Fixed Flat Thermal Rooflight
Double Glazed 1.2 U-Value
TECHNICAL Manufactured to:
BS EN – 12150
BS EN -1270
6mm Low E Toughened Safety Glass
6mm Toughened Safety Glass
Black Border
Warm Edge Super Spacer
Structurally Bonded Sealant
Thermally Broken Aluminium Frame
Argon gas filled
www.tuffxglass.co.uk
email: [email protected]
Tel No: 0845 3400 200
Fax No: 0845 3400 201
Please note it is the responsibility of the customer to ensure that all products purchased and used are compliant with Building Regulations.
Bed of Sealant by others
External Frame Size
***Important*** Internal sizes taken from here
For illustrative Purposes only
10mm gap between
stop bead and glass
Tel No: 0845 3400 200
TECHNICAL Manufactured to
BS EN – 12150
BS EN -1270
Option 1 (Fixing from Externally)
Fixed Rooflight Installation Guide
External Kerb Size
20
mm
3
7m
m
62
mm
Fixing Screw Cover
Horse shoe packer
Plaster by others
88.5mm *
mm
80.5mm
mmWeathered external
finish by others
2m
m
8.5mm
Fixed Flat Thermal Rooflight Typical Installation Guide
Double Glazed
Minimum Pitch 5°
* If finished kerb/upstand is wider than 88.5mm
an extended border will be required to cover
kerb/upstand (call office to discuss)
Please note it is the responsibility of the customer to ensure that all products purchased and used are compliant with Building Regulations
2mm Aluminium
frame profile
Bed of Sealant by others
External Frame Size
***Important*** Internal sizes taken from here
For illustrative Purposes only
10mm gap between
stop bead and glass
Tel No: 0845 3400 200
TECHNICAL Manufactured to
BS EN – 12150
BS EN -1270
Option 2 (Fixing from Internally)
Fixed Rooflight Installation Guide
External Kerb Size
20
mm
3
7m
m
62
mm
Fixing Joist Strap by others
Plaster by others
88.5mm *
mm
80.5mm
mm Weathered external
finish by others
8.5mm
Fixed Flat Thermal Rooflight Typical Installation Guide
Double Glazed
Minimum Pitch 5°
* If finished kerb/upstand is wider than 88.5mm
an extended border will be required to cover
kerb/upstand (call office to discuss)
Please note it is the responsibility of the customer to ensure that all products purchased and used are compliant with Building Regulations
2mm Aluminium
frame profile
1) Apply a thick bead of silicone all the way around the top of the timber
upstand/kerb
2) Position and lower the Rooflight frame over the top and side of the
upstand/kerb
3) Pre drill fixing holes through aluminium and timber upstand/kerb at
100mm from each corner and then at regular intervals.
4) Secure fixing screws with horse shoe packers and finishing caps
continuously all the way around securing the aluminium frame in place.
Timber upstand needs to have
a minimum pitch of 5° to allow
water to run off the rooflight
Option 1 (Fixing from Externally)
Fixed Rooflight Installation Guide
1) Apply a thick bead of silicone all the way around the top of the timber
upstand
2) Position the Rooflight over the upstand ensuring that the fixing straps have
been fixed to underside of frame (refer to diagram centre).
3) From the inside secure the fixing straps to inside the timber
upstand.
4) Internally finish by plaster boarding over the timber and straps leaving at
least a 10mm gap from the top of the plasterboard to glass.
Timber upstand needs to have
a minimum pitch of 5° to allow
water to run off the rooflight
Option 2 (Fixing from Internally)
Fixed Rooflight Installation Guide