Blazer 171-12 ca1 Jan 15
MASON COUNTY
TO: BOARD OF MASON COUNTY COMMISSIONERS
Reviewed:
FROM: David Loser Ext.
DEPARTMENT: Public Works/ER&R Monday Briefing: ____ Action Agenda: __x__
DATE: January 15, 2013 No.
ITEM: Replacement Public Works Vehicle #171, Request to Purchase
Background: Vehicle #171 (2002 Chevrolet Blazer) was damaged during the previous snow event and not economical to repair. Request authorization to replace the vehicle from the Washington State contracts. The ER&R fund would purchase the replacement vehicle. Cost, approximately $27,000 plus tax for the vehicle.
Recommended Action: Move the Board authorize the Equipment Rental
& Revolving Fund Manager to purchase one (1) new year 2013 utility 4x4 vehicle from the Washington State contract
Attachments: None.
MASON COUNTY
TO: BOARD OF MASON COUNTY COMMISSIONERS
Reviewed:
FROM: Brian Matthews Ext. 450 DEPARTMENT: Public Works
Action Item
DATE: January 15, 2013
ITEM: Local Agency Federal Aid Project Prospectus for approved Federal Highway Administration (FHWA) Funding for Intersection Safety Project County Road Project 1954, 1955 and 1956
Background: Federal Highway Administration (FHWA) will be approving and funding the intersection safety projects for the following county road projects: 1. CRP 1954 Lynch Road/Arcadia Road
MP 6.94- MP 7.00 Federal Funds: $300,000
Description: Improvement of intersection sight distance and signage.
2. CRP 1955 Matlock Brady Road/Schafer Park Road MP 27.46-MP 27.65 Federal Funds: $540,000 Local Funds: $5,000 (ROW)
Description: Realignment of intersection to improve sight distance.
3. CRP 1956 Pickering Road/Harstine Bridge Road MP 3.33 Federal Funds: $54,000
Description: Improvement of intersection sight distance and placement of impervious surfacing on intersection island to prevent placement of signs, etc.
Washington State Department of Transportation will release the allocated federal dollars to the County as soon as the Local Agency Federal Aid Project Prospectus forms have been approved and executed. Recommendation: I move the Board of County Commissioners authorize the Chair to execute the Local Agency Federal Aid Project Prospectuses approved Federal Highway Administration (FHWA) funding for County Road Projects 1954, 1955 and 1956 and authorize the Chair to sign all other pertinent documents for these projects. Attachment: Project Prospectus forms for CRP 1954, 1955 and 1956
Washington State Department of Transportation
Prefix Federal Aid Proiect Number Local Agency
CRP 1954 Proiect Number
Agency Mason County Public Works
Project Title Intersection Safety - Lynch Road/Arcadia Road
Project Termini From -- To M.P. 6.94 M.P. 7.00 From: To: I Length of Project 6.94 7.00 575'
Route ( )
Local Agency Federal Aid Project Prospectus
Date 1/07/2013 Central Contractor
Registration Exp.Date 2/13/2013
( WSDOT) Federal Employer Use Only Tax ID Number 91-6001354
Federal Program Title
~ 20.205 D Other
Start Latitude N47 11 38.39 Start Longitude Wl22 57 12.10
End Latitude N47 11 44.41 End Longitude Wl22 57 18.44
I Nearest City Name Shelton
I Project Zip Code 98584
I Award Type D Local ~ Local Forces D State D Railroad
Federal Agency I City Number County Number County Name I WSDOT Region ~ FHWA D Others NIA 23 Mason Olympic Region Congressional District I Legislative Districts I Urban Area Number
I TMA I MPO I RTPO
6 35 NIA RTPO
Total Local Agency Federal Funds
Phase Start Phase Estimated Cost Funding Date
(Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar) Month Year
P.E. $50 000 $50,000 06 2011
R/W
Const. $250 000 $250.000 9 2013 Total $300 000 $300.000
Description of Existina Facility (Existina Design and Present Condition) Roadway Width I ~umber of Lanes 22
Existing roadways are 'typical' County Rural Major Collectors. The pavement shoulder widths vary. Vertical site distance standards are not currently met. Intersection was identified based on its crash rates.
Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary)
Intersection sight distance will be improved at this intersection by shoulder grading, removal of a hump in the roadway that impacts sight distance and improved signage.
Local Agency Contact Person Melissa McFadden
Mailing Address
100 W. Public Works Drive
Project Prospectus Approval
DOT Form 140-101 EF Revised 11 /1 O
By
Title
Title County Engineer
City
Shelton
41·.Nfad County Engineer
Page 1of3
Phone (360) 427-9670
I State Zip Code WA 98584
Approving Authority
Date (. ll 2--01~ + Previous Editions Obsolete +
Agency Mason County Public Works
Tvpe of Proposed Work
Project Title Intersection Safety- Lynch Road/Arcadia Road
Date 1/07/2013
Project Type (Check all that Apply) Roadway Width Number of Lanes
0 New Construction 0 Path I Trail 03-R vanes 2 0 Reconstruction 0 Pedestrian I Facilities 02-R
0 Railroad 0 Parking ~Other
0 Bridge
Geometric Design Data Description Through Route Crossroad
D Principal Arterial D Principal Arterial
Federal D Urban D Minor Arterial D Urban D Minor Arterial
Functional D Collector D Collector
~ Major Collector ~ Major Collector Classification D Minor Collector D Minor Collector ~Rural
D Access StreeURoad ~Rural
D Access StreeURoad
Terrain D Flat ~Roll Posted Speed 15 Design Speed 15 ExistinQ ADT 549 Design Year ADT DesiQn Year Design Hourly Volume (DHV)
Performance of Work Preliminary Engineering Will Be Performed By
Mason County Public Works Engineering Construction Will Be Performed By
Mason County Public Works Road Maintenance
Environmental Classification
D Final ~ Preliminary
D Class I - Environmental Impact Statement (EIS) D Project Involves NEPA/SEPA Section 404
lnteragency Agreement
D Class Ill - Environmental Assessment (EA) D Project Involves NEPA/SEPA Section 404
lnteragency Agreement
Environmental Considerations
§ 771.117 Categorical exclusions - 23 CFR 771.1l7(C)(4)
D Mountain D Flat ~Roll 15 15 276
Others
0% Contract
0%
~ Class II - Categorically Excluded (CE) D Projects Requiring Documentation
(Documented CE)
DOT Form 140-101 EF Revised 11/10
Page 2 of 3
D Mountain
Agency
100 % Agency
100 %
Agency Mason County Public Works
Right of Way
l:8J No Right of Way Required *All construction required by the
contract can be accomplished within the existinQ riqht of wav.
Project Title Intersection Safety- Lynch Road/Arcadia Road
Date 1/07/2013
D Right of Way Required
D No Relocation D Relocation Required
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Power pole and phone pedestal may need to be relocated in current County right of way.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? D Yes L8J No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development.
Date
DOT Form 140-101 EF Revised 11/1 o
Agency Mason County
By
Page 3 of 3
Mayor/Chairperson
+ Previous Editions Obsolete +
Washington State Department of Transportation
Local Agency Federal A id Project Prospectus
Date 1107/2013 Prefix Route ( )
Federal Aid Central Contractor
Proiect Number Registration Exp.Date 2/13/2013
Local Agency CRP 1955 ( WS DOT ) Federal Employer
Proiect Number Use Only Tax ID Number 91-6001354
Agency Federal Program Title
Mason County Public Works ~ 20.205 D Other Project Title Start Latitude N47 05'45" Start Longitude Wl23 29'19" Intersection Safety - Matlock Brady Rd I Schafer Park Rd
N47 05'34" End Longitude W l 23 29 '22" End Latitude Project Termini From -- To I Nearest City Name I Project Zip Code M.P. 27.46 M.P. 27.65 Shelton 98584 From: To: 27.46 27.65
I Length of Project 1027'
I Award Type ~ Local D Local Forces D State D Railroad
Federal Agency I City Number I County Number I County Name I WSDOT Region ~ FHWA D Others NIA 23 Mason Olvmoic Region Congressional District I Legislative Districts I Urban Area Number
I TMA I MPO I RTPO
6 35 NIA RTPO
Total Local Agency Federal Funds
Phase Start Phase Estimated Cost Funding Date
(Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar) Month Year
P.E. $90 000 $90,000 06 2011
R/W $5.000 $5.000 01 2013
Const. $450.000 $450 000 9 2013
Total $545,000 $5,000 $540 000
Description of Existina Facility (Existing Design and Present Condition) Roadway Width I ~umber of Lanes vanes
Existing roadways are ' typical' County Rural Major Collectors and Minor Collectors. The pavement shoulder widths vary. Horizontal site distance does not meet design standards. Intersection was identified based on its crash rates.
