Manual Testing Qs

download Manual Testing Qs

of 31

Transcript of Manual Testing Qs

  • 7/30/2019 Manual Testing Qs

    1/31

    QuestionA general Question: If there are two bugsone with high priority and one with highseverity, which bug should be fixed first?

    RankAnswer Posted

    By

    Question Submitted By:: Sricha.comspark

    This Interview Question Asked @ Q3-Technologies

    I also faced this Question!! ALL Interview .com

    Answer We should consider and try to handle thebug of high priority because it may be

    possible that a bug have high severity but

    low priority .lets take a example of

    banking site a bug is raised of calculating

    the interest of account annually so if we

    see this bug in may month .we have time of

    11 month to remove this bug because after

    11 month this software is used again.

    0 Saleem Shakeel

    Answer high severity bugif i am testing an application and if the

    app is crashing

    then then the severity is high then it

    should be fixed

    because i cant test the entire flow if the

    application is

    crashing

    major spelling is high priority but not

    high severitybecause it wont affect the testing but

    before releasing to

    the client we have to fix it

    so the order is high severity and high

    priority

    0 Mudaseer

    Question

    what is mean by test preparation? and

    explain it? Rank

    Answer Posted

    By

    Question Submitted By:: Kirankumarreddy

    This Interview Question Asked @ IBM

    I also faced this Question!! ALL Interview .com

    Answer Test Preparation is checklist of theactivities that to be done before starting

    testing of application.

    0 Sricha

    http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page1.html#aid
  • 7/30/2019 Manual Testing Qs

    2/31

    Requirement Analysis

    Test Planning

    Test Case Development

    Test Environment Setup

    Test Execution

    Test Cycle Closure

    Answer test preparation is document which driveall feature activity

    done by testing engg. it contains

    1.how many test engg need?

    2.each engg what should do?

    3.creat test envi

    4.which tech we will use?5.what are the testing conduct that app?

    0 Dinesh Kumar

    Questionwhich phase is most important in STLCphases? and why ? Rank

    Answer Posted

    By

    Question Submitted By:: Kirankumarreddy

    This Interview Question Asked @ IBM

    I also faced this Question!! ALL Interview .com

    Answer Requirement Analysis and Test Planning arethe most prominent stages of STLC. If

    requirements are not analyzed

    correctly,plan will make accordingly and

    test cases will also developed incorrect.

    0 Sricha

    Question

    Is Test plan a running document or a fixed

    document? RankAnswer Posted

    By

    Question Submitted By:: Guest

    This Interview Question Asked @ Ernst-Young

    I also faced this Question!! ALL Interview .com

    Answer Test Plan is a running document, when atesting phase starts and the Test Manager

    0 Sricha

    http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page1.html#aid
  • 7/30/2019 Manual Testing Qs

    3/31

    is controlling the activities, the test

    plan should be updated to reflect any

    deviation from the original plan. After

    all, Planning and Control are continuous

    activities in the formal test process.

    QuestionWhat is difference between Test Plan andTest Strategy Rank

    Answer Posted

    By

    Question Submitted By:: Guest

    This Interview Question Asked @ Ernst-Young

    I also faced this Question!! ALL Interview .com

    Answer Test Strategy: It is a document is a high

    level document and normally developed byproject manager. This document defines

    Testing Approach to achieve testing

    objectives. The Test Strategy is normally

    derived from the Business Requirement

    Specification document.

    It sets the standards for testing processes

    and activities and other documents such as

    the Test Plan draws its contents from those

    standards set in the Test Strategy

    Document.

    Test Plan: is derived from the Product

    Description, Software Requirement

    Specification SRS, or Use Case Documents.The Test Plan document is usually prepared

    by the Test Lead or Test Manager and the

    focus of the document is to describe what

    to test, how to test, when to test and who

    will do what test.

    0 Sricha

    Question Testing process in your company? RankAnswer Posted

    ByQuestion Submitted By:: Chandbasha

    This Interview Question Asked @ oracle

    I also faced this Question!! ALL Interview .com

    Answer Review of the software requirementspecifications

    Objectives is set for the Major releases

    0 Sricha

    http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page1.html#aid
  • 7/30/2019 Manual Testing Qs

    4/31

    Target Date planned for the Releases

    Detailed Project Plan is build. This

    includes the decision on Design

    Specifications

    Develop Test Plan based on Design

    Specifications

    Test Plan : This includes Objectives,

    Methodology adopted while testing, Features

    to

    be tested and not to be tested, risk

    criteria, testing schedule, multi-

    platform support and the resource

    allocation for testing.

    Test Specifications

    This document includes technical details (

    Software requirements )

    required prior to the testing.

    Writing of Test CasesSmoke(BVT) test cases

    Sanity Test cases

    Regression Test Cases

    Negative Test Cases

    Extended Test Cases

    Development Modules developed one by one

    Build procedure :

    A build includes Installers of the

    available products multiple platforms.

