Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all...

102
Master Examination Practice Drill #8 2011 (16)

Transcript of Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all...

Page 1: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Master Examination

Practice Drill #8 2011

(16)

Page 2: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles installed in _________ require GFCI protection for personnel.O I. BathroomsO II. Kitchens

A. I onlyB. II onlyC. Neither I nor IID. Both I and II

Page 3: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

1. D 210.8(B)(1)&(2)

51

Page 4: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 2. Communications wires and cables shall have a voltage rating of NOT less than _____.A. 60 voltsB. 120 voltsC. 300 voltsD. 600 volts

Page 5: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

2. C 800.179 680

Page 6: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 3. An emergency system is required to have NO more than ______ to have power available in the event of failure of the normal electrical supply system.A. 10 secondsB. 15 secondsC. 45 secondsD. 5 minutes

Page 7: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

3. A 700.12 624

Page 8: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 4. X-ray equipment installed in a hospital may be served by a hard service cord with a suitable plug provided the branch-circuit rating does NOT exceed _______.A. 15 amperesB. 20 amperesC. 30 amperesD. 50 amperes

Page 9: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

4. C 517.71(A), Ex.

455

Page 10: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 5. Conductors supplying more than one (1) motor shall have an ampacity of NOT less than _____ of the full-load current rating of the largest motor in the group and 100% of the full-load current ratings of all the other motors in the group.A. 125 percentB. 110 percentC. 150 percentD. 175 percent

Page 11: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

5. A 430.24(1)&(2)

318

Page 12: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 6. Given: A straight pull of size 4 AWG and larger conductors is to be made in a junction box that will have 3 in. conduit and two (2) 2 in. conduits entering on the same side and exiting on the opposite wall. No splices will be contained in the box. Which of the following listed junction boxes is the MINIMUM required for this installation?A. 18 in. x 12 in.B. 20 in. x 18 in.C. 24 in. x 24 in.D. 30 in. x 30 in.

Page 13: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

6. C 314.28(A)(1) 183

3in. (largest conduit) x 8 = 24 in.

Page 14: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 7. Given” A recreational vehicle campground has one hundred-fifty (150) campsites provided with electrical power. Twenty-five (25) of the campsites are reserved as tent sites. How many of the sites are required to have a 20-ampere, 125-volt receptacle?A. 105B. 125C. 150D. None

Page 15: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

7. C 551.71 500

Page 16: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 8. Determine the MAXIMUM overcurrent protection permitted for size 14 AWG THWN copper motor control-circuit conductors tapped from the load side of a motor overcurrent protection device. Given: The conductors require short-circuit protection and do not extend beyond the motor control equipment enclosure.A. 20 amperesB. 25 amperesC. 30 amperesD. 100 amperes

Page 17: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

8. D Tbl. 430.72 (B)

327

Page 18: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 9. Where size 6 AWG THWN copper branch-circuit conductors supply a 240-volt, single-phase, 5,000 VA non-motor operated appliance, the MAXIMUM standard size circuit breaker permitted for overcurrent protection on this circuit is rated _______.A. 55 amperesB. 40 amperesC. 35 amperesD. 30 amperes

Page 19: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

9. C 422.11(E)(3) 291Single – phase

current formula

240.6(A) 91

I = Power I = 5,000 VA = 20.8 amperes x 150% = 31.2 amperes Volts Volts*NOTE – The next standard size circuit breaker with a rating of 35 amperes should be selected

Page 20: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 10. The ampacity of size 1/0 AWG THWN/THHN, dual-rated copper conductors enclosed in rigid metal conduit (RMC) when installed underground in direct contact with the earth is _______.A. 170 amperesB. 125 amperesC. 130 amperesD. 150 amperes

Page 21: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

10. D 300.5(B) 137Tbl.

310.104(A)169

Tbl. 310.15 (B)(16)

