MARK THORNTON ISO CORNER SECTION DETAIL

1
DN UP UP DN DN DN 87654321 12 11 10 9 8 7 6 5 4 3 2 1 DN 6 5 4 3 2 14 13 12 11 10 9 8 7 19 18 17 16 15 8 7 6 5 4 3 2 17 16 15 14 13 12 11 109 3 2 1 3 2 1 321 GROUND LEVEL 0 GROUND FLOOR PLAN 400 BASEMENT FLOOR PLAN -3000 FIRST FLOOR PLAN 4500 SECOND FLOOR PLAN 7695 THIRD FLOOR PLAN 11500 ROOF PLAN 15000 B C TOP OF ROOF ACCESS 17500 NAME: MARK THORNTON CLASS: DESIGN AND DETAIL 3 DATE: DRAWING NO. SCALE: CHECKED BY: ARCHITECTURAL TECHNOLOGY YEAR 3 1 : 100 KEY SECTION CURTAIN WALL CURTAIN WALL CONSTRUCTED FROM 50mm X 150mm ALUMINIUM MULLIONS @ 2000mm C/C WITH TRIPLE GLAZED GLASS PANELS WITH ARGON GAS IN CENTRE TO GET DESIRED U VALUE TO COMPLY WITH TGD PART L 600mm SPANDREL PANELS FIXED AT FLOOR INTERVALS WITH LAMATHERM FIRE STOP 1000mm X 2000mm WINDOW OPENINGS LOCATED AT EACH FLOOR TO PROVIDE VENTILATION AMBULANT DISABLES STAIRS PRE CAST CONCRETE STAIRS 1500mm WIDE WITH 300mm GOING AND 180mm RISERS STAIRS FIXED TO STRUCTURAL CONCRETE WALL WITH STEEL AND GLASS HANDRAIL BOLTED TO STAIRS STAIRS TO COMPLY WITH TGD M COLUMNS 400mm x 400mm STEEL REINFORCED CAST -INSITU CONCRETE COLUMNS AS PER STRUCTURAL ENGINEERS SPECIFICATIONS ROOF AND PARAPET 300MM CAST IN-SITU CONCRETE WITH DPM LAID UNDER 100 MM TAPERED RIGID BOARD INSULATION WITH 2 LAYERS OF TORCHED ON BITUM 2 70MM C SECTION CHANNELS WITH 400MM STEEL SHEETS FIXED EITHER SIDE FOR PARAPET WITH 100MMRIGID BOARD INSULATION WRAPPEDAROUND PARAPET DPM TO BE WRAPPED INSULATION AND OVERLAP 100MM WITH INSULATION ON THE CONCRETE WALL PARAPET FINISHED WITH ALUMINIUM CAPPING SUSPENDED CEILING SUSPENDED CEILING FIXED TO UNDERSIDE OF 300MM REINFORCED CAST IN SITU CONCRETE SLAB WITH WIRES 600X600MM CEILING TILES PLACED INTO GRID RAISED ACCESS FLOOR 192MM PEDESTALS FIXED TO 300MM REINFORCED WITH 600X600X38MM PANELS FIXED PEDESTALS TO ALLOW ACCESS CLADDING 100MM RIGID BOARD INSULATION FOR DESIRED U-VALUE TO COMPLY WITH TGD L STEEL BRACKETS FIXED TO CONCRETE WALL AND VERTICAL RAILS FIXED TO BRACKETS AND HORIZONTAL KINGSPAN BENCHMARK CARRIER RAIL FIXED TO VERTICAL RAILS 980MM AND 480MM LONG FIBRE CEMENT CLADDING FIXED TO CARRIER RAIL WITH BENCHMARK BRACKET NTS 10/03/2014 ISO Building Corner Section Detail

Transcript of MARK THORNTON ISO CORNER SECTION DETAIL

DNUP

UP

DN

DN

DN

87654321

121110987654321

DN

65432

1413121110987

1918171615

8765432

17161514131211109

321

321

321

GROUND LEVEL

0

GROUND FLOOR PLAN

400

BASEMENT FLOOR PLAN

-3000

FIRST FLOOR PLAN

4500

SECOND FLOOR PLAN

7695

THIRD FLOOR PLAN

11500

ROOF PLAN

15000

BC

TOP OF ROOF ACCESS

17500

NAME: MARK THORNTON

CLASS: DESIGN AND DETAIL 3

DATE:

DRAWING NO.SCALE:

CHECKED BY:

ARCHITECTURAL TECHNOLOGYYEAR 3

1 : 100

KEY SECTION

CURTAIN WALL

CURTAIN WALL CONSTRUCTED FROM50mm X 150mm ALUMINIUM MULLIONS@ 2000mm C/C WITH TRIPLE GLAZEDGLASS PANELS WITH ARGON GASIN CENTRE TO GET DESIRED U VALUETO COMPLY WITH TGD PART L600mm SPANDREL PANELS FIXED ATFLOOR INTERVALS WITH LAMATHERMFIRE STOP 1000mm X 2000mm WINDOWOPENINGS LOCATED AT EACH FLOORTO PROVIDE VENTILATION

AMBULANT DISABLES STAIRS

PRE CAST CONCRETE STAIRS1500mm WIDE WITH 300mmGOING AND 180mm RISERSSTAIRS FIXED TO STRUCTURALCONCRETE WALL WITH STEELAND GLASS HANDRAIL BOLTEDTO STAIRS STAIRS TO COMPLYWITH TGD M

COLUMNS

400mm x 400mm STEELREINFORCED CAST -INSITUCONCRETE COLUMNS AS PERSTRUCTURAL ENGINEERSSPECIFICATIONS

ROOF AND PARAPET

300MM CAST IN-SITU CONCRETEWITH DPM LAID UNDER 100 MMTAPERED RIGID BOARD INSULATIONWITH 2 LAYERS OF TORCHED ON BITUM2 70MM C SECTION CHANNELS WITH400MM STEEL SHEETS FIXED EITHER SIDEFOR PARAPET WITH 100MMRIGID BOARDINSULATION WRAPPEDAROUND PARAPETDPM TO BE WRAPPED INSULATION ANDOVERLAP 100MM WITH INSULATION ONTHE CONCRETE WALL PARAPET FINISHEDWITH ALUMINIUM CAPPING

SUSPENDED CEILING

SUSPENDED CEILING FIXED TOUNDERSIDE OF 300MM REINFORCEDCAST IN SITU CONCRETE SLABWITH WIRES 600X600MM CEILINGTILES PLACED INTO GRID

RAISED ACCESS FLOOR

192MM PEDESTALS FIXED TO300MM REINFORCED WITH600X600X38MM PANELS FIXEDPEDESTALS TO ALLOW ACCESS

CLADDING

100MM RIGID BOARD INSULATIONFOR DESIRED U-VALUE TO COMPLYWITH TGD L STEEL BRACKETS FIXEDTO CONCRETE WALL AND VERTICAL RAILSFIXED TO BRACKETS AND HORIZONTALKINGSPAN BENCHMARK CARRIERRAIL FIXED TO VERTICAL RAILS 980MMAND 480MM LONG FIBRE CEMENTCLADDING FIXED TO CARRIER RAIL WITHBENCHMARK BRACKET

NTS

10/03/2014

ISO Building CornerSection Detail