Descri tion of Pro osed Work Description of Proposed Work (Attach additional sheet(s) if necessary)
Intersection sight distance will be improved at this intersection through realignment of the currently-skewed roadway to a 90-degree intersection.
Local Agency Contact Person Title Phone Melissa McFadden Coun 360 427-9670
Mailing Address State Zip Code 100 W. Public Works Drive WA 98584
By
Project Prospectus Approval f. 13.iAJ) 3 Title County E ngineer Date
DOT Form 140-101 EF Page 1 of 3 + Previous Editions Obsolete + Revised 11 /1 o
Agency Project Title Mason County Public Works Intersection Safety - Matlock Brady Rd I Schafer
Date 1/07/2013
Tvpe of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes
0 New Construction 0 Path I Trail 03-R 34 2 0 Reconstruction 0 Pedestrian I Facilities 02-R
0 Railroad 0 Parking 1:81 Other
0 Bridge
Geometric Design Data Description Through Route Crossroad
D Principal Arterial D Principal Arterial
Federal D Urban D Minor Arterial D Urban D Minor Arterial
Functional D Collector D Collector
181 Major Collector D Major Collector Classification l:8J Rural D Minor Collector l:8J Rural 181 Minor Collector
D Access Street/Road D Access Street/Road
Terrain D Flat 181 Roll D Mountain D Flat DRoll D Mountain Posted Speed 45 35 Design Speed 50 40 Existinq ADT 629 375 Design Year ADT Desiqn Year Design Hourly Volume (DHV)
Performance of Work Preliminary Engineering Will Be Performed By Others Agency
Mason County Public Works % 100 % Construction Will Be Performed By
TBD
Environmental Classification
D Final IZ! Preliminary
D Class I - Environmental Impact Statement (EIS) D Project Involves NEPA/SEPA Section 404
lnteragency Agreement
D Class Ill - Environmental Assessment (EA) D Project Involves NEPA/SEPA Section 404
lnteragency Agreement
Environmental Considerations
Contract
100 %
~ Class II - Categorically Excluded (CE) ~ Projects Requiring Documentation
(Documented CE)
§ 771.117 Categorical exclusions - 23 CFR 771.117 ( c )( 4)
DOT Form 140-101 EF Revised 11/10
Page 2 of 3
Agency
%
Agency Mason County Public Works
Right of Way
D No Right of Way Required *All construction required by the
contract can be accomplished within the existinq riqht of wav.
Project Title Intersection Safety - Matlock Brady Rd I Schafer
Date 1/07/2013
~ Right of Way Required
~ No Relocation D Relocation Required
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Power poles and phone junction boxes/pedestals will need to be relocated to new right of way limits.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? D Yes ~No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development.
