CAC Meeting March 17, 2016 Gateway Cities COG Update Kekoa Anderson, PE COG Engineer

Transcript of March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project ·...

Page 1: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

CAC MeetingMarch 17, 2016

Gateway Cities COGUpdate

Kekoa Anderson, PECOG Engineer

Page 2: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

Background

Programs:

• Strategic Transportation Plan

• Livability Initiative

• Urban Greening

• LA River Revitalization

• Complete Street Master Plans

Process:

• Near-Term Tactics & Current Initiatives

• Long Range Planning & Assessment

• Administration (Steering Committee)

• Funding

Page 3: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

Consistency with Strategic Transportation Plan

Local and Regional Transit

Arterial Highways

Park & Ride Lots

Active Transportation

Goods Movement & Logistics

Transportation Technologies

(ITS)

Truck Enforcement

Freeways

The purpose of the Gateway Cities Strategic Transportation Plan is to develop a unified, subregionalmultimodal transportation improvement strategy that can be used to obtain funding for the GCCOG Cities.

Artesia

Avalon

Bell

Bellflower

Bell Gardens

Cerritos

Commerce

Compton

Cudahy

Downey

Hawaiian Gardens

Huntington Park

La Habra Heights

La Mirada

Analysis of all

transportation modes

STP FOCUS AREAS

Lakewood

Long Beach

Lynwood

Maywood

Montebello

Norwalk

Paramount

Pico Rivera

Santa Fe Springs

Signal Hill

South Gate

Vernon

Whittier

Unincorporated LA County

Page 4: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

Active Transportation

Page 5: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

Active Transportation

Page 6: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

LIVABILITY INTIATIVE

6

Page 7: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

LIVABILITY INTIATIVE

Page 8: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

Arterial – Master Plans

Arterial Streets:

• 25 - Major Arterial Corridors from STP

• 4 - Master Plans Underway

Projects:

1. Artesia Blvd

2. Lakewood/Rosemead Blvd

3. Florence Ave

4. Atlantic Corridor

Page 9: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

• Project Objectives Corridor Master Plan – Regional Level Document Existing Conditions, Constraints and Opportunities Complete Streets Evaluation & Alternatives

• Scope Data Collection and Review of Existing Conditions Multimodal Corridor Evaluation and Analysis Complete Streets Needs Analysis Community and Stakeholder Outreach Complete Streets Implementation Alternative Conceptual Designs of Complete Streets Master Plan Development Conceptual Design Alternative with Cost Estimate Presentation to Committees and City Council Finalize Conceptual Design of Complete Streets Master Plan

• Deliverables Master Plan & Complete Street Evaluation Study for Artesia Blvd.

Project Objectives, General Scope &

Deliverables

Page 10: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

Arterial Overlays & Typical Sections

Page 11: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

Structures

Patterns/Textures

Walls

Lighting

Fences/Railing

AESTHETICS, OPEN SPACE & PUBLIC ART

Public Art

Page 12: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

Transit Orientated Design (TOD)

Mixed-use,

compact

development

Page 13: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

Complete Streets - Water Quality

• Water Quality BMP’s

• Urban Forest & Enhanced vegetation

• Enhanced Stormwater systems

Page 14: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

LA River Master Plan & Urban Greening

Page 15: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor
Page 16: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

SEGMENT NODE FLORENCE/I-710 INTERCHANGEB - No 1

C: Drive Artesia Blvd - Street Designation 12-2-15

16

Storm Overflow Bypass

Low Flow Inlet A

BA

Treatment Train

Treatment Train OutletB

X

Page 17: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

SEGMENT NODE COOLIDGE PARK TO ATLANTIC AVELB-2

C: Drive Artesia Blvd - Street Designation 12-2-15 17

Proposed Soundwall

3

3

S

Page 18: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

C: Drive Artesia Blvd - Street Designation 12-2-15

Low Flow Inlet A

BA

Treatment Train

Treatment Train Outlet

B

SEGMENT NODE I-710 / PACIFIC COAST HWY INTERCHANGENo 2

Page 19: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

SEGMENT NODE SHOEMAKER BRIDGE REPLACEMENT/I-710 INTERCHANGENo 1

LB-MUST Treatment Facility

X

Reuse of Existing Bridge

Y

Page 20: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

Typical Project Program

FY 2016-2017 2018 2019

ConstructionBuild Phase 1(Date: TBD)

2020

Preferred Alternative

(2018)

DesignPS&E

Mid 2016 – Late 2017

PrepareFunding Plan

Visioning Plan2016

Prelim Eng./Environ Doc2017 – Mid 2018

Pla

nn

ed

to

Fu

nd

P

has

es

No

n-F

un

de

d

Ph

ase

s

Feasibility Study2017

SubmitGrants

Page 21: March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor Project · 2016-10-11 · March 17, 2016 - Urban Green Master Plan & Complete Streets - I-710 Corridor

QUESTIONS & ANSWERS

Contact Information:Kekoa Anderson, [email protected]

(949) 887-0731