Master Commissioning Plan Project Customization Guideline
Transcript of Master Commissioning Plan Project Customization Guideline
®
Questions & Solutions® Engineering, Inc.1079 Falls CurveChaska, Minnesota 55318QSEng.com
Master Commissioning Plan Project Customization GuidelineAmerican UniversityWashington, DCMarch 20, 2012
®
Questions & Solutions® Engineering, Inc.1079 Falls CurveChaska, Minnesota 55318QSEng.com
Rebecca Ellis, PE, LEED AP BD+C, CCP, CPMP, CxAPrincipal In [email protected]
Bob deVeyra, EIT, LEED AP BD+C, QCxPProject [email protected]© 2012 Questions & Solutions Engineering, Inc. All Rights Reserved.All other trademarks are the property of their respective owners.
Master Commissioning Plan Project Customization GuidelineAmerican UniversityWashington, DCMarch 20, 2012
Table of Contents
1. Introduction
Purpose
When to Customize the Commissioning Plan?
2. Initial Considerations
Is Commissioning Necessary?
Who will Serve as Commissioning Manager?
3. Develop a Project-Specific Commissioning Plan
Update Introduction
Establish the Commissioning Team
Define the Systems to be Commissioned
Define the Applicable Commissioning Activities
Updated and/or Additional Commissioning Documentation Templates & Examples
4. Commissioning Requirements for LEED Certification
Fundamental Commissioning: Energy & Atmosphere Prerequisite 1
Enhanced Commissioning: Energy & Atmosphere Credit 3 (2 points)
5. Suggested Commissioning Scope for CRDM Projects
6. Update the Master Commissioning Plan
1. Introduction
Purpose
When to Customize the Commissioning Plan?
2. Initial Considerations
Is Commissioning Necessary?
Who will Serve as Commissioning Manager?
3. Develop a Project-Specific Commissioning Plan
Update Introduction
Establish the Commissioning Team
Define the Systems to be Commissioned
Define the Applicable Commissioning Activities
Updated and/or Additional Commissioning Documentation Templates & Examples
4. Commissioning Requirements for LEED Certification
Fundamental Commissioning: Energy & Atmosphere Prerequisite 1
Planning Phase
Preliminary Commissioning
Plan
Owner’s Project Requirements (OPR)
Document
Design Phase
Basis of Design (BOD) Document
Preliminary Prefunctional Checklists & Functional
Performance Tests
Commissioning Specification
Construction Phase
Commissioning Schedule
Prefunctional Checklists
Completion
Final Prefunctional Checklists & Trend Log Specifications
Functional Performance
Testing
Commissioning Report
Deferred Testing
Final Commissioning Plan
Acceptance Phase Warranty Phase
Go to Design Phase
Go to Construction Phase
Go to Acceptance Phase
Go to Warranty Phase
On-Going Cx Phase
Final Functional Performance Tests
Commissioning Action List
Functional Performance
Re-Testing
Design Phase Commissioning Coordination
Meetings
Construction Phase Commissioning Coordination
Meetings
Acceptance Phase Commissioning Coordination
Meetings
On-Going Cx Phase
On-Going Operations
Enhanced Commissioning: Energy & Atmosphere Credit 3 (2 points)
Planning Phase
Preliminary Commissioning
Plan
Owner’s Project Requirements (OPR)
Document
Design Phase
Basis of Design (BOD) Document
Commissioning Design Reviews
O&M Training Planning
Preliminary Prefunctional Checklists & Functional
Performance Tests
Commissioning Specification
Construction Phase
Commissioning Schedule
Submittal Reviews
O&M Training Delivery
Prefunctional Checklists
Completion
Final Prefunctional Checklists & Trend Log Specifications
Functional Performance
Testing
Commissioning Report
Systems Manual & On-Going
Commissioning Plan
Deferred Testing
Warranty Phase Check-up & Meeting
Final Commissioning Plan
Acceptance Phase Warranty Phase
Go to Design Phase
Go to Construction Phase
Go to Acceptance Phase
Go to Warranty Phase
On-Going Cx Phase
O&M Training Agenda Reviews
Final Functional Performance Tests
Commissioning Action List
Functional Performance
Re-Testing
Design Phase Commissioning Coordination
Meetings
Construction Phase Commissioning Coordination
Meetings
Acceptance Phase Commissioning Coordination
Meetings
On-Going Cx Phase
On-Going Operations
5. Suggested Commissioning Scope for CRDM Projects
Planning Phase
Preliminary Commissioning
Plan
Owner’s Project Requirements (OPR)
Document
Design Phase
Basis of Design (BOD) Document
Commissioning Design Reviews
Preliminary Prefunctional Checklists & Functional
Performance Tests
Construction Phase
Commissioning Schedule
Submittal ReviewsFunctional
PerformanceTesting
Commissioning Report
Deferred Testing
Final Commissioning Plan
Acceptance Phase
Test, Adjust, and Balance (TAB) Report Review
Warranty Phase
Go to Design Phase
Go to Construction Phase
Go to Acceptance Phase
Go to Warranty Phase
On-Going Cx Phase
Final Functional Performance Tests
Commissioning Action List
Functional Performance
Re-Testing
Design Phase Commissioning Coordination
Meetings
Construction Phase Commissioning Coordination
Meetings
Acceptance Phase Commissioning Coordination
Meetings
On-Going Cx Phase
On-Going Commissioning
Activities
On-Going Operations
6. Update the Master Commissioning Plan