March 25, 2013Green Committee Meeting
Approval of minutes – Erich TiepelGrounds Report- Steve Sarro
Driving Range ImprovementsPhelps/Tanner consulting
Tree Care2012 MaintenanceImprelis
Water UpdateHarriman ConstructionOutlook on 2013
WaterRough maintenance and new mow linesProject Status: tees, dam, bunker
New Business
Agenda
Concept A
Concept A
Lower Range TeeNew Target GreensSome Mounding around the rangeReconstructed staging area and bag drop
North side of clubhouseMinor revisions to the Pfluger putting greenEstimated Cost for Range area only $455,000Estimated Cost for Staging Area only $225,000Estimated Design/Engineering Costs $75,000Total Estimated Cost for Concept A: $755,000
Concept A
Concept B
Concept B
Include the cope of work with Concept AMinor changes to the access from 12 Green
to 13 TeeMove 1 and 13 Tee back to gain
approximately 30 yardsShifts range to the left and away from 16
fairway.Changes to the practice greenEstimated Cost of $895,000
Concept B
More Poa
More Bent
Old Cottonwood
Harriman
Water Plan 2013 Storage Rights:Total of 107-122 AF
1. 24 AF in Soda Lakes2. 58 AF in Harriman3. 25-40AF from Mt. Mutual
Reservoir Co.
2012 was the hottest summer on recordPCC used 136 AF of storage water from
May through October