impervious to weather is kept at very safe place inside store.Correct Answer
FalseYour Answer
False
Select The BlankQuestion
Petroleum product imports are channealised through________.Correct Answer
Indian oil corporation
Your Answer Indian oil corporation
Multiple Choice Single AnswerQuestion
Procurement by more than one firm by pooling their requirements is :-Correct Answer
Cooperative buyingYour Answer
Cooperative buying
Multiple Choice Single AnswerQuestion
For the inspection of special Cutting tools which department is responsible?Correct Answer
Planning department & inspection departmentYour Answer
Maintenance department
Match The FollowingQuestion
Correct AnswerYour AnswerVendor ratingRight sourceRight source
Replenishment methodRight timeRight time
Competitive biddingRight priceRight price
EOQRight quantityRight quantity
Multiple Choice Single AnswerQuestion
The cost incurred in providing adequate insurance cover to the materials in transit and in storage is
Correct Answer Insurance costYour Answer
Insurance cost
Multiple Choice Multiple Answer
Question Import transactions are subject to following additional laws compared to
procurement from sources within the country as :-Correct Answer
Import trade control act ®ulation , Custom act , Central excise Rules 2002Your Answer
Import trade control act ®ulation , Custom act , Trade policy act 2000
True/FalseQuestion
Projects are usually subjected to uncertainty & often delay takes place in completion of projects which results in cost over runs.
Correct Answer True
Your Answer True
True/FalseQuestion
Contract whose object is not lawful are not void.Correct Answer
FalseYour Answer
False
True/FalseQuestion
Shortage chasing is intended to remind the supplier of the due date and obtain advance information of expected delays.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion
Optimal purchase quantity comprises :-Correct Answer
Annual inventory carrying cost , Annual procurement costYour Answer
Annual inventory carrying cost , Annual procurement cost , Set-up cost
Multiple Choice Multiple AnswerQuestion
Steel almirahs are used for storage of :-Correct Answer
Expensive items , Scarce itemsYour Answer
Expensive items , Scarce items , High risk materials
Multiple Choice Multiple AnswerQuestion
Some of the benefits if materials are supplied by the buyer are :-Correct Answer
The supplies of goods are guaranteed especially during the periods of shortages. , The frequent requests for the price revisions are avoided , The
buyer is sure of the quality of materials.Your Answer
The buyer is sure of the quality of materials. , The frequent requests for the price revisions are avoided , The unnecessary profit on materials are added
by the suppliers.
Multiple Choice Multiple AnswerQuestion
The buyers are asked to adopt the following method for follow up :-Correct Answer
Telephone , Letters , E-mail, telegramYour Answer
Telephone , Letters , E-mail, telegram
True/FalseQuestion
Stores is the "Safe Custody" for keeping materialsCorrect Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
Prices of certain commodity may be fixed by the government and thereby putting a restriction on both buyer and seller is :-
Correct Answer Government restrictions
Your Answer Government restrictions
Multiple Choice Multiple AnswerQuestion
A contract terminates under following condition :-Correct Answer
Discharge by performance , Discharge by Release , Discharge by novation
Your Answer Discharge by performance , Discharge by Release , Discharge by novation
Select The BlankQuestion
________ is followed in public sector organizations to identify the lowest potential bidder.Correct Answer Tender systemYour Answer
Tender system
True/FalseQuestion
The performance of an equipment can not be verified on the spot if the equipment is not in operation.
Correct Answer False
Your Answer True
Match The FollowingQuestion
Correct AnswerYour Answer
Speculative buyingBulk purchasing
Non perishable itemsCapital purchasing
Plant and machineryPlant and machinery
Group purchasingHardware materials
Bulk purchasingService contract
TypewritersHardware materials
True/FalseQuestion
Metals should be stored at least 15-20 cm above the ground.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
Costs involved in materials management areCorrect Answer
Basic cost of materials , Government tax and levies , Ordering costYour Answer
Basic cost of materials , Ordering cost , Overhead
Select The BlankQuestion
________ of the department refers to the placement of the department in the structure of the company.
Correct Answer Status
Your Answer Location
True/FalseQuestion
Value analysis is the cost reduction technique.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
For large engineering firms main store could be sub divided into :-Correct Answer
Finished part store , Raw material store , Semi finished item storeYour Answer
Raw material store , Semi finished item store , Finished part store
Multiple Choice Single AnswerQuestion
In project procurement what work is covered in detailed engineering stage?Correct Answer
Cross verification of technical specifications & finalisation of commercial terms
Your Answer Cross verification of technical specifications & finalisation of commercial
terms
Select The BlankQuestion
Sub contracting decisions must be based on outcome of ________ analysis.
Correct Answer Cost benefitYour Answer Cost benefit
Multiple Choice Multiple AnswerQuestion
Disadvantages of forward buying are :-Correct Answer
Such a buying may not serve entirely the needs of the production department , Price expectations if not realised may result in major financial
loss to the firm. , Large scale obsolescence may result if design changes occur.
Your Answer Price expectations if not realised may result in major financial loss to the
firm. , Large scale obsolescence may result if design changes occur.
Multiple Choice Single AnswerQuestion
Who act as a link between company's financial department and supplier's for timely payment?Correct Answer
Purchase divisionYour Answer
Purchase division
Multiple Choice Single AnswerQuestion
What is the meaning of stores layout?Correct Answer
Physical arrangement of space for storage material movement, office etc which should provide for most efficient receipt storage & issue of material
Your Answer Physical arrangement of space for storage material movement, office etc which should provide for most efficient receipt storage & issue of material
True/FalseQuestion
If item is manufactured in small quantities, set-up cost is high.Correct Answer
TrueYour Answer
True
Select The BlankQuestion
________is suitable for procurement from non-profit making organization.Correct Answer
Cost plus zero feeYour Answer
Fixed price agreements with escalation.
Select The BlankQuestion
________ reduce problems of material planning.Correct Answer
Reduction in lead timeYour Answer
Reduction in lead time
Multiple Choice Single AnswerQuestion
JIT aims at :-Correct Answer
Reduction in non-value added activitiesYour Answer
Reduction in non-value added activities
Multiple Choice Multiple AnswerQuestion
Complaints concerning should be made in such a way that negative reactions are avoided such as :-
Correct Answer Delivery failures , Rejection , Shortages
Your Answer Delivery failures , Rejection , Shortages
Multiple Choice Single AnswerQuestion
Internal factor influencing materials planning:-Correct Answer
Procurement lead timesYour Answer
Procurement lead times
Multiple Choice Single AnswerQuestion
The cost incurred in movement of materials from suppliers works to buyer's works is
Correct Answer Freight cost
Your Answer
Freight cost
True/FalseQuestion
Supplier's delivery ratings should be communicated on periodical basis.Correct Answer
TrueYour Answer
True
Select The BlankQuestion
When the costs are balanced, total cost is ________.Correct Answer
MinimumYour Answer
Fixed
Multiple Choice Single AnswerQuestion
The process of procurement of raw material, wip, finished goods, jigs, fixtures and other tools and equipments which are required for the operation
and maintenance of a manufacturing plant is known asCorrect Answer
PurchasingYour Answer Store keeping
Multiple Choice Single AnswerQuestion
Mechanical tests are performed to :-Correct Answer
Ascertain the strength of materialsYour Answer
Ascertain the strength of materials
Multiple Choice Single AnswerQuestion
Set-up cost means :-Correct Answer
Cost incurred to replenish the stock of item manufactured at home plantYour Answer
Cost incurred to replenish the stock of item manufactured at home plant
Multiple Choice Single AnswerQuestion
The main responsibility of inventory control division is :-Correct Answer
Fixing inventory levelsYour Answer
Fixing inventory levels
Multiple Choice Multiple AnswerQuestion
Special stores are created where :-Correct Answer
Material need to be held under the control of the bank , Material need to be held for perishable items , Material need to be held for explosive &
inflammable itemsYour Answer
Material need to be held under the control of the bank , Material need to be held for perishable items , Material need to be held for explosive &
inflammable items
Select The BlankQuestion
________ is a fundamental form of economical value.Correct Answer Esteem valueYour Answer
Cost value
Select The BlankQuestion
Discrepancies arising out of theft are tends to ________.Correct Answer Profit & Loss a/c
Your Answer Profit & Loss a/c
Multiple Choice Single AnswerQuestion
What is Earnest money?Correct Answer
Fixed amount collected along with TenderYour Answer
Fixed amount collected along with Tender
at 11:50 PM 0 comments Links to this post
Labels: Materials Management(Set-2)
Materials Management - 6
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion
EOQ model is based on the assumption that unit price is fixed.Correct Answer
TrueYour Answer
False
Multiple Choice Multiple AnswerQuestion
Obsolescence cost is :-Correct Answer
Due stock on hand , Part No. / NameYour Answer
Due stock on hand , Part No. / Name
Multiple Choice Multiple AnswerQuestion
Set-up cost comprises of :-Correct Answer
Work-order cost , Idle time costYour Answer
Work-order cost , Idle time cost
Multiple Choice Single AnswerQuestion
Quantity discounts reduces :-Correct Answer
Procurement costYour Answer Material cost
Multiple Choice Single AnswerQuestion
The document which is prepared by the engineering department is :-Correct Answer Bill of materialYour Answer
Bill of material
Multiple Choice Single AnswerQuestion
Which of the following is not the external factor influencing materials planning?
