Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICS
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSDiamond
Electron Beam Energy 3 GeV
Storage ring circumference 561.6 m
Number of cells 24Straight section lengths 6 x 8 m ( 4x ID, RF & Injection)
18 x 5 m
Beam current 300 mA(500 mA)
Emittance (hor., vert.) 2.7, 0.03 nm rad
• Diamond is the new UK Synchrotron Light Source
• Located at the Rutherford Appleton Laboratory (RAL) Oxfordshire
• Due online early 2007
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSProgramme PlanLinac Issue tender Oct. 14th ‘02
Place order Dec. 13th ‘02Install Aug. ‘04 - Apr. ‘05Commission with beam May. ‘05 – Jul. ‘05
Booster Tender for main components Feb. ‘03Order main components Jun ‘03Install Aug. ‘04 – Aug. ‘05Commission with beam Sep. ‘05 - Dec. ‘06
Storage Ring Start to order main components May. ‘03Girder assembly Aug. ‘04 - Jul. ‘05Girder installation Nov. ‘04 - Nov. ‘05Plant commissioning Dec. ‘04 - Dec. ‘05Commission with beam, no IDs Jan. - Mar. ’06Install IDs Apr. ’06Commission with IDs and FE May – Jul. ‘06
Beamlines Install beamlines Jan. ‘05 - Aug. ‘06Commission with beam Aug. ‘06 - Dec. ‘06
Diamond facility Start of operations 8th Jan. 2007
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSDiamond Accelerators
Linear accelerator (Linac) :100 MeV energy
Booster synchrotron :100 MeV - 3 GeV158 m in circumference
Storage Ring :3 GeV energy562 m in circumference
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSLocation on the RAL site, Oxfordshire
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSDiamond Building Concepts
Courtesy of Crispin Wride Architectural Design Studio,
JacobsGibb Ltd.
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSDiamond Building Detail
Courtesy of Crispin Wride Architectural Design Studio,
JacobsGibb Ltd.
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSDiamond Site June 2003
Picture Courtesy of Angelos Gonias
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSLinac
• ‘Turn-key’ contract for 100 MeV Linac with Accel Gmb
Includes installation and commissioning to a performance spec.
EPICS Controls, subcontracted
• DLS supplies vacuum, and diagnostic equipment.
• ProgressContract placed: Dec 02 Design Review: May 03Installation starts: Sept 04Services available: Dec 04Final acceptance: June 05
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSBooster
• 22 Cell FODO lattice with 36 dipole magnets
Missing dipole straights used for injection, extraction, RF and diagnostics
3Hz or 5Hz repetition rate
• Current Call for Tender for Magnet and vacuum assembly units
• Separate procurement of other components
• Installation and assembly by DLS
• Control system by DLS
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSStorage Ring
• 24 Cells Double Bend Achromat
• 72 Girders for Lattice
48 Dipoles (1 circuit ), 240 quads, 168 Sext696 Steerers168 BPMS384 Ion pumps, 196 Vac Gauges
• 21 straights for IDs, 3 Straights for Injection, RF and Diagnostics
• Calls for Tender
RF Cavities, Amplifiers, Girders, Vessels
• Contract placed for Quads
• Installation and assembly by DLS
• Control system by DLS
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSControl Instrumentation Areas (CIA)
• CIA per Cell
• CIAs house instrumentation racks in a clean temperature controlled environment
• IOCs for each technical area
Quad/Sext PSUs, Steerer PSUs, BPMS, Vacuum, MPS, Girder Alignment, 2x Front Ends, 2x IDs, PSS
• Design once, build 24
• CIAs linked to MCR using FOs
2x Computer networks, Timing signals, Reflective memory, MPS, Video and Point to Point Analogues
Minimise Copper connections CIA to CIA
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSSR RF System
• 2 SC RF cavities for Day 1(7 IDs and 300 mA)
• 3rd cavity being designed in
• Independent RF systems (IOTs/klystron)
• Single cryo-plant
• Calls for Tender issued for cavities and amplifiers
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSBeamlines
Status Proposal number
Initial identifier
Energy range
Source
001 BL01 Extreme conditions 5-100 keV 1m 3.5T MPW Planned for Year 1 002 BL06 Materials and magnetism 3-25 keV 5 m U33
003 BL08 Protein crystallography 3-25 keV 2m U23 in-vac 004 BL09 Protein crystallography 3-25 keV 2m U23 in-vac 005 BL10 Protein crystallography 3-25 keV 2m U21 in-vac 007 BL13 XAS microfocus 2-13 keV 2m U27 in-vac 008 BL14 Nanostructures 80-1500 eV 5m HU64 006 BL11 NCD 4-20 keV 2m U27
Agreed for Year 2 011 BLC Core XAS 2-35 keV BM 016 BLH Powder diffraction 5-25 keV U 019 BLK Microfocus macromolecular diffraction 6-18 keV U 023 BLO Circular dichroism spectroscopy 2-10 eV BM
To be considered at 027 XAS-3 4-35 keV 1.6T MPW SAC, May 2003 028 Small molecule X-ray diffraction 5-25 keV U
029 Monochromatic MX side station 12 keV U 030 JEEP 30-180 keV 3.5T MPW 032 Surface Interface structure analysis 0.2-10 keV U 034 Infrared microspectroscopy < 1eV BM 037 Surface and Interface diffraction 8-30 keV U 026 HERALDS 4-100 keV 3.5T MPW
Outline proposals 031 X-ray microscopy 0.9-2 keV U received 033 Inelastic X-ray scattering 5-25 keV U
035 Automated SAXS / WAXS 4-25 keV BM 036 New technology U 038 Coherent X-rays 4-25 keV U Undulators 17 Total Wigglers 4
Bending magnets 4
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSProposed Beamline Layout
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSControl System Architecture
• Based on EPICS using Two Layer Model
Primary interface to CS through VME IOCsUse VME64x, IP carriers, IP Modules and transition board for rear
connection Hot Swap capability
• Will use PLCs to manage interlocks for protection
Avoids Watch Dogs on IOCs and allow warm reboot of IOCs AB Control Logix PLCs for low end applications, eg Vac Valve controlSiemens S7/300 and S7/400 for high end applications, eg Linac and
Cryoplant
• Serial Interface to Instrumentation
Potentially several thousandSerial support through Stream Device and ORNL Serial
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSHardware
• Development
Linux for DevelopmentRunning EPICS 3.13.4 will move to 3.14.x
• Consoles
PCs running Linux Will support Win2000
• IOCs
VME64x PPC Processor boards
Select processor Autumn 2003Will use IP carrier and modulesPrimarily 7 slot crates
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSRecent Developments
• Standardised on SLS PSU controller for 1300 PSUs
Full digital regulationCS Interface through high speed point to point link
• Development of APS/SLS Event System with SLS and Micro Research
Move to 2.5Gbit transmission, reduce jitter, enable distribution of RF clock and recovery using VCO
• Development of Application Development Environment
Define processes and sequences of building applicationsLocal development on Linux PCs, CVS for revision control and
server for final check out to operationsNeed to integrate upload to RDB seamlessly
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICSFurther CS Developments are Presented
• Personnel Safety System
Martin Wilson
• Vacuum Controls
Steve Singleton
• Control System for a Helical Undulator
Pete Owens
• Relational Database Design
Vijayan Krishnamurthy
Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03
Mark HeronDiamond Light Source
EPICS