    TestingSmoke Test (BVT) Basic application test to

    take decision on further testing

    Testing of new features

    Cross-platform testing

    Stress testing and memory leakage testing.

    Bug Reporting

    Bug report is created

    Development Code freezing

    No more new features are added at this

    point.

    Testing

    Builds and regression testing.

    Decision to release the product

    Post-release Scenario for further

    objectives.

    http://history.back%28%29/
  • 7/30/2019 Manual Testing Qs

    5/31

    QuestionWhat can be done if requirements arechanging continuously? Rank

    Answer Posted

    By

    Question Submitted By:: Chandbasha

    This Interview Question Asked @ oracle

    I also faced this Question!! ALL Interview .com

    Answer in agile requirements keep changing sodevelop according to

    the changing requirements

    0 Mudaseer

    Answer If client requirements are chagingcontinuously, then below

    changes are expected.

    1. Change in design document or new design

    document HLD &

    LLD

    2. Change in test case scenarios

    3. Change in test cases

    4. Developer needs to write the code as per

    the change.

    5. Tester needs to write new test cases

    6. Tester needs to test the change.

    7. In agile, work done in iteration can beaffected.

    8. Involves more cost.

    0 Robby

    Answer IF THE REQUIREMENTS ARE CHANGING OR CLIENTNOT HAVING THE

    CLARITY ON REQUIREMENT, COMPANY WILL FOLLOW

    THE PROTOTYPE

    MODEL, MEANS FIRST COMPANY WILL DEVELOP THE

    SAMPLE SOFTWARE,THEN AFTER GETTING CLARITY ON REQUIREMENT,

    THEN THEY DEVELOP

    FINAL SOFTWARE TO RELEASE.

    IN THIS MODEL BUSINESS ANALYST WILL PREPARE

    PROTOTYPES FOR

    CLIENT TO GET THE CLARITY ON REQUIREMENT.

    2 Girishkumar

    http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page1.html#aid
  • 7/30/2019 Manual Testing Qs

    6/31

    Questionhow much testing is enough.and whydocumentation is needed Rank

    Answer Posted

    By

    Question Submitted By:: Chhabra Chhagan

    I also faced this Question!! ALL Interview .com

    Answer It totally depends on the exit criteria.There are 7 exit criteria' s to stop

    testing

    1. As soon as the release time is achieved

    2. As soon as the budget is exhausted

    3. When all of the planned testing is

    achieved with no major

    pending issues

    4. When the residual risk is minimal with

    no major pending

    issues5. When certain percentage of coverage is

    achieved in terms

    of requirements/code/risks with no major

    pending issues.

    It is also called thoroughness messure.

    6. When predicted no. of defects are found

    with no more

    major pending issues.

    7. Based on testing, sufficient info is

    generated &share

    with stake holders in letting them decide

    abt release.

    DOCUMENTATION is necessary because

    1. Maintaining documentation we can check

    the process.

    2. find the defects easily.

    3. requirements can be mapped.and can check

    whether each and

    every req has been covered or not.

    4. If defects are documented we can test

    whether the defect

    functionality has been fixed properly.

    5. In future if we get any project related

    to the same

    domain we can use the metrics, also we willknow which

    module has to be concentrated the most

    0 Priyanka

    QuestionWhat is the Sanity Testing?? Rank Answer Posted

    http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page1.html#aid
  • 7/30/2019 Manual Testing Qs

    7/31

    By

    Question Submitted By:: Vaiju_zoting

    I also faced this Question!! ALL Interview .com

    Answer Sanity testing is performed when the builds

    are relatively stable after multiple roundsof regression tests.

    It checks whether the bug fixes given are

    working fine or not.

    0 Rohituppal

    Question Explain the scenario with example. RankAnswer Posted

    By

    Question Submitted By:: VI also faced this Question!! ALL Interview .com

    Answer scenario ways of testing an application

    amt test case

    scenario example

    insert a valid card for example icici atm

    card

    insert an invalid card like pan card

    block the card and insert it

    0 Mudaseer

    Answer Scenario describes the event and actionthat occur in

    testing session.

    0 John

    Answer A scenario is a complete end to end task.

    Example:

    Login to the gmail application is one

    scenario

    0 Priyanka

    http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page1.html#aid
  • 7/30/2019 Manual Testing Qs

    8/31

    which can be further be used to write test

    cases

    Answer scenario is basically define : what to testexample :consider a pen

    scenarios are

    1.size of pen

    ink of pen

    color of pen

    color of ink

    tip size

    cap of pen

    refill of pen

    so many things like that about the pen

    which you can thing

    for test is called test scenario

    0 Bhavesh

    QuestionHow System testing is different from theFunctional testing?? Rank

    Answer Posted

    By

    Question Submitted By:: Vaiju_zoting

    I also faced this Question!! ALL Interview .com

    Answer system testing is end to end testing

    functional testing is checking the

    functionality

    0 Mudaseer

    Answer Testing the behaviour of system / softwareas defined in

    software requirement specification is

    called system testing.

