Masonry Training on Sanitation Models
Transcript of Masonry Training on Sanitation Models
Field demonstration training on Sanitation Models
9-11 November 2009 @ Thalavady
Hosted by:BODHANA (Thiruvalla Social Service Society)
Supported by Facilitated by
Community Based
Disaster Preparedness Project
WATERSANITATION
WATER AND SANITATION PROGRAMME
Back ground of the programme
Objective of the programme
DAY ONE: 9th November 2009
Water and sanitation programme was emerged in CBDP programme as a result of the participatory need assessment conducted among the coastal areas of tsunami affected areas. People in the operational area, especially the water logged areas, were facing severe shortage of pure drinking water and sanitation issues. Creating replicable low cost models in water and sanitation, emphasizing on the maximum utilization of people's knowledge and low cost technologies is the prime objective of the programme.
KSSF with the joint hands of Caritas India has developed low cost models in water filtering mechanisms and sanitary latrines suitable for the local conditions of each project area. With the objective of developing masons as a creative skilled work force available at partner level, we organized three day training programme at Thalavady, the operational area of BODHANA. Mr.Rajesh.PD, the Zonal Technical Officer-Caritas India, was the chief trainer of the sessions. Point persons of CBDP programme were also participated in the training programme.
To capacitate the trainee masons as a creative skilled work force available at partner level
To introduce and make them familiarize with different construction techniques on sanitation models
To familiarize the participants with innovative models on sanitation under different site conditions
All the participants reached at the training center at BODHANA by 11 am. Then the team was led to Manalel colony, Thalavady Panchayath for site visit.
The team visited the houses of Mr. Sasi Chirayathara and Mr. Sivaraman Chirayathara and observed the sites for construction and the two pit Ferro cement latrine's tanks made there..
After the lunch, the team gathered at Thalavady village development committee's rehabilitation training centre.
Field demonstration training on sanitation models 1
Participant team at the training center, BODHANA
Team members on the way to field
Participants along with the trainer Mr. Rajesh, visiting the toilet structures
Introductory meeting
The me ting started at 2.00 pm. e Mr. P.J.Varkey, State
Officer-Caritas India gave an introduction about the project
and the objective of the training. He welcomed all the
participants to the training program. Watsan is a component
of CBDP and the main objective is to generate awareness
among the public about the importance of sanitation and
also to generate replicable models, low cost and
geographically suited toilet structures, water purifying
techniques, filter well, back washing, phyto remediation,
rejuvenation etc.
Dr. Haridas, Asia Manager-NRM-Caritas India explained in
detail about the programme and introduced the trainer Mr.
Rajesh P.D, Zonal Technical officer-Caritas India. Then he
requested every body to participate actively in the training
and there by make it a participatory one. Also insisted all of
them to replicate the essence of the training in their own
fields of practice. And wanted to create an aesthetic sense
and thereby make out the maximum result of this training.
Then he introduced Mr. John the Program Support Officer of
Caritas India, Mr. O.J Deepak, the State Program Officer-
KSSF, Ms. Lakshmi, Documentation Officer-KSSF and the
staff of BODHANA. Then he worded that the basic objective
of the training is to generate low cost replicable models in
the community with the community participation. Then only
we can ensure the community ownership over the
structures.
Mr.Rajesh.PD took over the session and explained the
diagrams of the structures to be constructed during the
course of action for the three days. He facilitated in dividing
the participants into three groups and assigned work. Two
groups were assigned to make toilet structure using ferro
cement technology whereas the other one for brick work.
The group members sat together for discussing the
drawings for construction for 15 minutes and dispersed to
the respective sites.