Page 22: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 11. Every electrified truck parking space intended to provide an electrical supply for transport refrigerated units shall be equipped with a _______.O I. 30 ampere, 480-volt, 3-phase, 3-

pole, 4-wire receptacleO II. 60 ampere, 280-volt, 3-phase, 3-

pole, 4-wire receptacle

A. I onlyB. II onlyC. Either I or IID. Both I and II

Page 23: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

11. C 626.31(C( 551

Page 24: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 12. Flexible cord is permitted to be connected to fluorescent luminaires where the cord ___________.A. Has an ampacity of at least 20

amperesB. Is visible its entire lengthC. Is at least a size 12 AWGD. Runs through holes in walls

Page 25: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

12. B 410.62(C)(1)(2)a.

284

Page 26: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 13. An outdoor motor fuel gasoline dispensing pump is considered to be a Class I, Div. 2 hazardous location up to _____ above grade level within _____ horizontally from any edge of the motor fuel pump enclosure.A. 18 inches – 10 feetB. 24 inches – 20 feetC. 24 inches – 10 feetD. 18 inches – 30 feet

Page 27: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

13. A Tbl. 514.3(B)(1)

426

Page 28: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 14. Determine the MAXIMUM permitted operational setting of an adjustable inverse time circuit breaker used for branch-circuit, short-circuit and ground-fault protection of a 15 hp, 208-volt, three-phase, squirrel cage, Design B, continuous-duty ac motor. Assume the rating you select will be sufficient for the starting current of the motor and exceptions need not be applied.A. 46.20 amperesB. 80.85 amperesC. 115.5 amperesD. 369.6 amperes

Page 29: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

14. C 430.6(A)(1) 311Tbl. 430.250 338430.52(C)(1) 322Tbl. 430.52 323

FLC of motor – 46.2 amperes x 250% = 115.5 amperes

Page 30: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 15. What is the MAXIMUM distance between supports for straight horizontal runs of trade size 1 ½ in. PVC conduit?A. 10 feetB. 8 feetC. 6 feetD. 5 feet

Page 31: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

15. D Tbl. 352.30 210

Page 32: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 16. Unless approved for a higher voltage, surface nonmetallic raceways are NOT permitted where the voltage is _______ or more between conductors.A. 120 voltsB. 150 voltsC. 300 voltsD. 277 volts

Page 33: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

16. C 388.12(3) 237

Page 34: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 17. Determine the MAXIMUM size overload protection required for a 480-volt, 3-phase, 15 hp, continuous-duty ac motor, where given the following related information. Assume the value you select will permit the overload device to carry the motor load and modification of this value is not required.Design CTemperature rise – 40° CService factor – 1.12Nameplate ampere rating – 18 amperes

A. 20.7 amperes C. 22.5 amperesB. 18.0 amperes D. 23.4 amperes

Page 35: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

17. A 430.6(A)(2) 312430.32(A)(1) 319

FLA = 18 amperes x 115% = 20.7 amperes

Page 36: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 18. Any pipe or duct system foreign to the electrical installation must not enter a transformer vault? Which of the following listed is NOT considered foreign to the vault?A. A roof drainB. A building water mainC. An air duct passing through the vaultD. An automatic fire protection water

sprinkler

Page 37: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

18. D 450.47 355

Page 38: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 19. Given: A 50 kVA transformer with a 480-volt, 3-phase, primary and a 208Y/120 volt, 3-phase secondary is to be installed. Overcurrent protection is required on both primary and secondary side of the transformer. Determine the MAXIMUM size overcurrent protection device permitted on the primary side.A. 125 amperesB. 150 amperesC. 175 amperesD. 200 amperes