    It checks for functional and non functionalrequirements of

    the software.

    System testing is performed after

    integration testing.

    Before accepting the system testing, tester

    should perform

    http://www.allinterview.com/showqa/Manual-Testing/page1.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page1.html#aid
  • 7/30/2019 Manual Testing Qs

    9/31

    smoke testing so as to check whether basic

    functionalities

    are working fine or not.

    QuestionWhat is the client-server, standalone, web-based application.Post the correct answer.

    RankAnswer Posted

    By

    Question Submitted By:: V

    I also faced this Question!! ALL Interview .com

    Answer client server application the applicationwhich uses server to

    communicate and we cant use the

    application for other purposes

    for example skype and yahoo messenger

    standlone the application which is

    independent of server

    for example notepad,excel,

    web based application A web application is

    an application that is accessed by users

    over a network such as the Internet and we

    can access web application in different

    browsers like google chrome,internet

    explorer

    0 Mudaseer

    QuestionWhat are the stages of the Bug?? What isthe exact life cycle of the bug?? Rank

    Answer Posted

    By

    Question Submitted By:: Vaiju_zoting

    This Interview Question Asked @ Winsoft

    I also faced this Question!! ALL Interview .com

    Answer Bug life cycle

    1. When a new bug is found, it is assigned

    status as NEW

    and is assigned to developer.

    2. The project manager checks whether the

    bug is valid or

    not. Suppose for billing sysytem the valid

    password is dang

    & the tester is testing the functionality

    with some other

    0 Rohit

    http://www.allinterview.com/showqa/Manual-Testing/page2.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page2.html#aidhttp://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page2.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page2.html#aid
  • 7/30/2019 Manual Testing Qs

    10/31

    password wich causes login failure, en the

    manager will

    assign the status as REJECTED & assign it

    back to tester.

    3. If defect is valid then it is checked

    whether it is inscope or not. If not, then the defect is

    assigned status as

    POSTPONED.

    4. Then it is checked whether same defect

    was raised

    earlier or not. If yes, then the defect is

    assigned status

    as DUPLICATE.

    5. If no, then the defect is assigned to

    developer with

    status IN PROGRESS.

    6. Once the defect is fixed, it's status

    changes to fixed &

    assigned to tester.7. then the tester will retest & if it is

    fixed then assign

    status as closed.

    8. If not, then it is reopened.

    QuestionWhat is the difference between Build,Version and Release?? Reply soon... Rank

    Answer Posted

    By

    Question Submitted By:: Guest

    I also faced this Question!! ALL Interview .com

    Answer Build is the final application which issent to the testing

    department for testing.They are more

    frequent.

    Version is the number given to a released

    build.It is based

    on the builds

    Release is the software that is no longer

    intesting.(Testing has been completed).They

    are less frequent.

    0 Priyanka

    http://www.allinterview.com/showqa/Manual-Testing/page2.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page2.html#aid
  • 7/30/2019 Manual Testing Qs

    11/31

    Answer build is the software that is sent to testengineer for testing.test engineer get more

    builds in a week

    version is the number given to the build it

    helps to know whether we are working on

    correct build or not .it also mentions what

    features are added in the application

    release when the development and testing is

    over and the product is bug free we sent to

    client the client tests and if he accepts

    the build uploads to appstore(for android

    and iphone)(depends upon the software)

    0 Mudaseer

    Question

    Suppose you have given a project which haveless Requirementspecification documents or say nospecification what willyour decision how will you conduct thetesting.

    RankAnswer Posted

    By

    Question Submitted By:: Guest

    I also faced this Question!! ALL Interview .com

    Answer You conduct testing based on ur previousexperience if itbelongs to the same domain

    Or U vl be using exploratory testing...

    0 Priyanka

    Answer Focus on most usable areas as a customerpoint of view.

    Applied your test skills through ad hoc

    testing.

    0 Vineet

    Question

    Suppose you have given less time and youhave quite few testcases to run what will your steps toresolve this issue.

    RankAnswer Posted

    By

    http://www.allinterview.com/showqa/Manual-Testing/page2.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page2.html#aid
  • 7/30/2019 Manual Testing Qs

    12/31

    Question Submitted By:: Guest

    I also faced this Question!! ALL Interview .com

    Answer Risk based testing..prioritize ur test cases and execute

    Question

    my mail id is [email protected] if itype email id as

    [email protected] and password correctlythen what is theoutput?does it display inbox page

    RankAnswer Posted

    By

    Question Submitted By:: Mudaseer

    I also faced this Question!! ALL Interview .com

    Answer Yes it should as it's general rule, thatLogin id is never

    be case sensitive for email addresses and

    more but as far as

    email address i am 100% sure.