Field demonstration training on sanitation models 2
Mr.P.J.Varkey, State Officer-Caritas India in the introductory session
Dr.Haridas, Asia Manager-NRM, Caritas India explaining about the training programme
Group members examining the drawing and planning field work
Site One: Group 1-Thalavady GP, House of Mr.Sivaraman, Chirayathara, Manalel Colony
Activities: (1) Making of filtering system (2) Fixing of filter system inside the ferro cement tanks,(3) Construction of Ferro cement super structure
Clearing ground for the construction of support wall to the ferro cement tanks
Construction of support wall in progress
1 2
4 5 6
7 8 9
10 11 12
Construction of support wall in progress
3
Drilling PVC pipe for making the filter system to be placed inside the tank
Filling the perforated PVC pipe (110mm) fitted inside the tank with filter media
Filter system installed in the tank
Covering the ferro cement tanks after fixing the filter system
Fixing two layers of chicken net for the superstructure of the latrine
Smearing cement over the chicken net fixed after binding the two layers together
Finishing of the smearing
Covering slab placed over the tanks Fixing the slab over the tank and support wall
Field demonstration training on sanitation models 3
Site One: Group 2 -Thalavady GP, House of Mr.Sasi, Chirayathara, Manalel Colony
Activities: (1) Construction of platform for the toilet (2) Construction of obloid superstructure for the toliet using ferro cement technology (3) Making of junction box for the latrine
1 2 3
4 5 6
7 8 9
10 11 12
Constructing support wall for the ferro cement tanks
support wall construction before filling Platform of the latrine with support wall completed
Covering the top of the platform and the ferro cement tanks with cover slab
Shaping the iron rod to a circle for making obloid superstructure for the latrine
Preparing chicken net for making the obloid room
Fixing weld mesh for constructing the obloid superstructure
Smearing cement over chicken mesh bound with welded mesh
Director-KSSF observ ing the to i le t construction
Making of junction box Making of junction box Making of junction box
Field demonstration training on sanitation models 4
Site Two: Group 3 -Thalavady GP, House of Mrs.Kochumol, Pullamvelil.
Activities: (1) Construction of platform for the toilet (2) Making of cover slabs for the latrine (3) Making of junction box for the latrine
12 3
4 5 6
7 8 9
Taking measurment for building the basement of the toilet
Constructing the foundation with cement bricks
Basement construction in progress
Foundation work and the tanks finished
Making slab for covering the foundation Placing iron rods for reinforcement
Filling red soil in the foundation Mr.Rajesh.PD explaining the making of junction box
Team members in front of the completed foundation of the latrine
Field demonstration training on sanitation models 5
Fr.Romance Antony, Executive Director-KSSF and Fr. Varghese
Marathur, Director- BODHANA visited the site (Thalavady panchayath,
Manalel Colony, ward 10) on 11th November 09 at 11.30 am. They
interacted with the trainee masons and enquired about their experiences in the
training program.
Mr. Toney Thomas, Project Coordinator-CBDP-BODHANA explained and demonstrated the functioning of the chamber filter
constructed in the colony. They also visited the rejuvenated pond there. Mr. Siji, field staff-BODHANA explained
the functioning of the filter system immersed in the pond and water
collection using hand pump. Fr.Romance Antony appreciated the
efforts of the community and Mr. Siji
Directors' Visit to Manalel Colony
Evaluation and Valedictory meeting11th Nov 09 at 01.00 pm
After the field work the team were gatheres in village development rehabilitation training centre, Thalavady. Mr. O.J Deepak, State Programme Officer - KSSF welcomed the group to the gathering. He invited each participant for sharing their feed back on the three day training programme.
He thanked Caritas India and KSSF for arranging the training programme and appreciated the beneficiary selection of BODHANA. He promised to replicate the learning's from the training in their area.
The training was really good and effective. The programme planning and coordination was not that much good. Lack of building materials in the field affected the work. 100% utilization of the masons doesn't happen. Thanked Mr. Rajesh P.D for his efforts.
Appreciated and thanked Mr. Rajesh P.D for his creative idea and thinking. He opined that in the coastal areas of Alappad, the tsunami hit area; Ferro cement latrines will be more effective. He mentioned about the coordination problem and the shortage of building materials in the work site. He added that masons got less exposure to all the three models.
A very good experience. Lack of building materials caused wastage of time.
Appreciated the project coordinators of BODHANA for their coordination. He appreciated the mason Mr. Santhosh from TSSS for his dedicated and sincere work. He concluded by saying the he got a very good exposure.
Fr.Romance Antony thanked everyone for sharing their experiences and valuable feedbacks. He told that the program was a sudden arrangement, and because of that there were problems with planning and coordination. The training was done in a very needful community where we can generate replicable models.
