Page 1 of 21 Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive service offered by MBS. 2) It is the responsibility of the Licensee to ensure that the selected or nominated contractor observes this set of guidelines and Contractor House Rules set by MBS, and the Contractor is competent to carry out the contracted work. 3) Licensee / contractor must indicate rigger booking schedule and contact person requested by the contractor to carry out the work required. MBS reserves the right to charge licensee / contractor for additional labour if work cannot commence as per schedule due to no show of the customer or delay in contractor’s own setup schedule. Rescheduling will be allocated based on the next available slot if there is a no show of 30minutes or more from the stipulated schedule. On‐site or overtime charges will prevail. No refund is allowed. 4) All rigging work in the licensed area must be done in compliance with MBS rules and regulations and all applicable regulations in Singapore. The nominated contractor of the Licensee is not allowed to work in areas other than the licensed area, except with the written approval of Marina Bay Sands. 5) All lifting appliances i.e. motorized chain hoist, manual chain hoist and chain block, must be registered by MOM (Ministry of Manpower) and certified for usage by authorized examiners. For all lifting gears i.e. shackles, round slings, swivel and eyebolt, it must be rated or MOM certified. For more information on registration of lifting equipment, please refer to MOM website at: http://www.mom.gov.sg/workplace‐safety‐and‐health/lifting‐equipment 6) A signed PE (Professional Engineer) endorsement with reference to the structural plans and design calculations of the installation, must be submitted for a) ground trussing system / structure built from the ground with 4 meters and above in height (In cases where it is built on stage, the height of the stage shall be included to the total height of the built.) or b) rigging that bears any substantial load on the ceiling rigging points or c) Any LED wall build up from floor up. 7) All AV and rigging work must conform to the PE (Physical Engineer) endorsement submitted. PE must be on‐site to ensure that all work done conform to the PE endorsement. 8) To ensure compliance with PE endorsement document, MBS personnel will inspect the structural work / trussing work before proceeding with the hook up to the designated rig point. Any variation of the design must be re‐endorsed by the PE concerned. 9) For all structure built from ground, the ratio of the base to the height of structure must be at 1:4, with safety braces outrigger. See Appendix D.

Transcript of Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service...

Page 1: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 1 of 21  

Marina Bay Sands Requirement for Rigging Service 

1) Rigging and hanging of points in the licensed area of the event is an exclusive service offered by 

MBS.  

 

2) It is the responsibility of the Licensee to ensure that the selected or nominated contractor 

observes this set of guidelines and Contractor House Rules set by MBS, and the Contractor is 

competent to carry out the contracted work. 

 

3) Licensee / contractor must  indicate rigger booking schedule and contact person requested by 

the  contractor  to  carry  out  the  work  required.  MBS  reserves  the  right  to  charge  licensee  / 

contractor for additional  labour  if work cannot commence as per schedule due to no show of 

the customer or delay in contractor’s own setup schedule. Rescheduling will be allocated based 

on  the  next  available  slot  if  there  is  a  no  show  of  30minutes  or  more  from  the  stipulated 

schedule. On‐site or overtime charges will prevail. No refund is allowed. 

 

4) All rigging work in the licensed area must be done in compliance with MBS rules and regulations 

and all applicable regulations in Singapore. The nominated contractor of the Licensee is not 

allowed to work in areas other than the licensed area, except with the written approval of 

Marina Bay Sands. 

 

5) All lifting appliances i.e. motorized chain hoist, manual chain hoist and chain block, must be 

registered by MOM (Ministry of Manpower) and certified for usage by authorized examiners. 

For all lifting gears i.e. shackles, round slings, swivel and eyebolt, it must be rated or MOM 

certified. For more information on registration of lifting equipment, please refer to MOM 

website at: http://www.mom.gov.sg/workplace‐safety‐and‐health/lifting‐equipment 

 

6) A signed PE (Professional Engineer) endorsement with reference to the structural plans and design calculations of the installation, must be submitted for  a) ground trussing system / structure built from the ground with 4 meters and above in height 

(In cases where it is built on stage, the height of the stage shall be included to the total height of the built.) or  

b) rigging that bears any substantial load on the ceiling rigging points or c) Any LED wall build up from floor up. 

