www.mcconnelldowell.com MC CONNELL DOWELL O-BAHN CITY ACCESS PROJECT OCTOBER 2016 2016 Australian Tunnelling Conference Mario Russo Project Manager

Transcript of Mario Russo - McConnell Dowell

Page 1: Mario Russo - McConnell Dowell

www.mcconnelldowell.com

MCCONNELL DOWELL

O-BAHN CITY ACCESS

PROJECT

OCTOBER 2016

2016 Australian Tunnelling Conference

Mario Russo – Project Manager

Page 2: Mario Russo - McConnell Dowell

WHAT IS THE O-BAHN?

• The O-Bahn conceived by Daimler-Benz to enable buses to avoid congestion by sharing tram tunnels in Germany

• 1986 Adelaide opened world’s longest O-Bahn system (12 km of guided track)

• Over 1,000 O-Bahn bus services per weekday (every 60 sec in peak)

Page 3: Mario Russo - McConnell Dowell

WHAT IS THE O-BAHN?

• The O-Bahn services Adelaide’s North Eastern suburbs

• Interchanges

• Route through Linear Park

• End of the O-Bahn to the city centre

Page 4: Mario Russo - McConnell Dowell

PROJECT OBJECTIVE

To improve travel times and reliability, and reduce on-road delays for users of the O-Bahn service between the end of the busway at Gilberton and Grenfell Street over the next 30 years.

Page 5: Mario Russo - McConnell Dowell

PROJECT TEAM

Government of South AustraliaThe Department of Planning, Transport and Infrastructure

McConnell Dowell Constructors

Walbridge & Gilbert Consulting Engineers

KBR

Oxigen

Page 6: Mario Russo - McConnell Dowell

PROJECT SCOPE

Page 7: Mario Russo - McConnell Dowell

PROJECT SCOPE

Page 8: Mario Russo - McConnell Dowell

PROJECT SCOPE

Page 9: Mario Russo - McConnell Dowell

PROJECT SCOPE

Page 10: Mario Russo - McConnell Dowell

FAST FACTS

Length of tunnel 670 m

Sheetpiles 1,050 no. (2,000 tonnes)

Reinforcement 2,000 tonnes

Concrete 11,000 m3

Busway kerb tolerance 1.5mm in 3m

Precast roof planks 423 no.

Jet fans 6 no.

Page 11: Mario Russo - McConnell Dowell

TUNNEL DESIGN AND CONSTRUCTION

Page 12: Mario Russo - McConnell Dowell

Tunnel beneath roads

Top-down construction

Selected design

• Sheetpile walls

• In-situ concrete base slab

• Precast concrete roof

Alternatives considered

• TBM

• Jacked box

• CFA Piles

TUNNEL DESIGN AND CONSTRUCTION

Page 13: Mario Russo - McConnell Dowell

SHEETPILING

Page 14: Mario Russo - McConnell Dowell

SHEETPILING

Page 15: Mario Russo - McConnell Dowell

TUNNEL DESIGN AND CONSTRUCTION

Tunnel beneath parklands

Cut and cover construction

Selected design

• Open excavation

• In-situ concrete base slab

• In-situ concrete walls

• Precast concrete roof

Alternatives considered

• Precast walls

• Precast box

Page 16: Mario Russo - McConnell Dowell

• First Creek

• 66kV underground power alignment

• 66kV over head power alignment

• Heritage buildings

• Hackney Botanic Intersection

• Minimising tree removal and impact on the parklands

• Rymill Park Lake

• Turning radius of O-Bahn buses at 60 kph design speed

CONSTRAINTS ON GEOMETRY

Page 17: Mario Russo - McConnell Dowell

FIRST CREEK

Page 18: Mario Russo - McConnell Dowell

FIRST CREEK

Page 19: Mario Russo - McConnell Dowell

FIRST CREEK

Page 20: Mario Russo - McConnell Dowell

66kV UNDERGROUND ELECTRICAL

Page 21: Mario Russo - McConnell Dowell

66kV UNDERGROUND ELECTRICAL

Page 22: Mario Russo - McConnell Dowell

66kV UNDERGROUND ELECTRICAL

Page 23: Mario Russo - McConnell Dowell

INNOVATIVE ITS SOLUTIONS

Security

Management

Module

Busway PLC Based Plant Management & Control Module

BUSWAY ITS SYSTEM

SA DPTI TMC

STREAMS

Busway Traffic Management / ITS Module

CCTV

Management

Module

Fire / Life Safety Management Module

Communications Management Module

Access

ControlElectronic

Signage

Moveable

Median

VIDS

SystemOHVD

CDHDA

Wireless

Collison

Avoidance

Closure

Boom

Gates

CCTV

System

Public

AddressRRB

Busway

Help

Telephony

O&M

Telephony

Comms

Backbone

Tunnel

Vent. Plant

Power

Systems

Tunnel

Lighting

Drainage &

Water

Treatment

Building

Services /

HVAC

Air Flow &

Quality

Monitoring

UPS

Mngmnt

Smoke

Mgmnt

Fibre Optic

Heat

Detection

Incident

Mgmnt

Interfaces

Egress

Lighting

GRNBus

Ops.

Maint

WI-FI

Mobile

(4G)

AM /

FM

O-Bahn

MgmntMFIP

SAMFS

AS

16

68Mo

db

us

de

fin

itio

n

by

Co

ntr

ac

tor

Page 24: Mario Russo - McConnell Dowell

COMMUNITY AND STAKEHOLDERS

Community Engagement

• Construction updates

• Fact sheets

• Media releases

• Face to face meetings/door knocking

• SMS / Email updates

• 24/7 Information line

• Social media posts

• Real time traffic information via Traffic SA

• Free AddInsight App

Page 25: Mario Russo - McConnell Dowell

WORKING AROUND EVENTS

No major events have been impacted by the Project in 2016

Upcoming events adjacent the works include:

• Fringe Events (GOUD, Fringe Club & Gluttony) 2017

• Adelaide International 3 Day Event (2016 and 2017)

• Clipsal 500 (2017)

• Tour Down Under

• WOMAD

Page 26: Mario Russo - McConnell Dowell

Contract Award

December 2015

PROJECT SCHEDULE

Commenced Construction

March 2016

Complete Tunnel Structure

March 2017

Complete Tunnel Services

October 2017

Complete Commissioning

December 2017

Page 27: Mario Russo - McConnell Dowell

THROUGH SAFE, SMART & EFFICIENT INFRASTRUCTURE