Date
DOT Form 140-101 EF Revised 11 /1 O
Agency Mason County
By
Page 3 of 3
Mayor/Chairperson
+ Previous Editions Obsolete +
Washington State Department of Transportation
Local Agency Federal Aid Project Prospectus
Date 1/07/2013 Prefix Route ( )
Federal Aid Central Contractor
Proiect Number Registration Exp.Date 11/18/2011
Local Agency (WSDOT) Federal Employer Proiect Number CRP 1956 Use Only Tax ID Number 91-6001354
Agency Federal Program Title Mason County Public Works ~ 20.205 D Other
Project Title Start Latitude N47 14 53.78 Start Longitude W122 55 51.90 Intersection Safety - Pickering Rd I Harstine Bridge Rd
End Latitude - End Longitude -Project Termini From -- To I Nearest City Name I Project Zip Code M.P. 3.33 - Shelton 98584 From: To:
3.33 -I Len~th of Project I Award Type
D Local ~ Local Forces D State D Railroad Federal Agency I City Number County Number I County Name I WSDOT Region ~ FHWA D Others NIA 23 Mason Olympic Region Congressional District I Legislative Districts I Urban Area Number I TMA I MPO I RTPO 6 35 NIA RTPO
Total Local Agency Federal Funds
Phase Start Phase Estimated Cost Funding Date
(Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar) Month Year
P.E. $15,000 $15 000 06 2011
R/W
Const. $39.000 $39 000 10 2013
Total $54.000 $54 000
Description of Existina Facility (Existina Design and Present Condition) Roadway Width I ~umber of Lanes varies
Existing roadways are 'typical' County Rural Major Collectors and Minor Collectors. The pavement shoulder widths vary.
Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary)
Intersection sight distance will be improved at this intersection through vegetation removal and placement of impervious surfacing on intersection island to prevent placement of signs, etc.
Local Agency Contact Person Melissa McFadden
Mailing Address
100 W. Public Works Drive
Project Prospectus Approval
DOT Form 140-101 EF Revised 11 /1 o
By
Title
I Title County Engineer
City
Shelton
4.J·A4,vQ County Engineer
Page 1 of 3
Phone (360) 427-9670
I State Zip Code
WA 98584
Approving Authority
Date I· e. i-01~ + Previous Editions Obsolete +
Agency Mason County Public Works
Type of Proposed Work
Project Title Intersection Safety - Pickering Rd I Harstine Bridge
Date 1/07/2013
Project Type (Check all that Apply) Roadway Width Number of Lanes
0 New Construction 0 Path I Trail 03-R varies 2 0 Reconstruction 0 Pedestrian I Facilities 02-R
0 Railroad 0 Parking ~Other
0 Bridge
Geometric Design Data Description Through Route Crossroad
D Principal Arterial D Principal Arterial
Federal D Urban D Minor Arterial D Urban D Minor Arterial
Functional D Collector D Collector
181 Major Collector 181 Major Collector Classification D Minor Collector D Minor Collector ~Rural
D Access StreeURoad ~Rural
D Access StreeURoad
Terrain D Flat Posted Speed 40 Desian Soeed 40 Existina ADT 2634 Desian Year ADT Desian Year Design Hourly Volume (DHV)
Performance of Work Preliminary Engineering Will Be Performed By
Mason County Public Works Construction Will Be Performed By
Mason County Public Works
Environmental Classification
D Final ~ Preliminary
D Class I - Environmental Impact Statement (EIS) D Project Involves NEPA/SEPA Section 404
lnteragency Agreement
D Class Ill - Environmental Assessment (EA) D Project Involves NEPA/SEPA Section 404
lnteragency Agreement
Environmental Considerations
181 Roll D Mountain D Flat 181 Roll
35 35 2204
Others
%
Contract
%
l:8J Class II - Categorically Excluded (CE) D Projects Requiring Documentation
(Documented CE)
§ 771.117 Categorical exclusions - 23 CFR 771.117 ( C)( 4)
DOT Form 140-101 EF Revised 11/10
Page 2 of 3
D Mountain
Agency
100 Agency
100
%
%
Agency Mason County Public Works
Right of Way
~ No Right of Way Required *All construction required by the
contract can be accomplished within the existinq riqht of way.
Project Title Intersection Safety - Pickering Rd I Harstine Bridge
Date 1/07/2013
D Right of Way Required
~ No Relocation D Relocation Required
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
FM Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? D Yes ~No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development.