 

7) All AV and rigging work must conform to the PE (Physical Engineer) endorsement submitted. PE must be on‐site to ensure that all work done conform to the PE endorsement.  

 

8) To ensure compliance with PE endorsement document, MBS personnel will inspect the structural work / trussing work before proceeding with the hook up to the designated rig point. Any variation of the design must be re‐endorsed by the PE concerned. 

 

9) For all structure built from ground, the ratio of the base to the height of structure must be at 1:4, with safety braces outrigger. See Appendix D.  

 

Page 2: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 2 of 21  

10) For all LED wall build up on MBS stage platform, the center of gravity of the LED Wall must be at the center of the stage platform. The tie back must not be tied to the stage. The LED wall must be tie back to the counterweights using 2” pipe and ratchet strap. See Appendix E for any build up on stage and stage specifications. 

 

11) For LED wall or backdrop rigged, it should be aligned to the stage without leaving any gap. See Appendix F. 

 

12) The following Regulations & Code of Practice are applicable to govern the workmanship and quality of the work commenced for scaffolding. a) Workplace Safety and Health Act – (Chapter 354A, Section 65) Workplace Safety and 

Health (Scaffolds) Regulations 2011. 

 

13) Licensee / contractors shall ensure that only competent operators are tasked to operate the 

mobile elevated work platform (MEWP). MEWP operator must have licensed by a Ministry of 

Manpower Accredited Training Provider and familiar with the model of MEWP they are 

operating. 

 

14) While working at height in a mobile elevated work platform (MEWP), such as scissor lift and 

boom lift, the operator shall ensure that all persons on the MEWP use appropriate Personal 

Protective Equipment (PPE), including helmet and travel restraint system anchored to the 

manufacturers’ designated anchor point inside the MEWP. 

 

15) Wire rope clips must be installed correctly. Refer to Appendix G. 

 

16) Application for Rigging and hanging of points.  

MBS requires the nominated contractor to provide the following information and certification. 

All information and certification must be submitted at least 21 days before move‐in.  

a) Rigging Request Checklist. See Appendix H. 

b) Contractor’s Lifting Equipment Certificate. See Appendix I. 

c) Layout 

‐ Plan view of structure / truss with all dimensions. 

‐ Elevation view of structure / truss with all dimensions. 

‐ Plan of entire hall / ballroom to indicate markings of the rigging points / structure / 

truss. 

d) Date and time of setup. 

e) Date and time of teardown. 

f) Date, time and duration of Scissors / boom lift requirement. 

g) Date, time and duration of scissors / boom lift operator. 

h) Scissors / boom lift license.  

i) The PE endorsement must include: 

‐ Plan view of structure / truss with all dimensions and labelling. 

‐ Elevation view of structure / truss with all dimensions and labelling. 

‐ Perspective view of the design. 

Page 3: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 3 of 21  

‐ Plan of entire hall / ballroom to indicate markings of the rigging points / structure / 

truss. 

‐ A table of calculation on individual loadings of the structure / truss. Refer to Appendix 

A, B and C. 

‐ The specification of truss used. 

j) Fire‐retardant certificate for individual fabric/drapes. See Appendix J. 

 

17) MBS reserves the right to refuse to provide rigging services if the contractor fails to provide the 

information required for the rigging and hanging of points application or the hanging structure 

is deemed to be unsafe. MBS is not responsible or held liable for any delay or loss or 

subsequent loss results from the contractor’s substandard work. 

 

18) Reference Information 

Appendix A – Sample of Design Load Calculation. 

Appendix B – Sample of Calculation on Design Calculation Cantilever. 

Appendix C – Sample of Calculation on Indoor Goal Post Truss. 

Appendix D – Sample of Structure Support. 

Appendix E – Sample of Structure Support on stage and Stage Specifications 

Appendix F – Sample of structure rigged as backdrop. 

Appendix G – Installation of Wire Rope Clips. 