Responses by the participants
Richard, mason:
Johnson, Panchayath member:
Karthik, Field Officer, QSSS:
Ujesh, Asst. Coordinator, KIDS:
Tomy, Asst. Coordinator, TSSS:
Field demonstration training on sanitation models 6
He also insisted everyone to market all these models in the PRI level. He congratulated all the masons and appreciated BODHANA team. He also mentioned about the importance of community mobilization. He thanked Fr. Varghese the director of BODHANA and all the Caritas India personnel especially Mr. Varkey, Dr. Haridas, Mr. John, Mr. Rajesh P.D.
Fr.Varghese Marathur, Director-BODHANA thanked the KSSF team and the Caritas India personnel. He talked about the community's need and the developmental activities. In his words there are people still in poverty and are facing pathetic situation in their life. The difficulties that we were experienced in the field should be learning for each one of us. He urged everyone to enjoy and experience the happiness of giving.
Dr.Haridas, Mr.P.J.Varkey, Mr.P.J.John and Mr. Rajesh.PD attended the meeting.
The meeting ended at 2.30 pm and was dispersed for lunch.
Glimpses!
Water quality tested!
Village food!
The finishing touch!
Active involvement!
Field demonstration training on sanitation models 7
Sl no: Name& Address Partner Organisation Experience Contact No 1 Linson A.X
Avittapally (h) Azhikode Jetty Thrissur 680666
KIDS 8 years 95339050984
2 Wilson Vazhakkadathil (h) Kara P.O, Adavilangu Trissur district-680671
KIDS 35 Years 8089776756
3 K.D Johnson Kanappilli (h) Puthuvype P.O Pin-682508
ESSS 22 Years 9447325694
4 Jaimon Murappalli Balagram P.O Idukky-685552
CHASS 15 Years 9744796392
5 Biju N.M Murappit Balagram P.O Kottar, Idukky
CHASS 6 Years 9947160180
6 Sudheesh Shankkarady Edavanakkadu P.O Ernakulam
WSE 15 Years 9846444652
7 Davis V.P Vallooaran (h) South Vellarapilli P.O Sreemolam Nagaram Pin:-683580
WSE 25 Years 9895056393
8 Binoy Gangadharan Kunnumpurath (h) Manjappara P.O Nedumkandam, Idukky
QSSS 9 Years 9447901137
9 Santhosh Poothuvan (h) Kadinamkulam Puthukuttichi P.O Trivandrum
TSSS 11 Years 9745438127
10 Udayakumar Santhosh Vilasam Kaippalli Kuzhi Pangodu, Venganoor P.O Trivandrum
MSS 15 Years 9387721847
11 Richard P.J Pallithodu P.O Turavoor, Cherthala Alappuzha Dist.
ADS 25 Years 9744371325
12 Joseph ( Rijoy) Kuriyakkal (h) Pallithode P.O Cherthala-688586
ADS
5 Years
9747025445 9037526787
CONTACT DETAILS OF TRAINED MASONS
Field demonstration training on sanitation models 8
Details of participation
Sl no: Name Designation DSSS Day
1 Day
2 Day
3 1 Savitha R Coordinator WSE p p p 2 Davis RTA Staff WSE p p p 3 Sudheesh Mason WSE p p p 4 Jiji Ponnan Coordinator ADS p p p 5 Richard Mason ADS p p p 6 Rijoy Mason ADS p p p
7 Sr. Alice Asst. Coordinator CSSS p a a
8 Shibu Mason CSSS p a a 9 Rancy Mason CSSS p a a 10 Vipin Joe M.J Asst. Coordinator ESSS p p p 11 Johnson Panchayath member ESSS p p p 12 Jubichan P.J Coordinator CHASS p p p 13 Jaimon Mason CHASS p p p 14 Baiju C. Xavier CHASS p a a 15 Biju N.M Mason CHASS p p p 16 Thomas George Coordinator MSSS p p p 17 Udayakumar Mason MSSS p p p 18 Ujesh N.K Asst. Coordinator KIDS p p p 19 Linson Mason KIDS p p p 20 Wilson Mason KIDS p p p 21 Karthik Sasi Field officer QSSS p p p 22 Binoy Mason QSSS p p p 23 Tomy Kuriakose Asst. Coordinator TSSS p p p