Correct Answer Corporate objective
Your Answer Corporate objective
Select The BlankQuestion
Down time means ________.Correct Answer
Time required by equipment to become OKYour Answer
Time required by equipment to become OK
Multiple Choice Single AnswerQuestion
Security deposit means :-Correct Answer
Amount as reserve-part kept by scrap contractor for final adjustmentYour Answer
Amount paid by contractor to company
Multiple Choice Single AnswerQuestion
Identifying technical, financial, managerial and quality assurance capability of the vendors and thereby generate data to serve basis for preliminary
source selection is :-Correct Answer
Source investigation stageYour Answer
Source investigation stage
Select The BlankQuestion
________specification are usually flexible and can be altered during consultation with different manufacturers of the equipment.
Correct Answer Equipment
Your Answer Technical
Multiple Choice Single AnswerQuestion
Issues to top up supply to pre-fixed levels of items are :-Correct Answer Imprest issuesYour Answer
Imprest issues
Multiple Choice Multiple AnswerQuestion
Requests for price increase are received on account of the following reasons :-
Correct Answer Increase in cost of raw materials and boughtout parts , Changes in tax
structure , Added work contentYour Answer
Increase in cost of raw materials and boughtout parts , Changes in tax structure , Added work content
Select The BlankQuestion
Stock held by company represents ________.Correct Answer
MoneyYour Answer
Money
Select The BlankQuestion
Method suitable for items which are either of purely seasonal is ________.Correct Answer Seasonal buying
Your Answer Seasonal buying
Multiple Choice Single AnswerQuestion
The buying which is received in staggered lots, each lot at times may equal EOQ is :-
Correct Answer Contract buying
Your Answer Schedule buying
Multiple Choice Multiple AnswerQuestion
Special advance license for deemed export is granted in following cases :-Correct Answer
Supply of goods against advance license /Remission scheme , Supply of goods to export oriented units , Supply of capital goods to holders of licenses
under EPCG SchemeYour Answer
Supply of goods against advance license /Remission scheme , Supply of goods to export oriented units , Supply of capital goods to holders of licenses
under EPCG Scheme
True/FalseQuestion
Supplier's request for price increase should be analysed patiently by the buyer. A curt 'no' or 'negative' reply spoils relationships.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion
Actions involved in sample validation are :-Correct Answer
Follow up with the supplier until sample submission , Sample inspection , Feedback on defects and defect prevention
Your Answer Sample inspection , Feedback on defects and defect prevention
Multiple Choice Multiple AnswerQuestion
Special stores are created where :-Correct Answer
Material need to be held under the control of the bank , Material need to be held for perishable items , Material need to be held for explosive &
inflammable itemsYour Answer
Material need to be held for explosive & inflammable items , Material need to be held for costly items
Select The BlankQuestion
________ is suitable for procurement of prototypes, fixtures, development items.
Correct Answer Cost plus percentage of cost.
Your Answer Fixed price agreements
Select The BlankQuestion
In instantaneous replenishment system, production rate is ________ .Correct Answer
InfiniteYour Answer
Constant
Multiple Choice Single AnswerQuestion
Organization decided to import when :-Correct Answer
Item is not available in the countryYour Answer
Item is very critical functioning
Multiple Choice Single AnswerQuestion
Operating systems process data for :-Correct Answer
Routine operations of the depts.Your Answer
Routine operations of the depts.
Select The BlankQuestion
In MRP-1, manufacturing cycle of finished product is ________.Correct Answer
LongYour Answer
Short
Match The FollowingQuestion
Correct AnswerYour Answer
JITHighly vulnerable to supply failures
Purchasing timeTPM
Removal of uncertaintyHighly vulnerable to supply failures
Quality at sourceElimination of incoming inspectionElimination of incoming inspection
Lower unit cost
JITQuantity of production
True/FalseQuestion
Materials department is service department.Correct Answer
TrueYour Answer
False
Select The BlankQuestion
Malpractices are ________.Correct Answer
Manipulations by stores staffYour Answer
Manipulations by stores staff
True/FalseQuestion
Value analysis is necessary when company's profits soars.Correct Answer
FalseYour Answer
False
Match The FollowingQuestion
Correct AnswerYour Answer
Fast moving itemsVery near to the issue counterVery near to the issue counter
AntibioticsIn a air conditioned storeIn a air conditioned store
Costly items like fuel injectorIn locked cupboard & away from entrance of store.In locked cupboard & away from entrance of store.
Inflammable & hazardous itemsIn a separate storeIn a separate store
Multiple Choice Multiple AnswerQuestion
Discolourisation of soaps is due to :-Correct Answer
Exposure to light , MoistureYour Answer
Exposure to light , Moisture
Multiple Choice Multiple AnswerQuestion
Following are benefits of scientific stoke management :-Correct Answer
Reduction in downtime by efficient issues , Inventory control , Very less time required to identify & issue material
Your Answer Reduction in downtime by efficient issues , Very less time required to identify
& issue material
Multiple Choice Multiple AnswerQuestion
Following special schemes are announced by Indian Government under which import can be permitted at zero duty or at less duty :-
Correct Answer Export promotion capital goods scheme , Diamond &Jewellary promotion
scheme , Import by 100% export oriented unitsYour Answer
Export promotion capital goods scheme , Import by 100% export oriented units
True/FalseQuestion
Post parcel consignments are cleared through customs & clearance is done through foreign post office.
Correct Answer True
Your Answer False
True/FalseQuestion
Number of free days allowed for air consignments is 15 days from the flight date.
Correct Answer False
Your Answer False
True/False
Question The trade discount is not allowed as a percentage of published price.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion
Receiving inspector should have to :-Correct Answer
Segregate defectives , Maintain vendor wise quality recordsYour Answer
Segregate defectives , Maintain vendor wise quality records
Multiple Choice Single AnswerQuestion
Supplier may be asked to provide assistance for the first few days of working so that production losses can be avoided is known as :-
Correct Answer Spare part and supply contracts
Your Answer Seller's technical assistance during start up.
Select The BlankQuestion
All incoming materials are insured against ________Correct Answer Damage / lossYour Answer Damage / loss
True/FalseQuestion
Make or buy decision are of common concern to both materials and production department.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
Inflammable storage areas should be :-Correct Answer Well insulated
Your Answer Well insulated
Multiple Choice Multiple AnswerQuestion
The sub system of numerical system involves following :-Correct Answer
Sequential code , Decimal code , Block code systemYour Answer
Sequential code , Decimal code , Block code system
Multiple Choice Single AnswerQuestion
Stock-out is due to :-Correct Answer
Delay in deliveriesYour Answer
Delay in deliveries
Select The BlankQuestion
________is reimbursement of actual costs plus fixed fee.Correct Answer
Cost plus fixed feeYour Answer
Cost plus fixed fee
Select The BlankQuestion
________ is essence of purchase order.Correct Answer
DeliveryYour Answer
Delivery
Multiple Choice Multiple AnswerQuestion
Performance of product requires :-Correct Answer
Functionality , ReliabilityYour Answer
Functionality , Reliability
True/FalseQuestion
Ex-works means sale is made on rail/truck at the station of dispatch.
Correct Answer False
Your Answer False
True/FalseQuestion
The trade discount is not allowed as a percentage of published price.Correct Answer
FalseYour Answer
False
at 11:49 PM 0 comments Links to this post
Labels: Materials Management(Set-2)
Materials Management - 5
Select The BlankQuestion
Conformance to ________ is checked against component drawings.Correct Answer
DimensionsYour Answer Dimensions
Multiple Choice Single AnswerQuestion
The inventories which refer to the maintenance, repair and operation supplies which are consumed during process of manufacturing but do not
become part of the product is :-Correct Answer MRO inventories
Your Answer MRO inventories
True/FalseQuestion
Import substitution in reality should be looked upon as "Import avoidance"Correct Answer
TrueYour Answer
True
True/False
Question Deterioration & Obsolescence cost are similar.
Correct Answer False
Your Answer True
Select The BlankQuestion
Customs duty is charged on the imported goods as per ________.Correct Answer
Customs tariff rulesYour Answer
Customs tariff rules
Multiple Choice Multiple AnswerQuestion
In a contract buyer has right to :-Correct Answer
Examine the goods , Reject the goods delivered in wrong quantity , Reject non conforming goods
Your Answer Examine the goods , Reject the goods delivered in wrong quantity , Sue for
interest of buyer
Select The BlankQuestion
________ of the department refers to the placement of the department in the structure of the company.
Correct Answer Status
Your Answer Location
True/FalseQuestion
Purchasing policies are implemented by framing procedures and rules.Correct Answer
TrueYour Answer
True
True/FalseQuestion
Black bituminous paint should be applied to rubber parts.Correct Answer
FalseYour Answer
False
Multiple Choice Single AnswerQuestion
Pending purchases indent report :-Correct Answer
Highlights indents yet to be converted in to purchase-ordersYour Answer
Highlights indents yet to be converted in to purchase-orders
Multiple Choice Multiple AnswerQuestion
Correct issues must have :-Correct Answer
Written requisitions , Authorized requisitionsYour Answer
Written requisitions , Authorized requisitions , Name of requisitor
Multiple Choice Multiple AnswerQuestion
The following are the actions would help to improve effectiveness of materials planning :-
Correct Answer Accurate forecasting , Computerization , Shorter materials plan period
Your Answer Accurate forecasting , Computerization , Increase in lead time
Select The BlankQuestion
Systematic, formal and continuous analysis of all factors affect ________ management function is known as Materials research.