    0 Hash

    Questionwhat are the documents required to stop thetesting? Rank

    Answer Posted

    By

    Question Submitted By:: Priyanka

    I also faced this Question!! ALL Interview .com

    Answer This can be difficult to determine. Mostmodern software

    applications are so complex, and run insuch an

    interdependent environment, that complete

    testing can never

    be done. Common factors in deciding when to

    stop are:

    Deadlines (release deadlines, testing

    deadlines, etc.)

    Test cases completed with certain

    percentage passed

    Test budget depleted

    Coverage of

    code/functionality/requirements reaches aspecified point

    Bug rate falls below a certain level

    Beta or alpha testing period ends

    0 Hash

    http://www.allinterview.com/showqa/Manual-Testing/page2.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page2.html#aid
  • 7/30/2019 Manual Testing Qs

    13/31

    Answer If exit criteria is fulfilled then we canstop testing and give formal sign off

    showing the test coverage percentage.

    0 Rohituppal

    QuestionPlease any one tell me what is applicationarchiture in web

    based applicationsRank

    Answer Posted

    By

    Question Submitted By:: Hemavathi.gajjala

    This Interview Question Asked @ Prokarma

    I also faced this Question!! ALL Interview .com

    AnswerA modern web-based enterprise application

    has three basic

    layers.

    1. Client layer which renders webpages

    (Browser)

    2. Middle tier which includes: (WebServers

    ).

    2.1 Presentation Layer which generates

    webpages, including

    their dynamic content. It interprets

    webpages submitted

    from the client. it knows whichapplication to forward the

    client-based request they usually made up

    of ASP, JSP

    2.2 Business Logic Layer which enforces

    validations and

    which handles interaction with the

    database, Visual Basic or

    C++ apps are use in these servers mostly

    (The Web Server

    can generally handle requests for several

    applications like

    Microsoft IIS, Apache WebServer, IBM

    Websphere, etc are

    example of webservers.)

    3. Data layer which stores data between

    transactions

    0 Hash

    http://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page3.html#aid
  • 7/30/2019 Manual Testing Qs

    14/31

    Answer On my application browser is tere.forexample i want to request something.enter

    the URL in to browser.browser request to

    web server.If that is static request

    webserver can handil.if requests are

    dinamic webserver request to application

    server.then request goto dbserver.then

    request go to DB.DB give to respend to

    dbserver.dbserver toapplication

    server.application serverto

    webserver.webserver to browser wil give the

    response.

    APPLICATION(browser)

    ............>webserver....>application

    server........>dbsever.......>DB.(this is

    request)then response REVERSE

    0 Hema

    Question can you tell me test case for whatsapp? RankAnswer Posted

    By

    Question Submitted By:: Mudaseer

    I also faced this Question!! ALL Interview .com

    Answer install whats app from play google then itwill ask please enter your number enter

    your number it will send message to your

    number that your code is 1234(example)

    click on whats app then it displays the

    friends who are using whats app

    then send message to your friend send photo

    video audio

    create a group to broad cast message video

    broad cast message to your friends

    add profile picture

    do load testing because it is used by many

    people and many more test cases

    install the app on different androiddevices and versions 2.2,2.3,4

    (compatibility testing)

    check the app on different platforms like

    windows,iphone andriod blackberry

    0 Mudaseer

    http://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page3.html#aid
  • 7/30/2019 Manual Testing Qs

    15/31

    Question

    I give you a functional requirementdocument(FRD) of 10

    pages.Now you tell me,how to calculate Testeffort,As i

    Need to say to the client ?

    RankAnswer Posted

    By

    Question Submitted By:: Ali

    This Interview Question Asked @ Satyam

    I also faced this Question!! ALL Interview .com

    Answer First we have to understand the requirementdocument,Prepare

    the scenarios for the requirement

    specification,Analyze how

    many test case (both positive and negative

    scenarios that we

    can prepare for it,based on this we have to

    prepare the

    estimation

    0 Deepthi

    Answer We have to read the functional requirementdocument thoroughly and analyse the

    requirements. As per the requirements we

    have to prepare the test scenarios and

    write the test cases according to the test

    scenarios i.e. good test case means less

    no. of test cases cover more functionality

    of the requirements, based on this we have

    to prepare the estimation.

    0 Vuppala JaganMohan

    Questionwhat is the Exact difference between Sanityand Smoke testings Rank

    Answer Posted

    By

    Question Submitted By:: Guest

    I also faced this Question!! ALL Interview .com

    Answer Sanity means one will conduct overall

    testing on thereleased build, to confirm whether the

    build is proper or not.

