MASTERPLAN - Bell Park Sports Club · SOCCER PITCH upgraded KITCHEN & STORE FACILITIES EXISTING...
Transcript of MASTERPLAN - Bell Park Sports Club · SOCCER PITCH upgraded KITCHEN & STORE FACILITIES EXISTING...
SCOPE OF WORKS
• Remove plasterboard wall between entry foyer and function room, and replace with full height glass wall.
• Replace existing doors to function room with large full height timber doors.
• Replace carpet to function room & lobby.• Replace existing curtains with new including
curtains to glass wall.• Replace existing ceiling with new acoustic
plasterboard ceiling.• Replace existing windows to North façade with
operable doors onto deck• Install new outdoor timber deck and handrail
and pergola structure.• Relocate existing stage and all associated
services to suit new layout.
• Upgrade existing general lighting and install 5 new large scale feature drop pendant lights.
• Allow to repaint and make good as required to plasterboard walls.
• Clad over existing internal brick arch ways. Square up and install new timber sliding door.
• Minor upgrade to bar area as required.• New dining chairs to function area.• Remove passageway wall outside toilets and
extend lobby.• New glazed entry/airlock doors and side lights.• Upgrade fi nishes and lights to existing
conference room and convert offi ce to bridal/powder room.
• General upgrade of lobby fi nishes including installation of large feature skylight.
AMENITIES
• Paint all exiting brickwork white.• Retain existing toilet partitions, allow to
polished and replace existing doors with new laminate doors.
• Replace all existing sanitaryware including toilet suites, urinals, hand basins, taps and soap dispensers with new.
• Provide new decorative mirrors to suit new layout.
• Install new fl oors tiles.• Allow to tile long wall full height with new
decorative feature wall tiles.• Upgrade lighting.
Imag
es d
epic
t pot
entia
l des
ign
inte
nt, t
hey
are
not t
he d
esig
n.D
ES
IGN
INS
PIR
AT
ION
OUTDOORDECK
NEW LANDSCAPING
FUNCTIONDROP- OFF
EXIT RAMP
NEW LANDSCAPING
NEW LANDSCAPING
NEW LANDSCAPING
RAMP
RAMP
RAMP
up-graded
MALE TOILETS
up-graded
FEMALETOILETS
newskylight
re-located
STAGE
upgraded
MAIN FUNCTION
ROOMupgraded
FOYER
up-graded
CONFERENCEROOM
up-gradedSECUREANTE-ROOM
NEW LANDSCAPING
space division (multiple functions)
new
AIR LOCK
newskylight
upgraded
FOYER
MASTERPLAN
STAGE A - FUNCTIONS SPACESMASTERPLAN
MASTERPLAN
Imag
es d
epic
t pot
entia
l des
ign
inte
nt, t
hey
are
not t
he d
esig
n.D
ES
IGN
INS
PIR
AT
ION
STAGE B - MEMBERS’ FACILITIESMASTERPLAN
NEWLOADING
AREA
SOCCER PITCH
upgraded
KITCHEN & STORE
FACILITIES
EXISTINGGRANDSTAND
upgradedBAR/ SERVICE
new
MAIN
BAR
CAFE DECK
GLAZEDWIND
BREAK
EXTENDED SEATING
RESTAURANT
MEMBERS BAR/
LOUNGE/ CAFE
new
AIR LOCK
CHILDREN’S PLAY
SCOPE OF WORKS
• All new furniture to suit the new restaurant and bar layout.
• New fl oor fi nishes including carpet and tiles around the bar area and rubber fl oor behind the bar area.
• New glazed airlock and new glazed openings to East façade to connect with the grandstand.
• Upgrade to existing kitchen to allow for a functional space to cater for seating requirements.
• Demolish extended service area and extend grandstand seating.
• Extend and upgrade existing bar to improve service to functions area.
• New central bar area between restaurant and members’ bar.
• General upgrade of fi nishes and lighting to existing dining area to convert to a modern restaurant facility.
• General upgrade of fi nishes and lighting to members’ bar area.
• Construction new external cafe deck area including glazed wind break.
• New outdoor children’s play area.
SCOPE OF WORKS
• Provide complete new change room building with facilities to comply with FFV Class A standard.• Players change rooms 25m2 each minimum.• Massage table provided in each players dressing room.• Offi cial Room 20m2 minimum.• First Aid 10m2 minimum.
Imag
es d
epic
t pot
entia
l des
ign
inte
nt, t
hey
are
not t
he d
esig
n.D
ES
IGN
INS
PIR
AT
ION
MASTERPLAN
WOMENSVISITOR
WOMENSHOME
MENSVISITOR
MENSHOME
FIRST AID
OFFICIALSROOM
STORESERVICE
RM
MA
SS
AG
E
change room 21m2total 33m2
21m2
15m2
change room 25m2total 37m2
change room 25m2total 37m2
TO PITCHNEW
CHANGE ROOMS225m2
4m2 5m2
7m2STORE
7m2STOREE
STAGE C - NEW CHANGE ROOMSMASTERPLAN
STAGE C - NEW CHANGE ROOMSMASTERPLAN
EXTERIOR VIEWS
MAIN SOCCER PITCH
JUNIOR SOCCER
PITCH
CLUB BUILDING
SITE EXITONLY EXISTING
HOUSE
SIT
E B
OU
ND
AR
Y
SIT
E B
OU
ND
AR
Y
MID
LA
ND
HW
Y
LYNNBURN RD
GRANDSTAND
SITE ENTRANCE
ONLY
NEW LIGHTING
NEW LIGHTING
NEW CHANGEROOMS
LOCATION
CONVERT OLD CHAGEROOMS TO STORAGE
GRANDSTAND EXPANSION- VENUE CLASS A (500+)
CLUB BUILDINGEX
IST
ING
P
UB
LIC
TO
LIE
TS
REMOTE CONTROLRACING CAR AREA
FUTURE CARPARKEXPANSION
FUTURE CARPARKEXPANSION
NEW NETBALL COURTS
SEPTIC TANK DISCHARGE AREA
LOADING
EXISTINGLIGHTING
EXISTING LIGHTING
EXISTING LIGHTING
EXISTING LIGHTING
EXISTING LIGHTING
EXISTING LIGHTING
156
174
204
1
3
4
8
45
4418
66
126155
9
173
188
189 203
218
233 247
266 248
279
267
SCOPE OF WORKS
• New lighting to main soccer pitch.• Relocate existing lighting to practice
pitch.• Building entry changes, including new
entry portico, improved access and drop-off zone and disabled entry.
• Site entry changes to separate entry and exit points.
• New netball area.• Extended grandstand.• Future carpark expansion to old Bocce
area.• Additional soccer pitches (dependent
on land acquisition).• Convert existing change rooms to
storage.• Revision to car parking arrangement to
suit new layout.
NEW NETBALL E LCOURTS
POTENTIAL ADDITIONAL
SOCCER PITCHES
STAGE D - SITE ENHANCEMENTSMASTERPLAN