Correct Answer Materials
Your Answer Materials
True/FalseQuestion
OEM discount is given by the supplier with a view to widen customer's base.Correct Answer
TrueYour Answer
False
Multiple Choice Single AnswerQuestion
A buyer gives wrong idea to his supplier about his requirements or show a fictitious figure to get some price discount is called as :-
Correct Answer Misrepresentation of facts
Your Answer Misrepresentation of facts
Multiple Choice Multiple AnswerQuestion
Purchasing and procurement cost reduction is possible through :-Correct Answer
Blanket orders , Green purchasing , System contractingYour Answer
Blanket orders , Green purchasing , System contracting
Select The BlankQuestion
________ department in almost all companies is the biggest spending department and the custodian of company's purse.
Correct Answer Purchasing
Your Answer Purchasing
Select The BlankQuestion
________ find their use in identification of raw materials, lubricants, pipelines etc.
Correct Answer Colour codesYour Answer Colour codes
Select The BlankQuestion
________ is a complex combination of men, machines, materials and tools.Correct Answer ManufacturingYour Answer
Operation
Multiple Choice Single AnswerQuestion
What is the meaning of storekeeping?
Correct Answer Physical storage of goods under custodianship in a systematic manner
Your Answer Physical storage of goods under custodianship in a systematic manner
True/FalseQuestion
Value analysis is the cost reduction technique.Correct Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
Competitive price information must be treated as confidential and should not be disclosed to the bidders with an intention of allowing them to rebid is :-
Correct Answer Improprieties of bids
Your Answer Improprieties of bids
Match The FollowingQuestion
Correct AnswerYour Answer
JEJournal EntriesJournal Entries
POPurchase orderPurchase order
GRNGoods receipt noteGoods receipt note
DNDiscrepancy note.Discrepancy note.
Multiple Choice Single AnswerQuestion
Traffic division is concerned with :-Correct Answer
Arrangement of eco. Transportation of incoming and outgoing materialsYour Answer
Arrangement of eco. Transportation of incoming and outgoing materials
Multiple Choice Single AnswerQuestion
Issue of stock is :-Correct Answer
Process of reacting by storesYour Answer
Process of reacting by stores
True/FalseQuestion
Cancellation of orders on flimsy ground is unethical.Correct Answer
TrueYour Answer
True
Select The BlankQuestion
Systematic ________of stores is the key to its efficient operation.Correct Answer
LayoutYour Answer
Layout
Multiple Choice Single AnswerQuestion
Foreign trade is controlled by Government for :-Correct Answer
Promoting export &controlling importYour Answer
Promoting export &controlling import
Multiple Choice Multiple AnswerQuestion
In review system-optional replenishment :-Correct Answer
Reorder level is fixed , Review period is fixedYour Answer
Review period is fixed , Reorder level is fixed
Multiple Choice Multiple AnswerQuestion
The receiving stores copy is used by it :-Correct Answer
To ensure that supplier effects supply of only items ordered on him. , To
ensure that supplier does not supply more than the quantity stipulated in the purchase order. , To ensure that the supplier effect deliveries through the
mode of transport asked for by the buyer.Your Answer
To ensure that supplier does not supply more than the quantity stipulated in the purchase order.
True/FalseQuestion
A company wishing to use preferred numbers must decide first the smallest size to be made, then largest size to be made and then the total no. of sizes
to be made.Correct Answer
TrueYour Answer
False
Multiple Choice Single AnswerQuestion
Finished goods means :-Correct Answer
Goods which are ready to shipYour Answer
Goods which are ready to ship
True/FalseQuestion
JIT purchasing is indirectly the activity of pushing inventory on the suppliers.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
Quantity discounts are offered when :-Correct Answer
Buyer tempts to produce large quantity , Production is higher & cost is lessYour Answer
Buyer tempts to produce large quantity , Production is higher & cost is less
Multiple Choice Multiple AnswerQuestion
Advantages of fixed price agreements are :-Correct Answer
They are easy to administer , They give certainty to the buyer who knows
from the start, amount he has to pay for the goods/services. , They protect buyer from possible financial risks from price escalations
Your Answer They are easy to administer , They give certainty to the buyer who knows from the start, amount he has to pay for the goods/services. , They protect
buyer from possible financial risks from price escalations
Select The BlankQuestion
Originating department of daily material receipt report is ________.Correct Answer Receiving storeYour Answer
Receiving store
Select The BlankQuestion
________ is the arrangement of items into groups according to a pre determined pattern.
Correct Answer ClassificationYour Answer Classification
Multiple Choice Multiple AnswerQuestion
Main information in the bill of material is :-Correct Answer
Part no. , Material specification , Quantity per assemblyYour Answer
Part no. , Material specification , Quantity per assembly
Match The FollowingQuestion
Correct AnswerYour Answer
LCLabour cost as considered at the time of contractLabour cost as considered at the time of contract
MAActual material cost as on date.Actual material cost as on date.
MCMaterial cost as considered at the time of contractMaterial cost as considered at the time of contract
LA
Actual labour cost as on dateActual labour cost as on date
Multiple Choice Single AnswerQuestion Heat is :-
Correct Answer An physical agent
Your Answer An physical agent
Multiple Choice Single AnswerQuestion
A formal request to the purchase department, by the indentor to procure the items mentioned therein and within the indicated time schedule is :-
Correct Answer Purchase indent
Your Answer Purchase indent
True/FalseQuestion
Coal and coke gas used for power generation and process heating are direct materials.
Correct Answer False
Your Answer True
Select The BlankQuestion
In a contract of sale by description the goods sold must be of ________ quality.
Correct Answer MerchantableYour Answer Merchantable
True/FalseQuestion
Annual total cost remain constant though stock-turn over rate changes.Correct Answer
FalseYour Answer
False
Multiple Choice Multiple AnswerQuestion
Obsolescence cost is :-Correct Answer
Due stock on hand , Part No. / NameYour Answer
Due stock on hand , Cause of the event , Number of turns
True/FalseQuestion
Single tender system is used when there is only one supplier of the item.Correct Answer
TrueYour Answer
True
Select The BlankQuestion
In traditional purchasing, quality is confirmed ________.Correct Answer
On receiptYour Answer
On receipt
Question Conformance to ________ is checked against component drawings.
Correct Answer Dimensions
Your Answer Dimensions
Multiple Choice Single Answer
Question The inventories which refer to the maintenance, repair and operation supplies which are consumed during process of manufacturing but
do not become part of the product is :-
Correct Answer MRO inventories
Your Answer MRO inventories
True/False
Question Import substitution in reality should be looked upon as "Import avoidance"
Correct Answer True
Your Answer True
True/False
Question Deterioration & Obsolescence cost are similar.
Correct Answer False
Your Answer True
Select The Blank
Question Customs duty is charged on the imported goods as per ________.
Correct Answer Customs tariff rules
Your Answer Customs tariff rules
Multiple Choice Multiple Answer
Question In a contract buyer has right to :-
Correct Answer Examine the goods , Reject the goods delivered in wrong quantity , Reject non conforming goods
Your Answer Examine the goods , Reject the goods delivered in wrong quantity , Sue for interest of buyer
Select The Blank
Question ________ of the department refers to the placement of the department in the structure of the company.
Correct Answer Status
Your Answer Location
True/False
Question Purchasing policies are implemented by framing procedures and rules.
Correct Answer True
Your Answer True
True/False
Question Black bituminous paint should be applied to rubber parts.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question Pending purchases indent report :-
Correct Answer Highlights indents yet to be converted in to purchase-orders
Your Answer Highlights indents yet to be converted in to purchase-orders
Multiple Choice Multiple Answer
Question Correct issues must have :-
Correct Answer Written requisitions , Authorized requisitions
Your Answer Written requisitions , Authorized requisitions , Name of requisitor
Multiple Choice Multiple Answer
Question The following are the actions would help to improve effectiveness of materials planning :-
Correct Answer Accurate forecasting , Computerization , Shorter materials plan period
Your Answer Accurate forecasting , Computerization , Increase in lead time
Select The Blank
Question Systematic, formal and continuous analysis of all factors affect ________ management function is known as Materials research.
Correct Answer Materials
Your Answer Materials
True/False
Question OEM discount is given by the supplier with a view to widen customer's base.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question A buyer gives wrong idea to his supplier about his requirements or show a fictitious figure to get some price discount is called
as :-
Correct Answer Misrepresentation of facts
Your Answer Misrepresentation of facts
Multiple Choice Multiple Answer
Question Purchasing and procurement cost reduction is possible through :-
Correct Answer Blanket orders , Green purchasing , System contracting
Your Answer Blanket orders , Green purchasing , System contracting
Select The Blank
Question ________ department in almost all companies is the biggest spending department and the custodian of company's purse.
Correct Answer Purchasing
Your Answer Purchasing
Select The Blank
Question ________ find their use in identification of raw materials, lubricants, pipelines etc.
Correct Answer Colour codes
Your Answer Colour codes
Select The Blank
Question ________ is a complex combination of men, machines, materials and tools.
Correct Answer Manufacturing
Your Answer Operation
Multiple Choice Single Answer
Question What is the meaning of storekeeping?