    Smoke means before releasing the build

    developers will check

    the same or not.

    0 Narasimha

    http://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aid
  • 7/30/2019 Manual Testing Qs

    16/31

    Answer Both are tested by testers.When build is at the initial phase of STLC,

    say build No 1, then smoke testing is

    conducted to ensure build is suitable forfurther testing, where major functionality,

    critical areas, show stopper TC's are

    tested.

    When build is at the middle or final phase

    of STLC, say build No 20-100+, then sanity

    testing is conducted to ensure reported

    defects in the previous cycle is fixed and

    tester can go run for regression kind of

    testing.

    5 Shiva

    Answer Sanity and Smke are done by Testers only.

    Sanity is a small set of test cases

    executed to check if

    the built is ready to test or not.

    Smoke is a small set of regression test

    set, to check if

    built is ready to release. Once done, it is

    reday to go to

    UAT or production

    0 Varsha Saxena

    Answer Sanity testing:- 1- Unscripted, Narrow anddeep Testing

    2- Review Very Very

    important features and do deep testing.

    Smoke Testing:- 1- Scripted, Shallow and

    wide Testing

    2- Review all important

    features and do wide testing.

    0 Gagan Paigoriya

    Questioncan anyone please tell how a rally tool isused in testing.

    what are the tester roles in using thisRank

    Answer Posted

    By

    http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/
  • 7/30/2019 Manual Testing Qs

    17/31

    tool and the detailworking of this tool.

    Question Submitted By:: Jyothi

    I also faced this Question!! ALL Interview .com

    AnswerPlease refer below link for Video tutorials

    for rallydev,

    http://dev.help.rallydev.com/rally-video-

    tutorials

    In short,We can create User stories in

    RallyDev, User stories contains all

    requirements, Inside the user stories we

    can write Test cases. While executing test

    cases we can raise defect linked to that

    test cases, All things like test cases

    writing, test case execution, defects,

    tasks comes under the user stories. If user

    stories is too large then we can also

    create child user stores inside theparent(main) user stories.

    0 Ashutosh Singh

    Question

    how you r executing Test case explain indetail Rank

    Answer Posted

    By

    Question Submitted By:: Guest

    I also faced this Question!! ALL Interview .com

    Answer Analysing Requirments --> CreatingScenarios (Test Basis) --> According to

    Scenarios write test cases --> inside

    every test case there are steps to perform

    that test (which is main test execution).

    this is general answer depends which tool

    you use like i use HP Quality Center for

    manual testing.

    0 Hash

    Question

    hi....plz tell me what all kinds ofdocuments/reports are requiredfor manual testing of a simple

    website(simple static pages).in a organization.

    RankAnswer Posted

    By

    Question Submitted By:: Ankurdixit819

    http://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aid
  • 7/30/2019 Manual Testing Qs

    18/31

    This Interview Question Asked @ ibm , Iprosolutions, Tdfth, Hcl

    I also faced this Question!! ALL Interview .com

    Answer only the test cases and the the policy ofthe company.

    0 Jithin

    QuestionWhat are the test cases for sanity or smoketesting ? Rank

    Answer Posted

    By

    Question Submitted By:: Kishore

    This Interview Question Asked @ HealthTech

    I also faced this Question!! ALL Interview .com

    Answer smoke testing for gmail

    enter valid username and valid password

    expected result it should display inbox

    page

    click on compose mail enter valid mail id

    to which you have to

    send mail and subject and body of the mail

    click on send

    here only we are doing valid testing

    0 Mudaseer

    Answer Smoke testing for gmail

    When you click on the URL OF gmail.com,it

    should open the

    home page of gmail login page.

    0 Lakshmi

    QuestionWhat type of testing skills we requiredfor a testing. Rank

    Answer Posted

    By

    Question Submitted By:: [email protected]

    This Interview Question Asked @ Dell , Gg

    I also faced this Question!! ALL Interview .com

    http://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page3.html#aid
  • 7/30/2019 Manual Testing Qs

    19/31

    Answer FIRST STUDY THE THE REQUIREMENTS ANDANALYSE THE REQ.S

    HAVING THE KNOWLEDGE OF POSITIVE FLOOW OFAN

    APPLICATION

    AND NEGATIVE FLOW OF AN APPLN... FOR

    FINDING THE LOT OF DEFECTS .....

    0 Gangadhar

    Answer 1. Reading skills2.Questioning skills

    3.Communication skills

    4.Time Management

    5.Negative Thinking

    6.Team Builder

    0 Ashwini

    Answer It depend which type of testing you areafter.

    either white box or black box, manual or

    automated,

    functional or non-functional.

    for simple foundation level you can be a

    manual tester with

    knowledge of writing test scenarios, test

    cases, and executethem with the help of testing tools like HP

    Quality Center,

    some basic SQL knowledge is essential. (the

    most important

    thing you must have the knowledge about the

    product which

    you are going to test).