Appendix H – Rigging Request Checklist. 

Appendix I – Contractor’s Authorized Lifting Equipment. 

Appendix J – Fire Retardant Example  

 

 

Page 4: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 4 of 21  

AppendixA

Sample of Design Load Calculation  

 

𝑳𝒐𝒂𝒅 𝒂𝒕 𝑷𝒐𝒊𝒏𝒕 𝑿 𝒇𝒊𝒙𝒕𝒖𝒓𝒆 𝒘𝒆𝒊𝒈𝒉𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑨 𝒙 𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝒇𝒓𝒐𝒎 𝒀

𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝑿 𝒀 

 

Example (Figure 1):  𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑋 

130𝑘𝑔 𝑥 6𝑚 28𝑘𝑔 𝑥 5𝑚 13𝑘𝑔 𝑥 4.3𝑚 27𝑘𝑔 𝑥 3.6𝑚 7𝑘𝑔 𝑥 3𝑚 60𝑘𝑔 𝑥 6𝑚 38𝑘𝑔 𝑥 3𝑚 40𝑘𝑔 𝑥 3𝑚

6𝑚 

 𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑋 281.35𝑘𝑔  𝑳𝒐𝒂𝒅 𝒂𝒕 𝑷𝒐𝒊𝒏𝒕 𝒀 𝑳𝒐𝒂𝒅 𝒐𝒇 𝑬𝒒𝒖𝒊𝒑𝒎𝒆𝒏𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑨 𝒐𝒏 𝑷𝒐𝒊𝒏𝒕 𝒀 𝑳𝒐𝒂𝒅 𝒐𝒇 𝑬𝒒𝒖𝒊𝒑𝒎𝒆𝒏𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑩 𝒐𝒏 𝑷𝒐𝒊𝒏𝒕 𝒀  

𝑳𝒐𝒂𝒅 𝒂𝒕 𝑷𝒐𝒊𝒏𝒕 𝒀 𝒇𝒊𝒙𝒕𝒖𝒓𝒆 𝒘𝒆𝒊𝒈𝒉𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑨 𝑳𝒐𝒂𝒅 𝒂𝒕 𝑷𝒐𝒊𝒏𝒕 𝑿𝒇𝒊𝒙𝒕𝒖𝒓𝒆 𝒘𝒆𝒊𝒈𝒉𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑩 𝒙 𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝒇𝒓𝒐𝒎 𝒁

𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝒀 𝒁 

 

Example (Figure 1):  𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑌 130𝑘𝑔 28𝑘𝑔 13𝑘𝑔 27𝑘𝑔 7𝑘𝑔 60𝑘𝑔 38𝑘𝑔 40𝑘𝑔 281.35𝑘𝑔

13𝑘𝑔 𝑥 5.1𝑚 28𝑘𝑔 𝑥 3.9𝑚 130𝑘𝑔 𝑥 1.8𝑚 60𝑘𝑔 𝑥 6𝑚 38𝑘𝑔 𝑥 3𝑚 40𝑘𝑔 𝑥 3𝑚 60𝑘𝑔 𝑥 0𝑚

6𝑚 

 𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑌 228.9𝑘𝑔             

Page 5: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 5 of 21  

Example (Figure 1):  

𝑳𝒐𝒂𝒅 𝒂𝒕 𝑷𝒐𝒊𝒏𝒕 𝒁 𝒇𝒊𝒙𝒕𝒖𝒓𝒆 𝒘𝒆𝒊𝒈𝒉𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑩𝒇𝒊𝒙𝒕𝒖𝒓𝒆 𝒘𝒆𝒊𝒈𝒉𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑩 𝒙 𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝒇𝒓𝒐𝒎 𝒁

𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝒀 𝒁 

 𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑍 13𝑘𝑔 28𝑘𝑔 130𝑘𝑔 60𝑘𝑔 38𝑘𝑔 40𝑘𝑔 60𝑘𝑔