Date
DOT Form 140-101 EF Revised 11/10
Agency Mason County
By
Page 3 of 3
Mayor/Chairperson
+ Previous Editions Obsolete +
MASON COUNTY
TO: BOARD OF MASON COUNTY COMMISSIONERS
Reviewed:
FROM: Brian Matthews Ext. 450
DEPARTMENT: Public Works Action Item
DATE: January 15, 2013
ITEM: Request approval to use the County MRSC Consultant Roster to
select On-Call Consultants for Structural, Geotechnical, Hydraulic and Archaeological and Cultural Resource Archaeological and Cultural Resource services for the 2013-2014
Background: For calendar year 2012, the Board of County Commissioners authorized Public Works to use the Consultant Roster to select and enter into agreements for Geotechnical, Structural Archaeological and Cultural Resource services, as needed, during the 2012 calendar year. At this time, Public Works would like authorization to use the Consultant Roster to select and enter into agreements for these same services, along with Hydraulic services, as needed, during the 2013-2014 calendar years. We anticipate these services to be required at various locations across the county for County Road Projects and other Public Works activities; including emergencies.
Recommended Action: I move the Mason County Board of Commissioners authorize Public Works to select from the County MRSC Consultant Roster and enter into agreements for Structural, Geotechnical, Hydraulic, Archaeological and Cultural Resource consultant services, as needed for 2013-2014 calendar years. The maximum pay-out for each agreement not to exceed $50,000; Public Works will announce each consultant selection during a regular scheduled Commission meeting.
Attachments: None
.
MASON COUNTY
TO: BOARD OF MASON COUNTY COMMISSIONERS Reviewed:
FROM: Brian Matthews Ext. 450
DEPARTMENT: Public Works
Action Item
DATE: January 15, 2013
ITEM: Intergovernmental request and agreement for reimbursable work by Mason
Conservation District Background: Many times during project development, Mason County Department of Public Works requires the services of environmental consultants on a short-term basis for minor tasks. If we enter into an agreement with Mason Conservation District to provide environmental services on a reimbursable basis, this will avoid spending considerable staff time and prevent project delays, which would be caused by the normal process of selecting a consultant. We will request services from Mason Conservation only when it can reasonably be expected to result in an overall savings. Recommended Action: I move the Board authorize the Chair to execute an Inter-Governmental Request and Agreement for Reimbursable Work by Mason Conservation District to provide environmental services, as needed, for calendar year 2013.
Attachments: Original Agreement w/the Clerk of the Board
INTERGOVERNMENTAL REQUEST & AGREEMENT FOR REIMBURSABLE WORK BY MASON CONSERVATION DISTRICT
The MASON COUNTY DEPARTMENT OF PUBLIC WORKS hereby requests that the following described work be performed by the MASON CONSERVATION DISTRICT:
Description of work or services requested: Provide environmental services to Mason County, as needed, for calendar year 2013.
Cost shall be determined on an hourly basis, using the attached Rate Sheets from
Mason Conservation District (identified as Exhibits A). *********************************************************************************
Mason County Department of Public Works certifies that sufficient budgeted funds are available to cover the cost of the requested work or services. Submitted by: Approved by: DEPARTMENT OF PUBLIC WORKS BOARD OF COMMISSIONERS
MASON COUNTY, WASHINGTON ___________________________________ BRIAN MATTHEWS, PE RANDY NEATHERLIN, Chair Director of Public Works DATE: DATE: __________________ ******************************************************************************** MASON CONSERVATION DISTRICT Submitted by: Approved by:
BOARD OF SUPERVISORS MASON CONSERVATION DISTRICT Signature ___________________________________ (Name / Typed) Signature Title: ___________________________________
(Name / Typed)
Title: _______________________________ DATE: DATE: _____________________________ Comments: _________________________________________________________________ _______________________________________________________________________________
C:\Users\blr.MASON\Desktop\Risk Pool Designation Cvr Sheet.doc
MASON COUNTY TO: BOARD OF MASON COUNTY COMMISSIONERS
Reviewed:
FROM: Dawn Twiddy Ext. 422
DEPARTMENT: Human Resources Monday Briefing____ Consent Agenda__X__
DATE: January 15, 2013 No.
Item: Approval of the resolution appointing the current Mason County representatives to the
Washington Counties Risk Pool. Commissioner Tim Sheldon as the County’s representative and Commissioners Neatherlin and Jeffreys as alternate representatives.