    ISTQB foundation certification is good for

    start.

    Question

    do a new defect is required to logfor slight variation in steps on

    defectretest or the defect can be re open

    Rank Answer Posted By

    Question Submitted By:: Priya

    I also faced this Question!! ALL Interview .com

    Answer if you are using the HP QC tool fortesting purpose, and if

    the newly found defect is somewhat

    similar to a closed

    0 Naveen

    http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page4.html#aid
  • 7/30/2019 Manual Testing Qs

    20/31

    defect,then you can reopen the

    defect by adding appropriate

    comments in the comments section

    Questionwhat will the future for manualtesting Rank Answer Posted By

    Question Submitted By:: Guest

    I also faced this Question!! ALL Interview .com

    Answer have a great demand

    software exports in 2012 is

    increased in that testing occupied

    30 % and by future 2022 s.w exports

    incerased to 70% out of that testing

    occupies 50% so testing has great

    demand.

    0 Venu

    Questionwhat is the best defect(functionallyrelaleted) u find in ur career?

    Rank Answer Posted By

    Question Submitted By:: Manubolu.v28

    I also faced this Question!! ALL Interview .com

    Answer It depends upon its Severity andpriority . So If Against

    the functionality you find anything

    then its a great

    Defect , but if you are finding a

    defect which comes after

    several attemts or at rare condition

    then its not too much

    severe and Good defect .I have found

    first that when i was

    not able to login in a particular

    application which i am

    going to Test . And it was greatbecuase it was not

    itermittent issue , its Really a

    defect .

    0 Akshay Sinha

    http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page4.html#aid
  • 7/30/2019 Manual Testing Qs

    21/31

    Answer my project is on android applicationthe best defect i have i have found

    is force close it means the

    application crashes when i click on

    a link (i e the application is

    stopped by operating system)

    this is high priority and high

    severity defect which i have to

    report to developer immediately

    0 Mudaseer

    Question

    Can u please explain the regressiontesting criteria?

    we are having 1000 testcases, outof1000 TC'S 800 defects

    we find,whose priority and seviorityis high . in thissituation how we can done theregression testing?

    Rank Answer Posted By

    Question Submitted By:: Manubolu.v28

    This Interview Question Asked @ iGate

    I also faced this Question!! ALL Interview .com

    Answer if the application is not stablethen if there are blocker issues

    then we cant do regression testing i

    don't think 800 test cases have

    high severity and high priority

    defects

    0 Mudaseer

    Question

    hi i am kavita. i have completedsoftware testing course.iam electronics background.mytesting as question is whychoose in software testing as acareer.plz send me thisanswer and help me.

    Rank Answer Posted By

    Question Submitted By:: Kavita Devkar

    This Interview Question Asked @ LinguaNext

    I also faced this Question!! ALL Interview .com

    http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page4.html#aid
  • 7/30/2019 Manual Testing Qs

    22/31

    Answer because software has got moreopportunity so engineers choose

    software and there are software

    companies in bangalore

    0 Mudaseer

    Answer Scope of getting jobs is very veryhigh, Present days people

    are depending on internet with

    various resources, most of

    the Oriented companies are designing

    their own websites in

    better ways, therefore testing do

    key role for a quality

    product. Testers not only justify

    the given requirements but

    also the presence of value (UserFriendly)

    0 Narasimha

    Answer you can choose testing field becausein testing it doesn't

    matter from which stream you belong

    too.it only depends on

    your analytic perception and your

    observation.if you have good

    observation over the things so youmay be a buccaneer tester.

    0 Atul Vishwakarma

    Question

    hi friends...

    this is priya.i had 1 year ofexperiance in manual testingfrom jan-dec 2011 in a reputed level5 MNC and my CTC is

    3.25LPA . recently i cleared 2rounds of technical andafter 3days i will have hr interviewin a CMMI level3company...

    in hr interview they may ask aboutexpected ctc.what ishould answer for this question?

    Rank Answer Posted By

    http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/
  • 7/30/2019 Manual Testing Qs

    23/31

    i had more than a year gap, so whatpackage i can expect?same CTC or some % of hike?

    Question Submitted By:: Priya

    I also faced this Question!! ALL Interview .com

    Answer hi priya,Current ctc is too good for year

    experienced candidate.Well u can

    definitely ask for hike.I dont think

    1 year gap will cause any issue.All

    the best. :)

    0 Tina

    Answer hi tina...

    thanks for your reply..

    if i ask for hike, they may raise

    the gap issue.what should

    i do?

    0 Priya

    Answer still i did not had interview..may bnext week i mayhave..pls reply and help me...

