Master Scheduling
-
Upload
faroeuq-dcroew -
Category
Documents
-
view
818 -
download
1
description
Transcript of Master Scheduling
![Page 1: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/1.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Group 71) Mohd Nasrull B. Abd Rahman (GS21504)
2) Edwin Chan (GS21416)
Weekly Presentation
Master Scheduling
KMP 5903 Manufacturing Operation
Management
![Page 2: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/2.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Content• Scheduling• Master Scheduling• Axapta's Master Planning Software• Master Schedule Types• Scheduling Manufacturing Operations• High-Volume Systems• Gantt Load Chart• Loading• Sequencing• Scheduling Difficulties• Scheduling Service Operations• Cyclical Scheduling• Service Operation Problems• Scheduling Workload United Airlines (Video)• New process implementation, conversion schedule McDonald s (Video)
![Page 3: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/3.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
• Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization
• Effective scheduling can yield
– Cost savings
– Increases in productivity
Scheduling
![Page 4: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/4.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Master Scheduling
• Master scheduling is used for:– demand management– scheduling production– validating the production schedule– managing the production schedule
• The schedules generated by master scheduling as input to other manufacturing functions, such as material requirements planning and rough-cut capacity planning.
![Page 5: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/5.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Axapta's Master Planning Software
Master scheduling helps to calculate what needs
a) to be purchased and produced to fill a sales order:
b) to deliver the amount ordered on the date scheduled, and to generate transfers between warehouses if needed.
![Page 6: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/6.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Master Schedule Types
Master Demand Schedule (MDS)• The MDS is a statement of demand and contains details of
the anticipated shipment schedule• The master demand schedule provides an extra level of
control that allows to view and modify statement of demand before creating a detailed production schedule.
• Some of the demand types that the MDS considers are:– item forecasts– spares demand– sales orders– internal requisitions
![Page 7: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/7.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Master Production Schedule (MPS)• The MPS is a statement of supply required to meet the
demand for the items contained in the MDS. • The master production schedule defines the anticipated
build schedule for critical items. • An effective master production schedule provides the
basis for order promising and links the aggregate production plan to manufacturing by specific items, dates, and quantities.
Master Schedule Types
![Page 8: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/8.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
An example of a (very) simplified Master Production Schedule for
'Product A'.
![Page 9: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/9.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Scheduling Manufacturing Operations
High-volume
Intermediate-volume
Low-volume
Service operations
Build A
A Done
Build B
B Done
Build C
C Done
Build D
Ship
JAN FEB MAR APR MAY JUN
On time!
![Page 10: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/10.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
High-Volume Systems
• Flow system: High-volume system with Standardized equipment and activities
• Flow-shop scheduling: Scheduling for high-volume flow system
Work Center #1 Work Center #2 Output
![Page 11: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/11.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
High-Volume Success Factors
• Process and product design
• Preventive maintenance
• Rapid repair when breakdown occurs
• Optimal product mixes
• Minimization of quality problems
• Reliability and timing of supplies
![Page 12: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/12.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Scheduling Low-Volume Systems
• Loading - assignment of jobs to process centers
• Sequencing - determining the order in which jobs will be processed
• Job-shop scheduling– Scheduling for low-volume
systems with many variations in requirements
![Page 13: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/13.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Gantt Load Chart• Gantt chart - used as a visual aid for
loading and scheduling
WorkCenter
Mon. Tues. Wed. Thurs. Fri.
1 Job 3 Job 42 Job 3 Job 73 Job 1 Job 6 Job 74 Job 10
![Page 14: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/14.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Loading• Infinite loading
• Finite loading
• Vertical loading
• Horizontal loading
• Forward scheduling
• Backward scheduling
• Schedule chart
![Page 15: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/15.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Sequencing• Sequencing: Determine the order in which
jobs at a work center will be processed.
• Workstation: An area where one person works, usually with special equipment, on a specialized job.
![Page 16: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/16.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Sequencing• Priority rules: Simple heuristics
used to select the order in which jobs will be processed.
• Job time: Time needed for setup and processing of a job.
![Page 17: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/17.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Scheduling Difficulties
• Variability in– Setup times– Processing times– Interruptions– Changes in the set of jobs
• No method for identifying optimal schedule
• Scheduling is not an exact science
• Ongoing task for a manager
![Page 18: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/18.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Minimizing Scheduling Difficulties
• Set realistic due dates
• Focus on bottleneck operations
• Consider lot splitting of large jobs
![Page 19: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/19.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Scheduling Service Operations
• Appointment systems– Controls customer arrivals for service
• Reservation systems– Estimates demand for service
• Scheduling the workforce– Manages capacity for service
• Scheduling multiple resources– Coordinates use of more than one resource
![Page 20: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/20.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Service Operation Problems
• Cannot store or inventory services
• Customer service requests are random
• Scheduling service involves– Customers– Workforce– Equipment
![Page 21: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/21.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
Scheduling Workload United Airlines
![Page 22: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/22.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz
References
1) Book of Operations Management, William J. Stevenson 8th edition
2) http://www.mbsadvisor.com/axapta/masterscheduling.htm
3) http://www.mcts.com/Master-Scheduling.html
4) http://www.realtimesw.com/manufacturing/master_scheduling.htm
5) http://www.master-scheduling.com/
![Page 23: Master Scheduling](https://reader033.fdocuments.us/reader033/viewer/2022061117/5467cdcbb4af9f623f8b5935/html5/thumbnails/23.jpg)
KMP 5903 Manufacturing Operation Management
Dr. Faieza Abdul Aziz