MAP-21

2013 Washington State Public Transportation SymposiumAugust 26, 2013

Page 2: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

22

Presentation Overview

• MAP 21 Overview• Program Consolidation• Freight Provisions & other programs• Performance Based Planning & Targets• Schedule• What is Washington Doing?

Page 3: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

33

Moving Ahead for Progress in the 21st Century (MAP-21)

More than two and a half years after SAFETEA-LU expired, Congress passed a bill with bi-partisan support, and President Obama signed MAP-21 into law on July 6, 2012.

Jobs Drove MAP-21

“The bill … is the result of strong bipartisan and bicameral work…Fortunately … thousands of projects will not be closed down next week, and hundreds of thousands of workers will not receive pink slips.”

Representative John Mica

7/6/12

“… we have a bipartisan, bicameral agreement on a transportation bill which saves and creates millions of jobs.”

Senator Barbara Boxer

6/28/12

Page 4: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

44

• Strengthens America’s highways

• Establishes a performance-based program.

• Creates jobs and supports economic growth

• Supports the Department of Transportation’s (DOT) aggressive safety agenda

• Streamlines Federal highway transportation programs.

• Accelerates project delivery and promotes innovation.

MAP-21 Major Highway Policy Directions

Page 5: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

55

MAP-21 Overview

• Provides $105 billion over two years (through FFY14).

o Extended current law through the end of FFY12

o Effective date October 1st 2012.

o Federal gas tax extended through FFY16.

• Average annual funding at FFY12 levels, plus a minor inflationary increase (i.e. no new funding).

• Ensures two years of solvency for Highway Trust Fund.

• Consolidates and eliminates programs and moves to a performance-based system with targets.

• Fewer formula programs, most discretionary programs eliminated, no earmarks.

Page 6: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

66

Consolidated Highway Formula Programs•

Page 7: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

77

What is Washington State Doing?

Governor Gregoire’s Steering Committee established agreements on distribution of highway formula funds between the State and locals.• MPOs’ Project Funding Retained• Local Bridge Program Created• Safe Routes To School Program Retained• Transportation Alternatives Mostly Allocated to Regions• Overall Split — 66% state, 34% local

Washington is a national leader on performance measures & is well placed to meet the new requirements. • WSDOT already makes investment decisions based on performance

measures (Gray Notebook).• Washington State needs a collaborative process between the State,

MPOs & transit agencies to establish targets and performance measures.

Page 8: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

88

MAP-21 Highway Funding Splits

NHPP

STP

HSIP

Section 164 Penalty

Statewide Planning and

Research

TA

STP

CMAQ

HSIPNHPP

TA

MPP

MAP-21 Distributions – FHWA Funds to Washington State

Definitions:NHPP National Highway Performance Pro-gramSTP Surface Transportation ProgramCMAQ Congestion Mitigation and Air Quality ProgramHSIP Highway Safety Improvement Pro-gramTA Transportation AlternativesMPP Metropolitan Planning Program

State Funds66%

Local Funds34%

Page 9: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

99

Projects of National / Regional Significance

• Continues the PNRS Program by authorizing $500 million in FFY13.

• The funding will need to be appropriated from the General Fund.

• Aimed at critical high-cost capital projects.o Competitive grants to states, tribes and transit

agencies.oNo earmarks (vs. fully earmarked under SAFETEA-

LU).• USDOT must compile a report that identifies and

analyzes a comprehensive list of PNRS projects compiled via a survey of states.

Page 10: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

1010

TIFIA and Tolling Provisions

Expanded and enhanced TIFIA loan program.o Annual funding increased from $122 million to $750 million

in FFY13 and $1 billion in FFY14. (Lending capacity expanded from $1 billion annually to $10 billion annually).

o Applications accepted on a rolling basis.o Increased TIFIA participation in project costs from 33% to

49%.

Revisions to toll authorities.o Allows tolling/pricing of new capacity, including the

Interstate (but generally requires current level of free capacity to remain unchanged).

o Continues to allow tolling of bridges and tunnels on the Interstate if they are reconstructed.

o Extends toll pilots for Value Pricing and Interstate Reconstruction.

Page 11: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

1111

Freight Provisions• No dedicated freight funding.• National Freight Policy

o Directs USDOT to establish a National Freight Network & National Freight Strategic Plan.

o USDOT must establish performance measures.o States and MPOs must establish targets.o State freight advisory committees & freight plans encouraged.

• Prioritization of projects to improve freight movement.o Projects must be identified in a state freight plan to qualify for

increased federal share.o Increases the federal share to 95% on the Interstate and 90%

elsewhere.o USDOT must certify project improves efficiency of freight

movement.

Page 12: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

Performance Based Planning

Source: USDOT

Page 13: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

1313

Performance Management Overview

• MAP-21 identifies national goal areas.• USDOT establishes measures, with input.• States & MPOs set targets.• State & MPO plans describe how program and project

selection help achieve targets.• States report progress toward targets to USDOT

(within 4 years of enactment, biennially thereafter).o Reports are to show how states & MPOs are making progress

towards targets.

Page 14: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

1414

Rule Making Process

Source: USDOT

Page 15: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

1515

Rule Making Process

Proposed Regulation• FTA will issue ANPRMs prior to drafting NPRMs• NPRMs will come out in three phases.

Public Comment• 90 day minimum comment period after NPRM is published• One final rule effective date

States, MPOs and public transportation agencies set their own targets

• States set targets no later than 1 year after USDOT establishes measures

• Public Transportation (FTA) Public Transportation Agencies set State of Good Repair targets no later than 3 months after USDOT establishes measures

• MPOs select targets no later than 180 days after State and transit providers sets target

Page 16: MAP-21 2013 Washington State Public Transportation Symposium August 26, 2013.

U.S Department of Transportation

Federal Highway AdministrationFederal Transit Administration

Puget Sound Regional Councilwww.psrc.org

Charlie Howard206-464-7122

[email protected]

For More Information