Background: Amends Resolution No. 71-11 adopted November 1, 2011. Recommended Action: Move to approve the resolution appointing the Mason County
representatives to the Washington Counties Risk Pool. Commissioner Tim Sheldon as the County’s representative and Commissioners Neatherlin and Jeffreys as alternate representatives.
Attachments: Original on file with Clerk of the Board
Comment [D1]: If there are legal notification requirements please discuss with Diane, ext. 419.
Utilites- Cover Sheet_CHP Group #3_Project Completion Accept
MASON COUNTY
TO: BOARD OF MASON COUNTY COMMISSIONERS
Reviewed:
FROM: Tom Moore, Deputy Director Ext. 652
DEPARTMENT: Public Works, Utilities and Waste Management Division
Action Agenda
DATE: January 15, 2013 No. 8.___
ITEM: Adoption of Resolution No. ____ - 13 accepting construction of the
Belfair Sewer’s County Hookup Program, Group #3 Project as complete.
Background: At their March 20, 2012 regular meeting, the Board of
Commissioners authorized the Utilities & Waste Management Department to advertise and award the contract for construction of the County Hookup Program Group #3 sewer project. Bids for the project were opened and publically read aloud on Thursday, April 19, 2012. A total of 2
responsive/responsible bids were received. On April 24, 2012, the contract in the amount of $136,435.49 ($35,598.93, 20.7%, under the Engineer’s estimate for the project of $172,034.02) for construction of the Belfair Sewer County Hook-up Program (CHP) Group #3 project was awarded to Zephyr Inc., of Allyn, WA, the lowest responsible/responsive bidder on the project. Work began on the project in April 2012 and was completed in early November 2012.
This CHP Group #3 project constructed side sewer lateral connections to the new Belfair sewer system for 19 property owners in the Phase 1 area of the Belfair sewer system. The final cost for construction work for this project is $125,426.22 (8.1%) under the original contract award amount and $52,210.18 (27.1%) under the project’s engineer’s cost estimate. All work under this contract has been completed in accordance with the project plans and specifications and has been approved by the ESA, Inc., the Project Engineer of Record and the County’s Department of Utilities & Waste Management. The recommended action approves the final contract amount and constitutes the final acceptance of the work. There were no contractor claims filed against the City, and no liquidated damages were assessed against the contractor.
Utilites- Cover Sheet_CHP Group #3_Project Completion Accept
Recommended Action: Move to approve the final contract amount with Zephyr, Inc. for construction of the Belfair County Hook-up Program Group #3 project for the final cost of $125,426.22 and adopt Resolution No. ___ - 13 accepting construction of the Belfair County Hook-up Program Group #3 project as complete.
Attachments:
• Resolution No. ___ - 13 accepting the Belfair County Hook-up Program Group #3 project as complete.
RESOLUTION NO. ____ - 13
A RESOLUTION of the Mason County Board of Commissioners accepting the Belfair Sewer Project’s County Hook-up Program Group #2 Project as complete.
WHEREAS, the Board of County Commissioners of Mason County (Board) approved the Belfair Wastewater Treatment and Water Reclamation Facility project for the Belfair Urban Growth Area (UGA); and
WHEREAS, the Board has previously declared that the primary means of sewage collection and disposal in the Belfair UGA area shall be through construction and connection to the County's permanent sewer collection system and treatment facilities; and
WHEREAS, a part of construction of the Belfair Wastewater Treatment and Water Reclamation Facility project included construction of sewage collection main lines within the Phase 1 area of the Belfair UGA; and
WHEREAS, the Board has adopted regulations requiring that existing developed parcels
of property located within the Belfair UGA and within 500 feet of the alignment of the Belfair wastewater and reclamation facilities pipeline connect to public sewer facilities as soon as sewer service is available; and
WHEREAS, the Board created and funded the County Hook-up low interest loan
Program to assist property owners with existing structures within Phase 1 of the Belfair sewer project area with the cost of their required connection to the Belfair sewer system; and WHEREAS, at their January 10, 2012 regular meeting, the Board authorized the Utilities and Waste Management Department to advertise and award the contract for construction of the Belfair Sewer County Hook-up Program Group #2 Project; and WHEREAS, on February 1, 2012, a total of 5 responsible and responsive bids for the Belfair Sewer County Hook-up Program Group #2 Project were publically opened and read aloud; and
WHEREAS, on February 29, 2012, the Utilities and Waste Management Department awarded the contract for construction of the Belfair Sewer County Hook-up Program Group #2 Project to Zephyr, Inc., the lowest responsible & responsive bidder on the project, in the amount of $172,006.36; and WHEREAS, the County Hook-up Program Group #2 Project has been completed for a total construction cost of $163,026.61; and WHEREAS, the County Hook-up Program Group #2 Project has been completed in accordance with the project plans and specifications; and
WHEREAS, the County Hook-up Program Group #2 Project has been approved by representatives of ESA, Inc., the project’s Project Engineer of Record, and the County’s Department of Public Works, Utilities & Waste Management Division; and
WHEREAS, no contractor claims have been filed against Mason County relative to the County Hook-up Program Group #2 Project;
NOW THEREFORE, BE IT RESOLVED, that the Mason County Commissioners hereby accept the Belfair Sewer Project’s County Hook-up Program Group #2 Project as complete.
