Marketing Presentation - June 2016
-
Upload
mark-knippa -
Category
Documents
-
view
30 -
download
0
Transcript of Marketing Presentation - June 2016
![Page 1: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/1.jpg)
TREATMENT OF HYDROCARBON-CONTAMINATED SOIL
& RECYCLING
OF SOLID DRILLING WASTE
![Page 2: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/2.jpg)
Agenda•Boldwater Introduction
o Our Mission
o Environmental Awareness
o The Boldwater Difference
o Our Approach
•Boldwater’s Onsite Services
o Spill or Leak Treatment / Remediation
o Solid Drilling Waste Treatment
o Solid Drilling Waste Recycling
•Case Study
• Summary
![Page 3: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/3.jpg)
Our Mission: Solutions that Deliver Both Environmental & Cost Benefits Industry-Relevant Solutions
• To deliver superior alternatives and customer satisfaction through the development and implementation of customized oil & gas waste treatment solutions across a range of industry needs
• Demonstrate 100% project success and to expand applications for these all-natural and environmentally-friendly processes
• Implement a full line of eco friendly field services for both ex-situ and in-situ type remediation applications maximizing customer value associated with our bio-based solutions
Dependable Results
• All treatment and recycling processes are performed with the highest level of integrity and environmental controls that exceed all commercial and regulatory requirements
Cost-Saving Opportunities
• Projects are designed and executed to meet financial expectations and provide a lower cost when compared to alternative waste-handling practices
![Page 4: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/4.jpg)
Eco-Friendly Method & Results
• Only naturally-occurring microbial based materials are utilized in the treatment
• No hazardous or undesired by-products are used or generated
• We perform all work at the job site and eliminate heavy-haul trucks
• We eliminate volatile organic compounds (VOC’s) at job site
• Leachable TPH is rapidly reduced to trace amounts of CO & H2O
• No hazardous chemicals, combustion processes or dangerous processes are used
• We treat any hydrocarbon-contaminated soil with natural specially selected
microorganisms and co-factors
• We optimize the microbial activities resulting in very rapid and complete results
• Treated and remediated soil from any spills or leaks can be replaced or repurposed
• Only by-products from hydrocarbon decay are trace amounts of CO & H20
![Page 5: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/5.jpg)
The Boldwater Difference
Engineered Solutions Delivered to Your Operating Site
• Every project is uniquely designed and optimized allowing us to accurately plan the project variables to achieve the desired results and value
• Experienced personnel work with you to ensure all physical, legal and financial goals are realized
• We remain flexible and can shift effort & focus as the project unfolds to maximize value impact during each stage
Rapid Results
• Our patented processes work rapidly compared to the time required by comparable remediation
• Aromatic compounds and VOC’s are eliminated within minutes
• Long-chain hydrocarbons reduced in hours
Integrity
• Our professionals have more than 50 years of experience in the O&G industry
• We pledge transparency to our clients over the life of every project
![Page 6: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/6.jpg)
Our Approach…
Every Project Situation is viewed to be Unique
• Waste Treatment programs are customized to meet project needs based on:
o Volume of solid waste material
o Percentages of hydrocarbon contamination
o Characterization of the hydrocarbons and soil
o Timeline available / targeted for completion
o Surrounding area… concerns and controls
o Accessibility to the material and available space for work activity
Success is the Only Option… Every Time
• Expectations vs reality… we are flexible and optimize changes for best results
• We will balance the necessities of our clients, the safety of all personnel, and the
adherence to required regulatory standards
• Boldwater has achieved 100% success in every project
![Page 7: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/7.jpg)
Onsite Spill & Leak Treatment / RemediationOperational Assessments – Monthly and Quarterly
• Let us be your resource to help manage your assets and related regulatory challenges
• We train and assist your personnel for minor spills
• We equip your Operations with “Spill Response Packages” to manage routine activities
• Eliminate contamination around pipelines, processing plants, compressors, pump stations, and storage
Treatment of Hydrocarbon-Contaminated Soils
• We mobilize quickly to implement plans for large spills or leaks
• Lab-verified contaminate-free soil can then be re-placed or re-purposed
• Rapid results will allow you to quickly return the area to its native condition
• We work with you directly or as part of first responders / rapid action companies
Remediation for all NGL’s, Crude Oil, and Refined Products
• Our treatment solution works throughout the entire chain of hydrocarbons including crude oil, condensates and NGL’s, and refined products
![Page 8: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/8.jpg)
Customized Packages Fit Your Needs
Boldwater’s Spill Management Approach
1. Monthly and/or quarterly assessments and planning:
• Operations Reviews – we work with your field operations to evaluate status and determine needs