13𝑘𝑔 𝑥 5.1𝑚 28𝑘𝑔 𝑥 3.9𝑚 130𝑘𝑔 𝑥 1.8𝑚 60𝑘𝑔 𝑥 6𝑚 38𝑘𝑔 𝑥 3𝑚 40𝑘𝑔 𝑥 3𝑚 60𝑘𝑔 𝑥 0𝑚6𝑚

 

 𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑍 369𝑘𝑔 167.25𝑘𝑔  𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑍 201.75𝑘𝑔  Meyer Mina (a) = 130kg VLX Wash (b) = 23.33kg LED Par (c) = 9.32kg VL Spot 2500 (d) = 16.2kg ETC 19deg (e) = 3.5kg Motorized Chain Hoist = 60kg F34P Truss = 19kg Cables & Accessories = 20kg Total Load Point at X = 281.35kg 

VLX Wash (b) = 4.67kgLED Par (c) = 3.68kg VL Spot 2500 (d) = 10.8kg ETC 19deg (e) = 3.5kg LED Par (f) = 11.05kg VLX Wash (g) = 18.2kg Meyer Mina (h) = 39kg Motorized Chain Hoist = 60kg F34P Truss = 38kg Cables & Accessories = 40kg Total Load Point at Y = 228.9kg  

LED Par (f) = 1.95kg VLX Wash (g) = 9.8kg Meyer Mina (h) = 91kg Motorized Chain Hoist = 60kg F34P Truss = 19kg Cables & Accessories = 20kg Total Load Point at Z = 201.75kg  

   

Page 6: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 6 of 21  

AppendixB 

Sample of Design Calculation Cantilever 

 

 

𝑬𝒒𝒖𝒂𝒕𝒊𝒐𝒏 𝒐𝒏 𝒕𝒉𝒆 𝑳𝑬𝑫 𝑷𝒂𝒓 𝒂𝒕 𝑳𝟏 𝑾𝟏𝑫𝟏 𝑾𝟐𝑫𝟐 𝑾𝟑𝑫𝟑 𝑾𝟒𝑫𝟒

𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝑳𝟏 𝑳𝟐 

𝐸𝑞𝑢𝑎𝑡𝑖𝑜𝑛 𝑜𝑛 𝑡ℎ𝑒 𝐿𝐸𝐷 𝑃𝑎𝑟 𝑎𝑡 𝐿1 13𝑘𝑔 𝑥 7.85𝑚 13𝑘𝑔 𝑥 1.1𝑚 13𝑘𝑔 𝑥 4.9𝑚 13𝑘𝑔 𝑥 1.9𝑚

6𝑚 

𝐸𝑞𝑢𝑎𝑡𝑖𝑜𝑛 𝑜𝑛 𝑡ℎ𝑒 𝐿𝐸𝐷 𝑃𝑎𝑟 𝑎𝑡 𝐿1 25.89𝑘𝑔  

*L1 and L2, you may put all fixtures at one equation. 

*L2 is the reverse way with the same equation. 

LED Par at L1 = 25.89kg 

ETC 26deg at L1 = 14.86kg 

Molefay at L1 = 13.65kg 

Truss at L1 = 25kg 

Motorized Chain Hoist = 60kg 

Total Weight at L1 = 164.40kg 

 

   

Page 7: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 7 of 21  

𝑻𝒓𝒖𝒔𝒔 𝒐𝒏 𝑷𝒐𝒊𝒏𝒕 𝑳𝒐𝒂𝒅 

𝑊𝑃𝑀𝑇𝑜𝑡𝑎𝑙 𝑤𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑇𝑟𝑢𝑠𝑠𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑇𝑟𝑢𝑠𝑠

50𝑘𝑔10𝑚

5𝑘𝑔𝑚

 

𝑷𝒕𝒔 𝑳𝟏𝑳𝒐𝒂𝒅 𝟏 𝒙 𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝟏 𝑳𝒐𝒂𝒅 𝟐 𝒙 𝑫𝟐 𝑳𝒐𝒂𝒅 𝟑 𝒙 𝑫𝟑