Page 39: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

19. B 450.3(B) 348Tbl. 450.3(B) 349

240.6(A( 913 – phase current formulaI = kVA x 1000 I = 50 x 1000 = 50,000 = 60.2

amperes E x 1.732 480 volts x 1.732 831.36

60.2 amperes x 250% = 150.5 amperes*NOTE – A 150 ampere OCP device is required

Page 40: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 20. An inverse time circuit breaker used as the disconnecting means for a 50 hp, 480-volt, three-phase continuous-duty, induction-type type ac motor shall have an ampere rating of at LEAST ________.A. 82 amperesB. 75 amperesC. 163 amperesD. 98 amperes

Page 41: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

20. B 430.6(A)(1) 311Tbl. 430.250 338430.110(A) 332

FLC of motor = 65 amperes x 74.75 amperes

Page 42: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 21. Circuit breakers are NOT rated to carry 100 percent of the continuous load continuously, unless they have a rating for at LEAST _________.A. 100 amperesB. 200 amperesC. 400 amperesD. 600 amperes

Page 43: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

21. D Trade Knowledge

Page 44: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 22. A fifteen (15) ft. horizontal run of rigid metal conduit (RMC) is to be installed between two enclosures located in a Class II, Division 1 hazardous location. One enclosure is dust ignition proof, the other is not. The NEC® requires a MINIMUM of _______ sealing fittings.A. None requiredB. OneC. Two D. Three

Page 45: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

22. A 502.15(2) 387

Page 46: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 32. Where fuses are used for motor overload protection, if the supply system is a 3-wire, 3-phase, ac with one conductor grounded, the NEC® requires a MINIMUM of how many fuses?A. None requiredB. OneC. Two D. Three

Page 47: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

23. D 430.36 321

Page 48: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 24. Conductors leading to a gasoline motor fuel dispensing pump shall be _________.A. Provided with a switchB. Red in colorC. Orange in colorD. Insulated with MTW insulation

Page 49: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

24. A 514.11(A) 428

Page 50: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 25. In general, direct-buried cables of 13,000 volts must be buried at a depth of NOT less than ______.A. 24 inchesB. 30 inchesC. 36 inchesD. 42 inches

Page 51: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

25. B Tbl. 300.50, Col. 1

146

Page 52: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Click here to continue to non-timed drill

Page 53: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles installed in _________ require GFCI protection for personnel.O I. BathroomsO II. Kitchens

A. I onlyB. II onlyC. Neither I nor IID. Both I and II

Page 54: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

1. D 210.8(B)(1)&(2)

51

Page 55: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 2. Communications wires and cables shall have a voltage rating of NOT less than _____.A. 60 voltsB. 120 voltsC. 300 voltsD. 600 volts

Page 56: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

2. C 800.179 680

Page 57: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 3. An emergency system is required to have NO more than ______ to have power available in the event of failure of the normal electrical supply system.A. 10 secondsB. 15 secondsC. 45 secondsD. 5 minutes

Page 58: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

3. A 700.12 624

Page 59: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 4. X-ray equipment installed in a hospital may be served by a hard service cord with a suitable plug provided the branch-circuit rating does NOT exceed _______.A. 15 amperesB. 20 amperesC. 30 amperesD. 50 amperes

Page 60: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

4. C 517.71(A), Ex.

455

Page 61: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 5. Conductors supplying more than one (1) motor shall have an ampacity of NOT less than _____ of the full-load current rating of the largest motor in the group and 100% of the full-load current ratings of all the other motors in the group.A. 125 percentB. 110 percentC. 150 percentD. 175 percent

Page 62: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

5. A 430.24(1)&(2)

318

Page 63: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 6. Given: A straight pull of size 4 AWG and larger conductors is to be made in a junction box that will have 3 in. conduit and two (2) 2 in. conduits entering on the same side and exiting on the opposite wall. No splices will be contained in the box. Which of the following listed junction boxes is the MINIMUM required for this installation?A. 18 in. x 12 in.B. 20 in. x 18 in.C. 24 in. x 24 in.D. 30 in. x 30 in.

Page 64: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

6. C 314.28(A)(1) 183

3in. (largest conduit) x 8 = 24 in.

