“Market Mall Plus”
(MMP)
Valley Ridge Community Association
Planning Committee
(VRCA PC)
With Input From The:
Crestmont Community Association
(CCA)
January 14, 2014
(Wedding Pavilion)
![Page 2: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/2.jpg)
Agenda
• Welcome & Opening Remarks
• City’s Area Structure Plan (ASP) Process
• Regional Picture
• Background
• Valley Ridge & Crestmont Today
• “Market Mall Plus” Proposal: Shape + BVX / Loblaws
• VRCA PC Issues
• Crestmont Community Association (CCA) Issues
• Wrap-up
• Remarks from Councilor Ward Sutherland
• Q&A Session
![Page 3: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/3.jpg)
City of Calgary ASP Process
http://calgarycommunities.com/content/Community%20Guide%20to%20the%20Planning%20Process.pdf
We are here today
![Page 4: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/4.jpg)
C.O.P.
ASP
Proposed
Westview
ASP
Amended VR ASP
Calgary West
ASP
(Existing)
BVX /
Loblaw
Shape
Greenwood/
Greenbriar
Bowfort Rd
Interchange
Old Banff
Coach Rd.
Interchange
(133rd
St.)
VR / TCH
Interchange
Regional Context
Qu
alic
o
Sta
ge
4
x
Trinity Dev.
TCH
![Page 5: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/5.jpg)
Background & Potential Timeline
• VRCA PC & CCA have been working on MMP project since early 2011
• Multiple meetings with the City and developers
• City of Calgary Open Houses in 2013
• Going forward Approval Process (speculative): – City of Calgary to hold additional Open House early 2014
– Calgary Planning Commission to follow the Open House
– City of Calgary Council Hearing follows 1-2 months after CPC
– Sanitary to be finished by 2017
– VR Blvd / TCH ultimate interchange construction completion ?
– Construction / completion ??
![Page 6: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/6.jpg)
Valley Ridge & Crestmont Now
SOURCES: 2013 City of Calgary Census, Melcor, Cove Properties, Qualico
CRESTMONT STAGE 4 439 Residential Units
Status: Approval pending ASP (LOC2011-0110)
Trans-Canada Highway
VALLEY POINTE Melcor extension
Status: in progress (~119 of 171 lots occupied)
Old Banff Coach Rd
BURNCO
C.O.P.
VR Cove Condos Status: In progress
55 units
CRESTMONT
VALLEY RIDGE
2,300 residental units / 6,781 population (April 2013)
SHAPE
BVX /
LOBLAWS
“Market Mall
Plus”
![Page 7: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/7.jpg)
Shape Outline Plan – As Submitted
650,000 ft2 Commercial 100,000 ft2 Office
1,000 Residential Units
Wedding Chapel
(existing)
![Page 8: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/8.jpg)
BVX/Loblaws Outline Plan – As Submitted
Wedding Chapel
(existing)
Victory Village
(existing)
Climbing Centre
(approved)
Future Hwy Commercial
Mixed Use
Residential
300,000 ft2 Commercial 50,000 ft2 Office
1,560 Residential Units
![Page 9: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/9.jpg)
Market Mall • Built in 1971
• ~23 hectare site
• ~957,000 sq. ft.
• 229 stores
• Anchor / Major stores – The Bay, Target, Safeway,
• 7 access / egress points from 4 major arteries
• >14 mm. visitors annually ~38,000 per day avg.
Access / Egress Points
32 Ave NW
40 Ave NW
![Page 10: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/10.jpg)
Retail 1,000,000 sq. ft. 665,000 sq. ft. 956,977 sq. ft.
Office 150,000 “ 105,000 sq. ft. 125,776 sq. ft.
*Residential 2,560 units 1,792 units 0 units
Access TCH TCH 4 Major Roads
Entrance/Exit 1 1 7
Site Area 101 ha. 101 ha. ~23 ha.