𝑺𝒑𝒂𝒏 

𝑷𝒕𝒔 𝑳𝟐 𝑳𝒐𝒂𝒅 𝟏 𝑳𝒐𝒂𝒅 𝟐 𝑳𝒐𝒂𝒅 𝟑 𝑷𝒕𝒔 𝑳𝟏 

9kg/unit

7kg/unit

13kg/unit

Molefay

ETC 26Deg

LED Par

Power Cable 1kg/m

Legend & Specifications

 

   

Page 8: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 8 of 21  

AppendixC 

Sample of Indoor Goal Post Truss Design Calculation

5m

4.3m

3.6m

3m

0.9m

2.1m

6m 6m

4.2m

Section A Section B

A B C

Figure 4

(a) (b) (c) (d) (e) (f) (g)

X Y Z

 

𝑳𝒐𝒂𝒅 𝒂𝒕 𝑷𝒐𝒊𝒏𝒕 𝑿 𝒇𝒊𝒙𝒕𝒖𝒓𝒆 𝒘𝒆𝒊𝒈𝒉𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑨 𝒙 𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝒇𝒓𝒐𝒎 𝒀

𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝑿 𝒀 

𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑋 28𝑘𝑔 𝑥 5𝑚 13𝑘𝑔 𝑥 4.3𝑚 27𝑘𝑔 𝑥 3.6𝑚 7𝑘𝑔 𝑥 3𝑚 38𝑘𝑔 𝑥 6𝑚 38𝑘𝑔 𝑥 3𝑚 40𝑘𝑔 𝑥 3𝑚

6𝑚 

𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑋 129.35𝑘𝑔 

 

𝑳𝒐𝒂𝒅 𝒂𝒕 𝑷𝒐𝒊𝒏𝒕 𝒀 𝒇𝒊𝒙𝒕𝒖𝒓𝒆 𝒘𝒆𝒊𝒈𝒉𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑨 𝑳𝒐𝒂𝒅 𝒂𝒕 𝑷𝒐𝒊𝒏𝒕 𝑿𝒇𝒊𝒙𝒕𝒖𝒓𝒆 𝒘𝒆𝒊𝒈𝒉𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑩 𝒙 𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝒇𝒓𝒐𝒎 𝒁

𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝒀 𝒁 

𝐿𝑜𝑎𝑑𝑡 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑌 28𝑘𝑔 13𝑘𝑔 27𝑘𝑔 7𝑘𝑔 38𝑘𝑔 38𝑘𝑔 40𝑘𝑔 129.35𝑘𝑔

13𝑘𝑔 𝑥 5.1𝑚 28𝑘𝑔 𝑥 3.9𝑚 130𝑘𝑔 𝑥 1.8𝑚 38𝑘𝑔 𝑥 6𝑚 38𝑘𝑔 𝑥 3𝑚 40𝑘𝑔 𝑥 3𝑚 38𝑘𝑔 𝑥 0𝑚

6𝑚 

𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑌 206.5𝑘𝑔 

 

𝑳𝒐𝒂𝒅 𝒂𝒕 𝑷𝒐𝒊𝒏𝒕 𝒁 𝒇𝒊𝒙𝒕𝒖𝒓𝒆 𝒘𝒆𝒊𝒈𝒉𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑩𝒇𝒊𝒙𝒕𝒖𝒓𝒆 𝒘𝒆𝒊𝒈𝒉𝒕 𝒂𝒕 𝑺𝒆𝒄𝒕𝒊𝒐𝒏 𝑩 𝒙 𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝒇𝒓𝒐𝒎 𝒁

𝒅𝒊𝒔𝒕𝒂𝒏𝒄𝒆 𝒀 𝒁 

𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑍 13𝑘𝑔 28𝑘𝑔 130𝑘𝑔 38𝑘𝑔 40𝑘𝑔 38𝑘𝑔13𝑘𝑔 𝑥 5.1𝑚 28𝑘𝑔 𝑥 3.9𝑚 130𝑘𝑔 𝑥 1.8𝑚 38𝑘𝑔 𝑥 3𝑚 40𝑘𝑔 𝑥 3𝑚 38𝑘𝑔 𝑥 0𝑚