Correct Answer Physical storage of goods under custodianship in a systematic manner
Your Answer Physical storage of goods under custodianship in a systematic manner
True/False
Question Value analysis is the cost reduction technique.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Competitive price information must be treated as confidential and should not be disclosed to the bidders with an intention of allowing them
to rebid is :-
Correct Answer Improprieties of bids
Your Answer Improprieties of bids
Match The Following
Question Correct Answer Your Answer
JE Journal Entries Journal Entries
PO Purchase order Purchase order
GRN Goods receipt note Goods receipt note
DN Discrepancy note. Discrepancy note.
Multiple Choice Single Answer
Question Traffic division is concerned with :-
Correct Answer Arrangement of eco. Transportation of incoming and outgoing materials
Your Answer Arrangement of eco. Transportation of incoming and outgoing materials
Multiple Choice Single Answer
Question Issue of stock is :-
Correct Answer Process of reacting by stores
Your Answer Process of reacting by stores
True/False
Question Cancellation of orders on flimsy ground is unethical.
Correct Answer True
Your Answer True
Select The Blank
Question Systematic ________of stores is the key to its efficient operation.
Correct Answer Layout
Your Answer Layout
Multiple Choice Single Answer
Question Foreign trade is controlled by Government for :-
Correct Answer Promoting export &controlling import
Your Answer Promoting export &controlling import
Multiple Choice Multiple Answer
Question In review system-optional replenishment :-
Correct Answer Reorder level is fixed , Review period is fixed
Your Answer Review period is fixed , Reorder level is fixed
Multiple Choice Multiple Answer
Question The receiving stores copy is used by it :-
Correct Answer To ensure that supplier effects supply of only items ordered on him. , To ensure that supplier does not supply more than the
quantity stipulated in the purchase order. , To ensure that the supplier effect deliveries through the mode of transport asked for by the buyer.
Your Answer To ensure that supplier does not supply more than the quantity stipulated in the purchase order.
True/False
Question A company wishing to use preferred numbers must decide first the smallest size to be made, then largest size to be made and then the
total no. of sizes to be made.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question Finished goods means :-
Correct Answer Goods which are ready to ship
Your Answer Goods which are ready to ship
True/False
Question JIT purchasing is indirectly the activity of pushing inventory on the suppliers.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Quantity discounts are offered when :-
Correct Answer Buyer tempts to produce large quantity , Production is higher & cost is less
Your Answer Buyer tempts to produce large quantity , Production is higher & cost is less
Multiple Choice Multiple Answer
Question Advantages of fixed price agreements are :-
Correct Answer They are easy to administer , They give certainty to the buyer who knows from the start, amount he has to pay for the
goods/services. , They protect buyer from possible financial risks from price escalations
Your Answer They are easy to administer , They give certainty to the buyer who knows from the start, amount he has to pay for the
goods/services. , They protect buyer from possible financial risks from price escalations
Select The Blank
Question Originating department of daily material receipt report is ________.
Correct Answer Receiving store
Your Answer Receiving store
Select The Blank
Question ________ is the arrangement of items into groups according to a pre determined pattern.
Correct Answer Classification
Your Answer Classification
Multiple Choice Multiple Answer
Question Main information in the bill of material is :-
Correct Answer Part no. , Material specification , Quantity per assembly
Your Answer Part no. , Material specification , Quantity per assembly
Match The Following
Question Correct Answer Your Answer
LC Labour cost as considered at the time of contract Labour cost as considered at the time of contract
MA Actual material cost as on date. Actual material cost as on date.
MC Material cost as considered at the time of contract Material cost as considered at the time of contract
LA Actual labour cost as on date Actual labour cost as on date
Multiple Choice Single Answer
Question Heat is :-
Correct Answer An physical agent
Your Answer An physical agent
Multiple Choice Single Answer
Question A formal request to the purchase department, by the indentor to procure the items mentioned therein and within the indicated time
schedule is :-
Correct Answer Purchase indent
Your Answer Purchase indent
True/False
Question Coal and coke gas used for power generation and process heating are direct materials.
Correct Answer False
Your Answer True
Select The Blank
Question In a contract of sale by description the goods sold must be of ________ quality.
Correct Answer Merchantable
Your Answer Merchantable
True/False
Question Annual total cost remain constant though stock-turn over rate changes.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Obsolescence cost is :-
Correct Answer Due stock on hand , Part No. / Name
Your Answer Due stock on hand , Cause of the event , Number of turns
True/False
Question Single tender system is used when there is only one supplier of the item.
Correct Answer True
Your Answer True
Select The Blank
Question In traditional purchasing, quality is confirmed ________.
Correct Answer On receipt
Your Answer On receipt
at 1:36 AM 0 comments Links to this post
Labels: Materials Management(Set-3)
Saturday, May 2, 2009
Materials Management - 9
REEBOK OPENINGS IN SALES CLICK HERE
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
QuestionThe basic materials which have not undergone any conversion since their
receipts from suppliers is :-Correct AnswerRaw materialYour AnswerRaw material
Multiple Choice Single AnswerQuestionHeat is :-
Correct AnswerAn physical agent
Your AnswerAn physical agent
Multiple Choice Single AnswerQuestion
Inventory control system means :-Correct Answer
To achieve basic purpose of inventory creationYour Answer
To achieve basic purpose of inventory creation
Multiple Choice Multiple AnswerQuestion
Salient characteristics of kodak system are :-Correct Answer
Materials are divided into few broad classifications , Each preliminary class is further divided into sub classes , Each sub class is next amplified into kind of
itemsYour Answer
Materials are divided into few broad classifications , Each preliminary class is further divided into sub classes , Each sub class is next amplified into kind of
items
True/FalseQuestion
Turnover discount is usually related to the annual business and is paid in the form of credit note at the end of the year.
Correct AnswerTrue
Your AnswerTrue
True/False
QuestionManual inspection is economical when volume of output is small.
Correct AnswerTrue
Your AnswerTrue
Multiple Choice Multiple AnswerQuestion
Set-up cost is associated with :-Correct Answer
Period , Number of production runsYour Answer
Number of production runs , Machine cost
Multiple Choice Single AnswerQuestion
Stock taking is the responsibility of :-Correct Answer
StoresYour Answer
Stores & purchase
Match The FollowingQuestion
Correct AnswerYour Answer
Nut boltsMiscellaneous
Hand toolsTable and chair
Office equipmentOffice equipmentGrinding machineCapital equipmentCapital equipment
RimmerHand tools
Miscellaneous
Select The BlankQuestion
Standardized containers eliminates ________Correct AnswerTransit damage
Your Answer
Transit damage
Multiple Choice Multiple AnswerQuestion
What are the forecasting techniques?Correct Answer
Regression analysis , Exponential smoothening , Moving averageYour Answer
Moving average , Regression analysis , Exponential smoothening
Select The BlankQuestion
Deterioration of rubber parts can be avoided by ________.Correct Answer
Application of French chalkYour Answer
Application of organic chemicals
True/FalseQuestion
No restrictions are on rail transport.Correct Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
Primary function means :-Correct Answer
Basics required to make product worthYour Answer
Basics required to make product worth
Select The BlankQuestion
A bonnet of motor-car is an ________.Correct Answer
Protection to engineYour Answer
Protection to engine
True/FalseQuestion
Import substitution in reality should be looked upon as "Import avoidance"Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
Quantity discounts are offered when :-Correct Answer
Buyer tempts to produce large quantity , Production is higher & cost is lessYour Answer
Buyer tempts to produce large quantity , Production is higher & cost is less
Select The BlankQuestion
GRR are sent from ________.Correct Answer
Stores Dept.Your AnswerStores Dept.
Select The BlankQuestion
Method suitable for items which are either of purely seasonal is ________.Correct AnswerSeasonal buying
Your AnswerSeasonal buying
Multiple Choice Single AnswerQuestion
Deterioration implies :-Correct Answer
Reduction in value of materialYour Answer
Reduction in value of material
Multiple Choice Multiple AnswerQuestion
Lowest price may be quoted by the prospective seller :-Correct Answer
Deliberately with an intention to gain entry into the buyer's company , On account of failure to estimate the cost correctly and accurately. , Due to
arithmetical errors in his cost estimates.Your Answer
Deliberately with an intention to gain entry into the buyer's company , On account of failure to estimate the cost correctly and accurately. , Due to
arithmetical errors in his cost estimates.
Select The BlankQuestion
Set-up cost for manufactured item in own plant is ________.Correct Answer
Very highYour Answer
Very high
Multiple Choice Single AnswerQuestion
The submission of the final offers by the prospective sources is :-Correct Answer
Firm biddingYour AnswerFirm bidding
True/FalseQuestion
Deterioration & Obsolescence cost are similar.Correct Answer
FalseYour Answer
False
Multiple Choice Multiple AnswerQuestion
Value analysis speaks about :-Correct Answer
Cost improvement , Improvement in qualityYour Answer
Cost improvement , Improvement in quality
Multiple Choice Multiple AnswerQuestion
Objectives of material research are :-Correct Answer
To improve capability of purchase department to visualize problems which may be encountered in future. , To make optimum utilization of available
resources , To provide the enterprise a competitive edge.Your Answer
To improve capability of purchase department to visualize problems which may be encountered in future. , To provide the enterprise a competitive
edge. , To attain lower efficiency in purchasing activities.
Select The BlankQuestion
Fixed price is applied up to certain part of the contract and price is finally determined at an agreed point in the contract is ________
Correct AnswerFixed price with predetermination
Your AnswerCost plus percentage of cost.