24 Santhosh Mason TSSS p p p 25 Deepak.OJ Program Officer KSSF p p p 26 Lakshmi Sankar Documentation Officer KSSF p p p 27 Dr.Haridas Asia Manager-NRM Caritas India p a p 28 P.J.John PSO Caritas India p p p 29 PJ.Varkey State Officer Caritas India p a p
p-present, a-absent
Documentation team:
Deepak.OJ, State Program Officer-KSSF,
Lakshmi Shankar, Documentation Officer-KSSF
Field demonstration training on sanitation models 9
Estimate of Twin Pit Latrine with internal filtration for WatSan Programme in Kerala
Model 11. With Ferrocement Ring and ferrocement Obloid Toilet Room above latrine Sl. No Description No L B H Qty Unit Rate Amount
Super Structure - Toilet Room
1
Clearing the grass and other growth of vegitation and removal of rubbish upto a distance of 150m outside the periphery of the area cleared. 1 2.5 2.5 6.25 100m2 175.00 10.94
2
Ferrocement CM 1:3 for Basement and super structure for a height of 1.5m including all cost of material, labour, conveyance etc complete 1 3.1 1.3 4.03 1m2 761.72 3069.72
3
Ferrocement CM 1:3 for superstructure above 1.5 including all cost of material, labour, conveyance etc complete 1 3.1 1.05 3.26 1m2 1056.47 3444.08
4 Filling good earth inside the room for fixing closet 1 1.02 0.2 0.2 1m3 245.00 49
5
PCC in 1:4:8 for floor using 20mm Broken stone including all cost of material, labour, conveyance etc complete 1 1.02 0.05 0.05 1m3 4101.09 205.05
6
RR Masonry in CM 1:8 for steps including all cost of material, labour, conveyance etc complete 3 0.7 0.25 0.2 0.11 1m3 2620.29 288.23
7
Plastering in CM 1:6 for super structure including all cost of material, labour, conveyance etc complete
Steps 1 0.7 0.9 0.63
Floor 1 1.02 1.02
Subtotal 1.65 10m2 1553.99 256.41
8 Toilet Settings 1 1 Nos 500
9 GI Sheet and red oxide 1 1 Unit 500
10 PVC Door and fittings with PVC door frame 1 1 Nos 1250
Sub Total 9573.43
Twin pit latrine with Ferro cement pit and square shaped room with Ferro cement up to 0.3m above basement and GI sheet as side wall above it.
Pits
1
Clearing the grass and other growth of vegitation and removal of rubbish upto a distance of 150m outside the periphery of the area cleared. 1 2.5 2 5 100m2 175.00 8.75
2 Earth work excavation in Hard soil with initial lead of 50m and lift up to 1.5m
For pits 2 3.14x0.96x0.96/4 0.7 1.01
For Soak Pit 1 3.14x0.4x0.4/4 1 0.13
Sub Total 1.14 10m3 2187.50 249.38
3
Ferrocement pit of 3 feet wide for latrine with CM 1:3 and 14 guage weld mesh and 22 guage chicken net including all cost of material, labour and conveyance etc complete. 2 3.14x0.93 0.9 5.26 m2 761.72 4006.63
4
Ferrocement slab for top and bottom of pit of latrine with CM 1:3, 6mm Iron bars and 22 guage chicken net including all cost of material, labour and conveyance etc complete. 3 3.14x0.96x0.96/4 2.17 m2 754.81 1637.93
5 RCC 1:2:4 cover slab using 20mm Broken stone including all cost of material, labour, conveyance etc complete 1 1.3 1.3 0.08 0.14 m3 5855.00 819.7
6 Additional brick support in CM 1:8 placed at two sides of slab and between the two ends of the centre portion 2 0.3 0.2 0.3 0.04 m3 3567.86 142.71
7 PVC Bucket for soak pit 1 1 Nos 80 80
8
Filter Media including 20mm and 6mm Broken stone for the soak pit including all cost of material, labour, conveyance etc complete 1 3.14x0.3x0.3/4 0.4 0.03 m3 1499 44.97
