Mapping K-PowerNet’s Fiber Optic Network
-
Upload
scott-kusselson -
Category
Documents
-
view
7 -
download
1
Transcript of Mapping K-PowerNet’s Fiber Optic Network
![Page 1: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/1.jpg)
El Dorado Springs Area
Audit of K-PowerNet’s Fiber Optic Network
By Scott KusselsonProject Manager6/9/2015
![Page 2: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/2.jpg)
• Introduction• Coverage Area Maps• Stats
• Demonstration of CresentLink’s Capabilities• A look at Peculiar POP
• Benefits of a GIS Database
• Issues Faced
• Cost Analysis
• Timeline for Completion
• Summary
Outline of Topics
![Page 3: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/3.jpg)
![Page 4: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/4.jpg)
![Page 5: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/5.jpg)
• Total of 23 working weeks, 16 weeks spent in the field over 11 months
• Covered an area of over 10,000 sq. mi.
• Completed over 130 sites
• Added over 3300 pieces of equipment
Stats
![Page 6: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/6.jpg)
Demonstration of CresentLink’s Capabilities
![Page 7: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/7.jpg)
• Better recordkeeping because of a centralized location of information
• Operational and strategic benefits for the entire telecommunications department
• Greater efficiency in time spent researching information
• Managing information geographically
Benefits of a GIS Database
![Page 8: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/8.jpg)
• Biggest issue faced so far was the network speed of using GIS at sites
• Availability – Limited number knowledgeable personnel invested in maintaining the database
• Maintaining the GIS database• Executives needs to stress to field technicians the importance of
maintaining accurate data
- Using forms every time when working at a site or splice can
- Maintaining correct labels at sites
Issues Faced & Potential Setbacks
![Page 9: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/9.jpg)
Transport Engineering -
• 32 hr./Mo. researching where hardware is located
• 8 hr./Mo. saved by not having to update installation drawings. This will also minimize duplicate info.
• 9 hr./Mo. in time researching equipment cost estimates
Transport Engineers Savings –
49 hr./Mo. * $150/hr. = $7,350/Mo.
Cost Analysis
![Page 10: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/10.jpg)
Transport Network (When circuit database is built) -
• 32 hr./Mo. working on NOFA’s
Transport Network Savings –
32 hr./Mo. * $150/hr. = $4,800/Mo.
Cost Analysis
![Page 11: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/11.jpg)
Technician -
• 16 hr./Mo. accurately investigate fiber assignments plus 36 hr./Mo. for drive time for Transport Engineering
• 3 hr./Mo. having to research outdated handwritten splice diagrams
Technician Savings –
55 hr./Mo. * $150/hr. = $8,250/Mo.
GIS and CresentLink programs are a better tool for planning because I can check the results when done – Joe Warren
Cost Analysis
![Page 12: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/12.jpg)
Transport Engineering Savings - $7,350/Mo.
Transport Network Savings - $4,800/Mo. (When circuit database becomes available)
Technician Savings - $8,250/Mo.
$7,350/Mo. + $8,250/Mo. = $15,600/Mo. or $187,200/Yr.
When circuit database becomes available -
$7,350/Mo.+$4,800/Mo.+$8,250/Mo. = $20,400/Mo. or $244,800/Yr.
Total Cost Savings
![Page 13: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/13.jpg)
• At least another year to complete the physical components of Missouri
• At least 2 years to complete the physical components of Oklahoma
• Add an additional 1 year to the numbers above for continuous changes/ updates to keep the database current
• Variables include schedules and number of personnel working to complete this project
Timeline for Completion
![Page 14: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/14.jpg)
Timeline for Completion
![Page 15: Mapping K-PowerNet’s Fiber Optic Network](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d2a668bb61eb5d508b4678/html5/thumbnails/15.jpg)
• When complete the database will create a better workflow for the entire telecom dept.
• The database will save employees countless hours searching for the correct information
• There should be a database administrator for the eventual increasing in maintenance done to the database
• KAMO Power will initially save upwards of $187,000 per year for the physical database and $245,000 when the circuit database is complete
Summary