Mark J. Quimby Senior Project...

27
Indiana Michigan Ohio www.sme-usa.com consultants in the environment, geosciences, and materials Mark J. Quimby Senior Project Consultant

Transcript of Mark J. Quimby Senior Project...

Page 1: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Indiana

Michigan

Ohio

www.sme-usa.com consultants in the environment, geosciences, and materials

Mark J. Quimby

Senior Project Consultant

Page 2: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

BROWNFIELD SUCCESS STORY

2012 Brownfield Renewal Award Winner

Environmental Impact Category

Page 3: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

OVERVIEW

Project Overview

Challenges and Responses

Brownfield Funding

Sustainable Approaches and Lessons

Learned

Page 4: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

PROJECT OVERVIEW

Page 5: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Wind tower manufacturing

48-acre site

100,000 sq. ft. factory + 10,000 sq. ft.

offices

Heavy products - high floor, pavement

and ground loads

Requires road, rail and water

transportation facilities

$19,000,000 startup

DEVELOPMENT

Page 6: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

DEVELOPMENT

Page 7: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

DEVELOPMENT

Page 8: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

SITE CONDITIONS

2006 1973 1964 1955 2010

Page 9: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Industrial waste landfill (1950s – 1975)

Foundry sand

Coal tar

Colorful chemical wastes

Groundwater/leachate contamination

“Soil” contamination issues

Human contact

Vapor intrusion

SITE CONDITIONS

Page 10: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

SITE CONDITIONS

Page 11: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Investor capital

State capital fund loan

SBA 504 Loan

State brownfields grants and loan

EPA Brownfield RLF Grant loan

Local and state tax increment financing (TIF)

State tax credits

NO COMMERCIAL FINANCING!!!

PROJECT FINANCING

Page 12: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

CHALLENGES AND RESPONSES

Page 13: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Structural

Unconsolidated fill

Couldn’t penetrate underlying clay

High foundation and pavement loads

Environmental

Human exposure mitigation (entire site)

Vapor intrusion mitigation (entire building)

Surrounded by Great lakes surface water

CHALLENGES

Page 14: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Integrate structural and environmental

responses

Minimize and financing the extra costs

HOW DO WE?

Page 15: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Structural issues

Building support

Pavement and external loads

Generate no excess fill/waste

Necessary environmental responses

Subslab vapor intrusion barriers

Human contact exposure barriers

Storm water detention pond liners

STRUCTURAL AND ENVIRONMENTAL

ISSUES

Page 16: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Replace industrial wastes with

engineered fill

Driven conventional piles

Auger cast piles

Soil stabilization

Controlled Modulus Columns (CMC)

Rammed Aggregate Piers

FOUNDATION STRATEGIES

Page 17: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

CMC INSTALLATION

Page 18: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Structurally need cross-section to support

loads

Environmentally need contact barrier

Solution?

Exposure barrier “cap” that serves both

functions

All geotechnical and structural development

activities were classified as brownfield

redevelopment response actions to make

them eligible for brownfield financing using

EPA and state grants and loans

PAVEMENT AND LAYDOWN AREAS

Page 19: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

BROWNFIELD FUNDING

Page 20: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Building structural – needed for

redevelopment of a landfill and to protect

underlying aquifer

Engineered bases for pavement and

operations areas – needed for human

contact barrier

Vapor and contact barriers – human health

protection

Storm water detention pond liners – prevent

exacerbation by leaching

BROWNFIELD ELIGIBILITIES

Page 21: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Environmental = $5,200,000

State assessment grant = $70,000

State brownfield grant = $1,000,000

State brownfield loan = $1,000,000

EPA RLF Grant loan = $2,200,000

State/local brownfield TIF = $4,130,000

BROWNFIELD FINANCING

Page 22: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Assessment and due diligence = $70,000

Site Preparation = $225,000

Geotechnical engineering = $55,000

Soil stabilization = $1,200,000

Contact exposure barrier = $2,700,000

Vapor intrusion barrier = $625,000

Storm water detention pond liners = $170,000

Env management and monitoring = $160,000

BROWNFIELD COSTS

Page 23: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

SUSTAINABLE APPROACHES AND LESSONS LEARNED

Page 24: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Excess fill retained on site

Soil stabilization with no spoils

Minimal remediation – resources directed

to site development

Local contractors – minimal commuting

Minimal on-site engine idling

Use of biodiesel

SUSTAINABILITY

Page 25: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Integration of solutions for

environmental and structural challenges

was key to project success

Project would have been impossible

without public funding support at local,

state, and federal level

LESSONS LEARNED

Page 26: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

VENTOWER TODAY

Ventower is approaching plant production

capacity and is evaluating implementing

Phase II building expansion

Plan is operating seven days a week and

running three shifts

Plant employment is approaching 100 full-

time, high-paying, manufacturing jobs

A Brownfield Success Story

Page 27: Mark J. Quimby Senior Project Consultantepa.ohio.gov/Portals/30/brownfield_conference/docs/2014...Indiana Michigan Ohio consultants in the environment, geosciences, and materials Mark

Indiana

Michigan

Ohio

www.sme-usa.com consultants in the environment, geosciences, and materials

Mark J. Quimby

Senior Project Consultant