CAC MeetingMarch 17, 2016
Gateway Cities COGUpdate
Kekoa Anderson, PECOG Engineer
Background
Programs:
• Strategic Transportation Plan
• Livability Initiative
• Urban Greening
• LA River Revitalization
• Complete Street Master Plans
Process:
• Near-Term Tactics & Current Initiatives
• Long Range Planning & Assessment
• Administration (Steering Committee)
• Funding
Consistency with Strategic Transportation Plan
Local and Regional Transit
Arterial Highways
Park & Ride Lots
Active Transportation
Goods Movement & Logistics
Transportation Technologies
(ITS)
Truck Enforcement
Freeways
The purpose of the Gateway Cities Strategic Transportation Plan is to develop a unified, subregionalmultimodal transportation improvement strategy that can be used to obtain funding for the GCCOG Cities.
Artesia
Avalon
Bell
Bellflower
Bell Gardens
Cerritos
Commerce
Compton
Cudahy
Downey
Hawaiian Gardens
Huntington Park
La Habra Heights
La Mirada
Analysis of all
transportation modes
STP FOCUS AREAS
Lakewood
Long Beach
Lynwood
Maywood
Montebello
Norwalk
Paramount
Pico Rivera
Santa Fe Springs
Signal Hill
South Gate
Vernon
Whittier
Unincorporated LA County
Active Transportation
Active Transportation
LIVABILITY INTIATIVE
6
LIVABILITY INTIATIVE
Arterial – Master Plans
Arterial Streets:
• 25 - Major Arterial Corridors from STP
• 4 - Master Plans Underway
Projects:
1. Artesia Blvd
2. Lakewood/Rosemead Blvd
3. Florence Ave
4. Atlantic Corridor
• Project Objectives Corridor Master Plan – Regional Level Document Existing Conditions, Constraints and Opportunities Complete Streets Evaluation & Alternatives
• Scope Data Collection and Review of Existing Conditions Multimodal Corridor Evaluation and Analysis Complete Streets Needs Analysis Community and Stakeholder Outreach Complete Streets Implementation Alternative Conceptual Designs of Complete Streets Master Plan Development Conceptual Design Alternative with Cost Estimate Presentation to Committees and City Council Finalize Conceptual Design of Complete Streets Master Plan
• Deliverables Master Plan & Complete Street Evaluation Study for Artesia Blvd.
Project Objectives, General Scope &
Deliverables
Arterial Overlays & Typical Sections
Structures
Patterns/Textures
Walls
Lighting
Fences/Railing
AESTHETICS, OPEN SPACE & PUBLIC ART
Public Art
Transit Orientated Design (TOD)
Mixed-use,
compact
development
Complete Streets - Water Quality
• Water Quality BMP’s
• Urban Forest & Enhanced vegetation
• Enhanced Stormwater systems
LA River Master Plan & Urban Greening
SEGMENT NODE FLORENCE/I-710 INTERCHANGEB - No 1
C: Drive Artesia Blvd - Street Designation 12-2-15
16
Storm Overflow Bypass
Low Flow Inlet A
BA
Treatment Train
Treatment Train OutletB
X
SEGMENT NODE COOLIDGE PARK TO ATLANTIC AVELB-2
C: Drive Artesia Blvd - Street Designation 12-2-15 17
Proposed Soundwall
3
3
S
C: Drive Artesia Blvd - Street Designation 12-2-15
Low Flow Inlet A
BA
Treatment Train
Treatment Train Outlet
B
SEGMENT NODE I-710 / PACIFIC COAST HWY INTERCHANGENo 2
SEGMENT NODE SHOEMAKER BRIDGE REPLACEMENT/I-710 INTERCHANGENo 1
LB-MUST Treatment Facility
X
Reuse of Existing Bridge
Y
Typical Project Program
FY 2016-2017 2018 2019
ConstructionBuild Phase 1(Date: TBD)
2020
Preferred Alternative
(2018)
DesignPS&E
Mid 2016 – Late 2017
PrepareFunding Plan
Visioning Plan2016
Prelim Eng./Environ Doc2017 – Mid 2018
Pla
nn
ed
to
Fu
nd
P
has
es
No
n-F
un
de
d
Ph
ase
s
Feasibility Study2017
SubmitGrants