Marine Industrial Development in Southeast Alaska · · 2015-05-15Advanced Marine Manufacturing...
Transcript of Marine Industrial Development in Southeast Alaska · · 2015-05-15Advanced Marine Manufacturing...
4
Ship Assembly /Production Hall In Service
Panel & Module Fabrication scheduled for service fall 2013
Surface Preparation & Coatings Facility Located behind Ship Repair Hall (not visible) - Future
Land Level Berth 1 – in service
Dry Dock #2 - In service; 2,500 ton lift capacity
Dry Dock #1 - In service10,000 ton lift capacity
Operations Center – in service
Ketchikan Shipyard ImprovementsAdvanced Marine Manufacturing in Alaska
Ship Repair Hall – future
Emerging Marine Opportunities
Bering Sea Fishing VesselRebuild or Replace
Oil & Gas Cook InletArctic OCS
Marine TransportationAlaska Class Ferry Tustumena –ReplacementKennicott Refurbishment
AIDEA’sSpirit of Endeavor
www.ketchikanmarineindustry.com
Ketchikan’s Marine
Industry Future
DOUG WARD,
SENIOR PROJECT MANAGER
JASON CUSTER,
PROJECT COORDINATOR