BE IT FURTHER RESOLVED, that the Deputy Director of the Utilities & Waste
Management Division of the Mason County Public Works Department is hereby authorized to complete the contract closure process upon receiving appropriate releases from the Department of Revenue, Department of Employment Security and Department of Labor and Industries. PASSED this ______ day of January, 2013.
BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON Randy Neatherlin, Chair Tim Sheldon, Commissioner Terri Jefferys, Commissioner
ATTEST: Shannon Goudy, Clerk of the Board APPROVED AS TO FORM: Chief Deputy Prosecuting Attorney Tim Whitehead, WSBA #37621 cc: Elected Officials Dept. Heads
Utilities- Cover Sheet_CHP Group #2_Project Completion Accept
MASON COUNTY
TO: BOARD OF MASON COUNTY COMMISSIONERS
Reviewed:
FROM: Tom Moore, Deputy Director Ext. 652
DEPARTMENT: Public Works, Utilities and Waste Management Division
Action Agenda
DATE: January 15, 2013 No. 8.___
ITEM: Adoption of Resolution No. ____ - 13 accepting construction of the
Belfair Sewer’s County Hookup Program, Group #2 Project as complete.
Background: At their January 10, 2012 regular meeting, the Board of
Commissioners authorized the Utilities & Waste Management Department to advertise and award the contract for construction of the County Hookup Program Group #2 sewer project. Bids for the project were opened and publically read aloud on Wednesday, February 1, 2012. A total of 5 responsive/responsible bids were received. On February 29, 2012, the contract in the amount of $172,006.36 for construction of the Belfair sewer County Hook-up Program (CHP) Group #2 project was awarded to Zephyr Inc., the lowest responsible/responsive bidder on the project. Work began on the project in March 2012 and was completed in early June 2012.
This CHP Group #2 project constructed side sewer lateral connections to the new Belfair sewer system for 14 property owners in the Phase 1 area of the Belfair sewer system. The final cost for construction work for this project is $163,026.61, 5.2% ($8,979.75) below the contract award amount. All work under this contract has been completed in accordance with the project plans and specifications and has been approved by the ESA, Inc., the Project Engineer of Record and the County’s Department of Utilities & Waste Management. The recommended action approves the final contract amount and constitutes the final acceptance of the work. There were no contractor claims filed against the City, and no liquidated damages were assessed against the contractor.
Recommended Action: Move to approve the final contract amount with Zephyr, Inc. for construction of the Belfair County Hook-up Program Group #2 project for the final cost of $163,026.61 and adopt Resolution No. ___ - 13 accepting construction of the Belfair County Hook-up Program Group #2 project as complete.
Attachments:
• Resolution No. ___ - 13 accepting the Belfair County Hook-up Program Group #2 project as complete.
RESOLUTION NO. ____ - 13
A RESOLUTION of the Mason County Board of Commissioners accepting the Belfair Sewer Project’s County Hook-up Program Group #3 Project as complete.