Multiple Choice Multiple AnswerQuestion
Constituents of cost analysis are :-Correct Answer
Raw material , Labour costYour Answer
Raw material , Labour cost , Inventory carrying cost
Multiple Choice Single AnswerQuestion
Policies lay down administrative principles utilized in framing procedures and rules is :-
Correct AnswerInternal policies
Your AnswerInternal policies
Select The BlankQuestion
________ reduce problems of material planning.Correct Answer
Reduction in lead timeYour Answer
Reduction in lead time
True/FalseQuestion
OEM discount is given by the supplier with a view to widen customer's base.Correct Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
The organization set up by FAO & WHO to evolve food standards :-Correct Answer
Codex Alimentarious commissionYour Answer
Codex Alimentarious commission
Select The BlankQuestion
________ received in the daily mail can also provide information on the vendors of items which the buyer's company is interested in developing.
Correct AnswerCirculars
Your AnswerCirculars
True/FalseQuestion
Master production schedule is not a forecast of demand but is plan for production.
Correct AnswerTrue
Your AnswerTrue
True/FalseQuestion
Reorder quantity in fixed order interval system equal economic order quantity.
Correct AnswerFalse
Your AnswerFalse
Select The BlankQuestion
In traditional purchasing, quality is confirmed ________.Correct Answer
On receiptYour Answer
At buyer's end
Multiple Choice Multiple AnswerQuestion
The receiving stores copy is used by it :-Correct Answer
To ensure that supplier effects supply of only items ordered on him. , To ensure that supplier does not supply more than the quantity stipulated in the
purchase order. , To ensure that the supplier effect deliveries through the
mode of transport asked for by the buyer.Your Answer
To enable indentor to do follow up with the purchase department , To ensure that supplier effects supply of only items ordered on him. , To ensure that
the supplier effect deliveries through the mode of transport asked for by the buyer.
Multiple Choice Single AnswerQuestion
Material requisition means :-Correct Answer
Material request note signed by authorized personYour Answer
Request for material as required
True/FalseQuestion
Make or buy decision are of common concern to both materials and production department.
Correct AnswerTrue
Your AnswerTrue
Multiple Choice Single AnswerQuestion
What is the identification & location of stock in store?Correct Answer
Formulating & updating a system of stores and coding to items which should ensure efficient identification & location of goods.
Your AnswerFormulating & updating a system of stores and coding to items which should
ensure efficient identification & location of goods.
Match The FollowingQuestion
Correct AnswerYour AnswerVendor ratingRight sourceRight source
Replenishment methodRight timeRight time
Competitive biddingRight price
Right priceEOQ
Right quantityRight quantity
Multiple Choice Multiple AnswerQuestion
Typical examples of direct materials are :-Correct Answer
Cloth in the manufacture of garment , Wood in the manufacture of furniture , Fruits in a canning industry
Your AnswerCloth in the manufacture of garment , Wood in the manufacture of furniture ,
Fruits in a canning industry
Multiple Choice Multiple AnswerQuestion
Following are benefits of scientific stoke management :-Correct Answer
Reduction in downtime by efficient issues , Inventory control , Very less time required to identify & issue material
Your AnswerReduction in downtime by efficient issues , Inventory control , Very less time
required to identify & issue material
Multiple Choice Single AnswerQuestion
What is described in sale of goods Act 1930?Correct Answer
Various rules concerning delivery of goods to be agreed between seller & buyer
Your AnswerVarious rules concerning delivery of goods to be agreed between seller &
buyer
Select The BlankQuestion
________ is suitable for procurement of prototypes, fixtures, development items.
Correct AnswerCost plus percentage of cost.
Your AnswerFixed price agreements with escalation.
Multiple Choice Multiple AnswerQuestion
Steel almirahs are used for storage of :-Correct Answer
Expensive items , Scarce itemsYour Answer
Expensive items , Scarce items
True/FalseQuestion
Contract whose object is not lawful are not void.Correct Answer
FalseYour Answer
False
at 6:58 AM 0 comments Links to this post
Labels: Materials Management(Set-3)
Saturday, December 6, 2008
Materials Management - 8
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion
Small parcels, Samples, gifts which are received from other countries provisions of import policy & customs not applied on them.
Correct Answer False
Your Answer False
Match The FollowingQuestion
Correct AnswerYour AnswerDelivery time
As specified in contractWarranties
Essential stipulationsConditions
As per agreement
Collateral stipulationsWarranties
As specified in contractCaveat emptor
Fundamental principle of sale of goodsSale of goods act option
Multiple Choice Single AnswerQuestion
For the inspection of special Cutting tools which department is responsible?Correct Answer
Planning department & inspection departmentYour Answer
Planning department & inspection department
True/FalseQuestion
Black listing may be for a limited period or for an indefinite period.Correct Answer
TrueYour Answer
False
Select The BlankQuestion
Two-bin system supersedes ________.Correct Answer
Perpetual inventoryYour Answer
Perpetual inventory
Multiple Choice Multiple AnswerQuestion
Stores functions include :-Correct Answer
Receiving and issuing of materials , Keeping the record , Taking precautions to avoid pilferage, theft
Your Answer Receiving and issuing of materials , Keeping the record , Taking precautions
to avoid pilferage, theft
Multiple Choice Multiple AnswerQuestion
Analysis of certification correctness of material is required for :-Correct Answer
Bar stock , Castings
Your Answer High risk materials , Liquids
Select The BlankQuestion
________ is followed in public sector organizations to identify the lowest potential bidder.Correct Answer Tender systemYour Answer
Tender system
Select The BlankQuestion
Set-up cost for manufactured item in own plant is ________.Correct Answer
Very highYour Answer
Very less
Select The BlankQuestion
The ________ is raised by the receiving stores in receipt of materials and after physical verification of the quantity and quality.
Correct Answer Goods Receipt Report
Your Answer Goods Receipt Report
True/FalseQuestion
Metals should be stored at least 15-20 cm above the ground.Correct Answer
TrueYour Answer
True
True/FalseQuestion
JIT purchasing is indirectly the activity of pushing inventory on the suppliers.Correct Answer
TrueYour Answer
False
Multiple Choice Single Answer
Question Annual total cost is :-
Correct Answer Annual Material Cost + Annual Procurement Cost + Annual ICC
Your Answer Annual Material Cost + Annual Procurement Cost + Annual ICC
True/FalseQuestion
No restrictions are on rail transport.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
Advantages of forward buying are :-Correct Answer
Greater margin of profit on finished goods , Saving in procurement expenses as purchases are usually consolidated. , Security against shortages
Your Answer Greater margin of profit on finished goods , Saving in procurement expenses
as purchases are usually consolidated. , Security against shortages
Multiple Choice Single AnswerQuestion
The purchase of variety of items from single source is called as :-Correct Answer Blanket ordersYour Answer
Blanket orders
True/FalseQuestion
Inventory control technique is suited for low value indirect materials which are economical to procure them in certain pre fixed quantities.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion
Contracts of A & B class items should have :-Correct Answer
Value engineeringYour Answer Value analysis
True/FalseQuestion
Reorder quantity in fixed order interval system equal economic order quantity.
Correct Answer False
Your Answer True
Select The BlankQuestion
Indian railways carry almost ________ goods & passenger traffic.Correct Answer
0.75Your Answer
0.75
Select The BlankQuestion
The purchasing of Weigh bridge is________Correct Answer
Capital purchasingYour Answer
Import purchasing
Multiple Choice Multiple AnswerQuestion
Techniques of Simplification :-Correct Answer
Preferred numbers , Frequency analysis , Rationalized codificationYour Answer
Classification , Frequency analysis , Rationalized codification
Multiple Choice Multiple AnswerQuestion
Correct issues must have :-Correct Answer
Written requisitions , Authorized requisitionsYour Answer
Written requisitions , Authorized requisitions
Multiple Choice Multiple Answer
Question Rejection percentage to be allowed to the vendor depends on the :-
Correct Answer Configuration of component , Number of operations involved , Tolerances
and surface finishesYour Answer
Number of operations involved , Tolerances and surface finishes , Process
Select The BlankQuestion
One of the major pipe-line in India is ________.Correct Answer
Ankaleshwar - BarodaYour Answer
Barauni - Bajwa
Select The BlankQuestion
GRR are sent from ________.Correct Answer
Stores Dept.Your Answer Stores Dept.
Multiple Choice Multiple AnswerQuestion
Continuous Stock-taking is effective due to :-Correct Answer
Planned/scheduled activity , Discrepancies are noticed & corrected in short spell
Your Answer Planned/scheduled activity , Discrepancies are noticed & corrected in short
spell , Eliminates material losses
Multiple Choice Single AnswerQuestion
Limited competition is associated with higher price while wider competition enables buying at competitive rates is known as :-
Correct Answer Extent of competition
Your Answer Demand and supply condition
Select The BlankQuestion
________ is an addition of unnecessary cost to product
Correct Answer Poor design
Your Answer Poor design
Multiple Choice Multiple AnswerQuestion
The alpha numerical system operates as under :-Correct Answer
Each item is identified and is given a proper description. , Identical items are classified into groups and each group is provided a suitable heading. , Codes
are assigned to the next group, which are usually the alphabets.Your Answer
Each item is identified and is given a proper description. , Identical items are classified into groups and each group is provided a suitable heading. , Codes
are assigned to the next group, which are usually the alphabets.
Multiple Choice Single AnswerQuestion
How much saving in material cost can give benefit equivalent to eight to nine % rise in sales volume?