    0 Priya

    Question

    what is cross project referencewhat is entry and exit criteria forlogin page. Rank Answer Posted By

    Question Submitted By:: ChethanI also faced this Question!! ALL Interview .com

    Answer entry criteriaclick on login it should display

    login page

    enter username and password

    0 Mudaseer

    http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page4.html#aid
  • 7/30/2019 Manual Testing Qs

    24/31

    it should display home page if

    username and password matches

    is the exit criteria

    Questionwhat is traceability matrix and itsusefulness Rank Answer Posted By

    Question Submitted By:: Chethan

    I also faced this Question!! ALL Interview .com

    Answer Traceability matrix is used to mapbetween requirements and

    test cases

    it is used to check all requirements

    are covered or not?

    Tracabilty Matrix is a document

    which is used to Map the

    UseCase and testcases.i.e.it shows

    the full usecase on one

    side and names the respective

    testCases in which the flows

    of that usecase are covered.

    0 Ramakrishna

    Question

    1 Test Case can covert How manyscenario? OR

    how many scenario can cover 1 testcase.?

    Rank Answer Posted By

    Question Submitted By:: Navjyotsing

    This Interview Question Asked @ mastek , Ggh, Delhinet.pvt Ltd, Hcl

    I also faced this Question!! ALL Interview .com

    Answer mostly 1 scenario cover by 1 testcase,,but to increase the complexity

    in the project we can write morethan one.....

    0 Harpreet Singh

    Answer We can derive the test cases fromthe test scenario. So, each test

    0 Anitha[ABC Info]

    http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page4.html#aid
  • 7/30/2019 Manual Testing Qs

    25/31

    scenario will have more than 1 test

    cases based on the complexity. But,

    each test case belongs to only one

    test scenario.

    QuestionWhat is functional Testing ? Rank Answer Posted By

    Question Submitted By:: Robin86

    This Interview Question Asked @ UST , Ibm

    I also faced this Question!! ALL Interview .com

    Answer Testing each and every componentsagainst requirement specification is

    called functional testing

    0 [email protected]

    Answer Testing the functionality of acomponent or system based on

    the specification is known as

    functional testing.

    0 Nehit

    Answer Functional testing means testing thefunctionality of the system/software

    so as to see whether there is any

    deviation or any mismatch between

    the actual and expected output as

    per the requirements received from

    client.

    0 Rohituppal

    QuestionWhat is the basic difference betweenAlpha and beta testing?? Rank Answer Posted By

    Question Submitted By:: Dhrutisundar

    This Interview Question Asked @ DigiTech

    I also faced this Question!! ALL Interview .com

    Answer Alpha Testing: we can do testingbefore customer at our place

    0 Dorababu

    http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://www.allinterview.com/showqa/Manual-Testing/page4.html#aid
  • 7/30/2019 Manual Testing Qs

    26/31

    Beta Testing : we can do testing

    before customer at client place

    Answer Alpha Testing : Testing performed byclient at developer's

    site under guidance of developer and

    tester.

    Beta Testing : Testing done at

    Client side by client.

    0 Mulguri Pravin

    Answer Alpha Testing :Alpha Testing donein the company before delivering

    application to the client

    Beta Testing: Beta Testing done in

    the client place either by user or

    third party experts before

    implementing.

    0 Abhiram

    AnswerSuppose banking application is

    developed

    In alpha testing, the developed

    application will be used by few

    employees of bank itself.

    In beta testing, application will be

    used by few clients of bank itself.

    Depending upon the feedback recieved

    required changes are implemented.

    0 Rohituppal

    Question

    I would like to reserve railwayticket online and paying the farethrough net banking. Friends help meto write test cases???? Give answerfor this as soon as possible...

    Rank Answer Posted By

    http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/
  • 7/30/2019 Manual Testing Qs

    27/31

    Question Submitted By:: RenukaElumalai

    This Interview Question Asked @ 360Logica

    I also faced this Question!! ALL Interview .com

    Answer sign up

    select source and destination which

    you have to travel

    select date

    select the no of people

    enter the name of the persons who

    are travelling and age

    select pay through credit card

    enter your credit card no

    then the money should be deducted

    from your account

    then it should display the ticked

    has been booked

    and all the details should be

    present in the ticket

    and you should be able to take print

    out

    of the ticket

    2 Mudaseer

    Answer Also Class is need to be select like1AC, 2AC, Sleeper or General.

    0 Bharat Kapoor

    Answer Hope Mudassir won't mind i addedsome extra test cases.

    their could be more. obviously it

    depends on the application what it

    looks like or how it designed.

    Select source and destination which

    you have to travel

    Select Date.

    Select Timings.

    Select no of Adults.

    Select no of Children.

    Select Economy or First Class

    Ticket.

    0 Hash

    http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page4.html#aid
  • 7/30/2019 Manual Testing Qs

    28/31

    It should show the amount to be

    paid.