Page 65: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 7. Given” A recreational vehicle campground has one hundred-fifty (150) campsites provided with electrical power. Twenty-five (25) of the campsites are reserved as tent sites. How many of the sites are required to have a 20-ampere, 125-volt receptacle?A. 105B. 125C. 150D. None

Page 66: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

7. C 551.71 500

Page 67: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 8. Determine the MAXIMUM overcurrent protection permitted for size 14 AWG THWN copper motor control-circuit conductors tapped from the load side of a motor overcurrent protection device. Given: The conductors require short-circuit protection and do not extend beyond the motor control equipment enclosure.A. 20 amperesB. 25 amperesC. 30 amperesD. 100 amperes

Page 68: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

8. D Tbl. 430.72 (B)

327

Page 69: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 9. Where size 6 AWG THWN copper branch-circuit conductors supply a 240-volt, single-phase, 5,000 VA non-motor operated appliance, the MAXIMUM standard size circuit breaker permitted for overcurrent protection on this circuit is rated _______.A. 55 amperesB. 40 amperesC. 35 amperesD. 30 amperes

Page 70: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

9. C 422.11(E)(3) 291Single – phase

current formula

240.6(A) 91

I = Power I = 5,000 VA = 20.8 amperes x 150% = 31.2 amperes Volts Volts*NOTE – The next standard size circuit breaker with a rating of 35 amperes should be selected

Page 71: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 10. The ampacity of size 1/0 AWG THWN/THHN, dual-rated copper conductors enclosed in rigid metal conduit (RMC) when installed underground in direct contact with the earth is _______.A. 170 amperesB. 125 amperesC. 130 amperesD. 150 amperes

Page 72: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

10. D 300.5(B) 137Tbl.

310.104(A)169

Tbl. 310.15 (B)(16)

Page 73: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 11. Every electrified truck parking space intended to provide an electrical supply for transport refrigerated units shall be equipped with a _______.O I. 30 ampere, 480-volt, 3-phase, 3-

pole, 4-wire receptacleO II. 60 ampere, 280-volt, 3-phase, 3-

pole, 4-wire receptacle

A. I onlyB. II onlyC. Either I or IID. Both I and II

Page 74: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

11. C 626.31(C( 551

Page 75: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 12. Flexible cord is permitted to be connected to fluorescent luminaires where the cord ___________.A. Has an ampacity of at least 20

amperesB. Is visible its entire lengthC. Is at least a size 12 AWGD. Runs through holes in walls

Page 76: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

12. B 410.62(C)(1)(2)a.

284

Page 77: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 13. An outdoor motor fuel gasoline dispensing pump is considered to be a Class I, Div. 2 hazardous location up to _____ above grade level within _____ horizontally from any edge of the motor fuel pump enclosure.A. 18 inches – 10 feetB. 24 inches – 20 feetC. 24 inches – 10 feetD. 18 inches – 30 feet

Page 78: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

13. A Tbl. 514.3(B)(1)

426

Page 79: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 14. Determine the MAXIMUM permitted operational setting of an adjustable inverse time circuit breaker used for branch-circuit, short-circuit and ground-fault protection of a 15 hp, 208-volt, three-phase, squirrel cage, Design B, continuous-duty ac motor. Assume the rating you select will be sufficient for the starting current of the motor and exceptions need not be applied.A. 46.20 amperesB. 80.85 amperesC. 115.5 amperesD. 369.6 amperes

Page 80: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

14. C 430.6(A)(1) 311Tbl. 430.250 338430.52(C)(1) 322Tbl. 430.52 323

FLC of motor – 46.2 amperes x 250% = 115.5 amperes

Page 81: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 15. What is the MAXIMUM distance between supports for straight horizontal runs of trade size 1 ½ in. PVC conduit?A. 10 feetB. 8 feetC. 6 feetD. 5 feet