Correct Answer 0.01
Your Answer 0.01
Multiple Choice Single AnswerQuestion
The purchasing made under contract , usually formal, of needed materials, the delivery of which is frequently spread over a period of time is known as :-
Correct Answer Contract buying
Your Answer Contract buying
Multiple Choice Single AnswerQuestion
Which type of tendering is adopted when the requirements are urgent?Correct Answer Limited tenderYour Answer
Limited tender
True/FalseQuestion
Continuous stock-taking tends to dislocate the working of store.
Correct Answer False
Your Answer False
True/FalseQuestion
PO gives full and complete details of the materials to be supplied thereby avoiding ambiguities.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
External lead time is :-Correct Answer
Supplier's lead timeYour Answer
Supplier's lead time
Match The FollowingQuestion
Correct AnswerYour Answer
SuppliesAbrasive materials
ChemicalsPerishable materials
VegetablesVegetables
Packing materialsCartonCarton
EmptiesMetal containersMetal containers
Multiple Choice Multiple AnswerQuestion
Primary duties to be performed by purchase department are :-Correct Answer
Receipts, sorting of purchase indents and determination of method of buying , Performance evaluation and feedback , Search for suppliers
Your Answer
Receipts, sorting of purchase indents and determination of method of buying , Performance evaluation and feedback , Search for suppliers
Multiple Choice Multiple AnswerQuestion
In F.O.R. contract seller is responsible for :-Correct Answer
Arranging for movement of goods to the transporter's godown , Safe loading on into the vehicle , Keeping the material in deliverable state
Your Answer Arranging for movement of goods to the transporter's godown , Safe loading
on into the vehicle , Keeping the material in deliverable state
Multiple Choice Single AnswerQuestion
Primary function means :-Correct Answer
Basics required to make product worthYour Answer
Basics required to make product worth
Multiple Choice Single AnswerQuestion
Who act as a link between company's financial department and supplier's for timely payment?Correct Answer
Purchase divisionYour Answer
Purchase division
Select The BlankQuestion
Review system-optional replenishment is a modification of ________.Correct Answer
Fixed-order interval systemYour Answer
Fixed-order interval system
Multiple Choice Single AnswerQuestion
Value analysis job plan contains :-Correct Answer
9 stepsYour Answer
9 steps
Multiple Choice Multiple AnswerQuestion
Functions of Traffic division :-Correct Answer
Tracing missing consignments , Selecting the right kind of shipping service , Scrutinizing freight bills for payment.
Your Answer Selecting the right kind of shipping service , Scrutinizing freight bills for
payment.
Select The BlankQuestion
________Inspects the goods & issues a surveyor report certificate.Correct Answer
SurveyorYour Answer
Surveyor
Multiple Choice Multiple AnswerQuestion
Objectives of material research are :-Correct Answer
To improve capability of purchase department to visualize problems which may be encountered in future. , To make optimum utilization of available
resources , To provide the enterprise a competitive edge.Your Answer
To improve capability of purchase department to visualize problems which may be encountered in future. , To make optimum utilization of available
resources , To provide the enterprise a competitive edge.
True/FalseQuestion
Two bin system is better as compared to perpetual inventory system.Correct Answer
FalseYour Answer
True
True/FalseQuestion Small parcels, Samples, gifts which are received from othercountries provisions of import policy & customs not applied on them.
Correct Answer FalseYour Answer False
Match The FollowingQuestion Correct Answer Your Answer
Delivery time As specified in contract Warranties
Essential stipulations Conditions As per agreement
Collateral stipulations Warranties As specified in contract
Caveat emptor Fundamental principle of sale of goods Sale of goods actoption
Multiple Choice Single AnswerQuestion For the inspection of special Cutting tools which department
is responsible?Correct Answer Planning department & inspection department
Your Answer Planning department & inspection department
True/FalseQuestion Black listing may be for a limited period or for an
indefinite period.Correct Answer TrueYour Answer False
Select The BlankQuestion Two-bin system supersedes ________.
Correct Answer Perpetual inventoryYour Answer Perpetual inventory
Multiple Choice Multiple AnswerQuestion Stores functions include :-
Correct Answer Receiving and issuing of materials , Keeping therecord , Taking precautions to avoid pilferage, theft
Your Answer Receiving and issuing of materials , Keeping the record ,Taking precautions to avoid pilferage, theft
Multiple Choice Multiple AnswerQuestion Analysis of certification correctness of material is
required for :-Correct Answer Bar stock , Castings
Your Answer High risk materials , Liquids
Select The BlankQuestion ________ is followed in public sector organizations to
identify the lowest potential bidder.Correct Answer Tender system
Your Answer Tender system
Select The BlankQuestion Set-up cost for manufactured item in own plant is ________.
Correct Answer Very highYour Answer Very less
Select The BlankQuestion The ________ is raised by the receiving stores in receipt ofmaterials and after physical verification of the quantity and quality.
Correct Answer Goods Receipt ReportYour Answer Goods Receipt Report
True/FalseQuestion Metals should be stored at least 15-20 cm above the ground.
Correct Answer TrueYour Answer True
True/FalseQuestion JIT purchasing is indirectly the activity of pushing
inventory on the suppliers.Correct Answer TrueYour Answer False
Multiple Choice Single AnswerQuestion Annual total cost is :-
Correct Answer Annual Material Cost + Annual Procurement Cost +Annual ICC
Your Answer Annual Material Cost + Annual Procurement Cost + Annual ICC
True/FalseQuestion No restrictions are on rail transport.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Advantages of forward buying are :-
Correct Answer Greater margin of profit on finished goods , Savingin procurement expenses as purchases are usually consolidated. , Security
against shortages Your Answer Greater margin of profit on finished goods , Saving in
procurement expenses as purchases are usually consolidated. , Securityagainst shortages
Multiple Choice Single AnswerQuestion The purchase of variety of items from single source is
called as :-Correct Answer Blanket orders
Your Answer Blanket orders
True/FalseQuestion Inventory control technique is suited for low value indirectmaterials which are economical to procure them in certain pre fixed
quantities.Correct Answer TrueYour Answer False
Multiple Choice Single AnswerQuestion Contracts of A & B class items should have :-
Correct Answer Value engineeringYour Answer Value analysis
True/FalseQuestion Reorder quantity in fixed order interval system equal
economic order quantity.Correct Answer False
Your Answer True
Select The BlankQuestion Indian railways carry almost ________ goods & passenger
traffic.Correct Answer 0.75
Your Answer 0.75
Select The BlankQuestion The purchasing of Weigh bridge is________
Correct Answer Capital purchasingYour Answer Import purchasing
Multiple Choice Multiple AnswerQuestion Techniques of Simplification :-
Correct Answer Preferred numbers , Frequency analysis ,Rationalized codification
Your Answer Classification , Frequency analysis , Rationalizedcodification
Multiple Choice Multiple AnswerQuestion Correct issues must have :-
Correct Answer Written requisitions , Authorized requisitions Your Answer Written requisitions , Authorized requisitions
Multiple Choice Multiple AnswerQuestion Rejection percentage to be allowed to the vendor depends on
the :-Correct Answer Configuration of component , Number of operations
involved , Tolerances and surface finishes Your Answer Number of operations involved , Tolerances and surface
finishes , Process
Select The BlankQuestion One of the major pipe-line in India is ________.
Correct Answer Ankaleshwar - BarodaYour Answer Barauni - Bajwa
Select The BlankQuestion GRR are sent from ________.
Correct Answer Stores Dept.Your Answer Stores Dept.
Multiple Choice Multiple AnswerQuestion Continuous Stock-taking is effective due to :-
Correct Answer Planned/scheduled activity , Discrepancies are
noticed & corrected in short spell Your Answer Planned/scheduled activity , Discrepancies are noticed &
corrected in short spell , Eliminates material losses
Multiple Choice Single AnswerQuestion Limited competition is associated with higher price while
wider competition enables buying at competitive rates is known as :-Correct Answer Extent of competition
Your Answer Demand and supply condition
Select The BlankQuestion ________ is an addition of unnecessary cost to product
Correct Answer Poor designYour Answer Poor design
Multiple Choice Multiple AnswerQuestion The alpha numerical system operates as under :-
Correct Answer Each item is identified and is given a properdescription. , Identical items are classified into groups and each group is
provided a suitable heading. , Codes are assigned to the next group, whichare usually the alphabets.
Your Answer Each item is identified and is given a proper description. ,Identical items are classified into groups and each group is provided a
suitable heading. , Codes are assigned to the next group, which are usuallythe alphabets.
Multiple Choice Single AnswerQuestion How much saving in material cost can give benefit equivalent
to eight to nine % rise in sales volume?Correct Answer 0.01
Your Answer 0.01
Multiple Choice Single AnswerQuestion The purchasing made under contract , usually formal, of
needed materials, the delivery of which is frequently spread over a periodof time is known as :-
Correct Answer Contract buyingYour Answer Contract buying
Multiple Choice Single Answer
Question Which type of tendering is adopted when the requirements areurgent?