    Select confirm.

    Select pay through credit card.

    Enter your credit card details.

    Then the money should be deducted

    from your account.Then it should display the ticked

    has been booked.

    All the details should be present in

    the ticket.

    You should be able to take print out

    of the ticket.

    Question

    Can anyone tell me the test scenario

    for railway reservationonline booking. I need all testscenario.... please friendshelp me.

    Rank Answer Posted By

    Question Submitted By:: Renukaelumalai

    I also faced this Question!! ALL Interview .com

    Answer Before writing the TestCases PleaseCarefully Study the

    Application

    So,

    Application Under

    Test:https://www.irctc.co.inApplication Type: Web Application

    After this List down the

    Features/Functionalities of the

    Application

    In IRCTC case we have follwoing

    Features/functionalities:

    1.Signup-New User Registration.

    2.Account Activation through Email

    3.Account Activation through Mobile

    4.Forgot Password for Password reset

    5.Plan My Trip Feature

    6.Quick Book Feature

    7.Link to Book Mumbai Season Ticket

    8.My Transactions

    a. Booked History

    b. Print E-Ticekt

    c. Cancel-Eticket/refund

    d. Cencel History

    http://www.allinterview.com/showqa/Manual-Testing/page4.html#aidhttp://history.back%28%29/http://www.allinterview.com/showqa/Manual-Testing/page4.html#aid
  • 7/30/2019 Manual Testing Qs

    29/31

    e. File TDR

    f. TDR History

    g. Refund Status of Cancelled

    Ticekt

    h. Refund Status of Failed

    Transaction

    9.User Profilea. User Profile

    b. Change Password

    c. Master List of Passenger

    d. Passenger Travel List

    ....etc

    To cover all above features and Sub

    Featues we have to

    write more than 500 Testcases.

    For Sample I am writing some tests

    for IRCTC Login Page and

    IRCTC Plan My Travel Page

    --->IRCTC Login Page

    Test for SignUp Feature

    Test for Account Activation after

    SignUp

    Test for Password Recovery

    Test for all the links in the page

    --->IRCTC Plan My Travel Page

    Positive Test Cases for e-

    ticket(TicketType):

    Note:Business Rule:An e-ticket

    refers to the normal

    Internet ticket which can be booked

    up to the time of chart

    preparation for your train.

    An e-ticket can be booked in

    Confirmed/RAC/Waitlisted

    status.

    Test 'Find Trains' feature with all

    valid

    data :FROM,TO,Date,TicketType-e-

    ticket and General-Quota

    Test 'Find Trains' feature with allvalid

    data :FROM,TO,Date,TicketType-e-

    ticket and Tatkal-Quota

    Test 'Find Trains' feature with all

    valid

    data :FROM,TO,Date,TicketType-e-

    ticket and Ladies-Quota

  • 7/30/2019 Manual Testing Qs

    30/31

    Negative Test Cases for e-

    ticket(TicketType):

    Test 'Find Trains' feature with Test

    data :FROM,TO,Date,TicketType-e-

    ticket and General-Quota

    Test 'Find Trains' feature with Testdata :FROM,TO,Date,TicketType-e-

    ticket and Tatkal-Quota

    Test 'Find Trains' feature with Test

    data :FROM,TO,Date,TicketType-e-

    ticket and Ladies-Quota

    Positive Test Cases related to

    TicketType-i-ticket :

    Note:Business Rule:An i-ticket

    refers to the normal

    Internet ticket which will be

    delivered at your door stepin 2-3 days.

    For I ticket you have to book a

    ticket at least two days in

    advance to date of journey to ensure

    courier delivery.

    It can be booked in Confirmed/RAC

    /Waitlisted status

    Test 'Find Trains' feature with all

    valid

    data :FROM,TO,Date,TicketType-i-

    ticket and General-Quota

    Test 'Find Trains' feature with allvalid

    data :FROM,TO,Date,TicketType-i-

    ticket and Tatkal-Quota

    Test 'Find Trains' feature with all

    valid

    data :FROM,TO,Date,TicketType-i-

    ticket and Ladies-Quota

    Negative Test Cases for e-

    ticket(TicketType):

    Test 'Find Trains' feature with Test

    data :FROM,TO,Date,TicketType-i-

    ticket and General-QuotaTest 'Find Trains' feature with Test

    data :FROM,TO,Date,TicketType-i-

    ticket and Tatkal-Quota

    Test 'Find Trains' feature with Test

    data :FROM,TO,Date,TicketType-i-

    ticket and Ladies-Quota

    I hope with this you write all other

  • 7/30/2019 Manual Testing Qs

    31/31

    testcases,Still if you

    need personal help on this feel free

    to contact me on my

    mobile:9008566233(Bangalore)

    Thanks,

    Rajendra Prasad Reddy Penumalli