• Site Visits – we visit review locations as necessary for action and/or inspection
• Reports – we provide you with a comprehensive reports with pertinent information, activities and recommendations going forward
2. Spill Response
• We remain on-call and can mobilize for larger spill or leak events
3. Fast-Action Spill Packs
• We provide materials, resources and training for your personnel to quickly initiate a response for any spill or leak
![Page 9: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/9.jpg)
Onsite Treatment & Recycling of Drilling Wastes
Qualified & Proven
• Boldwater is authorized through State Regulatory groups such as the Railroad Commission
of Texas (TRRC) for the treatment of hydrocarbon-contaminated soils and permitted specifically to recycle solid drilling wastes
• Through our patented treatment & recycling processes, drilling operators are able to cost-
effectively manage and treat all solid drilling wastes and hydrocarbon contaminated soils
to eliminate future environmental liabilities
• All spill & leak treatments are performed onsite eliminating the need for loading, haul off
and disposal fees for these contaminated wastes
• With Recycling, we provide high quality flex base which offsets other flex base purchases
• Our Treatment & Recycling process adds value across a spectrum:
• Drilling – Rapid treatment of waste as it discharges the rig or after drilling is completed
• Construction – Recycled material is high quality base for roads or operational pad sites
• Corporate / Environmental – Through recycling, environmental liabilities are eliminated
![Page 10: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/10.jpg)
Working On-Site …Our Work Plans Are Designed For Efficiency & Value
• On-site Work Plans are flexible and place no restrictions on drilling activities
• Our work starts after your solid waste is separated from usable fluids via Solids Control
• We utilize open-top cuttings boxes for treatment of the contaminated drilling waste
• Treatment & Recycling are generally performed while drilling but can be handled
separately based on client preference
• Recycling steps are performed following the completion of the treatment phase
• The resulting Recycled Material:
o Tested by 3rd party labs to confirm all state and EPA regulatory requirements
o Is pre-approved for re-use in the construction of lease roads, county roads, production or drill pads
o Exceeds regulatory requirements for TxDOT Grade 2 flexible base
o Is a high quality that exceeds specifications of most native base materials
o Is an EPA recognized beneficial material which, when re-used, eliminates liabilities
![Page 11: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/11.jpg)
Why Recycle Drilling Wastes?Diminish costs associated with current processes
• Eliminates loading, hauling and disposal expenses
• Eliminates need for reserve pits and other waste handling
• Reduces Company oversight and personnel requirements
• Reduces the damaging effects of heavy truck traffic on road conditions & air quality
Provides a returned resource value
• Creates high quality road base material for qualifying roads and drill pads
Reduces or eliminates Operators waste liabilities
• Beneficial re-use eliminates all long term environmental liabilities for the Operator
• Recycling process utilizes 3rd party labs to confirm results
Value Proposition
• Our on-site treatment provides a cost savings compared to alternative waste handling methods
• Recycled Material is high quality, strength-stabilized & replaces purchase of other base
• Operator can reduce financial reserves usually associated waste liabilities
![Page 12: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/12.jpg)
Sample: Case Study Summary – TX, H&P Flex Rig
- Operator drilling: 10,385 ft Vertical plus 11,345 ft laterally
- Solids Control: Drying Shakers & Centrifuge
- Waste Cuttings: 60 yd3 Surface, 398 yd3 Production Section & 595 yd3 Centrifuge for total 1053 yd3 waste & 470 bbl associated OOC
- Job Actual Costs: $61,519 plus personnel ($58.43/yd3)
Recycled Material: 1990 yd3 x $25/yd3 = $49,758
Treating Cost: $11,761 or $23.49/yd3
- Test Results: Chloride 300 mg/L, TPH <5.00 mg/L, Benzene < 5.00 mg/L, pH 11.9
- Compressive Strength: 83 psiStarting material
composition
Road completed using
treated drilling waste
![Page 13: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/13.jpg)
DRILLING MUD USED TO;
- LUBRICATE DRILL BIT
- STABILIZE WELL
- REMOVE DRILL CUTTINGS
DRILLING MUD CARRIES DRILL
CUTTINGS TO SURFACE @ ~30%
OIL ON CUTTINGS %
DRILL CUTTINGS ARE
TREATED TO REDUCE TPH
TREATED CUTTINGS ARE
MIXED WITH AGGREGATE &
PLACED IN HOLDING CELL
ELIMINATESENVIRONMENTAL
LIABILITY
Flow Diagram for On-site Treatment of Drilling Waste
![Page 14: Marketing Presentation - June 2016](https://reader034.fdocuments.us/reader034/viewer/2022042723/58eed2e21a28ab18738b465b/html5/thumbnails/14.jpg)
Summary
• Boldwater is uniquely qualified for comprehensive eco–friendly treatment
of hydrocarbon-contaminated soils and recycling of solid drilling wastes
• Through our patented on-site treatment & recycling processes, clients are
able to cost-effectively manage and treat all contaminated soils & solid
drilling wastes
• We eliminate ongoing environmental liabilities associated with solid wastes
through our treatment and recycling programs
• Our all-natural processes produce very rapid and 100% proven results
• Boldwater is a reliable and vetted resource with experience, integrity, and
a verified history of 100% success