Correct Answer Limited tenderYour Answer Limited tender
True/FalseQuestion Continuous stock-taking tends to dislocate the working of
store.Correct Answer False
Your Answer False
True/FalseQuestion PO gives full and complete details of the materials to be
supplied thereby avoiding ambiguities.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion External lead time is :-
Correct Answer Supplier's lead timeYour Answer Supplier's lead time
Match The FollowingQuestion Correct Answer Your Answer
Supplies Abrasive materials Chemicals
Perishable materials Vegetables Vegetables
Packing materials Carton Carton
Empties Metal containers Metal containers
Multiple Choice Multiple AnswerQuestion Primary duties to be performed by purchase department are :-
Correct Answer Receipts, sorting of purchase indents anddetermination of method of buying , Performance evaluation and feedback ,
Search for suppliers Your Answer Receipts, sorting of purchase indents and determination ofmethod of buying , Performance evaluation and feedback , Search for
suppliers
Multiple Choice Multiple AnswerQuestion In F.O.R. contract seller is responsible for :-
Correct Answer Arranging for movement of goods to the transporter'sgodown , Safe loading on into the vehicle , Keeping the material in
deliverable state Your Answer Arranging for movement of goods to the transporter's godown
, Safe loading on into the vehicle , Keeping the material in deliverablestate
Multiple Choice Single AnswerQuestion Primary function means :-
Correct Answer Basics required to make product worthYour Answer Basics required to make product worth
Multiple Choice Single AnswerQuestion Who act as a link between company's financial department and
supplier's for timely payment?Correct Answer Purchase division
Your Answer Purchase division
Select The BlankQuestion Review system-optional replenishment is a modification of
________.Correct Answer Fixed-order interval system
Your Answer Fixed-order interval system
Multiple Choice Single AnswerQuestion Value analysis job plan contains :-
Correct Answer 9 stepsYour Answer 9 steps
Multiple Choice Multiple AnswerQuestion Functions of Traffic division :-
Correct Answer Tracing missing consignments , Selecting the rightkind of shipping service , Scrutinizing freight bills for payment.
Your Answer Selecting the right kind of shipping service , Scrutinizingfreight bills for payment.
Select The BlankQuestion ________Inspects the goods & issues a surveyor report
certificate.Correct Answer Surveyor
Your Answer Surveyor
Multiple Choice Multiple AnswerQuestion Objectives of material research are :-
Correct Answer To improve capability of purchase department tovisualize problems which may be encountered in future. , To make optimumutilization of available resources , To provide the enterprise a competitive
edge. Your Answer To improve capability of purchase department to visualize
problems which may be encountered in future. , To make optimum utilizationof available resources , To provide the enterprise a competitive edge.
True/FalseQuestion Two bin system is better as compared to perpetual inventory
system.Correct Answer False
Your Answer True
at 9:18 PM 1 comments Links to this post
Labels: Materials Management(Set-4)
Materials Management - 12
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False Question
Bulky items impervious to weather is kept at very safe place inside store. Correct Answer
False Your Answer
False
Select The Blank
Question
Petroleum product imports are channealised through________. Correct Answer
Indian oil corporation Your Answer
Indian oil corporation
Multiple Choice Single Answer
Question Procurement by more than one firm by pooling their requirements is :-
Correct Answer Cooperative buying
Your Answer Cooperative buying
Multiple Choice Single Answer
Question For the inspection of special Cutting tools which department is responsible?
Correct Answer Planning department & inspection department
Your Answer Maintenance department
Match The Following
QuestionCorrect Answer
Your Answer
Vendor ratingRight sourceRight source
Replenishment methodRight timeRight time
Competitive biddingRight priceRight price
EOQRight quantityRight quantity
Multiple Choice Single Answer
Question The cost incurred in providing adequate insurance cover to the materials in
transit and in storage is Correct Answer
Insurance cost Your Answer Insurance cost
Multiple Choice Multiple Answer
Question Import transactions are subject to following additional laws compared to
procurement from sources within the country as :- Correct Answer
Import trade control act ®ulation , Custom act , Central excise Rules 2002 Your Answer
Import trade control act ®ulation , Custom act , Trade policy act 2000
True/False Question
Projects are usually subjected to uncertainty & often delay takes place incompletion of projects which results in cost over runs.
Correct Answer True
Your Answer True
True/False Question
Contract whose object is not lawful are not void. Correct Answer
False Your Answer
False
True/False Question
Shortage chasing is intended to remind the supplier of the due date andobtain advance information of expected delays.
Correct Answer
False Your Answer
False
Multiple Choice Multiple Answer
Question Optimal purchase quantity comprises :-
Correct Answer Annual inventory carrying cost , Annual procurement cost
Your Answer Annual inventory carrying cost , Annual procurement cost , Set-up cost
Multiple Choice Multiple Answer
Question Steel almirahs are used for storage of :-
Correct Answer Expensive items , Scarce items
Your Answer Expensive items , Scarce items , High risk materials
Multiple Choice Multiple Answer
Question Some of the benefits if materials are supplied by the buyer are :-
Correct Answer The supplies of goods are guaranteed especially during the periods of
shortages. , The frequent requests for the price revisions are avoided , Thebuyer is sure of the quality of materials.
Your Answer The buyer is sure of the quality of materials. , The frequent requests forthe price revisions are avoided , The unnecessary profit on materials are
added by the suppliers.
Multiple Choice Multiple Answer
Question The buyers are asked to adopt the following method for follow up :-
Correct Answer Telephone , Letters , E-mail, telegram
Your Answer Telephone , Letters , E-mail, telegram
True/False
Question Stores is the "Safe Custody" for keeping materials
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Prices of certain commodity may be fixed by the government and thereby
putting a restriction on both buyer and seller is :- Correct Answer
Government restrictions Your Answer
Government restrictions
Multiple Choice Multiple Answer
Question A contract terminates under following condition :-
Correct Answer Discharge by performance , Discharge by Release , Discharge by novation
Your Answer Discharge by performance , Discharge by Release , Discharge by novation
Select The Blank
Question ________ is followed in public sector organizations to identify the lowest
potential bidder. Correct Answer
Tender system Your Answer Tender system
True/False Question
The performance of an equipment can not be verified on the spot if theequipment is not in operation.
Correct Answer False
Your Answer True
Match The Following
QuestionCorrect Answer
Your Answer
Speculative buyingBulk purchasing
Non perishable items
Capital purchasingPlant and machineryPlant and machinery
Group purchasingHardware materials
Bulk purchasing
Service contractTypewriters
Hardware materials
True/False Question
Metals should be stored at least 15-20 cm above the ground. Correct Answer
True Your Answer
True
Multiple Choice Multiple Answer
Question Costs involved in materials management are
Correct Answer Basic cost of materials , Government tax and levies , Ordering cost
Your Answer Basic cost of materials , Ordering cost , Overhead
Select The Blank
Question ________ of the department refers to the placement of the department in the
structure of the company.
Correct Answer Status
Your Answer Location
True/False Question
Value analysis is the cost reduction technique. Correct Answer
True Your Answer
True
Multiple Choice Multiple Answer
Question For large engineering firms main store could be sub divided into :-
Correct Answer Finished part store , Raw material store , Semi finished item store
Your Answer Raw material store , Semi finished item store , Finished part store
Multiple Choice Single Answer
Question In project procurement what work is covered in detailed engineering stage?
Correct Answer Cross verification of technical specifications & finalisation of commercial
terms Your Answer
Cross verification of technical specifications & finalisation of commercialterms
Select The Blank
Question Sub contracting decisions must be based on outcome of ________ analysis.
Correct Answer Cost benefit
Your Answer Cost benefit
Multiple Choice Multiple Answer
Question
Disadvantages of forward buying are :- Correct Answer
Such a buying may not serve entirely the needs of the production department
, Price expectations if not realised may result in major financial loss tothe firm. , Large scale obsolescence may result if design changes occur.
Your Answer Price expectations if not realised may result in major financial loss to the
firm. , Large scale obsolescence may result if design changes occur.
Multiple Choice Single Answer
Question Who act as a link between company's financial department and supplier's for
timely payment? Correct Answer Purchase division Your Answer
Purchase division
Multiple Choice Single Answer
Question What is the meaning of stores layout?
Correct Answer Physical arrangement of space for storage material movement, office etcwhich should provide for most efficient receipt storage & issue of material
Your Answer Physical arrangement of space for storage material movement, office etcwhich should provide for most efficient receipt storage & issue of material
True/False Question
If item is manufactured in small quantities, set-up cost is high. Correct Answer
True Your Answer
True
Select The Blank
Question ________is suitable for procurement from non-profit making organization.
Correct Answer Cost plus zero fee
Your Answer Fixed price agreements with escalation.
Select The Blank
Question ________ reduce problems of material planning.
Correct Answer Reduction in lead time
Your Answer Reduction in lead time
Multiple Choice Single Answer
Question JIT aims at :-
Correct Answer Reduction in non-value added activities
Your Answer Reduction in non-value added activities
Multiple Choice Multiple Answer
Question Complaints concerning should be made in such a way that negative
reactionsare avoided such as :-
Correct Answer Delivery failures , Rejection , Shortages
Your Answer Delivery failures , Rejection , Shortages
Multiple Choice Single Answer
Question Internal factor influencing materials planning:-
Correct Answer Procurement lead times
Your Answer Procurement lead times
Multiple Choice Single Answer
Question The cost incurred in movement of materials from suppliers works to buyer's
works is
Correct Answer Freight cost
Your Answer Freight cost
True/False Question
Supplier's delivery ratings should be communicated on periodical basis. Correct Answer
True Your Answer
True
Select The Blank
Question When the costs are balanced, total cost is ________.
