Project Goals
• Improve Safety & Mobility
• Improve Bicycle, Pedestrian and Transit Accommodations and Accessibility
• Improve the existing infrastructure
TOWN OF LEXINGTON
Project History & Public Outreach
•November 2012 – Public Workshop/Meeting
•Fall/Winter 2012 – Discussions with Town Boards and Committees
•February 2013 – Third Public Meeting
•March 2015 – Historic Districts Commission
•May 2015 – MassDOT Design Public Hearing
•July 2015 – Board of Selectmen’s Meeting
TOWN OF LEXINGTON
Pleasant Street – Existing Conditions
• Project in General
TOWN OF LEXINGTON
Pleasant Street – 1st Roundabout Concept
• Project in General
TOWN OF LEXINGTON
Pleasant Street – 2nd Roundabout Concept
• Project in General
TOWN OF LEXINGTON
Pleasant Street – Roundabout ROW Impacts
• Project in General
TOWN OF LEXINGTON
Pleasant Street Signal Concept
• Project in General
TOWN OF LEXINGTON
Marrett Road – Existing Conditions
• Project in General
TOWN OF LEXINGTON
Marrett Road Signal Concept
• Project in General
TOWN OF LEXINGTON
Marrett Road without Signal Concept
Questions