MMP (Proposed) Market Mall
Some context – Comparison to Market Mall
*Note – Crestmont Stage 4 residential proposal (439 units) not included.
MMP (City’s
70% Option)
Source: City of Calgary, Shape, BVX/Loblaws
![Page 11: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/11.jpg)
More Context - other Shopping Centers Shopping
Mall Access/ Egress Points
Retail Space
(sq. ft.)
Stores Major Stores Annual Visitors
Res. Units
Chinook Centre
10 1,355,000 >250 The Bay, Topshop, Pottery Barn, Sport Chek, Chapters, Jacob, Apple Store
14 mm 0
Cross Iron Mills
4
1,123,070 206 Bass Pro Shops, Outdoor World,; Bed, Bath & Beyond, Cineplex; Sport Chek; Winners; HomeSense; Toy’s ‘R Us
8 mm 0
Market Mall 7 957,000 229 The Bay, Target, Safeway, Sport Chek, Toy’s ‘R Us
14 mm 0
Southcentre Mall
7 1,052,100 186 The Bay, Sears, Sport Chek, Crate and Barrel
6.5 mm 0
Sunridge Mall 8 807,600 150 The Bay, Target, Sport Chek 9.5 mm 0
MMP Proposed
1 1,000,000 ? ? ? 2,560
MMP City’s 70% Option
1 665,000 ? ? ? 1,792
Chapel Grove (2001)
1 278,000 - Costco; (REJECTED BY CITY OF CALGARY)
- 906
mm = million
![Page 12: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/12.jpg)
Single point of access / egress
to MMP
TCH-VR Blvd & TCH-Stoney Tr. Ultimate Interchange Design
TCH WB To VR Blvd Stoney Tr SB & NB to VR Blvd TCH EB to VR Blvd
![Page 13: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/13.jpg)
N
BANFF
3 SB / 1 NB LANES UNDER TCH
ALL TCH WB
TRAFFIC ENTERS
BY
ONE SINGLE LANE
ALL EXITING TRAFFIC ONTO EB TCH
COMPRESSED INTO ONE SINGLE LANE
CALGARY
N
Shape’s
Proposed
Interim Design
Changes (Dec. 9, 2013)
MMP:
Just one way in & one way out!
The level of development this proposed inteterim design is meant to support is
unknown at this point.
![Page 14: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/14.jpg)
Key Points: “Market Mall Plus” 1. City Administration has concluded that, except for Crestmont Stage 4, no
further development will be allowed, without upgrades to the existing VR Blvd interchange.
2. Alberta Transportation (AT) and the City Administration confirm that the VR Blvd / TCH interchange will be completely re-constructed as part of the Stoney Trail extension project
3. City Administration has confirmed that AT’s planned ultimate design of the VR Blvd / TCH interchange will not support the full build-out of MMP as originally proposed by Shape & BVX/Loblaws
4. At this point, the City Administration has concluded that 70% of the proposed full development is a feasible option relating to AT’s ultimate interchange design.
5. Developer’s are promoting at least one interim design phase of construction of the VR Blvd / TCH interchange leading up to the ultimate design stage
6. The VRCA PC is still waiting for further details.
![Page 15: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/15.jpg)
• Scope of the combined developments is significantly over-scaled given the site configuration and capacity constraints associated with the VR Blvd / TCH interchange
– Traffic volumes and impacts (eg. Line-ups) are significantly underestimated
• An amendment to the Calgary West ASP is required to allow these proposals to go forward
– Pace and timing of approval process has been too fast given the above issues and the City of Calgary needs to slow down this process
– As a result, the community consultation process to date, has been sporadic and is currently incomplete. The City must adopt and execute a more structured, planned and collaborative approach.