Correct Answer Minimum
Your Answer Fixed
Multiple Choice Single Answer
Question The process of procurement of raw material, wip, finished goods, jigs,
fixtures and other tools and equipments which are required for the operationand maintenance of a manufacturing plant is known as
Correct Answer Purchasing
Your Answer Store keeping
Multiple Choice Single Answer
Question Mechanical tests are performed to :-
Correct Answer Ascertain the strength of materials
Your Answer Ascertain the strength of materials
Multiple Choice Single Answer
Question
Set-up cost means :- Correct Answer
Cost incurred to replenish the stock of item manufactured at home plant Your Answer
Cost incurred to replenish the stock of item manufactured at home plant
Multiple Choice Single Answer
Question The main responsibility of inventory control division is :-
Correct Answer Fixing inventory levels
Your Answer Fixing inventory levels
Multiple Choice Multiple Answer
Question Special stores are created where :-
Correct Answer Material need to be held under the control of the bank , Material need to be
held for perishable items , Material need to be held for explosive &inflammable items
Your Answer Material need to be held under the control of the bank , Material need to be
held for perishable items , Material need to be held for explosive &inflammable items
Select The Blank
Question ________ is a fundamental form of economical value.
Correct Answer Esteem value
Your Answer Cost value
Select The Blank
Question Discrepancies arising out of theft are tends to ________.
Correct Answer Profit & Loss a/c Your Answer Profit & Loss a/c
Multiple Choice Single Answer
Question What is Earnest money?
Correct Answer Fixed amount collected along with Tender
Your Answer Fixed amount collected along with Tender
at 9:16 PM 1 comments Links to this post
Labels: Materials Management(Set-4)
Materials Management - 11
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion EOQ model is based on the assumption that unit price is
fixed.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Obsolescence cost is :-
Correct Answer Due stock on hand , Part No. / Name Your Answer Due stock on hand , Part No. / Name
Multiple Choice Multiple AnswerQuestion Set-up cost comprises of :-
Correct Answer Work-order cost , Idle time cost Your Answer Work-order cost , Idle time cost
Multiple Choice Single AnswerQuestion Quantity discounts reduces :-
Correct Answer Procurement costYour Answer Material cost
Multiple Choice Single AnswerQuestion The document which is prepared by the engineering department
is :-
Correct Answer Bill of materialYour Answer Bill of material
Multiple Choice Single AnswerQuestion Which of the following is not the external factor
influencing materials planning?Correct Answer Corporate objective
Your Answer Corporate objective
Select The BlankQuestion Down time means ________.
Correct Answer Time required by equipment to become OKYour Answer Time required by equipment to become OK
Multiple Choice Single AnswerQuestion Security deposit means :-
Correct Answer Amount as reserve-part kept by scrap contractor forfinal adjustment
Your Answer Amount paid by contractor to company
Multiple Choice Single AnswerQuestion Identifying technical, financial, managerial and quality
assurance capability of the vendors and thereby generate data to serve basisfor preliminary source selection is :-
Correct Answer Source investigation stageYour Answer Source investigation stage
Select The BlankQuestion ________specification are usually flexible and can be
altered during consultation with different manufacturers of the equipment.Correct Answer Equipment
Your Answer Technical
Multiple Choice Single AnswerQuestion Issues to top up supply to pre-fixed levels of items are :-
Correct Answer Imprest issuesYour Answer Imprest issues
Multiple Choice Multiple Answer
Question Requests for price increase are received on account of thefollowing reasons :-
Correct Answer Increase in cost of raw materials and boughtoutparts , Changes in tax structure , Added work content
Your Answer Increase in cost of raw materials and boughtout parts ,Changes in tax structure , Added work content
Select The BlankQuestion Stock held by company represents ________.
Correct Answer MoneyYour Answer Money
Select The BlankQuestion Method suitable for items which are either of purely
seasonal is ________.Correct Answer Seasonal buying
Your Answer Seasonal buying
Multiple Choice Single AnswerQuestion The buying which is received in staggered lots, each lot at
times may equal EOQ is :-Correct Answer Contract buyingYour Answer Schedule buying
Multiple Choice Multiple AnswerQuestion Special advance license for deemed export is granted in
following cases :-Correct Answer Supply of goods against advance license /Remission
scheme , Supply of goods to export oriented units , Supply of capital goodsto holders of licenses under EPCG Scheme
Your Answer Supply of goods against advance license /Remission scheme ,Supply of goods to export oriented units , Supply of capital goods to
holders of licenses under EPCG Scheme
True/FalseQuestion Supplier's request for price increase should be analysed
patiently by the buyer. A curt 'no' or 'negative' reply spoilsrelationships.
Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Actions involved in sample validation are :-
Correct Answer Follow up with the supplier until sample submission, Sample inspection , Feedback on defects and defect prevention Your Answer Sample inspection , Feedback on defects and defect
prevention
Multiple Choice Multiple AnswerQuestion Special stores are created where :-
Correct Answer Material need to be held under the control of thebank , Material need to be held for perishable items , Material need to be
held for explosive & inflammable items Your Answer Material need to be held for explosive & inflammable items ,
Material need to be held for costly items
Select The BlankQuestion ________ is suitable for procurement of prototypes,
fixtures, development items.Correct Answer Cost plus percentage of cost.
Your Answer Fixed price agreements
Select The BlankQuestion In instantaneous replenishment system, production rate is
________ .Correct Answer InfiniteYour Answer Constant
Multiple Choice Single AnswerQuestion Organization decided to import when :-
Correct Answer Item is not available in the countryYour Answer Item is very critical functioning
Multiple Choice Single AnswerQuestion Operating systems process data for :-Correct Answer Routine operations of the depts.
Your Answer Routine operations of the depts.
Select The BlankQuestion In MRP-1, manufacturing cycle of finished product is
________.Correct Answer LongYour Answer Short
Match The FollowingQuestion Correct Answer Your Answer
JIT Highly vulnerable to supply failures Purchasing time
TPM Removal of uncertainty Highly vulnerable to supply failures
Quality at source Elimination of incoming inspection Eliminationof incoming inspection
Lower unit cost JIT Quantity of production
True/FalseQuestion Materials department is service department.
Correct Answer TrueYour Answer False
Select The BlankQuestion Malpractices are ________.
Correct Answer Manipulations by stores staffYour Answer Manipulations by stores staff
True/FalseQuestion Value analysis is necessary when company's profits soars.
Correct Answer FalseYour Answer False
Match The FollowingQuestion Correct Answer Your Answer
Fast moving items Very near to the issue counter Very near to theissue counter
Antibiotics In a air conditioned store In a air conditioned store
Costly items like fuel injector In locked cupboard & away from entrance ofstore. In locked cupboard & away from entrance of store.
Inflammable & hazardous items In a separate store In a separate store
Multiple Choice Multiple AnswerQuestion Discolourisation of soaps is due to :-Correct Answer Exposure to light , Moisture
Your Answer Exposure to light , Moisture
Multiple Choice Multiple AnswerQuestion Following are benefits of scientific stoke management :-
Correct Answer Reduction in downtime by efficient issues ,Inventory control , Very less time required to identify & issue material Your Answer Reduction in downtime by efficient issues , Very less time
required to identify & issue material
Multiple Choice Multiple AnswerQuestion Following special schemes are announced by Indian Government
under which import can be permitted at zero duty or at less duty :-Correct Answer Export promotion capital goods scheme , Diamond
&Jewellary promotion scheme , Import by 100% export oriented units Your Answer Export promotion capital goods scheme , Import by 100%
export oriented units
True/FalseQuestion Post parcel consignments are cleared through customs &
clearance is done through foreign post office.Correct Answer TrueYour Answer False
True/FalseQuestion Number of free days allowed for air consignments is 15 days
from the flight date.Correct Answer False
Your Answer False
True/FalseQuestion The trade discount is not allowed as a percentage of
published price.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Receiving inspector should have to :-
Correct Answer Segregate defectives , Maintain vendor wise qualityrecords
Your Answer Segregate defectives , Maintain vendor wise quality records
Multiple Choice Single AnswerQuestion Supplier may be asked to provide assistance for the first
few days of working so that production losses can be avoided is known as :-Correct Answer Spare part and supply contracts
Your Answer Seller's technical assistance during start up.
Select The BlankQuestion All incoming materials are insured against ________
Correct Answer Damage / lossYour Answer Damage / loss
True/FalseQuestion Make or buy decision are of common concern to both materials
and production department.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Inflammable storage areas should be :-
Correct Answer Well insulatedYour Answer Well insulated
Multiple Choice Multiple AnswerQuestion The sub system of numerical system involves following :-
Correct Answer Sequential code , Decimal code , Block code system Your Answer Sequential code , Decimal code , Block code system
Multiple Choice Single AnswerQuestion Stock-out is due to :-
Correct Answer Delay in deliveriesYour Answer Delay in deliveries
Select The BlankQuestion ________is reimbursement of actual costs plus fixed fee.
Correct Answer Cost plus fixed feeYour Answer Cost plus fixed fee
Select The BlankQuestion ________ is essence of purchase order.
Correct Answer DeliveryYour Answer Delivery
Multiple Choice Multiple AnswerQuestion Performance of product requires :-
Correct Answer Functionality , Reliability Your Answer Functionality , Reliability
True/FalseQuestion Ex-works means sale is made on rail/truck at the station of
dispatch.Correct Answer False
Your Answer False
True/FalseQuestion The trade discount is not allowed as a percentage of
published price.Correct Answer False
Your Answer False