9 Filling good earth over the pits and around the toilet room for rising the platform to prevent the direct entry of water 1 2.85 + 5.45 0.25 2.08 m3 245.00 509.6
10
Internal Filter with 110mm PVC Pipe and 50mm pipe filled with 6mm stone in between and connected to a soak pit with a valve mechanism 2 2 Nos 325.00 650
11 Reinforcement with 8mm iron Bars @ 15cm C/C including all cost of labour, material and conveyance etc complete 12.09 Kg 4801.65 580.52
12 Reinforcement with 6mm iron Bars @ 15cm C/C including all cost of labour, material and conveyance etc complete 1 4.07 Kg 4801.65 195.43
Sub Total 8925.62
Contigency 0.95
Grand Total 18500
Material Labour
Sl No Item Qty
40mm BS
20mm BS
6mm BS Sand
Cement
Rubble
Hollow Bricks 12x8x4
Mason Man
Women
Unit Cuft Cuft Cuft Cuft Bags Cuft Nos Nos Nos Nos Super structure Rate 26.9 31.15 31.15 62.3 300 21.24 13.5 450 350 350
1 Clearing Site 2.25 m2 0.01 2 Hollow Bricks in CM 1:8 for room 0.86 m3 4.86 0.5 0 147 1.3 0.3 0.4 3 Filling earth inside room 0.39 m3 0.3 4 PCC in 1:4:8 for floor using 20mm Broken stone 0.06 m3 2.01 0.95 0.21 0.01 0.06 0.21 5 RR Masonry in CM 1:8 for steps 0.11 m3 1.17 0.12 3.88 0.08 0.04 0.08 6 Plastering in CM 1:6 for super structure 19.06 m2 10.1 1.37 1.72 1.05 2.1 7 Toilet Settings 1 Nos 8 GI Sheet and red oxide 1 Unit 9 PVC Door and fittings 1 Nos
Sub Total for Room 0 2.01 0 17.08 2.2 3.88 147 3.11 1.76 2.79 Pits
1 Clearing Site 5 m2 0.03 2 Earth Work 1.69 m3 1.06 3 PCC in 1:3:6 for floor using 20mm BS 0.2 m3 6.71 3.18 0.88 0.04 0.2 0.7 4 Hollow Bricks in CM 1:6 0.63 Nos 3.56 0.48 0 108 0.9 0.2 0.3 5 RCC 1:2:4 for cover slab 0.28 m3 9.39 4.45 1.85 0.06 0.28 0.98
6 Plastering in CM 1:4 for inside tank where chances of exposure of tank 8.1 m2 4.29 0.87 0.73 0.45 0.89
7 Polithene bucket 10 litres 1 Nos 8 20mm Broken stone 0.006 m3 0.21 9 40mm Broken stone 0.002 m3 0.07
10 6mm Broken stone 0.004 m3 0.14 11 Filling earth over pit 2.91 m3 12 110mm PVC Pipe 4 m 12 40mm PVC Pipe 6 m 12 40mm PVC Bend 4 Nos 12 40mm PVC End Cap 4 Nos 12 40mm PVC Tee 2 Nos 12 63x40mm PVC reducer Bush 4 Nos 12 63mm PVC pipe 0.3 m 13 8mm Iron Bars 12.8 Kg 14 6mm Iron Bars 1.5 Kg
Sub Total for pit 0.07 16.31 0.14 15.48 4.08 0 108 1.73 2.22 2.87 Grand Total for both pit and room 0.07 18.32 0.14 32.56 6.28 3.88 255 4.84 3.98 5.66 Rounded to 0.07 18.32 0.14 32.56 6.28 3.88 255 5 4 6 Amount 1.88 570.67 4.36 2028.49 1884 82.41 3442.5 2250 1400 2100
Twin pit latrine with Brick Masonry pit in CM 1:6 and masonry super structure above pitCost of Room of Latrine above the pit with Hollow brick Masonry : Rs.8360Cost of Masonry pit for twin pit latrine : Rs.8860Main Materials Required for Construction
Model 4: Sectional Elveation of Twin Pit latrine with Hollow Brick Masonry for pit and room above pit
2.162.05
1.911.81
1.10
0.26
0.90
0.90
0.36
1.20 PCC 1:3:6 using 20mm BS - 3 inch
Hollow Brick masonry in CM 1:6
Plastering in CM 1:4
RCC 1:2:4 using 20mm BS - 8cm thick
PCC 1:4:8 using 20mm BS - 2 inch thick
Hollow Brick Masonry in CM 1:8
Soak Pit
Prepared By, Rajesh.P.D. Caritas India
G L
Steps
Twin pit latrine with Brick Masonry pit in CM 1:6 and masonry super structure above pit
KERALA SOCIAL SERVICE FORUMAMOS Center, Adichira, Thellakom PostKottayam, KERALA, INDIA - 686 016www.kssf.org, [email protected]
Children at Manalel colony, Thalavady