WHEREAS, the Board of County Commissioners of Mason County (Board) approved the Belfair Wastewater Treatment and Water Reclamation Facility project for the Belfair Urban Growth Area (UGA); and
WHEREAS, the Board has previously declared that the primary means of sewage collection and disposal in the Belfair UGA area shall be through construction and connection to the County's permanent sewer collection system and treatment facilities; and
WHEREAS, a part of construction of the Belfair Wastewater Treatment and Water Reclamation Facility project included construction of sewage collection main lines within the Phase 1 area of the Belfair UGA; and
WHEREAS, the Board has adopted regulations requiring that existing developed parcels
of property located within the Belfair UGA and within 500 feet of the alignment of the Belfair wastewater and reclamation facilities pipeline connect to public sewer facilities as soon as sewer service is available; and
WHEREAS, the Board created and funded the County Hook-up Low Interest Loan
Program to assist property owners with existing structures within Phase 1 of the Belfair sewer project area with the cost of their required connection to the Belfair sewer system; and WHEREAS, at their March 20, 2012 regular meeting, the Board authorized the Utilities and Waste Management Department to advertise and award the contract for construction of the Belfair Sewer County Hook-up Program Group #3 Project; and WHEREAS, on April 19, 2012, a total of 2 responsible and responsive bids for the Belfair Sewer County Hook-up Program Group #3 Project were publically opened and read aloud; and
WHEREAS, on April 24, 2012, the Utilities and Waste Management Department awarded the contract for construction of the Belfair Sewer County Hook-up Program Group #3 Project to Zephyr, Inc., the lowest responsible & responsive bidder on the project, in the amount of $136,435.49; and WHEREAS, the County Hook-up Program Group #3 Project has been completed for a total construction cost of $125,426.22; and WHEREAS, the County Hook-up Program Group #3 Project has been completed in accordance with the project plans and specifications; and
WHEREAS, the County Hook-up Program Group #3 Project has been approved by representatives of ESA, Inc., the project’s Project Engineer of Record, and the County’s Department of Public Works, Utilities & Waste Management Division; and
WHEREAS, no contractor claims have been filed against Mason County relative to the County Hook-up Program Group #3 Project;
NOW THEREFORE, BE IT RESOLVED, that the Mason County Commissioners hereby accept the Belfair Sewer Project’s County Hook-up Program Group #3 Project as complete.
BE IT FURTHER RESOLVED, that the Director of the Mason County Public Works
Department is hereby authorized to complete the contract closure process upon receiving appropriate releases from the Department of Revenue, Department of Employment Security and Department of Labor and Industries. PASSED this _______ day of January, 2013.
BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON Randy Neatherlin, Chair Tim Sheldon, Commissioner Terri Jefferys, Commissioner
ATTEST: Shannon Goudy, Clerk of the Board APPROVED AS TO FORM: Chief Deputy Prosecuting Attorney Tim Whitehead, WSBA #37621 cc: Elected Officials Dept. Heads
Adobe Lic 2013 ca1 Jan 15
MASON COUNTY
TO: BOARD OF MASON COUNTY COMMISSIONERS
Reviewed:
FROM: David Loser Ext.
DEPARTMENT: Public Works/ER&R Monday Briefing: ____ Action Agenda: __x__
DATE: January 15, 2013 No.
ITEM: Washington State Dept of Enterprise Services; Adobe Products
Purchase Agreement
Background: The Washington State Department of Enterprise Services has renewed their licensing agreement with Adobe to license Adobe products to state and local agencies. We are required to sign a new purchase agreement with the Department of Enterprise Services to continue purchasing Adobe products. I recommend that Robert Deans, our IS Supervisor be appointed as the Adobe Agency Coordinator for Mason County under this agreement. Respectfully request the Board of County Commissioners authorize the Chairperson to sign the attached Agreement with the Department of Enterprise Services.
Recommended Action: Move the Board of County Commissioners
designate Robert Deans as the Mason County Adobe Agency Coordinator, Ben Ramsfield as Backup Coordinator and authorize the Chairperson to execute the Adobe Products Purchase Agreement with the Washington State Department of Enterprise Services.
Attachments: Original agreements in Clerk’s office