Page 82: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

15. D Tbl. 352.30 210

Page 83: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 16. Unless approved for a higher voltage, surface nonmetallic raceways are NOT permitted where the voltage is _______ or more between conductors.A. 120 voltsB. 150 voltsC. 300 voltsD. 277 volts

Page 84: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

16. C 388.12(3) 237

Page 85: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 17. Determine the MAXIMUM size overload protection required for a 480-volt, 3-phase, 15 hp, continuous-duty ac motor, where given the following related information. Assume the value you select will permit the overload device to carry the motor load and modification of this value is not required.Design CTemperature rise – 40° CService factor – 1.12Nameplate ampere rating – 18 amperes

A. 20.7 amperes C. 22.5 amperesB. 18.0 amperes D. 23.4 amperes

Page 86: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

17. A 430.6(A)(2) 312430.32(A)(1) 319

FLA = 18 amperes x 115% = 20.7 amperes

Page 87: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 18. Any pipe or duct system foreign to the electrical installation must not enter a transformer vault? Which of the following listed is NOT considered foreign to the vault?A. A roof drainB. A building water mainC. An air duct passing through the vaultD. An automatic fire protection water

sprinkler

Page 88: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

18. D 450.47 355

Page 89: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 19. Given: A 50 kVA transformer with a 480-volt, 3-phase, primary and a 208Y/120 volt, 3-phase secondary is to be installed. Overcurrent protection is required on both primary and secondary side of the transformer. Determine the MAXIMUM size overcurrent protection device permitted on the primary side.A. 125 amperesB. 150 amperesC. 175 amperesD. 200 amperes

Page 90: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

19. B 450.3(B) 348Tbl. 450.3(B) 349

240.6(A( 913 – phase current formulaI = kVA x 1000 I = 50 x 1000 = 50,000 = 60.2

amperes E x 1.732 480 volts x 1.732 831.36

60.2 amperes x 250% = 150.5 amperes*NOTE – A 150 ampere OCP device is required

Page 91: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 20. An inverse time circuit breaker used as the disconnecting means for a 50 hp, 480-volt, three-phase continuous-duty, induction-type type ac motor shall have an ampere rating of at LEAST ________.A. 82 amperesB. 75 amperesC. 163 amperesD. 98 amperes

Page 92: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

20. B 430.6(A)(1) 311Tbl. 430.250 338430.110(A) 332

FLC of motor = 65 amperes x 74.75 amperes

Page 93: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 21. Circuit breakers are NOT rated to carry 100 percent of the continuous load continuously, unless they have a rating for at LEAST _________.A. 100 amperesB. 200 amperesC. 400 amperesD. 600 amperes

Page 94: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

21. D Trade Knowledge

Page 95: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 22. A fifteen (15) ft. horizontal run of rigid metal conduit (RMC) is to be installed between two enclosures located in a Class II, Division 1 hazardous location. One enclosure is dust ignition proof, the other is not. The NEC® requires a MINIMUM of _______ sealing fittings.A. None requiredB. OneC. Two D. Three

Page 96: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

22. A 502.15(2) 387

Page 97: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 32. Where fuses are used for motor overload protection, if the supply system is a 3-wire, 3-phase, ac with one conductor grounded, the NEC® requires a MINIMUM of how many fuses?A. None requiredB. OneC. Two D. Three

Page 98: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

23. D 430.36 321

Page 99: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 24. Conductors leading to a gasoline motor fuel dispensing pump shall be _________.A. Provided with a switchB. Red in colorC. Orange in colorD. Insulated with MTW insulation

Page 100: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

24. A 514.11(A) 428

Page 101: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

O 25. In general, direct-buried cables of 13,000 volts must be buried at a depth of NOT less than ______.A. 24 inchesB. 30 inchesC. 36 inchesD. 42 inches

Page 102: Master Examination Practice Drill #8 2011 (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.

Question

Answer

Reference NEC PG. #

25. B Tbl. 300.50, Col. 1

146