6𝑚 

𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑍 287𝑘𝑔 107.25𝑘𝑔 

𝐿𝑜𝑎𝑑 𝑎𝑡 𝑃𝑜𝑖𝑛𝑡 𝑍 179.75𝑘𝑔 

Page 9: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 9 of 21  

VLX Wash (a) = 23.33kg LED Par (b) = 9.32kg VL Spot 2500 (c) = 16.2kg ETC 19deg (d) = 3.5kg F34P Truss = 19kg F34P Truss Vertical Leg = 38kg Cables & Accessories = 20kg Total Load Point at X = 129.35kg 

 

VLX Wash (a) = 4.67kgLED Par (b) = 3.68kg VL Spot 2500 (c) = 10.8kg ETC 19deg (d) = 3.5kg LED Par (e) = 11.05kg VLX Wash (f) = 18.2kg Meyer Mina (g) = 39kg F34P Truss = 38kg F34P Truss Vertical Leg = 38kg Cables & Accessories = 40kg Total Load Point at Y = 206.5kg  

LED Par (e) = 1.95kg VLX Wash (f) = 9.8kg Meyer Mina (g) = 91kg F34P Truss = 19kg F34P Truss Vertical Leg = 38kg Cables & Accessories = 20kg Total Load Point at Z = 179.75kg  

 

   

Page 10: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 10 of 21  

AppendixD 

Sample of Supporting Structure

 

   

Page 11: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 11 of 21  

AppendixE

Sample of LED Wall build up on MBS Stage platform

Figure6

Figure7

Page 12: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 12 of 21  

NOTES:

PLYWOODPROTECTIONMUSTBEUSEDONTHESTAGEASABASEFORTHELEDWALL.

NODRILLING/PAINTINGISALLOWEDONTOTHESTAGE.

ANYDEBRIS/RESIDUESARETOBECLEANEDBEFOREHANDINGOVERBYTHECONTRACTOR.

CONTRACTORSARELIABLEFORANYDAMAGEINCCURED.

Page 13: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 13 of 21  

AppendixF

Sample of structure rigged as backdrop.

LED Wall

8'

C

LED Wall

8'

C

AppendixG

Installation of Wire Rope Clips

Page 14: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 14 of 21  

AppendixH

Rigging Request Checklist

Event Name:  _______________________________________________________________ 

Event Date:  _______________________________________________________________ 

Venue:  _______________________________________________________________ 

Setup Start Date:  ___________ (DD/MM/YY)  Setup Start Time:  ____________ (Hrs) 

Teardown Start Date:  ___________ (DD/MM/YY) Teardown Start Time: ____________ (Hrs)

Contractor Name:  _______________________________________________________________

Contact Person:  ______________________ Contact Number: ________________

PartA‐RiggingRequest

No  Rigging Request  Yes  No  Supporting Information 

1  Truss and Hoist required for the Event 

    If Yes, please provide the details below.  If No, please proceed to Part B‐ Scissor lift & Boom Lift Request.  

  a) Hoist i. Supplied by 

Contractor   

 ii. Supplied by MBS 

Contractor to provide the following information:1. PE Endorsement         2. Rigging Layout 3. Motor Hoist MOM Certification 4. No. of Hoist: __________________________  1. PE Endorsement          2. Rigging Layout 3. No. of Hoist: _____________________ 4. Truss at Working Height time: ____________ 5. Truss up / Trim Height time: ______________  

  b) Truss i. Supplied by 

Contractor  

 ii. Supplied by MBS 

    Contractor to provide the following information: 1. PE Endorsement     2. Rigging Layout      3. Motor Hoist MOM Certification 4. Truss Brand/Model/ load chart ____________ 

 1. PE Endorsement          2. Motor Hoist MOM Certification 

    

Page 15: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 15 of 21  

3. Type of Truss:                                        a) Global Truss F34P (290 × 290mm) 

Quantity:_____________________ b) Total Fabrication – OV Truss(300 × 300mm) 

Quantity:_____________________ c) Medium Duty (521 × 521mm)  

