Marion Street Pedestrian Bridge30% Preliminary Design
August 2nd, 2018
city of seattle
![Page 2: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/2.jpg)
Organization Chart
Rosales + Partners Bridge Design
Miguel Rosales, AIABridge Designer
HDR Engineer of Record
Paul Bott, PE, SEProject Manager
Office of the Waterfront
City of Seattle
Project is WSDOT funded
![Page 3: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/3.jpg)
Bridge Design Goals
1. Provide grade separated connection for patrons of Colman Dock Facility which improves dock operations and pedestrian circulation.
2. Provide a cost-effective, durable and context sensitive bridge solution which enhances the Waterfront as a place for people.
3. Enhance the City of Seattle Colman Dock Hub Strategy which creates a critical connection point between WSF, Transit, Streetcar, and support other hubs at King Street Station and Westlake.
![Page 4: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/4.jpg)
Existing Context
![Page 5: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/5.jpg)
Marion Street Bridge Existing Conditions
![Page 6: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/6.jpg)
Bridge Design Criteria
1. Minimum width between railings: 16’-0”
2. Minimum height of railings: 42”
3. Minimum Alaskan Way Roadway Clearance: 20-0”
4. Promenade Clearance: 14'-0" to 16'-0"
5. Minimum number of piers in the right of away
6. Safety and Aesthetic Lighting
7. Details and materials compatibility with Colman Dock Ferry Terminal
![Page 7: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/7.jpg)
February 2016 Design Options
Option 1Extradosed CIP Concrete
Option 3Fink Truss Steel
Option 2CIP Concrete
![Page 8: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/8.jpg)
Marion Street Bridge Concept
![Page 9: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/9.jpg)
Marion Street Pedestrian Bridge Replacement Project
PHASE 1
PHASE 1
Potential Future Phase
Potential Future Phase
Elevator
Elevators
+/- 110’+/- 480’+/- 175’
44’ 47’-81/2”
44’ 47’-81/2”
![Page 10: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/10.jpg)
Architectural Plan and Elevation - Main Span
39’-6” 105’ 45’-21/2”
44’ 110’ 47’-81/2”
+/-2
0’-6
”
Cle
aran
ce20
’
+/-2
3’-7
”
Slope 4.8%Slope 1.5%
44’ 110’ 47’-81/2”
16’
22’-2
”
16’
22’-2
”
16’Slope 4.8%Slope 1.5%
6’-1
”
![Page 11: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/11.jpg)
Architectural / Structural Piers - Main Span
+/-
+/-
![Page 12: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/12.jpg)
Architectural Sections - Main Span and Approach
Main Span Section
Approach Span Section
![Page 13: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/13.jpg)
Architectural / Structural Piers - Approach
+/-
+/-
![Page 14: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/14.jpg)
Lighting Details - Main Span and Approach
46’-1”
![Page 15: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/15.jpg)
Railing Details - Approach Bridge
![Page 16: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/16.jpg)
Railing Details - Main Span
![Page 17: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/17.jpg)
Railing Details - Approach Bridge Side
ELEVATED WALKWAY
![Page 18: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/18.jpg)
Railing Details - Ferry Terminal Side
![Page 19: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/19.jpg)
Railing Details - Ferry Terminal Side
![Page 20: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/20.jpg)
Temporary Transition Ramp – Plan and Elevation
+/- 67’
+/- 67’
Slope 5%
10’-1
0”
8’-2
”
17’-1
0”16
’ Slope 1.5%
![Page 21: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/21.jpg)
Architectural Section – Temporary Transition
![Page 22: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/22.jpg)
Temporary Transition Ramp
![Page 23: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/23.jpg)
Temporary Transition Ramp
![Page 24: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/24.jpg)
Temporary Transition Ramp
![Page 25: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/25.jpg)
Temporary Transition Ramp
![Page 26: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/26.jpg)
Temporary Transition Ramp
![Page 27: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/27.jpg)
Marion Street Pedestrian Bridge
![Page 28: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/28.jpg)
![Page 29: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/29.jpg)
![Page 30: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/30.jpg)
![Page 31: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/31.jpg)
![Page 32: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/32.jpg)
![Page 33: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/33.jpg)
![Page 34: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/34.jpg)
![Page 35: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/35.jpg)
Potential Future Phase
![Page 36: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/36.jpg)
![Page 37: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/37.jpg)
![Page 38: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/38.jpg)
![Page 39: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/39.jpg)
![Page 40: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/40.jpg)
![Page 41: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/41.jpg)
![Page 42: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/42.jpg)
![Page 43: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/43.jpg)
![Page 44: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/44.jpg)
![Page 45: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/45.jpg)
![Page 46: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/46.jpg)
![Page 47: Marion Street Pedestrian Bridge - Microsoft › media... · 2019-05-17 · Marion Street Pedestrian Bridge 30% Preliminary Design August 2nd, 2018 city of seattle. Organization Chart](https://reader036.fdocuments.us/reader036/viewer/2022070812/5f0be7ee7e708231d432ccc3/html5/thumbnails/47.jpg)
Marion Street Pedestrian BridgeQUESTIONS AND ANSWERS