• Ensuring the safe and efficient functioning of the TCH-VR Blvd interchange, and the underpass, is of paramount importance
VRCA Key Issues: “Market Mall Plus”
![Page 16: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/16.jpg)
VRCA Position
• VRCA does not support Shape’s or BVX / Loblaw’s initial development proposals in their present form
• Single point of access / egress for a Market Mall Plus scenario, including the City’s 70% option, at this unique site which would share access with existing area residents, is untenable and unacceptable
• VRCA has serious concerns regarding the City Administration’s recent conclusion that a 70% option will enable the ultimate VR Blvd interchange & underpass to function safely and efficiently
• VRCA favours a “right-sized” development and form for this unique location at Calgary’s western “gateway” along the Paskapoo Slopes
• No interim interchange: Ultimate VR Blvd / TCH interchange design needs to be built and in place first, before any development occurs
![Page 17: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/17.jpg)
www.CrestmontCommunity.org
CRESTMONT STAGE 4 88.31 acres
439 Residential Units
SHAPE PROPERTIES 650,000 sq. ft. Commercial
100,000 sq. ft. Office 1,000 Residential Units
BVX / LOBLAWS 350,000 sq. ft. Commercial
50,000 sq. ft. Office 1,560 Residential Units
VALLEY RIDGE
Trans-Canada Highway
CRESTMONT
COUGAR RIDGE
VALLEY POINTE Melcor extension
Crestmont Stage 5 ±220 Acres ±1,760 residential units
Calgary West Developments Location Map
![Page 18: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/18.jpg)
• 3 Additional traffic circles
• Left turn signal onto Trans Canada Highway (TCH) for Crestmont residents.
• Massive amounts of additional traffic
• 70% of proposed development is allowable
• SIGNIFICANT SAFETY RISK
• A significant decrease in level of service (delays) for Crestmont residents.
• A major accident could block access to Crestmont
www.CrestmontCommunity.org
Shape Outline Plan – Traffic Impact
![Page 19: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/19.jpg)
• Access road not to City Standards
• Who maintains the road for safe access / egress
• Area Structure Plan (ASP) need to insure only 7 units maximum is maintained
• Wildlife corridor interruption a significant concern
• Potential heritage archeological sites preservation preferred
www.CrestmontCommunity.org
Shape Outline Plan – Satellite Residential Pod
![Page 20: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/20.jpg)
• West of Creek ±220 acres future development
• No Crossing - Valley Ridge / Melcor precedence
• Development cannot occur before West Memorial Sanitary Trunk line upgrades
• WE MUST PROTECT THE SAFETY OF OUR CHILDREN AND RESIDENTS!
www.CrestmontCommunity.org
Qualico Phase 4 Amendment Plan – Creek Crossing / Traffic
![Page 21: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/21.jpg)
Wrap-up • Shape & BVX / Loblaws are only one of many proposals
happening along the TCH western corridor
• Both the proposed, and in our view, the City’s 70% option are significantly over-scaled
• Shape / Loblaws development scope needs to be “right-sized”
• SINGLE POINT OF ACCESS + MMP in addition to the existing base will result in safety, access and efficiency issues
• Proposed 7 lot satellite pod is deemed to be inappropriate by Crestmont.
• Multiple new intersections will create significant Crestmont access issues.
• This process continues, so stay involved, you can have a say, and we need your support.
![Page 22: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/22.jpg)
MMP will create a “lifestyle and safety bottleneck”
CALGARY
BANFF
N
TRA
NS-
CA
NA
DA
HIG
HW
AY
http://kiva.lib.utk.edu/omeka153/items/show/971
VALLEY
RIDGE
“Market Mall Plus” (Shape + Loblaws)
~1,000,000 sq. ft.
+ 2,560 units
Modified from:
Crestmont
![Page 23: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/23.jpg)
Remarks By Ward Sutherland
![Page 24: “Market Mall Plus” - Crestmontcrestmontcommunity.org/wp-content/uploads/...2014-_MarketMallPlus… · •VRCA PC & CCA have been working on MMP project since early 2011 •Multiple](https://reader034.fdocuments.us/reader034/viewer/2022042800/5a7043597f8b9ac0538bd04e/html5/thumbnails/24.jpg)
Open Q&A Session