Quantity:_____________________  

4. Base plate for Global Truss F34P(700 × 700mm )       Quantity:________________________  

 

  c) Hook‐Up  Contractor to provide the following information:1. PE Endorsement          2. Rigging Layout 3. Motor Hoist MOM Certification 4. No. of Hook‐Up points: ______________ 5. Truss Brand/Model/ load chart _______________ 

 

Page 16: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 16 of 21  

PartB‐Scissorlift&BoomLiftRequest

No  Scissor lift & Boom Lift Request  

Yes No Supporting Information

1  Scissor lift & Boom Lift required for the Event 

If Yes, please provide the following details below.**Remark: Minimum 4hrs Order  If No, please proceed to Part C‐ Pipes & Drapes Request 

  a) Scissor lift Only  If Yes, please provide the following information:1. Operator License Detail  2. Quantity: _______________ 2. Date: __________________(dd/mm/yyyy) 3. Time: ______(hrs) to  _____(hrs)   

  b) Scissor lift + Operator   If Yes, please provide the following information:1. Date: __________________(dd/mm/yyyy) 2. Operator Schedule: ______(hrs) to  _____(hrs)   

  c) Boom lift Only      If Yes, please provide the following information: 1. Operator License Detail  2. Date: __________________(dd/mm/yyyy) 3. Time: ______(hrs) to  _____(hrs)  

  d) Boom lift + Operator       If Yes, please provide the following information: 1. Date: __________________(dd/mm/yyyy) 2. Operator Schedule: ______(hrs) to  _____(hrs) 

  e) Boom lift  + Scissor lift    

  If Yes, please provide the following information: 1. Boom lift Operator License Detail 2. Scissor lift Operator License Detail 3. Date: __________________(dd/mm/yyyy) 4. Time: ______(hrs) to  _____(hrs)  

  f) Boom lift  + Scissor lift + Operators 

If Yes, please provide the following information:1. Date: __________________(dd/mm/yyyy) 2. Operators Schedule: _____(hrs) to  _____(hrs)  

 

 

 

 

 

Page 17: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 17 of 21  

PartC‐Pipes&DrapesRequest

No  Pipes & Drapes Request   Yes No Supporting Information

1  Drapes required for the Event 

    If Yes, please provide the following details below 

  a) Setup of own Drapes for the Event 

    If Yes, please provide the following information: 1. Fire Retard Certification  If No, please provide the following details from Part (b‐c) below.  

  b) Drapes Only provided by MBS 

    Please provide the following information: 1.  Layout indicating drape line  2.  Type of Drape                                                QTY 

‐ Drapes(3mL x 9mH)                                   ____            ‐ Drapes(2.9mL x 5mH)                                ____             ‐ Drapes(2.9mL x 1.5mH)                             ____             ‐ Drapes(300mmL x 400mmH)                    ____ ‐ Drapes(300mmL x 650mmH)                    ____ 

 

  c) Pipes and Drapes System provided by MBS 

    Please provide the following information: 1.  Layout indicating drape line  2.  Type of Drape                                                QTY 

‐ Pipes and Drapes (2.9mL x 5mH)             ____ ‐ Pipes and Drapes (2.9mL x 1.5mH)          ____  

 

 

 

 

 

 

 

 

 

 

Page 18: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 18 of 21  

AppendixI 

Contractor’s Authorised Lifting Equipment

No  Brand Name  Model  Type (Manual/Motorized)  Serial No  MOM Certification No 

           

           

       

       

           

           

           

       

       

           

           

       

           

           

           

           

       

           

           

           

           

       

           

           

           

           

       

           

           

       

       

       

           

           

       

           

           

           

           

       

           

Page 19: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 19 of 21  

AppendixJ(Part1)–ReferenceONLY

Page 20: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 20 of 21  

AppendixJ(Part2)–ReferenceONLY

Page 21: Marina Bay Sands Requirement for Rigging Service...Marina Bay Sands Requirement for Rigging Service 1) Rigging and hanging of points in the licensed area of the event is an exclusive

  

Page 21 of 21  

AppendixJ(Part3)–ReferenceONLY